CN1356436A - Technology for increasing capacity of tailings site by building dam along fixed axis - Google Patents

Technology for increasing capacity of tailings site by building dam along fixed axis Download PDF

Info

Publication number
CN1356436A
CN1356436A CN 01138878 CN01138878A CN1356436A CN 1356436 A CN1356436 A CN 1356436A CN 01138878 CN01138878 CN 01138878 CN 01138878 A CN01138878 A CN 01138878A CN 1356436 A CN1356436 A CN 1356436A
Authority
CN
China
Prior art keywords
dam
fixed axis
technology
mine tailing
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 01138878
Other languages
Chinese (zh)
Inventor
王柏纯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 01138878 priority Critical patent/CN1356436A/en
Publication of CN1356436A publication Critical patent/CN1356436A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Aiming, Guidance, Guns With A Light Source, Armor, Camouflage, And Targets (AREA)

Abstract

A technology for increasing the capacity of tailing site for metal mine features that the dam of the said tailing site is further built upward vertically along the axis of upper sub-dam and a hydraulic cyclone is used to discharge the coarse particles outside the damp and stack the fine particles inside the dam. Its advantages include high effect, and high safety.

Description

Technology for increasing capacity of tailings site by building dam along fixed axis
Affiliated field
The present invention relates to mine tailing and stack the field, particularly a kind of metallic ore mine tailing storehouse increase dilatation technology.
Background technology
Present domestic metallic ore mine tailing storehouse, majority have been in storage volume and the length of service near middle latter stage, continue to produce in order to keep the mine, are all seeking the preferred plan that the mine tailing later stage stores, to solve the storage problem that continues of mine tailing.The approach that solves: the one, build new mine tailing storehouse, the 2nd, transform existing mine tailing storehouse.If build new mine tailing storehouse, there is the problem that investment is many, expropriation of land is difficult, ambient influnence is big, the construction period is long; If dilatation is increased in the original debris storehouse, because the upstream method of building a dam is generally adopted in existing mine tailing storehouse, disperses the discharging mine tailing to build a dam, the sub-dam body that is built up contains multi-level clay parting, the dam seepage line height, structural strength is low, and dam stability is poor, increases dilatation if continue with upper reaches method, difficulty is big, can not build high dam, the dilatation amount is limited, and the unsettled hidden danger of dam body is arranged.
Summary of the invention
The present invention just provides a kind of energy and will have the mine tailing storehouse of building a dam with upper reaches method now and realize significantly increasing and dilatation, and guarantees the stable dilatation technology of building a dam of safety of dam body.
This method is to have the sub-axis of dam in top in the mine tailing storehouse of building a dam with upper reaches method now, for fixed axis 1 is built a dam, adopt hydrocyclone that the mine tailing slurry is carried out the classification of thickness particle, the coarse fraction tailings discharging is outside the dam, made full use of unemployed space outside the dam, fine fraction overflow mine tailing is filled in the storehouse, thereby has realized that the classification of mine tailing slurry builds a dam, dam body raises vertically upward, and dilatation is increased in the original debris storehouse.Fixed axis 1, general selection is positioned at the axis place on the sub-dam of topmost of upper reaches method production status.For guaranteeing that constant voltage gives the ore deposit, long for the axis of dam, adopt the high-density polyethylene pipeline to pressurize to the ore deposit; For the short dam body of the axis of dam, adopt pressure stabilizing well to give the ore deposit from pressing.Adopt hydrocyclone with the mine tailing step emission,, hydrocyclone can be installed in crawler belt and mechanically move and build a dam for the long dam body of the axis of dam; For the short dam body of the axis of dam, available hydrocyclone is mobile trolley used builds a dam.Coarse granule is emitted on and forms mine tailing sand setting accumulation body 2 outside the dam, because physical and mechanical property such as mechanical strength height, the water permeability of coarse granule mine tailing be strong, the dam body that builds up is more stable, and the particulate overflow is discharged into one-tenth mine tailing overflow lithosomic body 3 dam in.The partition size of hydroclone classification is the key factor of technology of building a dam, and determines that the basic principle of partition size boundary value is, guarantee the population equilibrium of tailings discharging amount in the dam, outside the dam, but coarse granule granularity minimum can not be less than 0.05mm outside the dam.Final base of dam place is provided with heap and builds drainage loose rock dam 5 outside the dam, and in order to protect the stable of final dam body toe place, drainage loose rock dam 5 are again that row's diafiltration water body can reduce phreatic line 4.Adopt conventional row to ooze measure in sand setting body domestic demand.The sand setting body is the coarse granule mine tailing outside the dam, and dustproof condition is good, can adopt portable void channels to carry out the moistening dust suppression of large tracts of land beach face, or adopts spray sprinkler dustproof.
Adopt the maintenance method of building a dam, just producing and increase dilatation near the mine tailing storehouse that stores time limit latter stage existing, it is big to have the dilatation amount, and security and stability is good, small investment, and many advantages such as expropriation of land is few, and annual running cost is low have very big economic benefit and remarkable social benefit.
Description of drawings
Accompanying drawing is a technology for increasing capacity of tailings site by building dam along fixed axis vertical section schematic diagram
The specific embodiment
With logical steel plate stone ore industry company mine tailing storehouse is example, and this mine tailing storehouse is existing builds a dam with upper reaches method, has been in storage volume and length of service latter stage at present, continue to produce in order to keep the mine, plan is increased dilatation with the fixed axis method of building a dam with the original debris storehouse, to solve the storage problem that continues of mine tailing.With the sub-dam of the topmost of present production status is fixed axis 1, carrying out layering vertically upward builds a dam, with hydrocyclone the mine tailing slurry is carried out the classification of thickness particle, the coarse fraction tailings discharging piles mine tailing sand setting accumulation body 2 outside the dam, fine fraction overflow mine tailing is filled to storehouse endogenetic sediment body 3, thereby dilatation is increased in the original debris storehouse.Build drainage loose rock dam 5 in the downstream, dam far from fixed axis 210m place, dam, in order to protect the stability at final dam body toe place, drainage loose rock dam 5 are again row's diafiltration dams, can reduce phreatic line 4.Give the ore deposit for guaranteeing constant voltage, because the axis of dam reaches 2000m, adopt high-density polyethylene pipeline pressurized delivered mine tailing, crawler belt is mechanically mobile builds a dam for the 375mm hydrocyclone is installed in diameter, the partition size of hydroclone classification is 0.05mm, greater than 0.05mm is coarse granule, is emitted on and forms mine tailing sand setting accumulation body 2 outside the dam, becomes mine tailing overflow lithosomic body 3 in the dam for the fine grained overflow is discharged into less than 0.05mm.The gradient is 1: 3 outside the dam.In the sand setting body, adopt conventional row to ooze measure.The sand setting body is the coarse granule mine tailing outside the dam, adopts portable void channels to carry out the moistening dust suppression of large tracts of land beach face.

Claims (6)

1, a kind of technology for increasing capacity of tailings site by building dam along fixed axis, it is characterized in that, the sub-dam of topmost with the mine tailing storehouse of building a dam with upper reaches method, for fixed axis (1) layering is vertically upward built a dam, dilatation is increased in the original debris storehouse, with hydrocyclone mine tailing is starched classification, the coarse fraction tailings discharging piles mine tailing sand setting accumulation body (2) outside the dam, fine fraction overflow ore pulp is filled to storehouse endogenetic sediment body (3), builds drainage loose rock dam (5) at Ba Xiayoudui.
2, a kind of technology for increasing capacity of tailings site by building dam along fixed axis according to claim 1 is characterized in that, utilizes the hydrocyclone unit that mine tailing is starched step emission.
3, according to claim 1,2 described a kind of technology for increasing capacity of tailings site by building dam along fixed axis, it is characterized in that, need constant pressure to starch to the waterpower cyclone for mine tailing.
4, a kind of technology for increasing capacity of tailings site by building dam along fixed axis according to claim 1 is characterized in that, reaches principle in a basic balance with volume of cargo in storage in the dam, outside the dam and determines hydroclone classification granularity boundary value, and partition size boundary minimum value is 0.05mm.
5, a kind of technology for increasing capacity of tailings site by building dam along fixed axis according to claim 1 is characterized in that, drainage loose rock dam (5) are positioned at final dam body toe place, and drainage loose rock dam (5) are again the drainage bodies.
6, a kind of technology for increasing capacity of tailings site by building dam along fixed axis according to claim 1 is characterized in that, it is dustproof to utilize water to carry out the moistening dust suppression of beach face or spray sprinkler.
CN 01138878 2001-12-24 2001-12-24 Technology for increasing capacity of tailings site by building dam along fixed axis Pending CN1356436A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01138878 CN1356436A (en) 2001-12-24 2001-12-24 Technology for increasing capacity of tailings site by building dam along fixed axis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01138878 CN1356436A (en) 2001-12-24 2001-12-24 Technology for increasing capacity of tailings site by building dam along fixed axis

Publications (1)

Publication Number Publication Date
CN1356436A true CN1356436A (en) 2002-07-03

Family

ID=4674830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01138878 Pending CN1356436A (en) 2001-12-24 2001-12-24 Technology for increasing capacity of tailings site by building dam along fixed axis

Country Status (1)

Country Link
CN (1) CN1356436A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100494629C (en) * 2006-04-17 2009-06-03 中国科学院力学研究所 Ribbed terrace method for wet type stack of fine tailings
CN100523433C (en) * 2006-04-05 2009-08-05 杜剑 Tail ore stock area structure with sewage percolation and resource regeneration
CN101851926A (en) * 2010-06-23 2010-10-06 贵阳铝镁设计研究院 Method for carrying out dry-method capacity expansion in mountainside wet-process red mud disposal site
CN101929161B (en) * 2009-06-24 2011-08-31 鞍钢集团矿业公司 Method for building high roller compaction water-permeable tailing dam by rock dumping
CN102261075A (en) * 2010-10-30 2011-11-30 鞍钢集团矿业公司 Method for optimizing waste rock field revetment by using solidified filling materials
CN102527690A (en) * 2012-01-11 2012-07-04 昆明理工大学 Curing and dry-piling method of iron tailings
CN103643683A (en) * 2013-11-28 2014-03-19 瓮福(集团)有限责任公司 Method for sub-dam heaping continuous operation
CN104912087A (en) * 2015-06-12 2015-09-16 北京矿冶研究总院 Center line type tailing damming method applying mold bags
CN105478225A (en) * 2016-01-05 2016-04-13 北京科技大学 Tailings grading and zoning high-concentration discharging system and method
CN109137819A (en) * 2018-07-12 2019-01-04 北京矿冶科技集团有限公司 A kind of Tailings Dam movable type cyclone classification is built a dam system and implementation method
CN110512572A (en) * 2019-09-03 2019-11-29 中国恩菲工程技术有限公司 Dam crest for middle wire type Tailing dam construction method increases method and dam crest increases equipment
CN111305211A (en) * 2020-03-05 2020-06-19 中钢集团马鞍山矿山研究总院股份有限公司 Novel method for heightening and expanding capacity of ultrafine particle tailing pond with one-time dam construction by adopting midline method
CN112502101A (en) * 2020-11-09 2021-03-16 紫金矿业集团股份有限公司 Tailing pond damming method

