CN1291670A CN 99122203 CN99122203A CN1291670A CN 1291670 A CN1291670 A CN 1291670A CN 99122203 CN99122203 CN 99122203 CN 99122203 A CN99122203 A CN 99122203A CN 1291670 A CN1291670 A CN 1291670A
Authority
CN
China
Prior art keywords
wall
continuous
plate
wall body
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 99122203
Other languages
Chinese (zh)
Other versions
CN1117905C (en
Inventor
许琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 99122203 priority Critical patent/CN1117905C/en
Publication of CN1291670A publication Critical patent/CN1291670A/en
Application granted granted Critical
Publication of CN1117905C publication Critical patent/CN1117905C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

A construction method for continuous wall of dual-layer wall features that the first unit wall is installed. Said unit wall in the form of dual-layer wall is composed of symmetrical upper and lower base plates, skeleton between said base plates, several support frames linked between said base plates, several horizontal bars, netted plates fixed between said support frames, and steel bars between support frames. its advantages are effective water-proof performance, protecting reinforcing bars, no influence to wall quality, and convenient construction and transportation.

Description

The continuous underground wall construction method and the structure thereof of heavy sliding folded group double wall
The present invention relates to a kind of continuous wall construction method and structure thereof of double wall.
At present, the operating type of general traditional diaphragm wall, at first dig and establish the paragraph zanjon desiring to dig the ground scope periphery of establishing ground, and this zanjon is for the reinforcing cage PC plate plate body of prefabricated one-body molded state (or insert) of inserting pre-group, when the reinforcing cage (or the standby PC plate of precasting) that will constitute by the bar frame group in advance, put in the zanjon, (or inject the curing compound of mixing every both sides by the PC plate by the top concrete perfusion again, make its sclerosis back form a wall body) with the PC plate, so form the one unit wall body of continuous wall, yet the constituted mode of known continuous wall has following defective:
One, because the formation of known continuous wall, be some warps such as above-mentioned formed interim unit wall body, form the continuous wall that connects and organize with continuous placement, so be to there is no between the unit wall body in twos element good, that can join combination, making in twos, the joint between the unit wall body has the gap, because of can't driving fit, just can't reach continuous wall integral body due watertightness of comprehensive metope and requirement of strength.
Two, because as: preceding known as described between two unit wall bodies of formation, because of space that can't fluid-tight engagement caused, its slit forms the flow-guiding mouth of infiltration naturally, therefore, the continuous wall that is connected still produces the infiltration situation, danger on causing constructing, and the puzzlement of operating period partition body drain water in the future.
Three, tradition is inserted behind the reinforcing cage mode of concrete perfusion again in zanjon, by reserving grouting mouthful on the reinforcing cage, behind mouthful of one time concrete perfusion of this grouting, treats its concrete setting and forms the sample attitude of unit wall body; But, the degree of depth is profound because the width of groove is narrow (surpassing more than 10 meters usually), and in being full of the groove of stabilizing solution, be in the milk, reinforcing cage pollutes and influences its grip except being subject to stabilizing solution, also sneak in the concrete easily in the groove because of wall soil, silt particle, and influence concrete strength, and then produce and reduce the strong end and the quality phenomenon that differs.
Four, known PC plate is after groove is gone in transplanting, utilize the consolidation liquid of hybrid modulation to inject groove, fill the both sides that coat the PC plate, after being solidified, it can form in conjunction with the wall body kenel, still, because no good bindiny mechanism between the PC plate, and only depend on the consolidation liquid combination, ratio in the time of may be because of the hybrid modulation of consolidation liquid, time error and easily changing, thereby cause influencing the intensity of globality structure.
Five, the continuous wall of tradition is by inserting reinforcing cage in the box cut; operation such as concrete perfusion and forming again; but normal because the domain condition is not good, execution control control is bad; and cause the level and smooth degree of vertical precision, concrete wall; and problem such as thickness of protection tier deficiency, wherein, except causing wall body cracking and corrosion of steel bar easily; and endanger outside the function of its retaining wall, also increase the construction burden.
Six, construct in being full of the groove of stabilizing solution owing to traditional diaphragm wall, and the one-body molded volume that constitutes of reinforcing cage (or PC plate) is too huge, causes except that constructional difficulties, the wall body quality also is difficult to control; Therefore, often need decorate diaphragm wall wall coarse or that may chap, not only reduce outside the underground constant volume space, more need repeatedly reinforcing construction, increase manpower, man-hour, costs such as material application on foot in the inboard walling in addition of the wall body of excavation face.
In view of this, the continuous underground wall construction method and the structure thereof that the purpose of this invention is to provide the folded group of a kind of heavy cunning double wall, it mainly provides in twos and can well join between the unit wall body, and has the effect water proofing property, and can guarantee reinforcement cover, grip and avoid collapsing hole, double team and sand and sneak into concrete, and influence the wall body quality; But provide convenient construction management and control in addition easily, and can omit surface finish work; Providing a kind of again can conveniently carry and not be subjected to construction depth to limit.
The object of the present invention is achieved like this: the continuous underground wall construction method of the folded group of a kind of heavy cunning double wall is characterized in that step is:
One, builds and lead wall;
Two, excavation groove;
Three, verticality is surveyed;
Four, clean baffle plate, and remove the bed mud of groove bottom;
Five, install the continuous wall of first double wall formula unit wall body, and the unit wall body of this continuous wall is the double wall pattern, symmetrically arranged upper and lower substrate about it is provided with and is; The cage construction group is located between upper and lower substrate, also being provided with some supports connects between upper and lower substrate, be provided with many horizontal bars and support again and be the line setting, between the support of arranging, be installed with the net matrix, between support subtend facing each other, be provided with the steel bar of hanger pattern in addition; Constitute the skeleton of continuous wall thus in advance, behind the shut die, filling prize, just can be prefabricated into the continuous wall unit wall body of two wall formulas at two external walls of this cage construction;
Six, the upper and lower unit of the continuous wall wall body of winding splices the continuous unit wall body of wall and inserts in the groove, and from the unit of top wall body end face penetration concrete;
Seven, return back to the unit construction that second step begins another paragraph again, finish connection until continuous wall.
The cell-wall body structure of the diaphragm wall of the folded group of a kind of heavy cunning double wall, it is characterized in that: it comprises upper and lower substrate and cage construction, wherein upper and lower substrate goes to upper and lower and is symmetrical arranged, the skeleton group is located between upper and lower substrate, this cage construction is provided with some supports and connects between upper and lower substrate, many again horizontal bars and support are the line setting, set firmly the net matrix between the support of arranging, and are provided with some steel bars in addition between support facing each other is relative.
Described substrate is the T type, and the level board face is made as fish plate, this fish plate intermediate vertical be provided with and add plate, the fish plate plate face at substrate is provided with some through holes that differ in size again.
The upper and lower substrate two ends of described cage construction are respectively equipped with frame, and with corresponding joining of butt joint side of another unit wall body of continuous wall of opposite side.
Row establishes some struts and this strut becomes shaped steel to form by the vertical bar reinforcing bar between the support of described cage construction, an end of this strut is provided with the abutting end in the recessed structural member again, and the other end be provided with the fish plate plate face that stretches out substrate elongated end and with the corresponding joint of upper and lower cell-wall body structure.
The abutting end of described strut is to contract in structure and is provided with interior hole slot, and the strut of reinforcing bar formula constitutes abutting end with the continuous device of reinforcing bar.
The end span of described cage construction between the support of relatively erectting established the junction plate of the support that links to each other, and connects at another far-end of the junction plate of support again and establishes a plate.
Between the continuous wall two unit wall bodies of described double wall formula, be provided with coupling mechanism.
Described coupling mechanism is provided with two plate bodys that connect relatively and a retaining is held member, and wherein, plate body articulates with axle, and retaining is held member retaining group in the plate body lateral plates.
Described two plate bodys are two fan doors to establishing.
Described plate body interior plate face place is provided with the grab of symmetry.
Described retaining is held member and is made of hack lever and tightening latch, and this tightening latch is crossed in the grab of plate body, connects with grab between upper and lower again hack lever.
Mitered adds steel bar between the net matrix of described cage construction or between support.
Described grouting operation is spliced the frame group when finishing a stage at wall body, only at bottom concrete perfusion partly, then repeats construction again, after continuous wall is finished by unit wall body winding, and the concrete perfusion simultaneously from the top again.
After between described upper and lower block construction wall body waterstop being set, use the spiro connecting element winding again.
Need to lay waterstop between the continuous wall wall body in described forward and backward stage, behind the excavation of excavation both sides, wear the screw of the cage construction of group two unit wall bodies again with spiro connecting element again, the combination that is spirally connected of two wall bodies.
The present invention is further described below in conjunction with drawings and Examples.
Fig. 1 is the construction process figure of exemplary embodiments of the present invention;
Fig. 2 is an exemplary embodiments cell-wall body structure exploded view of the present invention;
Fig. 3 is an exemplary embodiments cell-wall body structure constitutional diagram of the present invention;
Fig. 4 is the two wall formula cell-wall body structure figure of exemplary embodiments of the present invention;
Fig. 5 is another structure kenel winding figure of exemplary embodiments coupling mechanism of the present invention and edge frame;
Fig. 6 is the assembly bonding part sectional drawing of the upper and lower unit of exemplary embodiments of the present invention wall body;
Fig. 7 is provided with the steel bar state diagram of putting more energy into between exemplary embodiments double wall of the present invention;
Fig. 8 holds member state diagram in succession for the retaining of exemplary embodiments coupling mechanism of the present invention;
Fig. 9 washes user mode figure open for the plate body of exemplary embodiments coupling mechanism of the present invention;
Figure 10 finishes diaphragm wall and basement floor for exemplary embodiments of the present invention and connects and establish state diagram;
Among the figure: upper and lower substrate 1 fish plate 10 through holes 100 stiffeners 11 scissors steel parts 111 cage constructions 2 frames 20 screws 200 supports 21 struts 22 abutting ends 220 elongated ends 221 net matrixs 23 horizontal bars 24 junction plates 25 plates 26 steel bars 27 dividing plates 28 steel bar 29 overlap joint steel bars 3 grooves 4 grooves 5 coupling mechanisms 6 plate bodys 60 grabs 601 retainings of putting more energy into are held member 61 hack levers 610 tightening latches 611 wall bodies 7 and are hung and carry a hole 8 and lead wall A groove B intrusion pipe H pivot connecting element T shackles S load bar I spiro connecting element N waterstop P
As shown in Figure 1, the implementation step of present embodiment and method are as follows:
As shown in Figure 1, the implementation step of present embodiment and method are as follows:
One, builds and lead wall A: at first construct the precalculated position of diaphragm wall, dig if groove and be provided with and lead wall A at needs.
Two, excavation groove B: utilization excavates machine self-conductance wall A and vertically down deep-cuts, and native stone is grabbed out formation one groove B with the material handling device tool, it is formed for putting the straight dark formula groove B that continuous wall uses, collapse for fear of groove B again, when excavation groove B, need and inject stabilizing solution (being muddy water) in groove B, for the upper strata of gutter ditch wall.
Three, verticality is surveyed: B is excavated to desired depth when groove, survey (can utilize ultrasonic equipment) with vertical probe downwards with groove B, survey the verticality (view and emulate simultaneously whether the metope that digs is smooth, situations such as the whether avalanche of exploration metope, depression) of groove B and wall thereof in advance, with the precision of effective control wall body 7 and can be beneficial to constructing of connecting wall.
Four, remove bed mud and clean end plate: promptly clean end plate (or baffle plate, or 7 of unit wall bodies have the plate body 60 of coupling mechanism 6), and the bed mud of removing groove B bottom in the stage unit.
Five, install the continuous wall unit wall body 7 of first two-layer equation: digging the exit or entrance of a clitch above the groove light B that establishes, first unit wall body 7 of handling at first, the unit wall body 7 of this continuous wall system of casting in advance is double wall formula kenel, in ground (factory, the processing place) casting system in advance forms, and can make appropriate waterproofing work (as going up earlier marine glue) earlier at its outer wall, the structure of the unit wall body 7 of this double wall formula (shown in Fig. 2-4) is provided with: on two groups, infrabasal plate 1, can be set as the steel plate of T type shape or constitute by shaped steel, setting is symmetry storing up and down, the tabular fish plate 10 that is made as of its level, the perpendicular in addition stiffener 11 that is made as, default some through holes that differ in size 100 on the plate face of the fish plate 10 of substrate 1, look its demand again to the grasping force of cement, in addition last, on the vertical panel face of infrabasal plate 1, be provided with some shearing steel parts 111;
