CN1464151A - Construction method for curtain wall - Google Patents
Construction method for curtain wall Download PDFInfo
- Publication number
- CN1464151A CN1464151A CN 02111962 CN02111962A CN1464151A CN 1464151 A CN1464151 A CN 1464151A CN 02111962 CN02111962 CN 02111962 CN 02111962 A CN02111962 A CN 02111962A CN 1464151 A CN1464151 A CN 1464151A
- Authority
- CN
- China
- Prior art keywords
- hole
- curtain wall
- wall
- fixture
- stone material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
The curtain wall constructing process includes drilling holes in the back side of porcelain board or stone material, making back bolt pass through fixing and hanging rod, fixing the hanging rod with nuts onto the back side of porcelain board or stone material, drilling holes on wall in corresponding positions, cleaning the holes on wall, grouting anchoring agent into the holes and inserting the unions into the holes. Compared with available curtain wall constructing processes, the said one needs no installation of keel, and this can simplify the construction and lower the cost greatly.
Description
Technical field:
The present invention relates to the technical field of construction techniques, specifically a kind of being mainly used in carried out cladding job practices with porcelain plate or stone material as curtain wall.
Background technology:
At present, along with developing rapidly of Building Trade in China, curtain wall in architectural use also more and more widely but now domesticly need be installed keel when carrying out curtain wall construction, and it is complicated to exist construction, and the shortcoming that cost is high has brought certain degree of difficulty for the popularization of curtain wall
Summary of the invention:
The object of the present invention is to provide a kind of simple and reliable curtain wall construction method.
To achieve these goals, technical scheme of the present invention is: a kind of job practices of curtain wall, it is characterized in that: earlier in the boring of the behind of porcelain plate or stone material, back of the body bolt is passed the fixture of peg spare, adopt nut peg spare to be fixed on the back side of porcelain plate or stone material by this fixture, in the corresponding position boring of body of wall and peg spare, then foreign material in the hole of body of wall are cleaned out the back and in the hole, injected the anchoring agent and pipe connecting piece is inserted in the hole.
The present invention compares with existing curtain wall construction method does not need to install keel, thereby has simplified the operation of curtain wall construction greatly, and the construction cost of curtain wall is reduced significantly, has very big economic benefit, help the popularization of curtain wall, and construction safety is reliable.
Description of drawings:
Fig. 1 is the structural representation of the present invention one peg spare embodiment
Fig. 2 is the right view of Fig. 1
Fig. 3 is for being fixed on peg spare in the schematic diagram on porcelain plate or the stone material
Fig. 4 is the schematic diagram in the boring of body of wall relevant position
The schematic diagram of Fig. 5 for the hole of body of wall is cleared up
Fig. 6 is the schematic diagram that injects the anchoring agent in the hole of body of wall
Fig. 7 inserts in the body of wall hole schematic diagram that porcelain plate or stone material are fixed for peg spare
The specific embodiment:
The invention will be further described below in conjunction with drawings and Examples.
The present invention is a kind of job practices of curtain wall, it is different from prior art and is: bore a hole at least in the behind of porcelain plate or stone material 6 earlier, back of the body bolt 3 is passed the fixture 2 of peg spare 1, adopt nut peg spare to be fixed on the back side of porcelain plate or stone material by this fixture, in body of wall 8 and peg spare corresponding position boring 9, then foreign material in the hole of body of wall being cleaned out the back injects the anchoring agent and pipe connecting piece is inserted in the hole in the hole, one end of the peg spare in the enforcement 1 is fixedlyed connected with a fixture 2, being provided with on fixture 2 can be for carrying on the back hole or the opening 4 that bolt 3 passes, generally on fixture 2, be provided with opening upwards in the enforcement, back of the body bolt 3 passes the hole or the opening 4 of fixture during use, to be fixed on the back side of porcelain plate 6 or stone material with the fixture 2 that peg spare is connected as a single entity by nut 5, the anchoring agent can be adopted the epoxy resin of selling on the market.
Embodiment 1
Bore two holes in the behind of porcelain plate by 80 centimetres spacing earlier, each Kong Jun will carry on the back the opening that bolt passes the fixture of peg spare, adopt nut peg spare to be fixed on the back side of porcelain plate by this fixture, then by the requirement of curtain wall construction, bore two holes at body of wall and the corresponding position of peg spare, again with wire brush and dust catcher with after foreign material are cleaned out in the hole of body of wall, adopt syringe in each hole of being bored, to inject commercially available anchoring agent epoxy resin, after two minutes, will pipe connecting piece be inserted in each hole porcelain plate can be fixed on the body of wall respectively.
Embodiment 2
Bore four holes in the behind of stone material by 150 centimetres spacing earlier, each Kong Jun will carry on the back the hole that bolt passes the fixture of peg spare, adopt nut peg spare to be fixed on the back side of stone material by this fixture, then by the requirement of curtain wall construction, bore four holes at body of wall and the corresponding position of peg spare, again with wire brush and dust catcher with after foreign material are cleaned out in the hole of body of wall, adopt syringe in each hole of being bored, to inject the anchoring agent, after one minute respectively just pipe connecting piece insert in each hole and porcelain plate can be fixed on the body of wall.
Claims (3)
1, a kind of job practices of curtain wall, it is characterized in that: earlier in the boring of the behind of porcelain plate or stone material, back of the body bolt is passed the fixture of peg spare, adopt nut peg spare to be fixed on the back side of porcelain plate or stone material by this fixture, in the corresponding position boring of body of wall and peg spare, then foreign material in the hole of body of wall are cleaned out the back and in the hole, injected the anchoring agent and pipe connecting piece is inserted in the hole.
2, by the job practices of the described a kind of curtain wall of claim 1, it is characterized by: an end of peg spare is fixedlyed connected with a fixture, and being provided with on fixture can be for carrying on the back hole or the opening that bolt passes.
3, by the job practices of the described a kind of curtain wall of claim 1, it is characterized by: the blind hole that a back taper is arranged in the bottom in porcelain plate or hole, stone material behind.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02111962 CN1464151A (en) | 2002-06-06 | 2002-06-06 | Construction method for curtain wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02111962 CN1464151A (en) | 2002-06-06 | 2002-06-06 | Construction method for curtain wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1464151A true CN1464151A (en) | 2003-12-31 |
Family
ID=29741974
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 02111962 Pending CN1464151A (en) | 2002-06-06 | 2002-06-06 | Construction method for curtain wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1464151A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105952086A (en) * | 2016-04-27 | 2016-09-21 | 张家口家诚首佳新型建材股份有限公司 | Assembly-type energy-saving hanging plate |
-
2002
- 2002-06-06 CN CN 02111962 patent/CN1464151A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105952086A (en) * | 2016-04-27 | 2016-09-21 | 张家口家诚首佳新型建材股份有限公司 | Assembly-type energy-saving hanging plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN200978477Y (en) | Mounting structure of china clay plate curtain wall | |
CN206090859U (en) | Novel embedding slot | |
CN101899868A (en) | Construction method for rear planted wall steel tie | |
CN1464151A (en) | Construction method for curtain wall | |
CN205712561U (en) | A kind of prefabricated panel | |
CN109898852B (en) | Building template fastening device and fastening method | |
CN200968042Y (en) | Ceramic tile for architectural decoration | |
CN1464150A (en) | Construction method for curtain wall | |
CN111852528A (en) | Sectional recoverable high-strength prestressed anchor cable and its construction method | |
CN2697217Y (en) | Connector for multi-section flagpole | |
CN210482589U (en) | Novel prefabricated shear wall | |
CN204326565U (en) | Face frontier defense guardrail | |
CN209799349U (en) | Easily-installed and easily-disassembled building template | |
CN220791122U (en) | Profile steel step | |
JP4404430B2 (en) | Method of attaching a building decoration material and the attachment device | |
CN203174835U (en) | Combination hanging piece and beam-free ceramic gravel curtain wall system | |
CN207302492U (en) | A kind of gardens direction board being easily installed | |
CN206731644U (en) | A kind of convenient cleaning equipment of chemical anchor bolts | |
CN207177744U (en) | Drilling tool cleaning nozzle mounting bracket | |
CN220167558U (en) | Safety protection net | |
CN203174834U (en) | Combination hanging piece and ceramic gravel curtain wall with beams | |
CN206468003U (en) | A kind of Xin Jiamo guard bar structures | |
CN205444959U (en) | Safety protection device for building | |
CN220066708U (en) | Steel pipe clamp for bridge laying | |
CN105220837B (en) | A kind of installation method of ornamental sets of brackets on top of the columns |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |