CN2924005Y - Perforating, detecting, acidating and liquid-discharging integrated testing pipe string - Google Patents
Perforating, detecting, acidating and liquid-discharging integrated testing pipe string Download PDFInfo
- Publication number
- CN2924005Y CN2924005Y CN 200520106207 CN200520106207U CN2924005Y CN 2924005 Y CN2924005 Y CN 2924005Y CN 200520106207 CN200520106207 CN 200520106207 CN 200520106207 U CN200520106207 U CN 200520106207U CN 2924005 Y CN2924005 Y CN 2924005Y
- Authority
- CN
- China
- Prior art keywords
- test
- oil
- latus rectum
- pressure gauge
- pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
A perforating, detecting, acidulating, and liquid-discharging integrated testing pipe string applied to the technical field of oil-gas well oil test includes a slide-sleeve type hydraulic jet pump4 and a drift diameter grip type packer12,etc. An expanding-contracting short joint1, an oil tube or a drill rod2, a locating joint3, and the slide-sleeve type hydraulic jet pump4 are connected in turn and a drift diameter monitor pressure gauge carrier and a pressure gauge7, a full drift diameter selecting tester8, a drift diameter test pressure gauge carrier and a pressure gauge9, a jar10, a safety joint11, a drift diameter grip type packer12, a shock absorber13, and an oil tube14 are connected in turn. Carrying out integrated combined operations of the negative pressure perforating of oil tube conveying, stratum detecting, acidulating reforming, and the hydraulic pump liquid-discharging to the testing layer with a one-trip pipe string at the same time enhances the quality of the test oil, saves the test oil cost, and shortens the construction cycle. The non-flowing well of the formation-testing pipe string can realize a continuous fluid producing from the stratum without moving the pipe string. The utility model shortens the soak time of the perforating fluid to the stratum and avoids a secondary pollution to the oil layer during a pulling operation process.
Description
Technical field
The utility model relates to oil gas well formation testing technical field, specifically, is the integrated formation testing tubing string of a kind of perforation, test, acidifying and discharge opeing.
Background technology
In the existing oil gas well formation testing testing method, although the testing tool of application of advanced, can obtain data preferably, but can not realize that continuously a large amount of discharge opeings and fixed tubular column carry out large-scale measure operations such as acid fracturing, make to need a large amount of discharge opeings or need Pressure Curve in Oil Testing Well that acidifying transforms replace tubes post again, cause secondary pollution and formation testing test construction period longer easily.So finish the development trend that multinomial formation testing operation is an oil gas well formation testing testing method with one-trip string.
Aspect institutional operation, there is " perforation and APR test " connection to do and " perforation-MFE test-hydraulic jet pump discharge opeing " combination operation process technology with the immediate formation testing technology of the utility model at present.
Oil gas well " perforation with APR test " connection do be exactly packer, APR formation test tool are carried lower going-into-well together with perforating gun by oil pipe or drilling rod at the bottom of, make perforating gun aim at target zone deeply by the well logging school, base sealed packer is isolated target zone and annular space well killing fluid.Testing valve is opened in pressurization earlier to annular space, continues the ignition perforating gun that boosts then.Stratum liquid directly enters operating tool string and tests.After finishing, test trips out construction tool.This technology has solved the danger (when running into high-pressure oil-gas layer, well killing fluid is not enough to equilibrium strata pressure, and blowout takes place probably) that prevents formation contaminant (because target zone and annular space well killing fluid being isolated) and cable perforation before perforation.But the deficiency of technology is: must keep certain pressure, the less stable of its switch well at the oil jacket annular space on the one hand in the process of driving a well.On the other hand, non-the replace tubes post could be realized again from spray-up and need carry out acidifying (or acid fracturing) construction to the stratum time for the heavy oil tested layer of the further discharge opeing of needs or low pressure, has increased workload and easily oil reservoir is polluted.