One cage construction is located between the upper and lower substrate 1 by being arranged on stiffener 11 relative inner faces for 2 groups, and be provided with frame 20 in cage construction 2 both sides, this frame 20 can be made as back curved platysome or be made of shaped steel, or can be concave-convex surface in opposite directions symmetrical limit the buttcover plate face (as shown in Figure 5, the butt joint kenel of another shape of lateral frame board), on the plate face of frame 20, preset some screws 200 again; 20 of frames are then arranged and are provided with some supports 21, this support 21 can be by angle steel, shaped steel or reinforcing bar constitute, required at 21 TV structure bodies of two two stands, and row are established some struts 22 again, this strut 22 can be by upright bar reinforcing bar or angle steel, shaped steel forms, and strut 22 1 bottoms in structure, contract be provided be in hole slot be made as abutting end 220 (as shown in Figure 6, wherein be strut 22 users with the reinforcing bar, can utilize the continuous device of reinforcing bar to connect the abutting end 220 of group at strut 22, can supply last, the joint of lower unit wall body 7 is more convenient rapidly, and it is firm), the fish plate 10 plate faces that the other end then protrudes out substrate 1 are made as elongated end 221 (as Fig. 3, shown in 4), can keep supplying, lower unit structure wall body 7 correspondences are convenient to engage, more connect group on 21 on support again and be installed with net transverse sheet 23, use for internal mold, 20 of frames in cage construction 2 are provided with many horizontal bars 24 that are horizontally set in addition, this horizontal bar 24 forms affixed with support 21, secondly, the end that the support of erectting in subtend is 21 is provided with junction plate 25 cross-over connections that link to each other subtend two supports 21, junction plate 25 another far-ends of this support 21 then connect establishes a plate 26 (as Fig. 2, shown in 6), on two continuous walls, lower unit wall body 7 can utilize the junction plate 25 of the plate 26 corresponding next unit wall bodies 7 of a unit wall body 7 to fit and dock, moreover, relative inner face at two two stands 21 and frame 20, and be installed with the steel bar 27 that the truss pattern maybe can be ladder type, a side framework 20 of cage construction 2 is (near having a side that connects structure mechanism 6 in addition, about cage construction 2 by nearly 2/3rds places of a side) the appropriate position, be provided with the dividing plate 28 that mesh flake constitutes tabular pattern in 2 of cage constructions and group, this dividing plate 28 also can be installed on the steel bar 27 of 21 on support of coupling mechanism 6 one sides, in addition at 23 of the net matrixs of cage construction 2 (or 22 oblique of support 21 or struts), the needs of visual element structure wall body 7 its stiffness, other is provided with steel bar 29 (as shown in Figure 7) mitered of putting more energy into of some truss patterns.
Some overlap joint steel bars 2 shown in Fig. 1,4, are to connect group by cage construction 2 or its horizontal bar 24 places, and extend to wall body one side of basement, supply the bar splicing of the building structure of connecting wall and basement to use; Overlap joint steel bar 3 can be and bends in advance in reserving groove or be various steel bar connector.
Again, in order to be beneficial to underground connecting wall and basement structure body good combination, when frame group template, need the position of corresponding overlap joint steel bar 3 to reserve groove 4 (as shown in Figure 4), in addition, on being beneficial to, the intersegmental joint of lower unit wall body 7 and front and back team, and last, on the infrabasal plate 1, following fish plate 10 plate faces and frame 20 have a side deckle board face of screw 200, the corresponding punch position place of winding mutually, reserve for spiro connecting element N and can wear group screw 200 and through hole 100 groove 5 (as shown in Figure 4) with affixed two unit wall bodies 7, and above cage construction 2 appropriate position, need to reserve several hanging and carry hole 8, the double wall structure of these hole 8 break-through wall bodies 7 is (as Fig. 3, shown in 4).
Continuous wall block construction body skeleton through above formation, behind 2 liang of lateral surfaces difference of cage construction frame group external mold of double wall, make 23 of cope match-plate pattern and net matrixs form the concrete perfusion interval, then can go in the metope space by the grout hole place that reserves (be upper substrate 1 than large through-hole 100) concrete perfusion, treat to pull down exterior sheathing after the concrete setting, can form the continuous wall unit wall body 7 of double wall formula.
Moreover, because the width of groove B need be borrowed can ccontaining group of unit wall body 7, so working as with the wall of groove B, unit wall body 7 stays clearance, at this moment, can be from the corresponding group in advance some intrusion pipe H (shown in Fig. 3,4) of upper substrate 1 end face several through holes 100 places in the outer part of unit wall body 7, in order to injecting mud, make it ooze out double wall two outer side surfaces through intrusion pipe H, allow between unit wall body 7 and groove B metope the residue space fill up concordant and wall body 7 close and firm in groove B is located.
Secondly, between two walls of the continuous block construction body of wall in it then side subtend end face pivot group coupling mechanism 6 is arranged (as Fig. 2,3,5, shown in 8 and 9), this coupling mechanism 6 mainly is provided with the plate body 60 that two subtends are joined, be fixed in the double wall of continuous wall block construction wall body 7 and the inboard ora terminalis of subtend in the two side ends respectively of two plate bodys 60 with pivot connecting element T pivot group, the other end of two plate bodys 60 is with the articulated section be axle and free to rotate, make two plate bodys 60 to group, fan door-plates to establishing kenel as two, be provided with the grab 601 of symmetry again at the some appropriate locations of plate face of plate body 60, one retaining is held member 61 and is striden group in two plate bodys, 60 grabs 601, and the retaining group is at the interior plate face of plate body 60, it is provided with hack lever 610 and tightening latch 611 is formed shape like ladder, so utilize tightening latch 611 to stride frame in grab 601, the free end retaining of plate body 60 is held and can be fixed tentatively the position, formed coupling mechanism 6 is at the side of block construction wall body 7, and the effect of formation end baffle is (as Fig. 4, shown in 5).
Six, connect on the continuous wall of group, lower unit structure wall body 7: when the unit wall body 7 of the continuous wall of double wall formula of first module hangs slowly in excavating groove B, it with shaped steel again year hole 8 of hanging that load bar I passes wall body 7 tops, so that these unit wall body 7 supports are located at the exit or entrance of a clitch of groove B, and the unit wall body 7 of getting another double wall formula is folded group last, at first last, the retaining of the coupling mechanism 6 in the lower unit wall body 7 is held member 61 and is connected (as shown in Figure 8) with shackles S, secondly, make two folded 7 of the unit wall bodies of organizing be positioned at the unit wall body 7 of below, go into unit, top wall body 7 with elongated end 221 insert groups of its strut 22, in the abutting end 220 of its strut 22 (as shown in Figure 6), and the plate 26 of unit, top wall body 7 is fitted with the junction plate of unit, below wall body 7 25, and 7 of two unit wall bodies need be laid a waterstop P (as shown in Figure 6) between the plate face of butt joint substrate 1, and in the order, groove 5 that the unit wall body of following butt joint is 7 and the through hole 100 that wherein Gong is spirally connected align each other, utilize spiro connecting element N to pass two unit wall bodies 7 again, the through hole 100 of substrate 1 is screw lock winding fixed bit in addition, after 7 windings of two unit wall bodies are finished, just earlier two unit wall bodies of stacked combination are sling, again load bar I is withdrawn, insert among the groove B so that connect the unit wall body 7 of group, means reach (unit wall body 7 tops that promptly folded group goes up most have been connected to the exit or entrance of a clitch, groove B top) after the desired depth so that some unit wall body 7 assembling is engaged according to this, can push up and penetration concrete from the unit of top wall body 7, relend the dividing plate 28 that has netted pattern or tabular pattern between wall body 7 double walls and separate effect, the concrete spouting that makes injection is to dividing plate 28 positions (that is about dot element integral body 2/3rds), and by being embedded in intrusion pipe H in unit wall body 7 wall surfaces, mud is poured in construction slit between wall body 7 and soil layer, so, finish the sessions of the continuous wall of first paragraph.
Seven, return back to second step and begin the unit construction of another paragraph again, again when the continuous wall block construction wall body 7 of second stage hangs, before making, the wall body 7 of after-stage is convenient to assembling and is fitted tightly winding really, can roller be set at the top edge of 7 of front and back section wall bodies, borrow the wall body 7 of stream wheel guiding the latter half, before making, the back forms wall body 7 winding therebetween of two-stage, can reduce resistance, and then can allow adaptation better, and it is preceding, 7 of after-stage wall bodies also need add waterstop P, waterproof effect (shown in Fig. 5-7) with effective raising joint, so when 7 windings of second stage wall body finish and with 7 applyings of leading portion wall body after, just can be with the coupling mechanism 6 of 7 of front and back section wall bodies, 61 pull-ups of retaining structure spare, tightening latch 61 is broken away to be held the retaining of plate body 60, again by the grouting of the top between two walls of the cage construction 2 of wall body 7, so having the concrete perfusion of constructing simultaneously from leading portion wall body 7 side segment (about 1/3rd) to 2/3rds of back one section wall body 7 joins, and it is preceding, the coupling mechanism 6 that the back segment wall body is 7, when concrete perfusion, borrow concrete weight impulse force just can wash the plate body 60 of similar two fan door-sheet butt joints open (as shown in Figure 9), so, just the concrete structure unanimity of continuous wall of two stages before and after can making, and the subtend plate body 60 of this coupling mechanism 6 is turning again and stride group preceding, 7 of after-stage wall bodies, make to form between continuous wall and connect steelframe, before making, the structure that the after-stage wall body is 7 has joint, and can improve the intensity of structure, and the wall body 7 in stage can connect and organizes more driving fit before and after allowing, and raising waterproof effect