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100523433C (en) * 2006-04-05 2009-08-05 杜剑 Tail ore stock area structure with sewage percolation and resource regeneration
CN100494629C (en) * 2006-04-17 2009-06-03 中国科学院力学研究所 Ribbed terrace method for wet type stack of fine tailings
CN101929161B (en) * 2009-06-24 2011-08-31 鞍钢集团矿业公司 Method for building high roller compaction water-permeable tailing dam by rock dumping
CN101851926A (en) * 2010-06-23 2010-10-06 贵阳铝镁设计研究院 Method for carrying out dry-method capacity expansion in mountainside wet-process red mud disposal site
CN101851926B (en) * 2010-06-23 2014-03-12 贵阳铝镁设计研究院有限公司 Method for carrying out dry-method capacity expansion in mountainside wet-process red mud disposal site
CN102261075A (en) * 2010-10-30 2011-11-30 鞍钢集团矿业公司 Method for optimizing waste rock field revetment by using solidified filling materials
CN102261075B (en) * 2010-10-30 2012-11-28 鞍钢集团矿业公司 Method for optimizing waste rock field revetment by using solidified filling materials
CN102527690B (en) * 2012-01-11 2014-11-05 昆明理工大学 Curing and dry-piling method of iron tailings
CN102527690A (en) * 2012-01-11 2012-07-04 昆明理工大学 Curing and dry-piling method of iron tailings
CN103643683A (en) * 2013-11-28 2014-03-19 瓮福(集团)有限责任公司 Method for sub-dam heaping continuous operation
CN103643683B (en) * 2013-11-28 2015-05-06 瓮福(集团)有限责任公司 Method for sub-dam heaping continuous operation
CN104912087A (en) * 2015-06-12 2015-09-16 北京矿冶研究总院 Center line type tailing damming method applying mold bags
CN105478225A (en) * 2016-01-05 2016-04-13 北京科技大学 Tailings grading and zoning high-concentration discharging system and method
CN105478225B (en) * 2016-01-05 2019-04-19 北京科技大学 A kind of tailings Grading And Zoning high concentration exhaust system and discharge method
CN109137819A (en) * 2018-07-12 2019-01-04 北京矿冶科技集团有限公司 A kind of Tailings Dam movable type cyclone classification is built a dam system and implementation method
CN110512572A (en) * 2019-09-03 2019-11-29 中国恩菲工程技术有限公司 Dam crest for middle wire type Tailing dam construction method increases method and dam crest increases equipment
CN110512572B (en) * 2019-09-03 2024-05-07 中国恩菲工程技术有限公司 Dam crest heightening method and dam crest heightening equipment for neutral line tailing dam construction method
CN111305211A (en) * 2020-03-05 2020-06-19 中钢集团马鞍山矿山研究总院股份有限公司 Novel method for heightening and expanding capacity of ultrafine particle tailing pond with one-time dam construction by adopting midline method
CN112502101A (en) * 2020-11-09 2021-03-16 紫金矿业集团股份有限公司 Tailing pond damming method

Similar Documents

Publication Publication Date Title
CN1356436A (en) Technology for increasing capacity of tailings site by building dam along fixed axis
CN105478225B (en) A kind of tailings Grading And Zoning high concentration exhaust system and discharge method
CN103397645B (en) A kind of dry heap arranges with wet the tailings pile discharge method combined
CN105350498B (en) A kind of tailings discharging method of water saving
CN102691288B (en) Technique for raising storage content of stockpiled tailing reservoir
CN1232130A (en) Tails dyke and ash dyke dual-dyke safety embanking method
CN1521388A (en) Process and equipment for preparing and discharging high concentration and plaster mortar
Barrera et al. Sand tailings dams: design, construction and operation
CN106088107B (en) A kind of tailings impoundment is in the method in Caving Method with Large Space production mine surface subsidence hole
CN201012341Y (en) Multi-barrel water uprising force sizing machine
CN101929161B (en) Method for building high roller compaction water-permeable tailing dam by rock dumping
CN111957426A (en) High-efficient thick grading plant of thick mud of compound whirl of inside and outside water conservancy
CN204769204U (en) Pond method of filling out sediment thick liquid conveyor that builds a dam
CN109432878B (en) Settling, grading, reverse filtering, dewatering and dry piling method for fine tailings
CN1162505A (en) Treating process of tailings
CN111395365A (en) Piling and discharging system and method for dry-discharged tailings of strip mine stope
CN201050384Y (en) Device for preparing high-concentration full-tailing slurry for mine filling
CN104874472A (en) Automatic separating device for fine-sized slime in tailings conveying manifolds
CN106194224B (en) A kind of combined type artificial point column and its installation method suitable for stope
CN204620181U (en) Fine fraction sludge automatic separating apparatus in the defeated tail supervisor of mine tailing
CN201154328Y (en) High-efficiency dehydration swirler
CN2885421Y (en) Flock lamination magnetic separator
CN212370371U (en) High-efficient thick grading plant of thick mud of compound whirl of inside and outside water conservancy
CN215781720U (en) Pneumatic fluidized thickener
CN204841917U (en) Tailing ore pulp pump pond that realization granularity improves concentration in grades

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication