CN1290798A - Hole drilling technology for cohesionless prestressed concrete roof board - Google Patents

Hole drilling technology for cohesionless prestressed concrete roof board Download PDF

Info

Publication number
CN1290798A
CN1290798A CN 00129321 CN00129321A CN1290798A CN 1290798 A CN1290798 A CN 1290798A CN 00129321 CN00129321 CN 00129321 CN 00129321 A CN00129321 A CN 00129321A CN 1290798 A CN1290798 A CN 1290798A
Authority
CN
China
Prior art keywords
hole
presstressed reinforcing
concrete
reinforcing steel
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 00129321
Other languages
Chinese (zh)
Other versions
CN1121542C (en
Inventor
胡伟
洪湘
王履塽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 00129321 priority Critical patent/CN1121542C/en
Publication of CN1290798A publication Critical patent/CN1290798A/en
Application granted granted Critical
Publication of CN1121542C publication Critical patent/CN1121542C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The hole drilling includes the process of digging concrete floor board in the designed position to expose prestressed ribs to be cut, fixing the steel frame in required size in the hole, anchoring post-fitted anchor tackle to the prestressed ribs by usign a special extruder, fixing the anchor tackle onto the steel frame by using baffle plate with U-groove, depositing the hole edge and steel frame into integral steel-concrete frame and final cutting the prestressed ribs after tha concrete reaches its designed strength.

Description

A kind of hole drilling technology for cohesionless prestressed concrete roof board
The present invention relates to a kind of hole drilling technology for cohesionless prestressed concrete roof board field.
Punch at the unbonded prestressed concrete superstructure that has built up, traditional job practices is divided into three phases: the first step is treated the transformation superstructure earlier and is supported temporarily, simultaneously local stiffening is carried out at the position that punches.Chisel concrete floor system for second one, at the hole lateral dominance with work anchor with the prestressed reinforcement anchoring, cut off reinforcing bar then, put the tension prestress reinforcing bar.Reinforce the hole for the 3rd one, prestressed reinforcement of tensioning is removed the superstructure support system again.The major defect of this its existence of job practices is: the job practices complex procedures, corresponding engineering expense height is especially opened and stretch-draw once more putting of prestressed reinforcement, has not only prolonged the engineering time, increased engineering cost, and also will produce harmful effect for the stress performance of concrete floor system.
The objective of the invention is to invent a kind of hole drilling technology for cohesionless prestressed concrete roof board, it blocks the prestressed reinforcement operation behind anchoring prestressed reinforcement and the reinforcing hole and forms by punching, and makes job practices simple, and engineering cost reduces, and has shortened the engineering time.
The present invention is achieved in that at the design position and chisels concrete floor, and presstressed reinforcing steel to be blocked is come out, and the structural steel frame of making according to dimension of opening in advance is fixed on the place, hole; Adopt dedicated extruded facility that rear installed intermediate plate ground tackle is anchored on the presstressed reinforcing steel to be blocked; The band U-lag plate washer the rear installed intermediate plate ground tackle on the presstressed reinforcing steel is fixed on the structural steel frame, then the edge, hole is become the steel reinforced concrete frame with the structural steel frame integral cast, treat that concrete reaches design strength after, cut off presstressed reinforcing steel and finish the engineering that punches.
Advantage of the present invention is: job practices is simple, saves the duration 50%, saves construction costs 60% and since in work progress strong transfer all under the state of no relative displacement, finish, during as the installation ground tackle, do not have relative displacement between ground tackle and the presstressed reinforcing steel; When ground tackle is connected with structural steel frame, there is not relative displacement between the two yet; After cutting off presstressed reinforcing steel, presstressed reinforcing steel pulling force calmness is transferred to structural steel frame, and therefore, in whole superstructure punched transformation process, presstressed reinforcing steel and concrete stress state did not all change.
Below in conjunction with embodiment, the present invention will be further described:
Chisel concrete floor at the design position, presstressed reinforcing steel to be blocked is come out, the structural steel frame of making according to dimension of opening in advance is fixed on the place, hole; Adopt dedicated extruded facility that rear installed intermediate plate ground tackle is anchored on the presstressed reinforcing steel to be blocked; The band U-lag plate washer the rear installed intermediate plate ground tackle on the presstressed reinforcing steel is fixed on the structural steel frame, then the edge, hole is become the steel reinforced concrete frame with the structural steel frame integral cast, treat that concrete reaches design strength after, cut off presstressed reinforcing steel and finish the engineering that punches.

Claims (1)

1 one kinds of hole drilling technology for cohesionless prestressed concrete roof board is characterized in that: chisel concrete floor at the design position, presstressed reinforcing steel to be blocked is come out, the structural steel frame of making according to dimension of opening in advance is fixed on the place, hole; Adopt dedicated extruded facility that rear installed intermediate plate ground tackle is anchored on the presstressed reinforcing steel to be blocked; The band U-lag plate washer the rear installed intermediate plate ground tackle on the presstressed reinforcing steel is fixed on the structural steel frame, then the edge, hole is become the steel reinforced concrete frame with the structural steel frame integral cast, treat that concrete reaches design strength after, cut off presstressed reinforcing steel and finish the engineering that punches.
CN 00129321 2000-11-17 2000-11-17 Hole drilling technology for cohesionless prestressed concrete roof board Expired - Fee Related CN1121542C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 00129321 CN1121542C (en) 2000-11-17 2000-11-17 Hole drilling technology for cohesionless prestressed concrete roof board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 00129321 CN1121542C (en) 2000-11-17 2000-11-17 Hole drilling technology for cohesionless prestressed concrete roof board

Publications (2)

Publication Number Publication Date
CN1290798A true CN1290798A (en) 2001-04-11
CN1121542C CN1121542C (en) 2003-09-17

Family

ID=4593401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 00129321 Expired - Fee Related CN1121542C (en) 2000-11-17 2000-11-17 Hole drilling technology for cohesionless prestressed concrete roof board

Country Status (1)

Country Link
CN (1) CN1121542C (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101205765B (en) * 2006-12-20 2010-12-08 上海市第一建筑有限公司 Construction method for door opening of old structural underground wall
CN103147592A (en) * 2013-03-25 2013-06-12 湖南省建筑工程集团总公司 Re-anchoring and cut-off construction method of unbonded prestressed reinforcement during partial dismantling of existing building
CN103628698A (en) * 2013-12-09 2014-03-12 中国建筑一局(集团)有限公司 Construction method for holing pre-stressed floor slab in structural strengthening engineering
CN108425506A (en) * 2018-03-19 2018-08-21 中冶建筑研究总院有限公司 To the method that punches of existing prestressed structure plate
CN109441138A (en) * 2018-12-20 2019-03-08 中冶建筑研究总院有限公司 To the method that punches of existing prestressed structure plate
CN110778139A (en) * 2019-10-21 2020-02-11 上海市政工程设计研究总院(集团)有限公司 Local hole-opening construction method for unbonded prestressed tendon concrete slab

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101307650B (en) * 2004-06-09 2010-09-01 邱则有 Open formwork element for concrete filling

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101205765B (en) * 2006-12-20 2010-12-08 上海市第一建筑有限公司 Construction method for door opening of old structural underground wall
CN103147592A (en) * 2013-03-25 2013-06-12 湖南省建筑工程集团总公司 Re-anchoring and cut-off construction method of unbonded prestressed reinforcement during partial dismantling of existing building
CN103147592B (en) * 2013-03-25 2014-02-19 湖南省建筑工程集团总公司 Re-anchoring and cut-off construction method of unbonded prestressed reinforcement during partial dismantling of existing building
CN103628698A (en) * 2013-12-09 2014-03-12 中国建筑一局(集团)有限公司 Construction method for holing pre-stressed floor slab in structural strengthening engineering
CN103628698B (en) * 2013-12-09 2015-11-25 中国建筑一局(集团)有限公司 The construction method that in structural fortification, pre-stress floor punches
CN108425506A (en) * 2018-03-19 2018-08-21 中冶建筑研究总院有限公司 To the method that punches of existing prestressed structure plate
CN109441138A (en) * 2018-12-20 2019-03-08 中冶建筑研究总院有限公司 To the method that punches of existing prestressed structure plate
CN110778139A (en) * 2019-10-21 2020-02-11 上海市政工程设计研究总院(集团)有限公司 Local hole-opening construction method for unbonded prestressed tendon concrete slab

Also Published As

Publication number Publication date
CN1121542C (en) 2003-09-17

Similar Documents

Publication Publication Date Title
CN103615053B (en) Monolithic reinforced concrete structure post empiricism engineering method
CN106088148B (en) Pipe gallery template and its application
CN1121542C (en) Hole drilling technology for cohesionless prestressed concrete roof board
CN203200745U (en) Strengthening support of underground diaphragm wall in inverse construction method
CN101550723A (en) Construction method for codes of reserved structural column longitudinal steel bars
CN208996442U (en) A kind of working early-dismantling formwork system of cast-in-place concrete structure
CN203347233U (en) Tapered tie bolt for large steel formworks
CN1200170C (en) Construction method for longitudinally assembling prefabricated subsection of channel beam
CN210013073U (en) Assembled elevated expressway for loading and unloading ramps
CN109057322A (en) A kind of cast-in-place concrete early-dismantling formwork system and its construction method
CN214828502U (en) Prefabricated steel reinforcement cage hoist and mount construction equipment of culvert
CN105755943B (en) A kind of Arch Bridge Ribs block section and its construction method
CN201507115U (en) Stereotyped steel moulding plate with reinforcing steel bar reserve channels
CN111677000B (en) Method for simultaneously removing multiple connection parts of side wall of new and old subway station
CN201526157U (en) Concrete floor shaping lateral formwork
CN200955154Y (en) Tower-type crane '+' shaped steel structure base
CN215948630U (en) Embedded part reinforcing structure for high-truss laminated slab system
JP3889497B2 (en) Molding method for concrete basement
KR20080005134U (en) Precast panel for construction of retaining wall
CN214117604U (en) Embedded interface treating agent spraying device for building reinforcement operation
CN1117202C (en) Shutterings for prefabricating reinforced concretes of beams and columns for building frame and their installation technique
CN1485502A (en) Construction method of hanging module and cast-in-situ for ballast slab of channel beam
KR19990033150U (en) Guide Pipe for Rod Vibrator
CN216475156U (en) Multifunctional bridge support expansion foundation module
CN217759545U (en) Reinforced structure of precast concrete board

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee