CN104481509B - Deep water tests completion tubular column and the method for setting printing - Google Patents

Deep water tests completion tubular column and the method for setting printing Download PDF

Info

Publication number
CN104481509B
CN104481509B CN201410653033.6A CN201410653033A CN104481509B CN 104481509 B CN104481509 B CN 104481509B CN 201410653033 A CN201410653033 A CN 201410653033A CN 104481509 B CN104481509 B CN 104481509B
Authority
CN
China
Prior art keywords
packer
tubing string
setting
printing
deep water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410653033.6A
Other languages
Chinese (zh)
Other versions
CN104481509A (en
Inventor
李中
王尔钧
颜帮川
段泽辉
韦龙贵
孟文波
方满宗
魏安超
马磊
李祝军
熊永卫
张崇
徐斐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC China Ltd Zhanjiang Branch filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201410653033.6A priority Critical patent/CN104481509B/en
Publication of CN104481509A publication Critical patent/CN104481509A/en
Application granted granted Critical
Publication of CN104481509B publication Critical patent/CN104481509B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/04Measuring depth or liquid level
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
    • E21B33/064Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers specially adapted for underwater well heads
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs

Abstract

The invention discloses a kind of deep water test completion tubular column and the method that sets printing, tubing string include successively from bottom to top packer (1), setting tool assembly (10), landing nipple (2), with long string (3), hanger assembly (4), be sent into tubing string (5).The method for setting printing comprises the following steps:S1:The tubing string is hanged and is sequentially connected into well;S2:Hanger assembly, which is sat, to be hung to well head, closes preventer group printing flashboard, and electrical measurement school is deep;S3:According to school depth result upper lifting pipe post to packer set position, pitching, which is set, tests sealed packer, slips out of the hand;S4:Pull out of hole.The one-trip string of the present invention can realize that printing preventer group and packer setting test two purposes of envelope, the saving activity duration hangs, after hanger is sat and hung to well head, school depth operation is carried out again, deep water packer setting depth is influenceed smaller by tidal range, it can realize that the accurate school of tubing string is deep, packer setting precision can be improved to 0.3m during deepwater work.

