CN106640081A - Strip mine drilling and blasting design, construction and management method - Google Patents

Strip mine drilling and blasting design, construction and management method Download PDF

Info

Publication number
CN106640081A
CN106640081A CN201610721433.5A CN201610721433A CN106640081A CN 106640081 A CN106640081 A CN 106640081A CN 201610721433 A CN201610721433 A CN 201610721433A CN 106640081 A CN106640081 A CN 106640081A
Authority
CN
China
Prior art keywords
drilling
design
automatically
blasting
management method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610721433.5A
Other languages
Chinese (zh)
Inventor
张海涛
王泽军
王恒生
李晨
王骞
梁海明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA GOLD INNER MONGOLIA MINING Co Ltd
Original Assignee
CHINA GOLD INNER MONGOLIA MINING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA GOLD INNER MONGOLIA MINING Co Ltd filed Critical CHINA GOLD INNER MONGOLIA MINING Co Ltd
Priority to CN201610721433.5A priority Critical patent/CN106640081A/en
Publication of CN106640081A publication Critical patent/CN106640081A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/26Methods of surface mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Abstract

The invention discloses a strip mine drilling and blasting design, construction and management method. The method comprises the steps that drilling design is conducted automatically within a planed range, and a drilling coordinate report is automatically formed; drilling coordinates are transmitted to an automatic drilling system through a wireless terminal; and after drilling is completed, actual drilling coordinates and hole depth information data are automatically transmitted to a mining MES, and drilling and blasting design is automatically conducted. By adoption of the strip mine drilling and blasting, construction and management method, the drilling design efficiency is improved, it is guaranteed that construction on the site is conducted according to the design, a drilling standard operation procedure is automatically generated, semi automation of drilling and blasting design is achieved by adoption of software assistance, the design efficiency is extremely improved, the previous two-dimensional software design is replaced with three-dimensional software design, the design is more visualized, and the morphology of an ore body is understood more authentically through a three-dimensional profile. The blasting design is more close to actual situations through importing of measured data.

Description

A kind of opencut drilling and blasting design, construction and management method
Technical field
The present invention relates to surface mining management in design and operation field, specifically a kind of opencut drilling and blasting design, construction and pipe Reason method.
Background technology
At present, formulate production planning management, adopt stripping construction plan, mining design and for Ore proportioning management in, more dependence Artificial experience is made overall planning, neither one system, integrated management means directly perceived and advanced, it is difficult to ensure that the production schedule, Adopt being mutually linked for stripping construction plan, mining design and ore supplying tube reason, it is completely unimpeded, without careless omission.In addition, on executive meanses, It is many, multi-point and wide-ranging due to adopting hole operating personnel, add the puna duration longer, it is impossible to which real-time monitoring is to live each work Industry point situation and safe condition;Mining perforated design main time concentrates on the arrangement and loss late of blasthole and the meter of the rate of dilution Count in;On mining design pattern, original is put at the scene a little using GPS, and rig looks for a perforation means;More than mining business hold More dependence personnel strengthen management and complete on row, and inefficiency and easily generation are slipped up, and are unfavorable for extensive outsourcing mining Loss and dilution and for ore deposit Grade Control.
The content of the invention
To solve existing mining, production management is more is made overall planning by artificial experience, neither one system, directly perceived And advanced integrated management means;Mining perforated design main time concentrates on the arrangement and loss late and the rate of dilution of blasthole In calculating;Mining design pattern is put at the scene a little using GPS, and rig looks for a perforation means;Inefficiency and easily produce Raw error, is unfavorable for the loss and dilution of extensive outsourcing mining and the problems such as ore deposit Grade Control.The present invention provides a kind of outdoor Ore deposit perforated design, construction and management method, ore-rock is had a common boundary using software carry out perforated design respectively, using Radio Transmission Technology Punching design data is sent into cloth hole terminal automatic to rig, rig searches perforation hole automatically using GPS high-precision boreholes terminal Position, the real data produced after perforation is automatically transferred to mining MES system, and technical staff carries out explosion and sets automatically using software Meter.
For achieving the above object, the present invention provides following technical scheme:
A kind of opencut drilling and blasting design, construction and management method, carry out ore-rock point and wear a point quick-fried design, shape using three-dimensional mining software It is transferred on rig into borehole coordinate report, after drilling terminates, the information data transmission such as actual coordinate, hole depth of drilling is to mining MES system, carries out explosion design, carries out perforated design automatically in intended scope, automatically forms borehole coordinate report, and drilling is sat By wireless terminal transmission to automatic drilling system, after drilling terminates, the actual coordinate of drilling, hole depth information data are passed mark automatically It is defeated to mining MES system, explosion design is carried out automatically.
As further scheme of the invention:In the range of moon Mining scheme, with Grade Control model as geological foundation, profit Carry out perforated design point respectively to ore-rock with software and wear a point quick-fried design, by determining ore-rock boundary, explosion scope and Hole pattern parameters Information a, key automatically generates perforated design, forms borehole coordinate report.
As further scheme of the invention:Punching design data is sent into automatic to rig using Radio Transmission Technology Cloth hole terminal, rig searches perforation hole position automatically using GPS high-precision boreholes terminal, and the real data produced after perforation is passed automatically It is defeated to mining MES system, technical staff carries out explosion design automatically using software.
As further scheme of the invention:Self-cocking action network connectivity, Blasting simulation are carried out using software and rise Quick-fried time series analysis work, by self-cocking action network connectivity fire point and explosion line rule are arranged, and are automatically performed network connectivity, Problem present in blasting network line is found by Blasting simulation, by burst time analysis controlled blasting shake to greatest extent It is dynamic.
Compared with prior art, the invention has the beneficial effects as follows:
First burst region delimited according to monthly Mining scheme, the Grade Control model being then loaded into after present situation constraint, to grade Controlling model is coloured according to ore-rock attribute, and the ore-rock boundary of so each burst region is just very clear, then basis Ore-rock boundary further refines explosion subregion, and blast area is finally determined using ore-rock boundary boundary Control function behind defined area Domain, realizes that ore-rock point wears point quick-fried, loss late and the rate of dilution is calculated automatically, further reduction loss and dilution rate.According to final true Determine burst region to realize automatic cloth hole, go out figure using software, the perforated design efficiency for so substantially increasing.
Software can automatically generate perforation process guiding book, including numbering, quick-fried area, aperture x, aperture y, aperture z, hole The factors such as footpath, hole depth, inclination angle, then utilize drilling computer aided design system by the hole position in pop perforation job instruction The map mode that the data conversions such as coordinate, hole depth can be recognized into automatic cloth hole terminal, then using Radio Transmission Technology by ground Figure is sent to the automatic cloth hole terminal of rig.
The automatic cloth control terminal of rig spuds in when drilling rod is directed at hole position, and hole depth measure is carried out according to drill bit GPS after spudding in, etc. Stop drilling when reaching design requirement to drilling depth.Data are utilized rig automatic cloth control terminal nothing automatically after drilling terminates Line transmission technology is uploaded to mining MES system.Shows on the automatic cloth control terminal of rig simultaneously the next position for drilling and With the distance of the blasthole, it is more vivid to be moved easily next drilling.
The data actually returned after drilling include the information such as actual apertures position coordinate, hole depth, under designer is from mining MES Drilling measured data is carried, the former perforated design of control is checked error, then perforation personnel examined more than kinematic error, in error Interior importing software carries out explosion design.Self-cocking action network connectivity, Blasting simulation and burst time point are carried out using software The work such as analysis.Fire point and explosion line rule can be arranged by self-cocking action network connectivity, network connectivity is automatically performed, greatly Manual labor is alleviated greatly;By Blasting simulation it can be found that problem present in blasting network line;By the burst time point Analysis can shake to greatest extent in controlled blasting, particularly act on particularly evident in the bursting work of highwall.Using life Comprehensive blasting information, including design report book, perforation process book, powder charge guiding book, powder charge knot are generated into the key of function of reporting one Composition, explosion line graph, burst time and Technological Economy etc..
By realizing that perforated blasting design is semi-automatic using software auxiliary, design efficiency is drastically increased, it is conventional Perforated design main time is concentrated in the arrangement and loss late of blasthole and the calculating of the rate of dilution, by software when extremely short The interior calculating that can just complete steel for shot and loss late and the rate of dilution, and calculated according to true according to Grade Control model It is real.Designed by three-dimensional software and replace conventional two-dimentional Software for Design, design is more visualized, it is trueer by D profile Real understanding Ore body morphology.Explosion design increased by the importing of measured data and be more nearly actual conditions.
Description of the drawings
Fig. 1 is that the ore-rock point of opencut drilling and blasting design, construction and management method wears a point quick-fried design drawing.
Fig. 2 is the loss and dilution calculation procedure figure of opencut drilling and blasting design, construction and management method.
Fig. 3 is the borehole coordinate report figure of opencut drilling and blasting design, construction and management method.
Fig. 4 is the automatic cloth hole terminal map of opencut drilling and blasting design, construction and management method.
Fig. 5 is the automatic drilling system diagram of opencut drilling and blasting design, construction and management method.
Fig. 6 is the mining MES middle punch hum patterns of opencut drilling and blasting design, construction and management method.
Fig. 7 is the automatic blast hole line graph of opencut drilling and blasting design, construction and management method.
Fig. 8 is the pop perforation job instruction of opencut drilling and blasting design, construction and management method.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
In FIG, according to monthly Mining scheme, it is loaded onto the Grade Control model after present situation constraint and is entered according to ore-rock attribute Row is coloured, and then further refines explosion subregion according to ore-rock boundary, using ore-rock boundary boundary Control function behind defined area It is final to determine burst region, realize that ore-rock point wears point quick-fried, by Fig. 2 counting loss dilutions, further reduction loss and dilution rate.
The report of Fig. 3 borehole coordinates is automatically generated, drilling computer aided design system is then utilized by pop perforation operation Fig. 4 map modes that the data conversions such as hole position coordinate, hole depth in guiding book can be recognized into automatic cloth hole terminal, then utilize Map is sent cloth hole system automatic to Fig. 5 rigs by Radio Transmission Technology, and the automatic cloth control terminal of rig is when drilling rod is directed at hole position Spud in, hole depth measure is carried out according to drill bit GPS after spudding in, drilling is stopped until drilling depth reaches design requirement.In drilling Data are uploaded to Fig. 6 mining MES systems by the automatic cloth control terminal of rig using Radio Transmission Technology automatically after end.
The data actually returned after drilling include the information such as actual apertures position coordinate, hole depth, under designer is from mining MES Drilling measured data is carried, using software the works such as Fig. 7 self-cocking action network connectivities, Blasting simulation and burst time analysis are carried out Make.Fig. 8 pop perforation job instructions, including design report book, perforation process book, dress are generated using the key of function of reporting one is generated Medicine guiding book, charge constitution figure, explosion line graph, burst time and Technological Economy etc..
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of spirit or essential attributes without departing substantially from the present invention, the present invention can be in other specific forms realized.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit is required rather than described above is limited, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.Any reference in claim should not be considered as and limit involved claim.
Moreover, it will be appreciated that although this specification is been described by according to embodiment, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that for clarity those skilled in the art should Using specification as an entirety, the technical scheme in each embodiment can also Jing it is appropriately combined, form those skilled in the art Understandable other embodiment.

Claims (4)

1. a kind of opencut drilling and blasting design, construction and management method, carry out ore-rock point and wear a point quick-fried design using three-dimensional mining software, Form borehole coordinate report to be transferred on rig, after drilling terminates, the information data transmission such as actual coordinate, hole depth of drilling is to adopting Ore deposit MES system, carries out explosion design, it is characterised in that carry out perforated design automatically in intended scope, automatically forms drilling and sits Mark report, borehole coordinate is by wireless terminal transmission to automatic drilling system, after drilling terminates, the actual coordinate of drilling, hole depth Information data is automatically transferred to mining MES system, and explosion design is carried out automatically.
2. opencut drilling and blasting according to claim 1 designs, constructs and management method, it is characterised in that adopting stripping meter the moon In the range of drawing, with Grade Control model as geological foundation, carry out perforated design point respectively to ore-rock using software and wear a point quick-fried design, By determining ore-rock boundary, explosion scope and Hole pattern parameters information, a key automatically generates perforated design, forms borehole coordinate report Accuse.
3. opencut drilling and blasting according to claim 1 designs, constructs and management method, it is characterised in that using wireless biography Punching design data is sent cloth hole terminal automatic to rig by transferring technology, and rig is searched automatically using GPS high-precision borehole terminals Perforation hole position, the real data produced after perforation is automatically transferred to mining MES system, and technical staff is carried out quick-fried automatically using software Broken design.
4. opencut drilling and blasting according to claim 1 designs, constructs and management method, it is characterised in that entered using software The analysis work of row self-cocking action network connectivity, Blasting simulation and burst time, is arranged by self-cocking action network connectivity and is detonated Point and explosion line rule, are automatically performed network connectivity, and by Blasting simulation problem present in blasting network line is found, lead to Cross burst time analysis controlled blasting vibrations to greatest extent.
CN201610721433.5A 2016-08-25 2016-08-25 Strip mine drilling and blasting design, construction and management method Pending CN106640081A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610721433.5A CN106640081A (en) 2016-08-25 2016-08-25 Strip mine drilling and blasting design, construction and management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610721433.5A CN106640081A (en) 2016-08-25 2016-08-25 Strip mine drilling and blasting design, construction and management method

Publications (1)

Publication Number Publication Date
CN106640081A true CN106640081A (en) 2017-05-10

Family

ID=58852530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610721433.5A Pending CN106640081A (en) 2016-08-25 2016-08-25 Strip mine drilling and blasting design, construction and management method

Country Status (1)

Country Link
CN (1) CN106640081A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114810031A (en) * 2022-04-13 2022-07-29 中国葛洲坝集团易普力股份有限公司 Intelligent drilling design and construction method for surface mine blasting

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1723334A (en) * 2002-10-09 2006-01-18 Bhp比利顿创新公司 System and method(s) of mine planning, design and processing
RU2275587C1 (en) * 2004-10-22 2006-04-27 Государственное образовательное учреждение высшего профессионального образования "Хабаровский государственный технический университет" Method for determination of optimal parameters of explosive destruction of rocks
CN1790396A (en) * 2005-07-01 2006-06-21 济南东之林电器有限公司 Intelligent management system for blasting operation
CN102927865A (en) * 2012-11-12 2013-02-13 北京速力科技有限公司 High-accuracy global system positioning (GPS) geared drill automatic hole arrangement system
RU2475698C2 (en) * 2011-03-23 2013-02-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Кабардино-Балкарский государственный университет им. Х.М. Бербекова" (КБГУ) Method of blasting of rock mass
CN103470298A (en) * 2013-10-02 2013-12-25 河南理工大学 Design method of hole-drilling and hole-forming process scheme for drainage of outburst coal seam
CN104533528A (en) * 2015-01-23 2015-04-22 中国有色金属长沙勘察设计研究院有限公司 Surface mine fine mining system adopting GNSS (Global Navigation Satellite System) technology and surface mine fine mining method
CN104596371A (en) * 2014-12-09 2015-05-06 北方爆破科技有限公司 Digitized surface blasting operation method
CN105320831A (en) * 2014-08-01 2016-02-10 丹东东方测控技术股份有限公司 Method for achieving real-time high-precision location of strip mine driller drilling rod

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1723334A (en) * 2002-10-09 2006-01-18 Bhp比利顿创新公司 System and method(s) of mine planning, design and processing
RU2275587C1 (en) * 2004-10-22 2006-04-27 Государственное образовательное учреждение высшего профессионального образования "Хабаровский государственный технический университет" Method for determination of optimal parameters of explosive destruction of rocks
CN1790396A (en) * 2005-07-01 2006-06-21 济南东之林电器有限公司 Intelligent management system for blasting operation
RU2475698C2 (en) * 2011-03-23 2013-02-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Кабардино-Балкарский государственный университет им. Х.М. Бербекова" (КБГУ) Method of blasting of rock mass
CN102927865A (en) * 2012-11-12 2013-02-13 北京速力科技有限公司 High-accuracy global system positioning (GPS) geared drill automatic hole arrangement system
CN103470298A (en) * 2013-10-02 2013-12-25 河南理工大学 Design method of hole-drilling and hole-forming process scheme for drainage of outburst coal seam
CN105320831A (en) * 2014-08-01 2016-02-10 丹东东方测控技术股份有限公司 Method for achieving real-time high-precision location of strip mine driller drilling rod
CN104596371A (en) * 2014-12-09 2015-05-06 北方爆破科技有限公司 Digitized surface blasting operation method
CN104533528A (en) * 2015-01-23 2015-04-22 中国有色金属长沙勘察设计研究院有限公司 Surface mine fine mining system adopting GNSS (Global Navigation Satellite System) technology and surface mine fine mining method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114810031A (en) * 2022-04-13 2022-07-29 中国葛洲坝集团易普力股份有限公司 Intelligent drilling design and construction method for surface mine blasting

Similar Documents

Publication Publication Date Title
CN108930539B (en) BIM-based tunnel overbreak and underexcavation control method
CN114708393B (en) Mine stress field twinning modeling assimilation system and method in full-time air mining process
CN103184887B (en) Method for underground tunnel drilling construction and geological information inversing
US10494912B2 (en) Integrated well survey management and planning tool
NO343378B1 (en) Design of drilling patterns for drilling rock cavities
CN104156782A (en) Balancing-optimalizing method, for project time limit, quality and cost, used in concrete faced rockfill dam construction
EA010244B1 (en) Method of blasting operations in open pit
CN106530101A (en) Ore rock determining and exploration contrast method
SA518391607B1 (en) Methods of Selecting an Earth Model from a Plurality of Earth Models
CN108898670B (en) Three-dimensional geological modeling method based on entity and profile
CN107144192A (en) A kind of intelligent construction method of pinpoint blasting
CN106640081A (en) Strip mine drilling and blasting design, construction and management method
CN105422097A (en) Coal seam group mining method
CN101664845B (en) Numerical control cutting system of intersecting steel structure of plurality of geometries on offshore oil platform
CN117473792B (en) Method, system, equipment and medium for optimally designing gas extraction hole
CN110173252A (en) A kind of encryption method and its evaluation method of horizontal well development gas reservoir well pattern
CN107657087A (en) Pipeline layout method for arranging based on BIM technology
CN107529583A (en) Construction of explosion economy minimum backbreaks method and its laser is accurately directed to device
CN113280703B (en) Drilling and blasting construction tunnel overbreak and underexcavation control method based on BIM technology
Liu et al. Visible calculation of mining index based on stope 3D surveying and block modeling
CA2923540C (en) Integrated well survey management and planning tool
CN214499020U (en) Hydrothermal geothermal well factory
CN109238047A (en) A kind of intelligent rapid setting-out method suitable for drillhole blasting
WO2021002853A1 (en) Multi-agent, multi-objective wellbore gas-lift optimization
Zhang et al. Research on Open Mining Intelligent Equipment Based on Internet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170510

RJ01 Rejection of invention patent application after publication