CN100523433C - Tail ore stock area structure with sewage percolation and resource regeneration - Google Patents

Tail ore stock area structure with sewage percolation and resource regeneration Download PDF

Info

Publication number
CN100523433C
CN100523433C CNB2006100601973A CN200610060197A CN100523433C CN 100523433 C CN100523433 C CN 100523433C CN B2006100601973 A CNB2006100601973 A CN B2006100601973A CN 200610060197 A CN200610060197 A CN 200610060197A CN 100523433 C CN100523433 C CN 100523433C
Authority
CN
China
Prior art keywords
gutter
layer
resource regeneration
oozing
water resisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2006100601973A
Other languages
Chinese (zh)
Other versions
CN1847616A (en
Inventor
杜剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2006100601973A priority Critical patent/CN100523433C/en
Publication of CN1847616A publication Critical patent/CN1847616A/en
Application granted granted Critical
Publication of CN100523433C publication Critical patent/CN100523433C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention is structure for preventing tail ore from polluting water resource. The structure includes base layer, waterproof board layer, water permeating and draining pipe layer and earth work fabric layer set from bottom to up. The base layer rolling grooves and concrete layer; the waterproof board layer is made of high density polyethylene plate; the water permeating and draining pipe layer has antirust spring water permeating and draining pipe, crushed stone stuffing, surface cement mortar layer, and extruded plastic board in the vertical surface; and the earth work fabric layer has overlapped earth work fabric. The present invention can prevent harmful chemical matter, heavy elements and water from tail ore to pollute underground water, river and soil in the peripheral area.

Description

A kind of mining tailing wasteland structure of oozing row's type bilge water resisting resource regeneration
Technical field
The present invention relates to the anti-soil technology of water resource, especially relate to a kind of mining tailing wasteland structure of the row's of oozing type bilge water resisting resource regeneration.
Background technology
According to statistics, the industrial solid wastes total amount of the annual discharging of whole world extractive industry reaches tens billion of tons, in China, and about 6.20 hundred million tons of the barren rock mine tailing of the annual discharging of ferrous metal mine, the annual barren rock mine tailing of discharging of nonferrous metal mine reaches 1.15 hundred million tons, about 1.30 hundred million tons of gangue.The a large amount of dischargings arbitrarily and the accumulation dam site of these chats, mine tailing are arranged unreasonable, heavy damage the natural ecological environment of land resources, not only occupy a large amount of soils, destroy natural landscape, and its composition is very complicated, contains multiple harmful components even radioactive substance, by media severe contamination mining areas such as water, air and soil and underground water, river and farmland on every side, in addition, stack chats, mine tailing instability, cause that easily talus moves and disaster such as mud-rock flow.
The comprehensive regulation of mine tailing bilge water resisting resource regeneration is the major issue that concerns environment for human survival.Processing to mine tailing is to carry out collection and treatment with the form of building tailing dam formation mining tailing wasteland mostly at present, moisture content leans on natural evaporation and infiltrates soil naturally in the mine tailing, its discharging only relies on simple pipe of cement discharging, is difficult to accomplish the pollution-free collection of mine tailing, and moisture content non-pollution discharge in the mine tailing.And because moisture content is difficult to effective discharging in the mine tailing, tailing dam is prone to outer infiltration, very easily bursts, and forms accident potential.
Summary of the invention
Technical problem to be solved by this invention is the present situation of administering at tailings pollution, a kind of mining tailing wasteland structure of oozing row's type bilge water resisting resource regeneration is proposed, emphasis solves regeneration, the collection and recycling of moisture content in the mine tailing, to stop mining tailing wasteland by the be rivals in a contest pollution of environment of water, soil media and tailings pile.
Technical problem of the present invention is solved by following technical scheme:
The characteristics of the mining tailing wasteland structure of this row's of oozing type bilge water resisting resource regeneration are:
Mining tailing wasteland Dou slope and bottom are provided with basic unit, waterproof lamellar from bottom to top, ooze gutter layer and geotechnological layer of cloth;
Described basic unit is the basic unit of smooth compacting, and end is provided with the indent of top, Dou slope section finishing, and the indent top is provided with plain concrete and bears down on one;
Described waterproof lamellar is on Dou slope, reservoir area and waterproof is set with high density polyethylene (HDPE) (HDPE) plate above the bottom base that adopt hot blast welding machine double slit heat seal overlap joint between plate and the plate, end presses solidly;
The described gutter layer that oozes is on the Dou slope of mining tailing wasteland and antirust spring is set above the splash guard of bottom oozes gutter, and the rubble inserts is set oozing between the gutter, the surface is the permeable bonding course of cement mortar, and vertical plane also is pasted with filling and oozes the extruded sheet that the gutter gap is used;
Described geotechnological layer of cloth is to be provided with filtration, draining, isolation, defensive geotextiles on the surface of cement mortar bonding course, adopts double-sided self-adhesive adhesive tape overlap joint between cloth and the cloth;
Also be embedded with many high density polyethylene drainage pipes in dam body, the mode that the vertical fixedly antirust spring of boundling of employing oozes gutter in the large-scale reservoir area is provided with vertically oozes discharge pipe line.
Technical problem of the present invention is solved by following further technical scheme:
Described splash guard is the high density polyethylene (HDPE) plate that thickness is at least 2.0mm.The high density polyethylene (HDPE) splash guard has hot strength height, anti-puncture ability is good, the antiseepage ability is strong and thermal deformation is little characteristics, adopt thickness to be at least the ground of the high density polyethylene (HDPE) splash guard of 2.0mm as the reservoir area sealing, can stop moisture content intrusion reservoir area underground water and peripheral river, soil and massif in mine tailing harmful chemical, heavy metal element and the mine tailing, reach the effect of the antifouling improvement of mine tailing.
Overlap joint between described splash guard and plate width at least is 5cm, adopts the inflation check, and air tight is up-to-standard.
The described gutter that oozes is the gutter that oozes that diameter is at least φ 4.5cm, and its spacing is 0.4m~0.5m.Every joint length is 2m or 4m.
Described rubble inserts is that volume is the rubble inserts of long (2~4) m * wide (0.4~0.5) m * height (0.04~0.05) m, is used for filling and oozes space between gutter.
The cement-sand ratio of described cement sand bed is 1: 3, and thickness is at least 0.5cm.
Overlap joint between described geotextiles and cloth width at least is 10cm, and fixing coarse sand and the rubble of adopting in bottom presses solidly, Dou slope and the fixing dedicated fixed bail that adopts of vertical plane.