Description

Deep water tests completion tubular column and the method for setting printing
Technical field
The invention belongs to marine deep water well completing test technical field, in particular to a kind of deep water test completion tubular column and set The method of printing.
Background technology
At present, at home and abroad in marine deepwater drilling and completion, marine deep water well completing test printing and packer setting are normal It is with technique:Divide tubing string twice, a printing tubing string, a lower packet tubing string.Tubing string causes the activity duration twice due under It is longer, and deepwater drilling platform somewhat expensive, therefore production cost is very high.Further, since deep water packer setting depth by Tidal range influence is very big, causes existing packer setting precision also poor.
Above-mentioned discussion content purpose be to reader introduce may be described below and/or advocate it is of the invention each The various aspects of the related technology of individual aspect, it is believed that the discussion content contributes to as reader with background's information, to be advantageous to more Understand various aspects of the invention well, it is therefore to be understood that be that these discussions are read with this angle, it is existing without being to recognize that Technology.
The content of the invention
A kind of deep water test completion tubular column is provided and set it is an object of the invention to avoid deficiency of the prior art The method of printing, to improve operation timeliness, improve school depth precision.
The purpose of the present invention is achieved through the following technical solutions:
Deep water tests completion tubular column, and the tubing string connects including packer, setting tool assembly, positioning successively from bottom to top Head, with long string, hanger assembly, be sent into tubing string, the setting tool assembly include setting tool, become buckle joint, it is described fixed Position joint is that the long string of matching somebody with somebody is used to connect setting tool assembly for confirming to match somebody with somebody long tube column length below hanger assembly And the drilling tool between hanger assembly, the hanger assembly are used to sit hanging tube post to well head.
Wherein, the tubing string internal diameter meets electrical measurement, the requirement of pitching.
Present invention also offers a kind of using the deep water as described above test completion tubular column method that is set and printed, Comprise the following steps:
S1:The tubing string is sequentially connected into well, is insertion during tripping in, inside and outside tubing string;
S2:Hanger assembly, which is sat, to be hung to well head, closes preventer group printing flashboard, and electrical measurement school is deep;
S3:According to the setting tool assembly of school depth result upper lifting pipe post, packer to packer set position, pitching is set Sealed packer is tested, is slipped out of the hand;
S4:Pull out of hole.
The present invention is by integrating conventional deep water well completing test printing and packer setting tubing string in one-trip string, in hanger Preventer group can be printed after hanging well head while carry out school depth operation by sitting, deep to packer setting according to school depth result upper lifting pipe post Degree, realizes packer setting.The one-trip string of the present invention can realize that printing preventer group and packer setting test two purposes of envelope, Save the activity duration.For 500~3000m depth of water well completing test operations, can be improved the field operation time 4 using this method~ 10 hours, save operating cost 50~3,000,000 yuan.It can realize that hanger is sat using this tubing string and method to hang to well head, then School depth operation is carried out, deep water packer setting depth is influenceed smaller by tidal range, it is possible to achieve the accurate school of tubing string is deep, can be in depth Packer setting precision is improved to 0.3m during water operation.
Brief description of the drawings
Using accompanying drawing, the invention will be further described, but the embodiment in accompanying drawing does not form any limit to the present invention System, for one of ordinary skill in the art, on the premise of not paying creative work, can also be obtained according to the following drawings Other accompanying drawings.
Fig. 1 is the schematic diagram that deep water test completion tubular column set printing.
Include in Fig. 1:1 --- packer;2 --- landing nipple;3 --- with long string;4 --- hanger is total Into;5 --- it is sent into tubing string;6 --- marine riser;7 --- hanger assembly variable buckle;8 --- preventer group;9 --- pit shaft; 10 --- setting tool assembly.
Embodiment
In order that those skilled in the art more fully understands technical scheme, it is below in conjunction with the accompanying drawings and specific real Apply example the present invention is described in further detail, it is necessary to explanation, in the case where not conflicting, embodiments herein and Feature in embodiment can be mutually combined.
As shown in figure 1, deep water test completion tubular column of the present invention includes packer 1, sets work successively from bottom to top Have assembly 10, landing nipple 2, with long string 3, hanger assembly 4, feeding tubing string 5.Feeding tubing string 5 lower end passes through suspension Device assembly variable buckle 7 (on) be connected with the upper end of hanger assembly 4, the lower end of hanger assembly 4 by hanger assembly variable buckle 7 (under) It is connected with the upper end with long string 3, the lower end with long string 3 is provided with landing nipple 2, and the lower end of landing nipple 2 is connected with packing Device 1 and setting tool assembly 10.The tubing string internal diameter meets electrical measurement, the requirement of pitching, and tube column strength meets that rotation, tension will Ask.The setting tool assembly 10 includes setting tool, becomes buckle joint, and the landing nipple 2 is to be used to confirm hanger assembly Match somebody with somebody the length of long string 3 below, it is described to be used to connect the brill between setting tool assembly 10 and hanger assembly 4 with long string 3 Tool, placed with long tube column length according to design packer setting depth.The hanger assembly 4 is used to sit hanging tube post to well Mouthful.
The invention provides a kind of method for being set and being printed using deep water as described above test completion tubular column, bag Include following steps:
S1:The tubing string is entered into pit shaft 9 through marine riser 6, is insertion during tripping in, inside and outside tubing string;
S2:After tubing string tripping in place, hanger assembly 4 is slowly sat into extension to well head, closing preventer group 8 and prints flashboard, Printing flashboard can print corresponding trace on tubing string, while well head can install electrical measurement depth correction instrument device, according to landing nipple 2 come school Positive tubing string depth;
S3:After school is terminated deeply, according to the slow upper lifting pipe post of school depth result to packer setting depth, make tubing string sets work Have assembly 10, packer 1 to packer set position, pitching, which is set, tests sealed packer, after packer setting tests sealing lattice, takes off Hand;
S4:Pull out of hole.
The one-trip string of the present invention can realize that printing preventer group and packer setting test two purposes of envelope, when saving operation Between.For 500~3000m depth of water well completing test operations, the field operation time can be improved 4~10 hours using this method, saved Province operating cost 50~3,000,000 yuan.It can realize that hanger is sat using this tubing string and method to hang to well head, then carry out school and make deeply Industry, deep water packer setting depth are influenceed smaller by tidal range, it is possible to achieve the accurate school of tubing string is deep, can be during deepwater work Packer setting precision is improved to 0.3m.
Many details are elaborated in above description to facilitate a thorough understanding of the present invention, still, the present invention can be with It is different from other modes described here using other to implement, it is thus impossible to be interpreted as limiting the scope of the invention.
In a word, although the present invention illustrates above-mentioned preferred embodiment, although it should be noted that those skilled in the art Member can carry out various change and remodeling, unless such change and remodeling deviate from the scope of the present invention, otherwise should all wrap Include within the scope of the present invention.

Claims (2)

1. a kind of method for carrying out setting printing using deep water test completion tubular column, the deep water test completion tubular column is from bottom to top Successively include packer (1), setting tool assembly (10), landing nipple (2), with long string (3), hanger assembly (4), be sent into Tubing string (5), the setting tool assembly (10) include setting tool, become buckle joint, and the landing nipple (2) is to be used to confirm to hang Match somebody with somebody long string (3) length below hanging device assembly, it is described to be used to connect setting tool assembly (10) with long string (3) and hanger is total Drilling tool between (4), the hanger assembly (4) are used to sit hanging tube post to well head, it is characterised in that methods described is included such as Lower step:
S1:The tubing string is sequentially connected into well, is insertion during tripping in, inside and outside tubing string;
S2:Hanger assembly, which is sat, to be hung to well head, closes preventer group printing flashboard, and electrical measurement school is deep;
S3:According to the setting tool assembly of school depth result upper lifting pipe post, packer to packer set position, pitching, which is set, tests envelope Packer, slip out of the hand;
S4:Pull out of hole.
2. the method according to claim 1 for carrying out setting printing using deep water test completion tubular column, it is characterised in that:Institute State tubing string internal diameter and meet electrical measurement, the requirement of pitching.
CN201410653033.6A 2014-11-17 2014-11-17 Deep water tests completion tubular column and the method for setting printing Expired - Fee Related CN104481509B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410653033.6A CN104481509B (en) 2014-11-17 2014-11-17 Deep water tests completion tubular column and the method for setting printing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410653033.6A CN104481509B (en) 2014-11-17 2014-11-17 Deep water tests completion tubular column and the method for setting printing

Publications (2)

Publication Number Publication Date
CN104481509A CN104481509A (en) 2015-04-01
CN104481509B true CN104481509B (en) 2018-03-20

Family

ID=52756101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410653033.6A Expired - Fee Related CN104481509B (en) 2014-11-17 2014-11-17 Deep water tests completion tubular column and the method for setting printing

Country Status (1)

Country Link
CN (1) CN104481509B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105134167B (en) * 2015-08-19 2018-01-23 中国海洋石油集团有限公司 A kind of deep water tests school depth specific purpose tool
CN106761710A (en) * 2016-12-15 2017-05-31 中国石油天然气股份有限公司 A kind of horizontal well and directional well set and test envelope integrated technique

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2275282A (en) * 1993-02-11 1994-08-24 Halliburton Co Abandonment of sub-sea wells
CN1860282A (en) * 2003-08-08 2006-11-08 澳洲澳德赛能源有限公司 Method of suspending, completing and working over a well
CN2924005Y (en) * 2005-08-25 2007-07-18 中国石油天然气集团公司 Perforating, detecting, acidating and liquid-discharging integrated testing pipe string
CN202064920U (en) * 2011-06-01 2011-12-07 中国石油天然气股份有限公司 Pipe column for segmentation well completion technology of thickened oil horizontal well
CN102454381A (en) * 2010-10-22 2012-05-16 中国石油化工股份有限公司 Oil-gas reservoir barefoot well cementing and completion method and device
CN202900205U (en) * 2012-10-23 2013-04-24 中国石油天然气股份有限公司 Multifunctional formation testing well completion integral pipe column

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2275282A (en) * 1993-02-11 1994-08-24 Halliburton Co Abandonment of sub-sea wells
CN1860282A (en) * 2003-08-08 2006-11-08 澳洲澳德赛能源有限公司 Method of suspending, completing and working over a well
CN2924005Y (en) * 2005-08-25 2007-07-18 中国石油天然气集团公司 Perforating, detecting, acidating and liquid-discharging integrated testing pipe string
CN102454381A (en) * 2010-10-22 2012-05-16 中国石油化工股份有限公司 Oil-gas reservoir barefoot well cementing and completion method and device
CN202064920U (en) * 2011-06-01 2011-12-07 中国石油天然气股份有限公司 Pipe column for segmentation well completion technology of thickened oil horizontal well
CN202900205U (en) * 2012-10-23 2013-04-24 中国石油天然气股份有限公司 Multifunctional formation testing well completion integral pipe column

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
深水完井测试管柱结构设计;张晓涛;《中国优秀硕士学位论文全文数据库 工程科技Ⅰ辑》;20110415(第4期);第18-30、42-44页 *
雅轮凝析气藏一次完井新技术;曾文广 等;《钻采工艺》;20080125;第31卷(第1期);第53-55页 *

Also Published As

Publication number Publication date
CN104481509A (en) 2015-04-01

Similar Documents

Publication Publication Date Title
CA2538196A1 (en) Deep water drilling with casing
EP2808482A3 (en) External grip tubular running tool
CN104481509B (en) Deep water tests completion tubular column and the method for setting printing
NO20064018L (en) Methods for painting a formation overpressure
WO2009151774A3 (en) Wireline drilling system and method
CN201080804Y (en) Multifunctional wellhead pressure test packer
CN111335837A (en) Pressure-maintaining coring inner barrel for coal rock
CN203452702U (en) Transmission tool for through-drill-rod open-hole well logging instrument
WO2018107095A2 (en) Casing running tool adapter
CN204113267U (en) A kind of water injection well can test envelope measurement and adjustment instrument
CN206562920U (en) The interchangeable casing head of a kind of mandrel, slips hanger
CN108915630A (en) A kind of simple plugging device
CN107165616A (en) A kind of steering tool device
CN203394521U (en) Suspended drill collar unit device for test of three-parameter logging-while-drilling tool
CN105350937A (en) High-seal packer
CN107503710B (en) Method for assembling vertical column of well cementation cementing head
CN208803826U (en) A kind of simple plugging device
CN203978378U (en) Grey instrument is squeezed in a kind of packing
CN213330898U (en) Testing device in geological exploration hole of slurry pressure feed type horizontal directional drilling engineering
CN108678713A (en) Wellhead assembly and its application method for more expansion tube tripping in
CN108625780A (en) A kind of eccentric location device suitable for radial bore
CN204851081U (en) Middle part shut -in well pours into high temperature water under high pressure horizontal well completion pipe string of low -gravity liquid into
CN105134167B (en) A kind of deep water tests school depth specific purpose tool
CN209875095U (en) Drill chuck connecting structure for road detection
CN205100968U (en) A internal diameter lead stamp for salvaging downhole tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Applicant after: CHINA NATIONAL OFFSHORE OIL Corp.

Applicant after: CNOOC (China) Limited,Zhanjiang Branch

Address before: Chinese CNOOC Building No. 25 Beijing 100010 Dongcheng District Chaoyangmen North Street

Applicant before: CHINA NATIONAL OFFSHORE OIL Corp.

Applicant before: CNOOC (China) Limited,Zhanjiang Branch

CB02 Change of applicant information
CB03 Change of inventor or designer information

Inventor after: Li Zhong

Inventor after: Li Zhujun

Inventor after: Xiong Yongwei

Inventor after: Zhang Chong

Inventor after: Xu Fei

Inventor after: Wang Erjun

Inventor after: Yan Bangchuan

Inventor after: Duan Zehui

Inventor after: Wei Longgui

Inventor after: Meng Wenbo

Inventor after: Fang Manzong

Inventor after: Wei Anchao

Inventor after: Ma Lei

Inventor before: Wang Erjun

Inventor before: Li Zhujun

Inventor before: Xiong Yongwei

Inventor before: Zhang Chong

Inventor before: Xu Fei

Inventor before: Li Jianyi

Inventor before: Yan Bangchuan

Inventor before: Li Zhong

Inventor before: Duan Zehui

Inventor before: Wei Longgui

Inventor before: Meng Wenbo

Inventor before: Fang Manzong

Inventor before: Wei Anchao

Inventor before: Ma Lei

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180320

Termination date: 20211117

CF01 Termination of patent right due to non-payment of annual fee