" perforation-test-hydraulic jet pump discharge opeing " combination operation process technology has realized perforation-MFE test and the integrated formation testing construction of hydraulic pump discharge opeing.Its process unit has added hydraulic jet pump on " perforation and MFE testing combination operation " tubing string.Hydraulic jet pump fluid-discharge technology technology is to inject high voltage power liquid to underground hydraulic pump from ground by oil pipe, when passing through nozzle, trunnion and anemostat, pump in-core high voltage power liquid forms a negative pressuren zone at nozzle and trunnion place, thereby suck and carry stratum liquid, return out ground with power fluid through sleeve pipe, separate and measure.Compare with conventional fluid-discharge technology (fall liquid level, liquid nitrogen discharge opeing or utilize simple discharge opeings such as NAVI pump, screw pump or pumping), can realize continuously, big pressure reduction (but negative pressure is to 3000m), high yield discharge opeing as vaporize water.The stratum there is certain de-plugging effect, thereby understands the true production capacity on stratum.Before discharge opeing, can take to squeeze small-sized measures such as thinner, stratum cleaning agent, return discharge opeing then immediately.The hydraulic pump power fluid can be heated and can be added breakdown of emulsion, viscosity reduction, pour-point depressant, has satisfied high requirement of coagulating the heavy oil wells discharge opeing.The technology shortcoming is: can not realize that 1, motionless test string directly carries out acidifying large-scale modification measures such as (acid fracturings) to test layer, carries out discharge opeing then immediately.2, switch well operating difficulties in inclined shaft and heavy oil wells.3, MFE tester internal diameter is less and be not latus rectum.Can not be lowered on the one hand well testing instrument such as pressure gauge from ground to carrying out the well testing operation below the tester.On the other hand, viscous crude or stratum impurity stop up tester easily and cause test crash during test.
Summary of the invention
The purpose of this utility model is to keep on the basis of advantage of above technology, use new testing tool and kit, perforation, test, acidifying and fluid-discharge technology are organically combined, provide perforation, test, acidifying and discharge opeing integrated formation testing tubing string, thereby reach the final purpose that improves the formation testing effect, shortens construction period and reduction operating cost.
The utility model is achieved in that and comprises Telescopic short piece 1, oil pipe or drilling rod 2, orientation spool 3, sleeve type hydraulic jet pump 4, holder rubber bowl 5, ball seat 6, latus rectum monitoring pressure meter holder tube and pressure gauge 7, all-pass is directly selected tester 8, latus rectum test pressure meter holder tube and pressure gauge 9, bumper jar 10, safety joint 11, latus rectum slip-type packer 12, damper 13, oil pipe 14, caber formula tapping point duration and degree of heating 15, perforating gun 16, Telescopic short piece 1, oil pipe or drilling rod 2, orientation spool 3, sleeve type hydraulic jet pump 4 connects successively, holder rubber bowl 5 is socketed on the sleeve type hydraulic jet pump 4, latus rectum monitoring pressure meter holder tube and pressure gauge 7, all-pass is directly selected tester 8, latus rectum test pressure meter holder tube and pressure gauge 9, bumper jar 10, safety joint 11, latus rectum slip-type packer 12, damper 13, oil pipe 14 connects successively, and perforating gun 16 tops are provided with caber formula tapping point duration and degree of heating 15.
The utility model also adopts following technical scheme:
Latus rectum test pressure meter holder tube and pressure gauge 9 directly select tester below 8 at all-pass, latus rectum monitoring pressure meter holder tube and pressure gauge 7 above all-pass is directly selected tester 8, the below of ball seat 6.
Latus rectum monitoring pressure meter holder tube and pressure gauge 7, latus rectum test pressure meter holder tube and pressure gauge 9 are built-in latus rectums.
Holder rubber bowl 5 is positioned at the below of sleeve type hydraulic jet pump 4 and directly is connected with it, and ball seat 6 is positioned at the below of holder rubber bowl 5 and is connected with oil pipe.
Advantage of the present utility model is:
1, utilizes one-trip string that test layer is finished tubing transmission underbalance perforating-formation testing-acidifying (acid fracturing) and transform and the integrated integration of operation of hydraulic pump discharge opeing, improved the formation testing quality, saved the formation testing cost, shortened construction period.Can realize that the nonflowing well fixed tubular column makes the continuous production fluid in stratum.Shorten the soak time of perforating fluid, avoided in the rountrip process secondary pollution oil reservoir to the stratum.
2, all instruments all are latus rectums in a whole set of test string, can be lowered to well testing instruments such as direct-reading pressure gauge from ground to the following igniter head of tester position.
3, keep certain pressure at the Shi Buxu that drives a well at annular space, greatly improved the stability of switch well operation.
The selected selection testing valve of this tubing string is compared with latus rectum APR testing valve-LPR-N valve commonly used at present, except latus rectum Test Switchboard valve with identical function, Shi Buxu keeps certain pressure at annular space driving a well, it is more stable to drive a well like this, simultaneously this testing valve can with the hydraulic pump integrated construction.All instruments all are latus rectums in a whole set of tubing string, can carry out big discharge capacity acid fracturing construction.Can be lowered to simultaneously well testing instrument such as direct-reading pressure gauge from ground to igniter head position.
Description of drawings
Accompanying drawing is a structural representation of the present utility model.
The specific embodiment
As shown in drawings, 1-Telescopic short piece; 2-oil pipe or drilling rod; The 3-orientation spool; 4-sleeve type hydraulic jet pump; 5-holder rubber bowl; The 6-ball seat; 7-latus rectum monitoring pressure meter holder tube and pressure gauge; The 8-all-pass is directly selected tester; 9-latus rectum test pressure meter holder tube and pressure gauge; The 10-bumper jar; The 11-safety joint; 12-latus rectum slip-type packer; The 13-damper; The 14-oil pipe; 15-caber formula tapping point duration and degree of heating; The 16-perforating gun.
Perforation-test-acidifying is connected as shown in drawings with the integrated formation testing tubing string of discharge opeing.All instruments are threaded by test string (oil pipe or drilling rod).Mainly comprise the perforation parts that the body of a gun 16, caber igniter head 15, screen casing and damper 13 etc. are formed.Finish underbalance perforating operation to test layer.Damper 13 is the influences to the formation testing tubing string of the instantaneous pressure that produces when preventing that perforating gun 16 from igniting.Oil filling pipe is in order to adjust packer 12 degree of depth between damper 13 and igniter head 15.
This operating tool string also comprises the test component that slip-type packer 12, latus rectum manometer 9 and all-pass directly select tester 8 to form.Wherein test pressure meter holder tube 9 directly selects tester below 8 at all-pass, latus rectum monitoring pressure meter holder tube and pressure gauge 7 above all-pass is directly selected tester 8, the below of ball seat 6.Latus rectum monitoring pressure meter holder tube and pressure gauge 7, latus rectum test pressure meter holder tube and pressure gauge 9 are built-in latus rectums, and pressure, moisture recorder are electronics, are writing down the sealing situation of tubing string and the pressure and the temperature of whole test process.
This operating tool string also comprises the discharge opeing parts of being made up of ball seat 6, holder rubber bowl 5 and sleeve type hydraulic jet pump 4 etc.Wherein ask rubber bowl 5 to be positioned at the below of sleeve type hydraulic jet pump 4 and directly be connected with it, ball seat 6 is positioned at the below of holder rubber bowl 5 and is connected with oil pipe.Sleeve type hydraulic jet pump 4 is (oil jacket is not communicated with) of sealing during requiring the tubing string before discharge opeing to go into well, perforation and formation testing, opens sliding sleeve when needs well-flushing and discharge opeing again, realizes that oil jacket is communicated with.
Operation sequence of the present utility model is:
(1) instrument is gone into well: pit shaft installs preventer after being ready to (replacing perforating fluid at the oil reservoir position behind drifting, the scraping well-flushing), with this integrated pipe string precalculated position of going into the well in proper order of doing instrument by design.
(2) perforation: tubing string and set packer are adjusted in dark back, well logging school, make perforating gun aim at target zone, connect ground flow then, and annular space is suppressed and driven a well, caber igniting perforation.
(3) the switch well surveying tries: suppress by test designing requirement annular space and carry out the operation of switch well, obtain the formation testing parameter.
(4) product is asked in the hydraulic pump discharge opeing: annular space is suppressed and is opened testing valve, throws the pump core and opens hydraulic pump sliding sleeve and discharge opeing, returns and washes out the pump core.(looking concrete condition determines whether to implement)
(5) acidifying: carry out acidifying (acid fracturing) construction.
(6) discharge opeing: acid back is if not blowing then pitching and pump core utilize the hydraulic pump discharge opeing once more and ask product.
(7) shut-in pressure survey power is recovered, and discharge opeing finishes the back because of ball seat closing well is automatically arranged, and can carry out the parameter comparison of acidifying front and back to test layer like this, thereby obtains the complete data on stratum.
(8) finish integrated the test, propose tubing string.
Claims (3)
1, perforation, test, the integrated formation testing tubing string of acidifying and discharge opeing, comprise Telescopic short piece (1), oil pipe or drilling rod (2), orientation spool (3), sleeve type hydraulic jet pump (4), holder rubber bowl (5), ball seat (6), latus rectum monitoring pressure meter holder tube and pressure gauge (7), all-pass is directly selected tester (8), latus rectum test pressure meter holder tube and pressure gauge (9), bumper jar (10), safety joint (11), latus rectum slip-type packer (12), damper (13), oil pipe (14), caber formula tapping point duration and degree of heating (15), perforating gun (16), it is characterized in that: Telescopic short piece (1), oil pipe or drilling rod (2), orientation spool (3), sleeve type hydraulic jet pump (4) connects successively, holder rubber bowl (5) is socketed on the sleeve type hydraulic jet pump (4), latus rectum monitoring pressure meter holder tube and pressure gauge (7), all-pass is directly selected tester (8), latus rectum test pressure meter holder tube and pressure gauge (9), bumper jar (10), safety joint (11), latus rectum slip-type packer (12), damper (13), oil pipe (14) connects successively, and perforating gun (16) top is provided with caber formula tapping point duration and degree of heating (15).
2, the integrated formation testing tubing string of perforation according to claim 1, test, acidifying and discharge opeing, it is characterized in that: latus rectum test pressure meter holder tube and pressure gauge (9) are directly selected below the tester (8) at all-pass, latus rectum monitoring pressure meter holder tube and pressure gauge (7) are directly selected tester (8) top, the below of ball seat (6) at all-pass.
3, the integrated formation testing tubing string of perforation according to claim 1, test, acidifying and discharge opeing, it is characterized in that: holder rubber bowl (5) is positioned at the below of sleeve type hydraulic jet pump (4) and directly is connected with it, and ball seat (6) is positioned at the below of holder rubber bowl (5) and is connected with oil pipe (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520106207 CN2924005Y (en) | 2005-08-25 | 2005-08-25 | Perforating, detecting, acidating and liquid-discharging integrated testing pipe string |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520106207 CN2924005Y (en) | 2005-08-25 | 2005-08-25 | Perforating, detecting, acidating and liquid-discharging integrated testing pipe string |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2924005Y true CN2924005Y (en) | 2007-07-18 |
Family
ID=38260437
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200520106207 Expired - Lifetime CN2924005Y (en) | 2005-08-25 | 2005-08-25 | Perforating, detecting, acidating and liquid-discharging integrated testing pipe string |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2924005Y (en) |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102213083A (en) * | 2011-04-19 | 2011-10-12 | 中国石油化工集团公司 | Negative pressure perforation and ultra-negative pressure pump suction integrated production process |
CN102312665A (en) * | 2011-09-21 | 2012-01-11 | 中国石油化工股份有限公司 | Stratum perforation test device |
CN101519954B (en) * | 2009-03-23 | 2012-07-04 | 胜利油田胜利泵业有限责任公司 | Multifunctional combination operation process and device for injection pump unit |
CN101749000B (en) * | 2010-01-18 | 2012-10-03 | 张宣来 | Energy-concentrated bullet blasting and perforating process |
CN102852508A (en) * | 2012-08-23 | 2013-01-02 | 陕西延长石油(集团)有限责任公司研究院 | Liquid CO2 fracturing technology for shale gas well |