Described gutter is that diameter is the gutter of φ 15cm~φ 20cm, and its spacing is 0.8m~1.2m.
Technical problem of the present invention is also solved by following further technical scheme:
At auxilliary fixing permeable woven cloth or the permeable straw mats of pasting in exposed geotextiles surface.
Adopt the polysulfide sealant sealing in pre-buried tailing dam junction of oozing gutter.
In filtering ponds, be provided with the spongy layer that secondary filter is used, perhaps be provided with sponge and active carbon interlayer that secondary filter is used.
Compared with prior art, the advantage that the present invention had sees the following form with effect: this table is by the design of 20 years reservoir areas, discharges 1,000 tons the mining tailing wasteland structure of oozing row's type bilge water resisting resource regeneration and having now of identical scale mine tailing day and build the antifouling pond of precipitation throw in the antifouling method of water purification agent and carry out technical performance and contrast outside mining tailing wasteland.
Figure C200610060197D00081
Contrast shows: the present invention adopt have the hot strength height, high density polyethylene (HDPE) splash guard that anti-puncture ability is good, the antiseepage ability is strong and thermal deformation is little characteristics and thickness are at least 2.0mm is as the ground of reservoir area sealing, ooze gutter and geotextiles double filtration discharging, the little filtration of filtering ponds secondary, emphasis have solved the regeneration of moisture content in the mine tailing, collection and recycling.The present invention can effectively stop in harmful chemical in the mine tailing, heavy metal element and the mine tailing moisture content and stack by water, soil media and mine tailing and invade reservoir area underground water and peripheral river, soil and massif, reaches the antifouling effect of remarkable improvement mine tailing.Mining tailing wasteland structure of oozing row's type bilge water resisting resource regeneration of the present invention, the instant antifouling discharging of energy, instant regeneration, safe and reliable, the overall efficiency height, integrated cost is low, and the water in the clear water reserviors can reenter production link and use.
Description of drawings
Below in conjunction with the specific embodiment and contrast accompanying drawing the invention will be further described.
Fig. 1 is a construction schematic diagram of the present invention;
Fig. 2 is the antifouling regeneration schematic diagram of draining that oozes of the present invention.
The specific embodiment
A kind of large-scale mining tailing wasteland structure of oozing row's type bilge water resisting resource regeneration
The large-scale mining tailing wasteland Dou slope as shown in Figure 1 and the deck of bottom are provided with basic unit 1, waterproof lamellar 2 from bottom to top, ooze gutter layer 3 and geotechnological layer of cloth 4;
Described basic unit 1 is the basic unit of smooth compacting, and end is provided with the indent 5 of top, Dou slope section finishing, and indent 5 tops are provided with plain concrete and bear down on one 6.
Described waterproof lamellar 2 is on Dou slope, reservoir area and the waterproof high density polyethylene (HDPE) plate that thickness is 2.0mm is set above the bottom base 1, adopt hot blast welding machine double slit heat seal overlap joint between plate and the plate, end presses solidly, overlap joint between splash guard and plate width at least is 5cm, adopt the inflation check, air tight is up-to-standard.
The described gutter layer 3 that oozes is on the Dou slope of mining tailing wasteland 14 and diameter is set above the splash guard of bottom is that the antirust spring of φ 4.5cm oozes gutter, the spacing of oozing gutter is 0.45m, and is oozing the rubble inserts 7 for long 3m * wide 0.45m * high 0.045m of space packing volume between the gutter.Its surface is the cement mortar bonding course, and the cement-sand ratio of cement sand bed is 1: 3, and thickness is 0.5cm.Vertical plane also is pasted with filling and oozes the extruded sheet that the gutter gap is used, and the connector that oozes gutter comprises cross, T word, perpendicular type polyvinyl chloride connector.
Described geotechnological layer of cloth 4 is to be provided with filtration, draining, isolation, defensive geotextiles on the surface of cement mortar bonding course, adopt double-sided self-adhesive adhesive tape overlap joint between cloth and the cloth, lap width is 10cm, fixing coarse sand and the rubble of adopting in bottom, Dou slope and the fixing dedicated fixed bail that adopts of vertical plane.
As shown in Figure 2, also being embedded with many diameters in dam body 8 is the high density polyethylene drainage pipe 9 of φ 18cm, and gutter 9 spacings are 1.0m, also adopts mode that the vertical fixedly antirust spring of boundling oozes gutter to be provided with and vertically oozes discharge pipe line 10.
The polysulfide sealant sealing is adopted in mine tailing dam body 8 junctions of oozing gutter at pre-buried antirust spring.
Be provided with sponge and active carbon interlayer 12 that secondary filter is used in filtering ponds 11, the water that enters in the clear water reserviors 13 from filtering ponds 11 can reenter the production link use.
Above content be in conjunction with concrete preferred implementation to further describing that the present invention did, can not assert that concrete enforcement of the present invention is confined to these explanations.For the general technical staff of the technical field of the invention, without departing from the inventive concept of the premise, its framework form can be flexible and changeable, can the subseries product.Just make some simple deduction or replace, all should be considered as belonging to the scope of patent protection that the present invention is determined by claims of being submitted to.

Claims (9)

1. mining tailing wasteland structure of oozing row's type bilge water resisting resource regeneration is characterized in that:
Mining tailing wasteland Dou slope and bottom are provided with basic unit, waterproof lamellar from bottom to top, ooze gutter layer and geotechnological layer of cloth;
Described basic unit is the basic unit of smooth compacting, and end is provided with the indent of top, Dou slope section finishing, and the indent top is provided with plain concrete and bears down on one;
Described waterproof lamellar is on Dou slope, reservoir area and waterproof high density polyethylene (HDPE) plate is set above the bottom base, adopts hot blast welding machine double slit heat seal overlap joint between plate and the plate, and end presses solidly;
The described gutter layer that oozes is on the Dou slope of mining tailing wasteland and antirust spring is set above the splash guard of bottom oozes gutter, and the rubble inserts is set oozing between the gutter, the surface is the permeable bonding course of cement mortar, and vertical cross section also is pasted with filling and oozes the extruded sheet that the gutter gap is used;
Described geotechnological layer of cloth is to be provided with filtration, draining, isolation, defensive geotextiles on the surface of cement mortar bonding course, adopts double-sided self-adhesive adhesive tape overlap joint between cloth and the cloth;
Also be embedded with many high density polyethylene drainage pipes in dam body, the mode that the vertical fixedly antirust spring of boundling of employing oozes gutter in the large-scale reservoir area is provided with vertically oozes discharge pipe line.
2. mining tailing wasteland structure of oozing row's type bilge water resisting resource regeneration according to claim 1 is characterized in that:
Described splash guard is the high density polyethylene (HDPE) plate that thickness is at least 2.0mm.
3. mining tailing wasteland structure of oozing row's type bilge water resisting resource regeneration according to claim 1 and 2 is characterized in that:
Overlap joint between described splash guard and plate width at least is 5cm, adopts the inflation check, and air tight is up-to-standard.
4. mining tailing wasteland structure of oozing row's type bilge water resisting resource regeneration according to claim 3 is characterized in that:
The described gutter diameter that oozes is at least φ 4.5cm, and its spacing is 0.4m~0.5m.
5. mining tailing wasteland structure of oozing row's type bilge water resisting resource regeneration according to claim 4 is characterized in that:
Described rubble inserts is that volume is the rubble inserts of long (2~4) m * wide (0.4~0.5) m * height (0.04~0.05) m.
The cement-sand ratio of described cement sand bed is 1: 3, and thickness is at least 0.5cm.
6. mining tailing wasteland structure of oozing row's type bilge water resisting resource regeneration according to claim 5 is characterized in that:
Overlap joint between described geotextiles and cloth width at least is 10cm, fixing coarse sand and the rubble of adopting in bottom, Dou slope and the fixing dedicated fixed bail that adopts of vertical plane.
7. mine tailing storehouse of oozing row's type bilge water resisting resource regeneration according to claim 6
Plot structure is characterized in that:
Described gutter is that diameter is the gutter of φ 15-φ 20cm, and its spacing is 0.8m~1.2m.
8. mining tailing wasteland structure of oozing row's type bilge water resisting resource regeneration according to claim 7 is characterized in that:
At auxilliary fixing permeable woven cloth or the permeable straw mats of pasting in exposed geotextiles surface.
9. mining tailing wasteland structure of oozing row's type bilge water resisting resource regeneration according to claim 8 is characterized in that:
Adopt the polysulfide sealant sealing in pre-buried mine tailing junction of oozing gutter.
CNB2006100601973A 2006-04-05 2006-04-05 Tail ore stock area structure with sewage percolation and resource regeneration Expired - Fee Related CN100523433C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100601973A CN100523433C (en) 2006-04-05 2006-04-05 Tail ore stock area structure with sewage percolation and resource regeneration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100601973A CN100523433C (en) 2006-04-05 2006-04-05 Tail ore stock area structure with sewage percolation and resource regeneration

Publications (2)

Publication Number Publication Date
CN1847616A CN1847616A (en) 2006-10-18
CN100523433C true CN100523433C (en) 2009-08-05

Family

ID=37077323

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100601973A Expired - Fee Related CN100523433C (en) 2006-04-05 2006-04-05 Tail ore stock area structure with sewage percolation and resource regeneration

Country Status (1)

Country Link
CN (1) CN100523433C (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101929197A (en) * 2010-09-01 2010-12-29 中冶沈勘工程技术有限公司 Permeable tailings pond seepage drainage structure
CN102747757A (en) * 2012-06-18 2012-10-24 同济大学 Rainwater collection and using method for desertification area
CN103422886A (en) * 2013-08-14 2013-12-04 中国神华能源股份有限公司 Artificial retaining dam for coal mine distributed underground reservoir and damming method thereof
CN108457696B (en) * 2017-02-20 2020-08-25 中庆建设有限责任公司 Hollow wall water drainage waterproof tunnel
CN112459552B (en) * 2020-09-08 2022-06-14 中国电建集团华东勘测设计研究院有限公司 Production waste residue protection structure of large sand aggregate processing system and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0482405A1 (en) * 1990-10-26 1992-04-29 Alfred Kunz GmbH & Co. Method for secondary construction of an underground sealing-base under a consisting dump
CN1162505A (en) * 1996-04-12 1997-10-22 崔正洙 Treating process of tailings
CN2405967Y (en) * 2000-01-10 2000-11-15 毛国兵 Semi-rigid drainage pipe for ash-dam
CN1356436A (en) * 2001-12-24 2002-07-03 王柏纯 Technology for increasing capacity of tailings site by building dam along fixed axis

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0482405A1 (en) * 1990-10-26 1992-04-29 Alfred Kunz GmbH & Co. Method for secondary construction of an underground sealing-base under a consisting dump
CN1162505A (en) * 1996-04-12 1997-10-22 崔正洙 Treating process of tailings
CN2405967Y (en) * 2000-01-10 2000-11-15 毛国兵 Semi-rigid drainage pipe for ash-dam
CN1356436A (en) * 2001-12-24 2002-07-03 王柏纯 Technology for increasing capacity of tailings site by building dam along fixed axis

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
尾矿工程. 赵晖,64-66,冶金工业部长春黄金设计院. 1986 *
尾矿库灾害及其工程整治. 王凤江等.中国地质灾害与防治学报,第14卷第3期. 2003
尾矿库灾害及其工程整治. 王凤江等.中国地质灾害与防治学报,第14卷第3期. 2003 *
金属矿山尾矿综合利用与资源化. 张锦瑞等,17-43,冶金工业出版社. 2002 尾矿工程. 赵晖,64-66,冶金工业部长春黄金设计院. 1986
金属矿山尾矿综合利用与资源化. 张锦瑞等,17-43,冶金工业出版社. 2002 *

Also Published As

Publication number Publication date
CN1847616A (en) 2006-10-18

Similar Documents

Publication Publication Date Title
CN100523433C (en) Tail ore stock area structure with sewage percolation and resource regeneration
CN205914499U (en) Soil heavy metal mine waste residue separation structure
CN102767302A (en) Distributed underground reservoir and construction method thereof
CN206028294U (en) Ecological processing system of electrolytic manganese sediment safety
CN202482392U (en) Three-dimensional lixivium gathering system with bottom anti-seepage for mine dump leaching field
CN103408187B (en) Water purifying and water storing unit, and water purifying and water storing system
CN110182819B (en) Modified bentonite and modification method and application thereof
CN111456106A (en) In-situ bottom barrier structure, semi-barrier, barrier and liquid discharge system and construction method
CN109209494A (en) A kind of waste water for mine laneway is removed contamination separate system
CN203428981U (en) Anti-seepage structure on bottom of constructed wetland pool
CN208749373U (en) A kind of Tunnel Gushing disposal plant
CN210288488U (en) Anti-fouling and anti-blocking landfill seepage prevention system
CN100567649C (en) The structure of a kind of bottom of the reservior landfill waste residue
CN203531023U (en) Water-proof and drainage integrated coiled material
CN210288156U (en) Rainwater and sewage diversion tunnel
CN111706392B (en) Plugging and constructing method suitable for abandoned mine hole and mine tunnel
CN202201785U (en) Safety landfill site for sludge immobilization
CN214832933U (en) Landfill reservoir area seepage prevention system capable of protecting geomembrane
CN203188252U (en) Seepage prevention structure applied to evaporation pond in coal chemical industry
CN211730523U (en) Double-faced film-coated sodium bentonite waterproof blanket
CN112942443A (en) Landfill reservoir area seepage prevention system capable of protecting geomembrane and construction method thereof
CN212026361U (en) Seepage-proofing structure of underground rigid hazardous waste safety landfill
CN203270515U (en) Full tailing hydraulic reclamation split film yarn woven geofabriform piled dam
CN210177447U (en) Reclaimed water recycling ecological environment-friendly temporary storage tank filtering system
CN206438582U (en) A kind of novel rainwater stores stagnant with utilizing integral system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Zhang Gaoxiang

Document name: Notification that Application Deemed not to be Proposed

EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20061018

Assignee: Shenzhen Chengsong Industrial Development Co.,Ltd.

Assignor: Du Jian

Contract record no.: 2010440000290

Denomination of invention: Tail ore stock area structure with sewage percolation and resource regeneration

Granted publication date: 20090805

License type: Exclusive License

Record date: 20100323

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090805

Termination date: 20170405