CN1300743C - Intelligent management system for blasting operation - Google Patents

Intelligent management system for blasting operation Download PDF

Info

Publication number
CN1300743C
CN1300743C CNB200510043965XA CN200510043965A CN1300743C CN 1300743 C CN1300743 C CN 1300743C CN B200510043965X A CNB200510043965X A CN B200510043965XA CN 200510043965 A CN200510043965 A CN 200510043965A CN 1300743 C CN1300743 C CN 1300743C
Authority
CN
China
Prior art keywords
data
data acquisition
explosion
acquisition unit
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
CNB200510043965XA
Other languages
Chinese (zh)
Other versions
CN1790396A (en
Inventor
邵纪峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINAN DONGZHILIN ELECTRIC APPLIANCES CO Ltd
Original Assignee
JINAN DONGZHILIN ELECTRIC APPLIANCES CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=36788228&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN1300743(C) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by JINAN DONGZHILIN ELECTRIC APPLIANCES CO Ltd filed Critical JINAN DONGZHILIN ELECTRIC APPLIANCES CO Ltd
Priority to CNB200510043965XA priority Critical patent/CN1300743C/en
Publication of CN1790396A publication Critical patent/CN1790396A/en
Application granted granted Critical
Publication of CN1300743C publication Critical patent/CN1300743C/en
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention relates to a management system based on data acquisition devices (palm computers) and digital tags (radio frequency cards or bar codes), which is composed of hardware and software, wherein the hardware is composed of a computer, a communication apparatus, a data acquisition device and a digital tag (radio frequency card or bar code); the data acquisition device exchanges data with the computer through a data communication cable or communication seat; the digital tag (radio frequency card or bar code) is identified by the data acquisition device as the unique identity for the personnel identity and the blasting site. An operator holds the data acquisition device in hand so as to examine the blasting work, and records all process data at any time according to the program prompting information in the data acquisition device; after the blasting finishes, the examined data are transmitted to a database of the blasting management system through the data communication cable so as to carry out management analysis, data archiving, information inquiry, etc.

Description

Intelligent management system for blasting operation
One, affiliated technical field
The present invention relates to the management system that the appliance computer software engineering is controlled, guides, retrains, supervised the blasting operation flow process by data acquisition unit.
Two, background technology
At present, blasting operation adopts fireman's time control card or other modes to manage usually, paper note notes blasting operation process.In a complete blasting operation process, because process complicated related personnel do not operate in proper order in strict accordance with regulation shotfiring safety rules, forging blasting process data and the problem of time happens occasionally, the complicated course of work lacks the effective supervision management, thereby cause violation operation, be hiding some dangers for of security incident.How controlled blasting work flow, making it carry out explosion in strict accordance with the shotfiring safety rules is a difficult problem being badly in need of solution at present.
Three, summary of the invention
The present invention adopts data acquisition unit (palm PC) and digital label (radio-frequency card or bar code) technology, develops a kind of management system that the blasting operation flow process is controlled, guides, retrains, supervised of being used for.This security of system is reliable, easy and simple to handle, automaticity is higher, and whole blasting operation process is operated in strict accordance with the shotfiring safety rules of national regulation, thoroughly stops in the blasting operation because of causing security incident in violation of rules and regulations.
Technical scheme of the present invention is:
A kind of management system based on data acquisition unit (palm PC) and digital label (radio-frequency card or bar code), the two large divisions forms by hardware and software.Wherein hardware is made of computing machine, communication apparatus, data acquisition unit, digital label (radio-frequency card or bar code).Data acquisition unit is by data communication cable or communication seat and computing machine swap data; Digital label (radio-frequency card or bar code) is discerned by data acquisition unit as the unique identification in personnel identity and explosion place.
The software of native system is divided into computer information management system, three subsystems of WEB inquiry system and data acquisition unit system:
(1) computer information management system is mainly finished operations such as the gathering of explosion data, analysis, transmission, management, inquiries.
1, the management system flow process is as follows:
1) system initialization;
2) enter system, choice menus can be operated explosion site management module, personal information administration module, digital label administration module, enquiry module, data transmission module, demolition report module respectively accordingly.
3) withdraw from.
2, the management system practical work process is as follows:
1) preliminary work.According to required explosion situation, the explosion place is set, distributes tasks such as order of classes or grades at school, configuration personnel.Identify with digital label for each explosion place then; And distribute the digital label of distinguishing its identity for the blasting work personnel.
2) identification blast operations person.Before blasting process began, the data acquisition unit operator read the digital label of oneself holding, and confirmed identity by the data acquisition unit identification, with display operation person's name, and noted down on the data acquisition unit screen.
3) confirm the explosion place.Read the place card, will show the explosion place name on the data acquisition unit screen,, will enter blasting technology process processing section if show correctly.
4) blasting process.Data acquisition unit is according to standard blasting operation process prompting operation person, different requirements at various projects, system provides modes such as selection, manual input, personnel identity card read in checking process, the operator only need confirm whether data are correct, confirm the automatic record check PROJECT TIME of back system, and the inspection item below pointing out automatically, after all blasting process inspection items finish, the system prompt explosion finishes, automatically switch to original state, wait for the inspection of explosion next time or other explosion places.
5) explosion data processing.After the explosion inspection finishes, the operator takes data acquisition unit to administrative authority or computer center, pass through communication apparatus, the inspection result data that is stored in the data acquisition unit is transferred in the computing machine intelligent management system for blasting operation database, gather, analyze, manage by explosion information management system software, print or browse various forms etc.
3, the communication module process is as follows:
1) connects;
2) data acquisition unit receives the inspection program of intelligent management system for blasting operation or the check result that is stored in the data acquisition unit is transferred to computing machine, and deposits in the intelligent management system for blasting operation database;
3) disconnect connection.
(2) WEB inquiry system is mainly used in explosion and reports inquiry etc. in violation of rules and regulations, and its flow process is as follows:
1, login system.Open any browser, input explosion WEB inquiry system network address in address field;
2, data retrieval.In searching page, select conditions such as retrieval date, order of classes or grades at school, personnel, place, will obtain the results list according to search condition;
3, browse report in violation of rules and regulations.Select the explosion record in above-mentioned retrieval tabulation, will show the violation report of this blasting technology process, the violation operation step takes place in clear all information of listing whole blasting technology process of meeting on the page, and data will be pointed out with The Scarlet Letter in violation of rules and regulations;
4, close browser, log off.
(3) data acquisition unit system is mainly used in the blasting operation process and stores fox message, and its flow process is as follows:
1, after the start, shows initial interface on the data acquisition unit screen;
2, verification operation person's identity;
3, checking blasting operation place;
4, by set flow process controlled blasting flow process, by operator's record check result;
5, inspection finishes, and the prompting blasting operation is finished, and automatically returns to the start interface, waits for other explosion inspections;
6, all can enter battery saving mode in above any position, and system re-powers after power down, return to the work at present state.
The present invention is directed to the blasting operation management and develop, creative computing machine, data acquisition unit and the digital label of adopting constituted hardware environment, cooperates data acquisition unit and computing machine intelligent management system for blasting operation software, and advantage is as follows:
1, system adopts the Common Hardware ﹠ Software development platform, and exploitation, operation and maintenance cost are cheap;
2, original paper note notes mode is changed into the method for operation of advanced science, realized no paper operation.Check that the data true and accurate is timely.
3, the operator uses digital label to discern, thereby inspection item all has its assurance writing time data reliably true.
4, the inspection data are handled automatically.The inspection data transmission of data acquisition unit storage is behind computing machine, and system analyzes automatically, gathers, the automaticity height.
5, system extension is simple, and the scope of application is extensive.After the system operation, expanding system easily, and do not need update routine.
6, simple to operate, stable.Be convenient to the operator and operate grasp, just can skillfully use through short-term cultivation.
7, sturdy and durable, the anti-electromagnetic interference (EMI) of data acquisition unit of Shi Yonging and digital label, antidetonation shatter-resistant, be applicable to the environment of warm humidity, and authenticate cruelly by national coal security protection, therefore can normally use in the more abominable workplace of environment.
8, the data acquisition unit program is worked out according to standard blasting operation process, prompting operation person is by flow operations, and constraint blasting operation personnel are to hilllock arrival time, its behavior of standard, realized that really time control, personnel put in place, avoided the careless mistake that occurs easily only according to memory operation in the work of blowing out.
Four, description of drawings
Fig. 1 is that hardware of the present invention is formed structural drawing
Fig. 2 is a data acquisition unit system module structural drawing of the present invention
Fig. 3 is system operation mode figure of the present invention
Five, embodiment
A kind of management system based on data acquisition unit (palm PC) and digital label (radio-frequency card or bar code), the two large divisions forms by hardware and software.It is characterized in that: hardware is made of computing machine, communication apparatus, data acquisition unit, digital label (radio-frequency card or bar code).Data acquisition unit is by data communication cable or communication seat and computing machine swap data; Digital label (radio-frequency card or bar code) is discerned by data acquisition unit as the unique identification in personnel identity and explosion place.
The software of native system is divided into computer information management system, three subsystems of WEB inquiry system and data acquisition unit system:
(1), management system
1, system login receives user login name and claims and password, and is correct, then logins successfully;
2, enter system, system operates according to user right;
(1), personnel's Role Management module, for the personnel of different user groups classify, the role had the functional module of authority under the user can only use;
(2), the personal information administration module, the personnel's of all kinds of using systems operation such as increase deletion modifications grade is provided;
(3), the digital label administration module, for personnel and place adding, revise digital label;
(4), enquiry module, finish comprehensive inquiry according to date, operator, explosion place and above condition combination in any etc.;
(5), data transmission module, place plan that needs explosion and the related work personnel that participate in explosion are generated the blasting work plan, be transferred to then in the data acquisition unit, the work of being convenient to is used; The explosion that is stored in the data acquisition unit is checked data transmission to computing machine, use explosion management system management explosion to check data, thereby analyze, gather etc.;
3, log off.
(2), WEB inquiry system
(1), login system;
(2), set the search condition inquiry, in searching page, select single conditioned disjunction integrated conditions such as Query Dates, operating personnel or explosion place to carry out data retrieval, Query Result will show on searching page;
(3), in above-mentioned Query Result, select to check, will show the violation report of selected blasting technology process;
(4), inquiry system provides the more information about explosion related personnel, explosion place and other modules;
(5), log off.
(3) data acquisition unit system
(1), scan operation person's digital label, if operator's digital label is correctly validated, display operation person's name on the data acquisition unit screen, system continues operation, otherwise system will continue wait and read till correct operator's digital label, carry out next-step operation, if the operator cancels operation, can return original state by the appointed function key;
(2), scanning explosion place digital label, if explosion place digital label is correctly validated, show the explosion place name on the data acquisition unit screen, system responds, otherwise system will wait for up to the correct explosion place digital label of identification, carry out next-step operation, if the operator cancels operation, system receives the appointed function key and returns original state;
(3), system's blasting technology flow process according to the rules operates, in whole explosion checking process,, will not allow to withdraw from or return for the data integrity unitarity;
(4), the blasting process inspection finishes, system prompt is finished, and automatically switches to initial page then;
(5), system can enter power save mode by function key, state before button will return to and shut down once more when arbitrary interface, arbitrary process;
(6), system is at open state, promptly during original state, will allow to carry out data transmission by communication cable and computing machine.

Claims (7)

1, a kind of intelligent management system for blasting operation is made up of software systems, computing machine, communication apparatus, data acquisition unit and digital label, it is characterized in that:
Described intelligent management system for blasting operation is by data acquisition unit and digital label record blasting operation process data;
Described software systems comprise computer information management system, WEB inquiry system and data acquisition unit system, and described computer information management system is used to manage blasting operation fox message, blasting operation personal information and blasting operation location information; Described WEB inquiry system is used to analyze explosion and checks data, generates blasting operation form and explosion violation operation report; Described data acquisition unit system is used for being connected communication by computer interface with data acquisition unit, the location information of transmission blasting operation fox message, blasting operation personal information and blasting operation, and from data acquisition unit receiving check result data;
Described data acquisition unit embedded data collector terminal software, from intelligent management system for blasting operation software, obtain reference time, receive explosion fox message, blasting operation personal information and blasting operation location information, and the information stores that receives in self storer, outage back data can not lost; Described data acquisition unit also is used in the blasting operation process, points out the explosion fox message according to predefined program circuit on screen, checks data by keyboard typing explosion, and is saved in the storer, and the outage back checks that data can keep for a long time; The data acquisition unit program is by data communication cable or communication seat and computing machine communication;
Described digital label is used for sign and participates in explosion personnel identity or explosion place, and digital label has uniqueness in system.
2, explosion management system according to claim 1, it is characterized in that described explosion management system receives the data that data acquisition unit gathers after, the analytical review data generate blasting process form and violation operation report automatically.
3, explosion management system according to claim 1, after it is characterized in that described software systems are blasting operation fox message, blasting operation personal information and blasting operation location information tissue, be transferred to data acquisition unit by communication cable or communication seat, and storage.
4, explosion management system according to claim 1 is characterized in that described explosion management system follows the shotfiring safety rules, according to dissimilar blasting site, formulates the fox message that is fit to its blasting process demand.
5, explosion management system according to claim 1 is characterized in that described data acquisition unit in order to prompt time, explosion place and fox message, by keyboard input checking data, and storage.
6, explosion management system according to claim 1, the data acquisition unit that it is characterized in that adopting is when reading digital label information, adopt contact or the contactless mode that reads, wherein contactlessly comprise the noctovisor scan bar code or read mode such as electronic chip information.
7, explosion management system according to claim 1 is characterized in that described digital label adopts radio-frequency card, bar code, IC-card maybe can store the electronic chip of data.
CNB200510043965XA 2005-07-01 2005-07-01 Intelligent management system for blasting operation Ceased CN1300743C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200510043965XA CN1300743C (en) 2005-07-01 2005-07-01 Intelligent management system for blasting operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200510043965XA CN1300743C (en) 2005-07-01 2005-07-01 Intelligent management system for blasting operation

Publications (2)

Publication Number Publication Date
CN1790396A CN1790396A (en) 2006-06-21
CN1300743C true CN1300743C (en) 2007-02-14

Family

ID=36788228

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200510043965XA Ceased CN1300743C (en) 2005-07-01 2005-07-01 Intelligent management system for blasting operation

Country Status (1)

Country Link
CN (1) CN1300743C (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100451533C (en) * 2007-03-08 2009-01-14 济南东之林电器有限公司 Mine intelligent explosion management system
CN101110067B (en) * 2007-06-07 2010-06-30 李萍丰 Intelligent analytical method and system for blasting operation
CN101644927B (en) * 2009-05-31 2011-12-14 北京龙德时代科技发展有限公司 Monitoring and controlling system for linkage blasting
CN101645180B (en) * 2009-05-31 2011-04-20 北京龙德时代科技发展有限公司 Intelligent data acquisition unit
CN101644553B (en) * 2009-05-31 2013-09-11 北京龙德时代科技发展有限公司 Monitoring and data transmission system of exploder
CN102314642A (en) * 2011-08-12 2012-01-11 华电国际电力股份有限公司山东分公司 Management system for safe production behavior of operating personnel
CN102628660B (en) * 2012-04-20 2015-07-08 毛允德 Mine-used interlocking detonating method and mine-used interlocking detonating system
CN106640081A (en) * 2016-08-25 2017-05-10 中国黄金集团内蒙古矿业有限公司 Strip mine drilling and blasting design, construction and management method
CN106600186A (en) * 2016-11-30 2017-04-26 上海吉联新软件股份有限公司 Rapid cargo sorting indication system
CN108038615A (en) * 2017-12-11 2018-05-15 西安科技大学 A kind of colliery sector Post Value appraisal procedure
CN111207637B (en) * 2020-03-09 2021-03-16 深圳市宏源建设工程有限公司 Subway safety protection zone control blasting auxiliary system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ZA200004542B (en) * 1999-05-31 2001-05-22 Smi Technology Pty Ltd Detonator and blasting control apparatus.
JP2003132093A (en) * 2001-10-29 2003-05-09 Nippon Steel Corp Data log system
CN1480743A (en) * 2002-09-02 2004-03-10 中国石油集团东方地球物理勘探有限责 Intelligent system for contolling synchronous explosion according to time transmitted from GPS

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ZA200004542B (en) * 1999-05-31 2001-05-22 Smi Technology Pty Ltd Detonator and blasting control apparatus.
JP2003132093A (en) * 2001-10-29 2003-05-09 Nippon Steel Corp Data log system
CN1480743A (en) * 2002-09-02 2004-03-10 中国石油集团东方地球物理勘探有限责 Intelligent system for contolling synchronous explosion according to time transmitted from GPS

Also Published As

Publication number Publication date
CN1790396A (en) 2006-06-21

Similar Documents

Publication Publication Date Title
CN1300743C (en) Intelligent management system for blasting operation
CN103729905A (en) Graphical inspection system and inspection method
CN203849768U (en) Graphical inspection system
CN105989268A (en) Safety access method and system for human-computer identification
CN104700169A (en) Method and system for inspecting and managing invoices
CN104036177A (en) Intelligent terminal fingerprint unlocking device and method
CN109359113B (en) Tax payment report checking method and device, storage medium and server
CN107832618A (en) A kind of SQL injection detecting system and its method based on fine granularity control of authority
CN110457346A (en) Data query method, apparatus and computer readable storage medium
CN116645024A (en) Chemical storage and management system
CN113434542B (en) Data relationship identification method and device, electronic equipment and storage medium
Klein et al. smartFIX: An adaptive system for document analysis and understanding
CN113704406A (en) Chinese paraphrase matching system and method for popular abbreviations
CN107392033B (en) Android device penetration test system and automatic penetration test method thereof
CN102831172A (en) Method and device for processing data in enterprise patent databank
CN203366330U (en) Questionnaire type-in device for health management
CN1475946A (en) Human affairs document integration system and method
CN114780602A (en) Data tracing analysis method and device, computer equipment and storage medium
CN111538750A (en) Information restoration method and device, computer system and readable storage medium
CN112270626A (en) Enterprise credit line management method, device, storage medium and server
CN102254358A (en) Work attendance checking device
CN112527655A (en) Software version quality abnormity detection method and device, electronic equipment and storage medium
CN1237464C (en) Door guard information security system and method
KR102475028B1 (en) Drawing interconnection and information retrieval system
CN115033633B (en) Remote operation and maintenance service realization method and system in information creation environment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C35 Partial or whole invalidation of patent or utility model
IW01 Full invalidation of patent right

Decision date of declaring invalidation: 20090501

Decision number of declaring invalidation: 13255

Granted publication date: 20070214