CN103161438A (en) * | 2011-12-15 | 2013-06-19 | 中国海洋石油总公司 | Tubular column of perforation fracturing test system |
CN104481509A (en) * | 2014-11-17 | 2015-04-01 | 中国海洋石油总公司 | Deepwater test well completion tubular column and setting and printing method thereof |
CN104564022A (en) * | 2014-09-03 | 2015-04-29 | 北京石大博诚科技有限公司 | BOSW supermicro oil production test liquid construction method |
CN105089567A (en) * | 2014-05-08 | 2015-11-25 | 天津大港油田钻采技术开发公司 | Adjustable quick liquid discharging and oil testing device for low-density fluid in deep well and operating method of adjustable quick liquid discharging and oil testing device |
CN105672976A (en) * | 2014-11-20 | 2016-06-15 | 中国石油化工股份有限公司 | Acidizing, negative-pressure and flowback integrated equipment and technology |
CN105804727A (en) * | 2016-05-06 | 2016-07-27 | 中国石油集团渤海钻探工程有限公司 | One-trip layering oil testing process pipe column |
CN106062312A (en) * | 2014-03-06 | 2016-10-26 | 国际壳牌研究有限公司 | Method and apparatus for reservoir testing and monitoring |
CN109915130A (en) * | 2017-12-07 | 2019-06-21 | 中国石油天然气股份有限公司 | A kind of formation testing device and method |
CN110700878A (en) * | 2019-10-24 | 2020-01-17 | 中煤科工集团西安研究院有限公司 | Pumping screw pump drilling tool system for accumulated water in underground drilling hole of coal mine and construction method thereof |
CN111155992A (en) * | 2018-11-07 | 2020-05-15 | 中国石油天然气股份有限公司 | Multilayer combined operation oil testing device and method |
CN111255420A (en) * | 2018-11-30 | 2020-06-09 | 中国石油天然气股份有限公司 | Oil well oil testing device and oil testing method |
CN111980656A (en) * | 2020-07-27 | 2020-11-24 | 克拉玛依市红都有限责任公司 | Three-layer three-stage acid fracturing flow-back test integration method |
CN114607344A (en) * | 2020-12-03 | 2022-06-10 | 中国石油天然气股份有限公司 | Acid fracturing integrated pipe column and acid fracturing method |
-
2005
- 2005-08-25 CN CN 200520106207 patent/CN2924005Y/en not_active Expired - Lifetime
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101519954B (en) * | 2009-03-23 | 2012-07-04 | 胜利油田胜利泵业有限责任公司 | Multifunctional combination operation process and device for injection pump unit |
CN101749000B (en) * | 2010-01-18 | 2012-10-03 | 张宣来 | Energy-concentrated bullet blasting and perforating process |
CN102213083A (en) * | 2011-04-19 | 2011-10-12 | 中国石油化工集团公司 | Negative pressure perforation and ultra-negative pressure pump suction integrated production process |
CN102213083B (en) * | 2011-04-19 | 2013-10-23 | 中国石油化工集团公司 | Negative pressure perforation and ultra-negative pressure pump suction integrated production process |
CN102312665A (en) * | 2011-09-21 | 2012-01-11 | 中国石油化工股份有限公司 | Stratum perforation test device |
CN103161438A (en) * | 2011-12-15 | 2013-06-19 | 中国海洋石油总公司 | Tubular column of perforation fracturing test system |
CN103161438B (en) * | 2011-12-15 | 2017-04-19 | 中国海洋石油总公司 | Tubular column of perforation fracturing test system |
CN102852508A (en) * | 2012-08-23 | 2013-01-02 | 陕西延长石油(集团)有限责任公司研究院 | Liquid CO2 fracturing technology for shale gas well |
CN106062312A (en) * | 2014-03-06 | 2016-10-26 | 国际壳牌研究有限公司 | Method and apparatus for reservoir testing and monitoring |
CN105089567A (en) * | 2014-05-08 | 2015-11-25 | 天津大港油田钻采技术开发公司 | Adjustable quick liquid discharging and oil testing device for low-density fluid in deep well and operating method of adjustable quick liquid discharging and oil testing device |
CN105089567B (en) * | 2014-05-08 | 2018-01-05 | 天津大港油田钻采技术开发公司 | Deep-well is adjustable low density flow quick fluid-discharge formation testing device and its operational method |
CN104564022A (en) * | 2014-09-03 | 2015-04-29 | 北京石大博诚科技有限公司 | BOSW supermicro oil production test liquid construction method |
CN104481509B (en) * | 2014-11-17 | 2018-03-20 | 中国海洋石油集团有限公司 | Deep water tests completion tubular column and the method for setting printing |
CN104481509A (en) * | 2014-11-17 | 2015-04-01 | 中国海洋石油总公司 | Deepwater test well completion tubular column and setting and printing method thereof |
