A kind of perforator method of inspection and be used for the device of this method of inspection
The present invention relates to a kind of perforator method of inspection and be used for the device of this method of inspection, particularly relate to a kind of perforator method of inspection of simulation stratum condition and be used for the device of this method of inspection.
In existing perforator perforating effect inspection technology, the method of check perforation ereisma perforating effect is under the normal temperature and pressure conditions of ground, perforator aimed at the mark, and target---annular concrete target carries out perforation, opens the punching quality that the annular concrete target detects perforator then.Because this method concrete target simulated formation medium, be subjected to the influence of the preparation error of concrete target easily, and ground and down-hole objective condition are widely different, the result causes ground check result and down-hole practical application gap very far away, its result can not truly reflect the practical application effect of perforator in the down-hole, therefore can not choose reasonable perforator and evaluation perforating result.
The object of the present invention is to provide a kind of perforator method of inspection and be used for the device of this method of inspection, make its can analogue perforation device in underground service condition, accurately select perforator and perforating condition.
The object of the present invention is achieved like this:
As shown in Figure 1, layer is during perforation over the ground at underground pit shaft for perforator, and perforation jet 45 is subjected to pit shaft internal pressure P
1, formation pore pressure P
2With formation overburden pressure P
3And the influence of formation temperature, so the result during the perforator perforation can be different because of the difference of these conditions.The method of inspection that the present invention adopts is in the environment for use of ground simulation perforator in the down-hole, i.e. three pressure in Shi Ji downhole temperature and down-hole: wellbore pressure P
1, formation pore pressure P
2With formation overburden pressure P
3The time, under this environment, the perforator perforating effect is tested; And because the formation condition difference, the wellbore pressure that perforator is subjected to is compared with strata pressure and three kinds of situations can be occurred: promptly wellbore pressure greater than, equal, less than perforating stratum pressure, therefore can adjust pressure parameter, it is conformed to actual conditions.This method can be reflected in perforation performance and the effect under certain pressure and the temperature condition intuitively, truly, and this can't reach in the existing perforator method of inspection.
A kind of perforator method of inspection in ground simulation downhole perforation formation overburden pressure, perforating stratum pore pressure and wellbore pressure and temperature, places perforator and carries out perforating effect check under this environment.Pressure condition can be under malleation, negative pressure, the equilibrium pressure condition, promptly in the pit shaft pressure greater than, equal, less than under the perforating stratum pressure condition, perforator carries out perforating effect check under this environment.
For using the perforating effect of said method check perforator, invented the employed verifying attachment of this method of employing.Complete unit checks kettle, temperature control system and control pressurer system, blasting machine to form by perforator.Perforator check kettle comprises cylindrical shell 2, perforator 4, target body assembly 7, chuck 9 upper-lower seal parts, the last seal head 27 of cylindrical shell 2 and its upper end, the lower seal head 10 of pressure ring 1 and lower end, pressure ring 20 forms a high voltage bearing container, temperature pick up 13 is loaded in the seal head 27, its lead-in wire 28 comes out to link to each other with blasting machine with temperature control system respectively by last seal head 27 and pressure ring 1 with perforator ignition fuse 29, the last seal plug 21 of target body assembly 7 is divided into two parts up and down with container, top: perforator 4 leans on its support frame on splicing sleeve 5, hang the center, the space on top constitutes wellbore pressure storehouse P
13, being passed a bridge by pit shaft pressurization 6 is connected with control pressurer system, for it provides pressure; Target body assembly 7 is being assembled in bottom center, 22 of target body outer steel sleeves on target body lower end cap 24, liner target body rubber sleeve 23, the upper end hangs fixedly target body of pressure cap assembly 26 by target body, the annular space formation formation pore pressure storehouse P in the target body assembly 7
2, passing a bridge by pressure 11 is connected with control pressurer system, for it provides pressure; Target body assembly 7 outer annular spaces are burden pressure storehouse P
38, passing a bridge by pressure 12 is connected with control pressurer system, for it provides pressure; Cylindrical shell 2 outer walls connection chuck 9, the middle cavity that forms uses for heat transfer medium, and last interface 17, lower interface 18 are arranged on it, and there is fuel outlet 19 lower end, and perforator check kettle and chuck are fixed by flange 15, chuck lower flange 16 in upper flange 14, the chuck.