So, implement according to above-mentioned step repetitiousness, block construction wall until continuous wall becomes connection to take group successively, just can form the configuration of a continuous wall, then can excavate operation, after the ground digging is dug and has been established, before passing respectively with spiro connecting element N again, each wall body 7 that after-stage joins, screw 200 on frame 20 its plate faces that join therebetween, with the wall body 7 that will be connected again screw lock fix, so, again with the front and back side screw lock winding in addition of each wall body 7, utilize overlap joint steel bar 3 in the chase 5 be preset at the interior wall face portion to pull out again again and stretch to basement wall direction, just can utilize this overlap joint steel bar 3 and ground reinforcing bar to overlap steel mutually and connect 3 and overlap mutually, form one state (as shown in figure 10) for conspiring to create to be fixedly connected with the ground reinforcing bar.
Place the double wall bottom of the unit wall body 7 of the bottom to can be flat or sharp limit kenel, but need not establish the groove 4 of plate 26 and inboard metope.
In addition, when implementing the grouting operation, also can splice the frame group when finishing a stage at wall body 7, only bottom partly concrete perfusion as a stage, then repeat construction again, after continuous wall was finished by 1 winding of unit wall body, from top while concrete perfusion, then the concrete in the middle of the double wall also can form the integral body with coherence again.
Advantage of the present invention and effect are as follows:
One, adopts the combined type form of construction work, i.e. the precasting double wall of outside use suitability for industrialized production in the continuous wall Form, pars intermedia be respectively with the construction of terrain concrete perfusion, so, can borrow high-quality precasting double wall Construction method protective layer deficiency, the reinforcing bar grip of improving known steel reinforcement cage (or PC plate) are not good, and wall body The defectives such as cracking, steel bar corrosion, in addition, concrete perfusion between double wall, but the forward and backward stage wall of cross-over connection Body forms uniformity, also can improve the problem of joint infiltration between traditional integrated wall body unit.
Two, lifting precasting double wall formula continuous wall unit wall body in the excavation groove can utilize the double wall opposing Lateral earth pressure, with avoid advancing to bury in the prior art method insert steel reinforcement cage and concrete perfusion consuming time excessively of a specified duration, resistance of soil Descend, collapse in the accidents such as hole and double team and produce, more can improve the interior silt particle of groove and sneak into concrete, and affect The defective of concrete quality.
Three, wall body end face in unit to be having the plate body of pivot group door leaf template formula, and utilizes gear to hold the member block The coupling mechanism of body displacement is as end plate, when gear is held member and withdrawn no longer the block resistance plate body, at concrete perfusion The time, borrow concrete weight impulse force, just can open by the plate body that door leaf is board-like, more can utilize door leaf tabular But the continued access steelframe between plate body conduct and forward and backward stage unit wall, and then, improve in twos between the unit wall body Tensile material is discontinuous.
Four, between upper and lower unit wall body with the fixing combination of splicing mutually that is spirally connected, make construction depth more not limited and Also improve traditional handling steel reinforcement cage and bury the PC plate underground, because it is all integrated structure, its length, Highly be subject to the restriction of transporting equipment and construction space.
Five, in advance casting is made, splicing arranges the groove that inserts continuous wall, this specification of structure one of unit again Cause, can effectively grasp the wall precision.
Six, the continuous wall unit wall body light precasting of double wall formula is for subsequent use, and its metope also can be done earlier the water-repellent paint place Reason, and in twos between the unit wall body all group be provided with water blocking tape, make the integral body of continuous wall really have waterproof, anti-Ooze effect.
Seven, reserve the overlap joint steel bar, be beneficial to the winding of continuous wall and ground reinforcing bar, and then strengthen continuous wall and ground Intensity between based structures.
Eight, again for the chase of accommodating reservation overlap joint steel bar, also can establish the water band in this chase, except making the ground metope And grasp between continuous wall, outside the effect of firm combination, also can avoid the puzzlement of composition surface infiltration.
Nine, the continuous wall cell-wall body structure of double wall formula, on the ground (places such as workshop, processing place) Precasting manufacturing, product mass-energy are fully managed control, reliability height, and need not surdimensionnement, and tradition construction Method safety, economic and quick.

Claims (16)

1, the continuous underground wall construction method of the folded group of a kind of heavy cunning double wall is characterized in that step is:
One, builds and lead wall;
Two, excavation groove;
Three, verticality is surveyed;
Four, clean baffle plate, and remove the bed mud of groove bottom;
Five, install the continuous wall of first double wall formula unit wall body, and the unit wall body of this continuous wall is the double wall pattern, symmetrically arranged upper and lower substrate about it is provided with and is; The cage construction group is located between upper and lower substrate, also being provided with some supports connects between upper and lower substrate, be provided with many horizontal bars and support again and be the line setting, between the support of arranging, be installed with the net matrix, between support subtend facing each other, be provided with the steel bar of hanger pattern in addition; Constitute the skeleton of continuous wall thus in advance, behind the shut die, filling prize, just can be prefabricated into the continuous wall unit wall body of two wall formulas at two external walls of this cage construction;
Six, the upper and lower unit of the continuous wall wall body of winding splices the continuous unit wall body of wall and inserts in the groove, and from the unit of top wall body end face penetration concrete;
Seven, return back to the unit construction that second step begins another paragraph again, finish connection until continuous wall.
2, the cell-wall body structure of the diaphragm wall of the folded group of a kind of heavy cunning double wall, it is characterized in that: it comprises upper and lower substrate and cage construction, wherein upper and lower substrate goes to upper and lower and is symmetrical arranged, the skeleton group is located between upper and lower substrate, this cage construction is provided with some supports and connects between upper and lower substrate, many again horizontal bars and support are the line setting, set firmly the net matrix between the support of arranging, and are provided with some steel bars in addition between support facing each other is relative.
3, by the folded cell-wall body structure of organizing the diaphragm wall of double wall of the described heavy cunning of claim 2, it is characterized in that: described substrate is the T type, and the level board face is made as fish plate, this fish plate intermediate vertical be provided with and add plate, the fish plate plate face at substrate is provided with some through holes that differ in size again.
4, by the folded cell-wall body structure of organizing the diaphragm wall of double wall of the described heavy cunning of claim 2, it is characterized in that: the upper and lower substrate two ends of described cage construction are respectively equipped with frame, and with corresponding joining of butt joint side of another unit wall body of continuous wall of opposite side.
5, by the folded cell-wall body structure of organizing the diaphragm wall of double wall of the described heavy cunning of claim 2, it is characterized in that: row establishes some struts and this strut becomes shaped steel to form by the vertical bar reinforcing bar between the support of described cage construction, an end of this strut is provided with the abutting end in the recessed structural member again, and the other end be provided with the fish plate plate face that stretches out substrate elongated end and with the corresponding joint of upper and lower cell-wall body structure.
6, by the cell-wall body structure of the diaphragm wall of the folded group of the described heavy cunning of claim 5 double wall, it is characterized in that: the abutting end of described strut is to contract in structure and is provided with interior hole slot, and the strut of reinforcing bar formula constitutes abutting end with the continuous device of reinforcing bar.
7, by the folded cell-wall body structure of organizing the diaphragm wall of double wall of the described heavy cunning of claim 2, it is characterized in that: the end span of described cage construction between the support of relatively erectting established the junction plate of the support that links to each other, and connects at another far-end of the junction plate of support again and establishes a plate.
8, by the continuous underground wall construction method of the folded group of the described heavy cunning of claim 1 double wall, it is characterized in that: between the continuous wall two unit wall bodies of described double wall formula, be provided with coupling mechanism.
9, by the continuous underground wall construction method of the folded group of the described heavy cunning of claim 8 double wall, it is characterized in that: described coupling mechanism is provided with two plate bodys that connect relatively and a retaining is held member, and wherein, plate body articulates with axle, and retaining is held member retaining group in the plate body lateral plates.
10, by the continuous underground wall construction method of the folded group of the described heavy cunning of claim 9 double wall, it is characterized in that: described two plate bodys are two fan doors to establishing.
11, by the continuous underground wall construction method of the folded group of the described heavy cunning of claim 9 double wall, it is characterized in that: described plate body interior plate face place is provided with the grab of symmetry.
12, by the continuous underground wall construction method of claim 9, the folded group of 11 described heavy cunnings double wall, it is characterized in that: described retaining is held member and is made of hack lever and tightening latch, and this tightening latch is crossed in the grab of plate body, connects with grab between upper and lower again hack lever.
13, by the continuous underground wall construction method of the folded group of the described heavy cunning of claim 1 double wall, it is characterized in that: mitered adds steel bar between the net matrix of described cage construction or between support.
14, by the folded continuous underground wall construction method of organizing double wall of the described heavy cunning of claim 1, it is characterized in that: described grouting operation is spliced the frame group when finishing a stage at wall body, only at bottom part concrete perfusion, then repeat construction again, after continuous wall is finished by unit wall body winding, again from top while concrete perfusion.
15, by the continuous underground wall construction method of the folded group of the described heavy cunning of claim 1 double wall, it is characterized in that: after between described upper and lower block construction wall body waterstop being set, use the spiro connecting element winding again.
16, by the folded continuous underground wall construction method of organizing double wall of the described heavy cunning of claim 1, it is characterized in that: need to lay waterstop between the continuous wall wall body in described forward and backward stage, again behind the excavation of excavation both sides, wear the screw of cage construction of group two unit wall bodies again with spiro connecting element, the combination that is spirally connected of two wall bodies.
CN 99122203 1999-10-12 1999-10-12 Construction method and structure of continuous underground wall of dual-layer wall Expired - Fee Related CN1117905C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 99122203 CN1117905C (en) 1999-10-12 1999-10-12 Construction method and structure of continuous underground wall of dual-layer wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 99122203 CN1117905C (en) 1999-10-12 1999-10-12 Construction method and structure of continuous underground wall of dual-layer wall

Publications (2)

Publication Number Publication Date
CN1291670A true CN1291670A (en) 2001-04-18
CN1117905C CN1117905C (en) 2003-08-13

Family

ID=5282357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 99122203 Expired - Fee Related CN1117905C (en) 1999-10-12 1999-10-12 Construction method and structure of continuous underground wall of dual-layer wall

Country Status (1)

Country Link
CN (1) CN1117905C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469801A (en) * 2013-09-03 2013-12-25 上海建科工程咨询有限公司 Method for constructing foundation pit enclosure structure on basis of prefabricated ground walls
CN106284304A (en) * 2016-08-09 2017-01-04 上海市机械施工集团有限公司 A kind of pre-manufactured steel casing diaphram wall and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469801A (en) * 2013-09-03 2013-12-25 上海建科工程咨询有限公司 Method for constructing foundation pit enclosure structure on basis of prefabricated ground walls
CN106284304A (en) * 2016-08-09 2017-01-04 上海市机械施工集团有限公司 A kind of pre-manufactured steel casing diaphram wall and construction method thereof

Also Published As

Publication number Publication date
CN1117905C (en) 2003-08-13

Similar Documents

Publication Publication Date Title
CN101939492B (en) Precast temporary facility structure and construction method for the same
US6240700B1 (en) Constructing method for underground continuous double-row walls and the structure of continuous double-row walls
CN1958966A (en) Underground consecutive sinking well type openweb wall body, and construction method
CN106013218A (en) Building method for open caisson for underground garage
CN1076982A (en) The excavator of building diaphragm wall and the building method of diaphragm wall
CN114319396A (en) Construction method of bottomless box cofferdam suitable for underwater complex geological conditions
CN1167857C (en) Foundation pit side-wall flexible support method
CN110939455B (en) Construction method of tunnel portal structure
CN1048573A (en) Building basement precasting on the ground vertically falls job practices
CN1117905C (en) Construction method and structure of continuous underground wall of dual-layer wall
CN1512012A (en) Plastic and earth-work combined retaining wall
CN104074197A (en) Large-diameter thin-walled tubular pile composite anchor rod type foundation pit support structure and construction method thereof
CN1206429C (en) Wall module of well walls and method for building wall bodies of well walls by using module
CN1129273A (en) Technology for forming underground continuous wattled wall and apparatus thereof
CN1837514A (en) Column supported underground continuous wall
CN1177108C (en) Technology for building continuous underground wall of dual-layer wall by stirring and deposition
JP2001193058A (en) Construction method of diaphragm wall and unit wall of diaphragm wall
KR20070000368A (en) Construction structure, unit for use in construction structure and carrying apparatus
KR20060136338A (en) Construction structure, unit for use in construction structure and carrying apparatus
CN1156633C (en) Steel-frame building structure
CN113235645B (en) Tower crane foundation reserved joint bar assembly type forming die construction method
JP2001207445A (en) Construction method of diaphragm wall
CN1873164A (en) Construction method for multi-storied building
CN1431385A (en) General self-support closed digging structure
RU2465401C1 (en) Method to erect underground structures by "wall in soil" method and wall in soil erected by this method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee