CN1306201C - Two-step underground pipe-driving construction process - Google Patents

Two-step underground pipe-driving construction process Download PDF

Info

Publication number
CN1306201C
CN1306201C CNB021512272A CN02151227A CN1306201C CN 1306201 C CN1306201 C CN 1306201C CN B021512272 A CNB021512272 A CN B021512272A CN 02151227 A CN02151227 A CN 02151227A CN 1306201 C CN1306201 C CN 1306201C
Authority
CN
China
Prior art keywords
well
pipe
rolling machine
ring rolling
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB021512272A
Other languages
Chinese (zh)
Other versions
CN1506605A (en
Inventor
吴欣之
金钦
孙继辉
王国弼
金中林
杨乃刚
李新利
印家骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Co Ltd filed Critical Shanghai Mechanized Construction Co Ltd
Priority to CNB021512272A priority Critical patent/CN1306201C/en
Publication of CN1506605A publication Critical patent/CN1506605A/en
Application granted granted Critical
Publication of CN1306201C publication Critical patent/CN1306201C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention relates to a two-step construction method for underground push pipes, which comprises: an operation well and a receiving well for the push pipe construction are arranged between two preset laying ends. The present invention is characterized in that a guide steel pipe is arranged between the operation well and the receiving well according to the requirement of the designed axial line for propping the operation well and the receiving well by a miniature remotely controlled guide pipe pushing jack, a hole is expanded and formed by a cutter head hole expander or an extruding hole expander under the propelling action of a propulsion device in the guide direction of the guide steel pipe, the pipe is laid along with the jacking of the hole expander section by section, and the guide steel pipe is pushed out by the cutter head hole expander or the extruding hole expander and then recycled by the receiving well.

Description

Underground push pipe two operation method of construction
Technical field
The present invention relates to a kind of underground pipe jacking construction method, particularly a kind of underground push pipe two operation method of construction.
Background technique
In the municipal pipeline construction, often need and repair at present at underground grooving pipeline installation to pipeline, mode long construction period with excavation, the underground utility very dense in highway section, down town particularly, the pipeline juxtaposition distributes, wanting to re-lay new pipeline can't be undertaken by traditional digging mode, if and the face of land has building also can't excavate, in the downtown area, road is carried out excavation construction traffic and people's life are brought great inconvenience, existing underground pipe jacking construction method is to stamp two mouthfuls of active wells pipe one to be saved at an active well with hydraulic ceiling coil equipment then and head in the place that 2 needs carry out pipe laying, thereby finish non-excavation pipe installation construction method, but this method is subjected to the restriction of top tube diameter size, can't realize the function of a tractor serves several purposes.
Summary of the invention
The objective of the invention is to solve in the prior art underground pipe jacking construction method and be and stamp two mouthfuls of active wells in the place that 2 needs carry out pipe laying and pipe one is saved at an active well with hydraulic equipment then and head into, eject from another active well again, thereby finish non-excavation pipe installation construction method, but this method is subjected to the restriction of top tube diameter size, and a necessary pipe diameter is equipped with the problem of a push-bench.Technical solution of the present invention designs underground push pipe two operation method of construction, its working procedure is: the active well of jacking construction is set and accepts well predetermined the laying between two ends, and at active well and accept between well requirement, utilize miniature remote controlled guide pipe push-bench at active well and accept to head between well a guiding steel pipe by the design axis; Then, be guiding with the guiding steel pipe, under advancing, advancing means carries out the reaming moulding with cutterhead ring rolling machine or extruding ring rolling machine, head into the tubing of laying with ring rolling machine by joint, by the cutterhead ring rolling machine or push the guiding steel pipe that ring rolling machine ejects and in accepting well, reclaim.Advantage of the present invention is easily to lay the pipeline of various different-diameters, and guidance quality is good, can effectively control the deviation of axis, because the cost of ring rolling machine is 1/20th of a push-bench cost, can greatly reduce cost, and realizes the function of a tractor serves several purposes.
Description of drawings
Accompanying drawing is a structural representation of the present invention,
Embodiment
Its working procedure is among the figure: the active well 1 of jacking construction is set and accepts well 2 predetermined the laying between two ends, and at active well 1 and accept the requirements of 2 in well, utilize miniature remote controlled guide pipe push-bench 3 at active well 1 and accept 2 in well and head into a guiding steel pipe 4 by the design axis; Then, with guiding steel pipe 4 is guiding, carry out the reaming moulding with cutterhead ring rolling machine 5 or extruding ring rolling machine 5 under advancing means 7 advances, head into the tubing 6 of laying with ring rolling machine 5 by joint, the guiding steel pipe 4 that is ejected by cutterhead ring rolling machine 5 or extruding ring rolling machine 5 reclaims in accepting well 2.When chance cutterhead ring rolling machine 5 carried out the reaming moulding under advancing means 7 advances, the earth of smashing in cutterhead ring rolling machine 5 was dashed to the steel pipe 4 that leads by the high pressure water in the cutterhead ring rolling machine 5, flowed out reception by accepting well 2 again.

Claims (1)

1, underground push pipe two operation method of construction, its working procedure is:
(1) active well of jacking construction is set and accepts well predetermined the laying between two ends, and at active well and accept between well, utilize miniature remote controlled guide pipe push-bench at active well and accept to head between well a guiding steel pipe by the requirement of design axis;
(2) then, be guiding with the guiding steel pipe, under advancing, advancing means carries out the reaming moulding with cutterhead ring rolling machine or extruding ring rolling machine, head into the tubing of laying with ring rolling machine by joint, by the cutterhead ring rolling machine or push the guiding steel pipe that ring rolling machine ejects and in accepting well, reclaim.
CNB021512272A 2002-12-12 2002-12-12 Two-step underground pipe-driving construction process Expired - Fee Related CN1306201C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB021512272A CN1306201C (en) 2002-12-12 2002-12-12 Two-step underground pipe-driving construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB021512272A CN1306201C (en) 2002-12-12 2002-12-12 Two-step underground pipe-driving construction process

Publications (2)

Publication Number Publication Date
CN1506605A CN1506605A (en) 2004-06-23
CN1306201C true CN1306201C (en) 2007-03-21

Family

ID=34234340

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB021512272A Expired - Fee Related CN1306201C (en) 2002-12-12 2002-12-12 Two-step underground pipe-driving construction process

Country Status (1)

Country Link
CN (1) CN1306201C (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101852311B (en) * 2009-04-03 2013-05-15 五冶集团上海有限公司 Pipe-jacking installation method of bypass pipeline
CN103398215A (en) * 2013-08-20 2013-11-20 江苏沃迪建设工程有限公司 Minimally-invasive non-excavation pipe jacking and pull technology
CN104806816B (en) * 2015-05-08 2017-07-25 淄博华润燃气有限公司 A kind of construction method of push pipe bilayer PE pipes push pipe into cast iron pipe
CN104907592A (en) * 2015-06-19 2015-09-16 江西洪都航空工业集团有限责任公司 Chambering tool special for chambering speed brake beam
CN105889624A (en) * 2016-04-27 2016-08-24 河北钢铁股份有限公司邯郸分公司 Construction method for underground pipeline passing through railway line
CN106195442A (en) * 2016-08-25 2016-12-07 马轩 A kind of pusher push pipe head
CN106369223B (en) * 2016-10-31 2018-04-10 中铁二十局集团第五工程有限公司 A kind of silt stratum pipe jacking construction method
CN106402490B (en) * 2016-10-31 2018-04-10 中铁二十局集团第五工程有限公司 Silt stratum push pipe jacking construction method based on steel bushing head tool pipe
CN106594386B (en) * 2016-12-23 2019-03-01 中石化石油工程设计有限公司 A kind of no-dig technique brill top, which is combined, wears crossing pipeline laying method
CN106988751B (en) * 2017-04-07 2019-11-01 广东盛际工程咨询有限公司 Small diameter tube drainage pipeline push pipe equipment and pipe jacking construction method
CN107701851B (en) * 2017-10-18 2023-08-25 广东科朗管网技术有限公司 Rotary cutting pipeline repairing device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1065713A (en) * 1991-04-12 1992-10-28 冯树刚 Spring push pipe penetrating ground method and device thereof
JPH11223276A (en) * 1998-02-05 1999-08-17 Nkk Corp Method and device for laying pipe
CN2350612Y (en) * 1998-07-09 1999-11-24 上海市第二市政工程有限公司顶管技术研究所 Expending device for push bench
CN2412136Y (en) * 1999-11-23 2000-12-27 上海市第二市政工程有限公司顶管技术研究所 Main jacking appts. for pipe jacking construction
US6238140B1 (en) * 1998-10-28 2001-05-29 Lanny T. Boes Method for laying tile or pipe underground
CN1329222A (en) * 2001-08-10 2002-01-02 冯树刚 Device for drilling and crossing river by directly tracking designed curve through pipeline
US6491476B2 (en) * 1998-04-22 2002-12-10 Tracto-Technik Paul Schmidt Spezialmaschinen Method and apparatus for the trenchless laying of pipework underground

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1065713A (en) * 1991-04-12 1992-10-28 冯树刚 Spring push pipe penetrating ground method and device thereof
JPH11223276A (en) * 1998-02-05 1999-08-17 Nkk Corp Method and device for laying pipe
US6491476B2 (en) * 1998-04-22 2002-12-10 Tracto-Technik Paul Schmidt Spezialmaschinen Method and apparatus for the trenchless laying of pipework underground
CN2350612Y (en) * 1998-07-09 1999-11-24 上海市第二市政工程有限公司顶管技术研究所 Expending device for push bench
US6238140B1 (en) * 1998-10-28 2001-05-29 Lanny T. Boes Method for laying tile or pipe underground
CN2412136Y (en) * 1999-11-23 2000-12-27 上海市第二市政工程有限公司顶管技术研究所 Main jacking appts. for pipe jacking construction
CN1329222A (en) * 2001-08-10 2002-01-02 冯树刚 Device for drilling and crossing river by directly tracking designed curve through pipeline

Also Published As

Publication number Publication date
CN1506605A (en) 2004-06-23

Similar Documents

Publication Publication Date Title
CN1306201C (en) Two-step underground pipe-driving construction process
CN103924925B (en) A kind of jetting self-propelled drilling increases gas permeability of coal seam method and device
CN111306360A (en) Trenchless pipeline jacking and laying construction method
CN103899349B (en) A kind of pre-pumping method of coal-bed gas and drainage holes radial direction creep into guiding device
US20030070841A1 (en) Shallow depth, coiled tubing horizontal drilling system
CN202325239U (en) Hydraulic jet radial drilling device
KR20030045695A (en) Method for Digging a Tunnel
CN110847325A (en) Construction process of sewage pipe network in villages and towns by horizontal directional drilling
CN214273689U (en) Tunnel in-situ extension prestressed anchor cable tensioning structure
CN101055047A (en) A process for horizontal directional drill passing through and tampering casing for separating gravel
CN104695961A (en) Stone exploiting method
CN111894661B (en) Subway collapse emergency treatment system and implementation method thereof
DE19808478C2 (en) Process for trenchless laying of pipes
CN2298338Y (en) Drilling for construction in clayed layer large tube shed
CN114526010A (en) From pipe shed drill jumbo of taking steel pipe extrusion connector
KR200283509Y1 (en) Directional curve excavator for pipework
CN220319565U (en) Traction jacking pipe and jacking equipment suitable for pressure imbalance stratum
KR20060101734A (en) Method for constructing non-excavation directivity pipe
CN2205438Y (en) Device for pipe curve drilling passing through stratum
CN101105032A (en) Hydraulic ceiling coil pore-forming technique and device
CN219866605U (en) Miniature push pipe device of primary pore-forming PVC
CN221209630U (en) Non-excavation hydraulic pipe expander for underground pipeline
CN104818946A (en) Hydraulic jetting sidetrack drilling device and underground tool system
KR100449002B1 (en) A tunnelling method for the small sized tunnel and its apparatus
CN214116963U (en) Hydraulic drilling machine for removing concrete in drainage pipeline

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI MECHANIZED CONSTRUCTION CO., LTD.

Free format text: FORMER NAME: SHANGHAI CITY MECHANIZED CONSTRUCTION CO.

CP01 Change in the name or title of a patent holder

Address after: 200072, Shanghai, 200 old Shanghai Road

Patentee after: Shanghai Mechanized Construction Group Co., Ltd.

Address before: 200072, Shanghai, 200 old Shanghai Road

Patentee before: Shanghai Mechanical Construction Co.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070321

Termination date: 20181212

CF01 Termination of patent right due to non-payment of annual fee