CN105672976A (en) * | 2014-11-20 | 2016-06-15 | 中国石油化工股份有限公司 | Acidizing, negative-pressure and flowback integrated equipment and technology |
CN105804727A (en) * | 2016-05-06 | 2016-07-27 | 中国石油集团渤海钻探工程有限公司 | One-trip layering oil testing process pipe column |
CN109915130A (en) * | 2017-12-07 | 2019-06-21 | 中国石油天然气股份有限公司 | A kind of formation testing device and method |
CN111155992A (en) * | 2018-11-07 | 2020-05-15 | 中国石油天然气股份有限公司 | Multilayer combined operation oil testing device and method |
CN111155992B (en) * | 2018-11-07 | 2023-05-26 | 中国石油天然气股份有限公司 | Multi-layer combined oil testing device and method |
CN111255420A (en) * | 2018-11-30 | 2020-06-09 | 中国石油天然气股份有限公司 | Oil well oil testing device and oil testing method |
CN110700878A (en) * | 2019-10-24 | 2020-01-17 | 中煤科工集团西安研究院有限公司 | Pumping screw pump drilling tool system for accumulated water in underground drilling hole of coal mine and construction method thereof |
CN110700878B (en) * | 2019-10-24 | 2020-10-27 | 中煤科工集团西安研究院有限公司 | Pumping screw pump drilling tool system for accumulated water in underground drilling hole of coal mine and construction method thereof |
CN111980656A (en) * | 2020-07-27 | 2020-11-24 | 克拉玛依市红都有限责任公司 | Three-layer three-stage acid fracturing flow-back test integration method |
CN114607344A (en) * | 2020-12-03 | 2022-06-10 | 中国石油天然气股份有限公司 | Acid fracturing integrated pipe column and acid fracturing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2924005Y (en) | Perforating, detecting, acidating and liquid-discharging integrated testing pipe string | |
CN2924006Y (en) | Integrated formation-testing pipe string of cross-packer back-perforating, detecting and discharging liquid | |
CN101429848B (en) | Method and apparatus for hydraulic jet side drilling for radial branching borehole | |
CN102288742B (en) | Well drilling simulation test device | |
CN102121377B (en) | Pressure-while-drilling measuring device and measurement method thereof | |
CN108798660B (en) | Stress measuring device by hydraulic fracturing method | |
WO2005113938A3 (en) | Methods for using a formation tester | |
CN109838223A (en) | A kind of volume fracturing method of deep layer complexity shale gas | |
CN101709639A (en) | Mineshaft multiphase flow device for simulating deep-water oil and gas production | |
CN104500057A (en) | Testing method of liquid producing profile of horizontal well | |
CN105587274A (en) | Concentric tube straddle downward return perforating, testing, liquid draining and modifying system and operation method | |
CN104948149B (en) | A kind of multimedium dispensing system suitable in mining site complexity oil reservoir | |
CN203856456U (en) | Well testing pipe column | |
CN203835351U (en) | Hydraulic power sand blasting perforation and APR testing combined operation device | |
CN102296950B (en) | Hydraulic shearing type sampling drilling tool | |
CN102230377A (en) | Multifunctional gas lifting strata testing string | |
CN109025915B (en) | Full-drift-diameter cross-isolation lower-return-hole-testing combined pipe column and operation method thereof | |
CN103334709A (en) | Casing pipe annular gas injection technology | |
CN104819858A (en) | Test device for evaluating reliability of downhole tool of horizontal well | |
Aleksandrovich | Bottomhole formation zone completion through ultra deep multibranch channels: experimental research of a new technology | |
CN201318149Y (en) | Unidirectional inner blowout control pump-out type blanking plug | |
CN202866772U (en) | Sand blasting slotting perforation tool | |
CN104234709A (en) | Device for obtaining stratum real fluid samples of cased well | |
CN104863550A (en) | Hydraulic sand blasting perforation and APR (annular pressure responsive) testing combined process | |
CN106499334A (en) | Down-hole is slidingly sealed instrument, unlimited extended reach drilling device and its boring method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Expiration termination date: 20150825 Granted publication date: 20070718 |
|
EXPY | Termination of patent right or utility model |