CN1458388A - Triple liquid draining system for perforation, formation testing and jet flow pump - Google Patents
Triple liquid draining system for perforation, formation testing and jet flow pump Download PDFInfo
- Publication number
- CN1458388A CN1458388A CN 03127980 CN03127980A CN1458388A CN 1458388 A CN1458388 A CN 1458388A CN 03127980 CN03127980 CN 03127980 CN 03127980 A CN03127980 A CN 03127980A CN 1458388 A CN1458388 A CN 1458388A
- Authority
- CN
- China
- Prior art keywords
- perforation
- jet pump
- formation testing
- formation
- jet flow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The present invention relates to one technological system for completing negative pressure perforation of oil well, formation test and jet flow pump liquid drainage in once operation. The technological system includes perforator, formation testing unit, jet pump, sand supporting leather cap, positioning short joint, negative pressure jet pump, test pressure gage, testing unit, pressure transmitting joint, damper, igniting head, perforating gun, oil pipe, etc. connected successively. The said triple operation can speed construction, reduce secondary formation pollution and raise the quality of the acquired formation data.
Description
Technical field
The present invention relates to the underbalance perforating of Pressure Curve in Oil Testing Well and a kind of process system of a formation testing and a construction operation of jet pump discharge opeing.
Background technology
In the past, Pressure Curve in Oil Testing Well mainly adopted the formation testing method that TCP (perforation) DST (formation testing) two does.Its major defect is to be subjected to oil pipe (or drilling rod) content constraints, can't finish its discharge opeing work fully in nonflowing well, usually causes the unclear situation of fluidity and production capacity, has influenced the formation testing progress.
Summary of the invention
The objective of the invention is to avoid weak point of the prior art, is one and a kind of beam hole, test, discharge opeing are provided, and effective perforation and formation testing and jet pump three are made the fluid-discharge technology system.
Can take following technical scheme to realize purpose.
Perforation and formation testing and jet pump three are made the fluid-discharge technology system, comprise perforation, formation testing device, it is characterized in that: also have jet pump, holder rubber bowl, connect and compose by oil pipe.
The relative prior art of present technique has following advantage and effect
But the negative pressure jet pump can connect into the supporting use of disposable tubing string with TCP+DST technology under the prerequisite that does not influence perforation and formation testing, fully finish its discharge opeing work, thereby has improved the effect of formation evaluation; TCP+DST+JET three combination operation process systems have accelerated formation testing speed greatly, have improved operating efficiency, have avoided the secondary pollution on stratum simultaneously, and it is applicable to all kinds of oil gas water wells of well depth≤4500m hole deviation≤72 °, discharge capacity≤600m
3/ d; But the negative pressure jet pump has positive and negative row's function, its volume is little, discharge capacity big, reliable operation, and external sliding sleeve in the negative pressure that having to pressurize opens, thereby guaranteed the negative pressure performance of tubing string, designed the husky leather cup of dustproof bypass type holder simultaneously, mainly prevented factor because of formation sand production, sand card tubing string, guaranteed finishing of sleeve pipe pressurization igniting perforation, when playing lower tubular column, link up up and down, reduce resistance, effective.
Description of drawings
Accompanying drawing is that perforation and formation testing and jet pump three are made the fluid-discharge technology system schematic.
The specific embodiment
In conjunction with embodiment technical scheme is described in detail.
Embodiment 1, perforation and formation testing and jet pump three are made the fluid-discharge technology system, comprise perforation, formation testing device, also have jet pump 2, holder rubber bowl 3, connect and compose by oil pipe 1.
Embodiment 3, perforation and formation testing and jet pump three are made the fluid-discharge technology system, and on embodiment 1 or 2 bases, rubber tray 3 is dustproof bypass type.
Its operating principle, behind the following complete body tubing string, finish perforation and formation testing work earlier, when formation fluid is not enough to when up-flow goes out well head, the negative pressure sliding sleeve that is just pressurizeing and opening jet pump, in oil pipe (or drilling rod), drop into jet pump working barrel core (pump core portability pressure gauge and sampler as requested) then, after the pump core puts in place, well depth and production capacity situation according to well are adjusted ground high voltage power pump to the required operating pressure of jet pump, can finish the discharge opeing work on stratum smoothly by fixed tubular column, after the end, the well-flushing that recoils can be gone out the working barrel core of jet pump.
Claims (3)
1, a kind of perforation and formation testing and jet pump three are made the fluid-discharge technology system, comprise perforation, formation testing device, it is characterized in that: also have jet pump, holder rubber bowl, connect and compose by oil pipe.
2, perforation according to claim 1 and formation testing and jet pump three are made the fluid-discharge technology system, it is characterized in that: jet pump is a suction type.
3, perforation according to claim 1 and 2 and formation testing and jet pump three are made the fluid-discharge technology system, it is characterized in that: holder rubber bowl is dustproof bypass type.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03127980 CN1242156C (en) | 2003-04-27 | 2003-04-27 | Triple liquid draining system for perforation, formation testing and jet flow pump |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03127980 CN1242156C (en) | 2003-04-27 | 2003-04-27 | Triple liquid draining system for perforation, formation testing and jet flow pump |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1458388A true CN1458388A (en) | 2003-11-26 |
CN1242156C CN1242156C (en) | 2006-02-15 |
Family
ID=29430437
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 03127980 Expired - Fee Related CN1242156C (en) | 2003-04-27 | 2003-04-27 | Triple liquid draining system for perforation, formation testing and jet flow pump |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1242156C (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100395428C (en) * | 2006-03-24 | 2008-06-18 | 中国石油天然气股份有限公司 | Cracking four-linking technology |
CN102213083A (en) * | 2011-04-19 | 2011-10-12 | 中国石油化工集团公司 | Negative pressure perforation and ultra-negative pressure pump suction integrated production process |
CN111852403A (en) * | 2019-04-23 | 2020-10-30 | 邓选华 | Perforation, test and electric submersible pump liquid discharge triple-connection operation process |
-
2003
- 2003-04-27 CN CN 03127980 patent/CN1242156C/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100395428C (en) * | 2006-03-24 | 2008-06-18 | 中国石油天然气股份有限公司 | Cracking four-linking technology |
CN102213083A (en) * | 2011-04-19 | 2011-10-12 | 中国石油化工集团公司 | Negative pressure perforation and ultra-negative pressure pump suction integrated production process |
CN102213083B (en) * | 2011-04-19 | 2013-10-23 | 中国石油化工集团公司 | Negative pressure perforation and ultra-negative pressure pump suction integrated production process |
CN111852403A (en) * | 2019-04-23 | 2020-10-30 | 邓选华 | Perforation, test and electric submersible pump liquid discharge triple-connection operation process |
Also Published As
Publication number | Publication date |
---|---|
CN1242156C (en) | 2006-02-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2924005Y (en) | Perforating, detecting, acidating and liquid-discharging integrated testing pipe string | |
CN102121377B (en) | Pressure-while-drilling measuring device and measurement method thereof | |
CN103510893B (en) | A kind of drilling equipment utilizing traffic monitoring to realize bottom pressure control and method | |
CN101100938B (en) | Method and system for removing fluid from a subterranean zone using an enlarged cavity | |
CA2537855A1 (en) | Downhole draw down pump and method | |
CN202170788U (en) | Interlayer staged fracturing technical pipe column for thick reservoir layer | |
CN1458388A (en) | Triple liquid draining system for perforation, formation testing and jet flow pump | |
CN2646382Y (en) | Perforation and formation testing and flowing thribble working test oil equipment of jet injector | |
CN108533180A (en) | A kind of drilling engineering is with boring hole-drawing device and reaming method | |
CN203856456U (en) | Well testing pipe column | |
CN204126624U (en) | Open-hole horizontal well fixed tubular column jetting sectional well completion fracturing string | |
CN105569620A (en) | Method and device for deep penetration perforation used in well completion of open hole well | |
CN105089578B (en) | A kind of method that perforation and the connection of oil production by layer make device and oil recovery | |
CN211027493U (en) | Device for accurately extracting NAP L pollutants in underground water | |
CN107630693A (en) | A kind of electro-hydrodynamic fracturing device applied to shale gas exploitation | |
CN115387763A (en) | Ball plug gas lift experimental device and experimental method | |
CN218971405U (en) | Low-sinking horizontal well tubular pump for coal bed gas | |
CN2793291Y (en) | Drilling oblique device for branched well | |
CN116044366B (en) | Long-acting tracing real-time monitoring method for perforation, fracturing and production stages of oil and gas reservoir | |
CN214697810U (en) | Staged fracturing string for horizontal well | |
CN215169916U (en) | Hydraulic jet pipe column for fracture acidizing | |
CN109519154A (en) | Sediment cleaning tooling and method for cleaning in a kind of horizontal well sieve tube | |
CN219736927U (en) | Sampler of adjustable degree of depth | |
CN2871834Y (en) | Combined drainer for acidifying or fracturing ground and jet-flowing pump | |
CN110907223B (en) | Ultra-deep sampling device for critical liquid level high turbidity water and use method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20060215 Termination date: 20130427 |