Inner barrel is up big and down small, and cylindrical shell chuck lower end connects oil-out 19, is convenient to put the heat medium in the chuck.2 of chuck 9 and cylindrical shells also are provided with reinforcing rib.Target body assembly and inner barrel are provided with reinforcing rib.
Temperature control system is made up of medium storage facilities, firing equipment, temperature controller, and temperature controller is connected with firing equipment with perforator check kettle detector unit.Again come out finish circulation after going into the heating of perforator check kettle by heat transfer medium through firing equipment heating is laggard when heating.For ease of timely cooling, behind firing equipment, connect cooling system, start cooling system during cooling, heat transfer medium is gone into perforator check kettle through the cooling system cooling is laggard, to coming out to finish circulation again after the cooling of perforator check kettle.For ease of the control temperature, firing equipment preferably adopts electric heater as heating source, is controlled on the design temperature by temperature controller.Medium temperature control is to be realized by the make-break operation to the electrical heating elements of the many groups in the heater by the temperature controller that connects temperature element in the perforation kettle, in temperature-rise period, control system drops into one or more groups electric heater to reach best intensification and thermostatic process automatically according to the difference of medium temperature of being surveyed and design temperature.The control of higher temperature adopts conduction oil as heat transfer medium, and water is as heat transfer medium during lower temperature.
Control pressurer system comprises that pressure provides and controls, and pressure is provided by super-pressure pump input liquid, on each pressure inlets pipeline pressure detecting element and pressure controller is housed respectively, stops pressurization during to setting pressure automatically.Also be provided with drain valve on the pipeline, but the superpressure releasing pressure automatically, the safety when guaranteeing pressure precise control and superpressure.
According to prior art, this covering device also can carry out the demonstration directly perceived of computer Automatic Control and whole data and flow process with detecting, the collection of each parameter of control, carrying by data transaction.The operation of package unit can focus on the operating desk.
Because perforator perforating methods of the present invention and device, place the actual environment for use of simulation to use perforator, and corresponding device thereof is provided, therefore not only make things convenient for the perforator operation but also can obtain the perforating result of perforator exactly.
Below in conjunction with drawings and Examples method of the present invention and device are done detailed explanation.
Fig. 1 is a perforator downhole perforation view;
Fig. 2 is for penetrating device hole check kettle structure schematic diagram;
Fig. 3 is a perforator verifying attachment systematic schematic diagram.
Complete unit checks kettle, temperature control system and control pressurer system, blasting machine to form by perforator.By seen in fig. 2, perforator check kettle comprises cylindrical shell 2, perforator 4, target body assembly 7, chuck 9, the upper-lower seal part, the last seal head 27 of cylindrical shell 2 and its upper end, the lower seal head 10 of pressure ring 1 and lower end and pressure ring 20 form a high voltage bearing container, temperature pick up 13 is loaded in the seal head 27, its lead-in wire 28 comes out to link to each other with blasting machine with temperature control system respectively by last seal head 27 and pressure ring 1 with perforator ignition fuse 29, the last seal plug 21 of target body assembly 7 is divided into two parts up and down with container, top perforator 4 leans on its support frame on splicing sleeve 5, hang the center, the space on top constitutes wellbore pressure storehouse P
13, being passed a bridge by pit shaft pressurization 6 is connected with control pressurer system, and for it provides pressure, the gap bridge 6 that pressurizes is by 25 linings of chuck seal receptacle assembly; Target body assembly 7 is being assembled in bottom center, 22 of target body outer steel sleeves on target body lower end cap 24, liner target body rubber sleeve 23, the upper end hangs fixedly target body of pressure cap assembly 26 by target body, the annular space formation formation pore pressure storehouse P in the target body assembly 7
2, passing a bridge by pressure 11 provides system to be connected with formation pore pressure, for it provides pressure; Target body assembly 7 outer annular spaces are burden pressure storehouse P
38, passing a bridge by pressure 12 is connected with pressure supply system, for it provides pressure; Cylindrical shell 2 outer walls connection chuck 9, the middle cavity that forms uses for heat transfer medium, and last interface 17, lower interface 18 are arranged on it, and there is fuel outlet 19 lower end, and perforator check kettle and chuck are fixed by flange 15, chuck lower flange 16 in upper flange 14, the chuck.
As shown in Figure 3, control pressurer system connects pressurizing valve 40 by super-pressure pump 43, solenoid electric valve 42 forms, link to each other with pit shaft pressurization gap bridge 6, pressure gap bridge 12, the pressure gap bridge 11 of perforator check kettle respectively, pressure detecting element 41 and drain valve are housed respectively on the pressure inlets pipeline, pressure detecting element 41 links to each other with pressure controller, provides source of the gas by air compressor 44, the safety in the time of can guaranteeing pressure precise control and superpressure.Three pressure of three pressure bins can be separate in the perforation check kettle, and also three kinds of pressure under the simulation well are distinguished, i.e. wellbore pressure P by UNICOM mutually
1, formation pore pressure P
2With formation overburden pressure P
3Pressure control in the perforation check kettle then is to realize according to the keying of controlling super-pressure pump and pressurizing valve after being compared with setting pressure by measuring pressure.During the device pressurization, inject liquid to the perforation kettle, when arriving setting pressure, stop transfusion, keep pressure by super-pressure pump.
Temperature control system is divided heating circuit, cooling circuit and temperature controller, and the conversion in loop is that the switching by electric T-shaped valve realizes.Heating circuit is: top petrol tank 30 low sides through slippage pump 37 be connected with low level fuel tank 38, the bottom is connected with gs-oil separator 31 bottoms, opposite side is high-end to be connected with low level fuel tank 38 tops, the heaters 36 that are connected to many group electrical heating elements behind the gs-oil separator 31 bottoms connection circulation pump 33 directly link to each other with import 18 through path changeover switch 35 one tunnel, another road links to each other with import 18 behind heat interchanger 34 tube sides, perforator check kettle outlet 17 links to each other with gs-oil separator 8 tops, and gs-oil separator 31 tops link to each other with top petrol tank 30.Cooling circuit is: heat interchanger 34 shell sides one end links to each other with cooling tower 39, and the other end links to each other with water tank 32 through pump, and water tank 32 links to each other with cooling tower 39.The mobile dependence oil circulating pump 33 of conduction oil in system realized.Conduction oil in the gs-oil separator by heater 36 heating, enters perforation kettle chuck by import 18 after oil circulating pump 33 pressurizations, perforator check kettle heating back is come out to gs-oil separator 31 from exporting 17, finishes whole circulation.Otherwise during the experimental rig cooling, stop electric heater 36 earlier, the conduction oil path changes heat interchanger 34 and water heat exchange over to, and the input import 18 of cooling back enters perforator check kettle chuck, makes the cooling of perforation kettle.Medium temperature control is to be realized by the make-break operation to the electrical heating elements of the many groups in the heater by the temperature controller that connects temperature element in the perforator check kettle, in temperature-rise period, control system drops into one or more groups electric heater to reach best intensification and thermostatic process automatically according to the difference of medium temperature of being surveyed and design temperature.
During test last seal head 27, the pressure ring 1 of target body assembly 7, intermediate seal plug 21, band perforator 4 lift successively and go into perforator and check in the kettle container and also compress sealing with upper press ring 1, temperature sensor wires 29 is linked on the temperature controller, heat up by chuck with conduction oil then, after reaching design temperature, stop heating, constant temperature.By control pressurer system burden pressure, pore pressure and wellbore pressure are pressurizeed as requested again.Press the blasting machine perforator perforation that detonates after being incubated the time of setting, then the target body assembly is taken out, target body is opened target detect, the state behind the perforation is measured, record the perforating result of perforator under this condition.Under the temperature environment of setting, the value of conversion burden pressure, pore pressure and wellbore pressure is checked the perforation performance of various model perforators under malleation, negative pressure or equilibrium pressure condition.
Under the temperature environment of setting, also can check various model perforators under malleation, negative pressure or equilibrium pressure condition perforation to the influence of perforation in-place permeability.
At first the original permeability of rock core target is measured, after finishing it is fitted together, then last seal head 27, the pressure ring 1 of rock core target assembly 7, band perforator lifted to go in the perforation test chamber also successively and compress sealing with upper press ring 1 with rock core target assembly 7, heat up then, after reaching design temperature, pressurize again, keep burden pressure, pore pressure and wellbore pressure on request.The perforator perforation that detonates after being incubated the time of setting is adjusted burden pressure, pore pressure and wellbore pressure according to designing requirement behind the perforation, and the permeability to the rock core target behind the perforation quantitatively detects then.