CN1200170C - Construction method for longitudinally assembling prefabricated subsection of channel beam - Google Patents

Construction method for longitudinally assembling prefabricated subsection of channel beam Download PDF

Info

Publication number
CN1200170C
CN1200170C CN 02137151 CN02137151A CN1200170C CN 1200170 C CN1200170 C CN 1200170C CN 02137151 CN02137151 CN 02137151 CN 02137151 A CN02137151 A CN 02137151A CN 1200170 C CN1200170 C CN 1200170C
Authority
CN
China
Prior art keywords
construction
channel beam
present
prefabricated
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02137151
Other languages
Chinese (zh)
Other versions
CN1485498A (en
Inventor
沈秀芳
陈文艳
顾民杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Original Assignee
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering and Rail Transit Design and Research Institute filed Critical Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority to CN 02137151 priority Critical patent/CN1200170C/en
Publication of CN1485498A publication Critical patent/CN1485498A/en
Application granted granted Critical
Publication of CN1200170C publication Critical patent/CN1200170C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The present invention relates to the construction of bridges and over bridges and an erection type, particularly to a construction method for longitudinally assembling prefabricated subsections of channel beams. The present invention has the method that the channel beams are sectionally prefabricated, and then, the sectionally prefabricated channel beams are assembled into an integral channel beam on lifting devices, such as bridge-erecting machines, etc. The present invention has the advantages that the construction can not generate great influence on urban environment and ground traffic; construction cost is saved; the construction period is shortened, and the present invention is convenient for the implementation of standardized construction, standardized construction and mechanized construction.

Description

The job practices of longitudinally assembling prefabricated subsection of channel beam
Technical field
The present invention relates to bridge and viaduct build and bridge set up class, particularly a kind of job practices of longitudinally assembling prefabricated subsection of channel beam.
Background technology
The job practices of the bridge that domestic existing orbit traffic overhead bridge is adopted all is to adopt the cast-in-place on the spot job practices of full framing usually, and the flow process of this method is: A. sets up support on the ground of handling well, makes template then on support; B. assembling reinforcement and bellows on template are installed with prestressing tendon in the bellows; C. water and smash the beam body concrete; Reach certain intensity and after the length of time Deng the beam body concrete, the whole prestressing force of stretch-draw beam body; D. mud jacking sealing off and covering anchorage and striking and template.This job practices has following shortcoming: during (1) construction, whole bridge is all established support from ground in the plane of projection, and is very big to the influence of urban environment and traffic above-ground; (2) ground has enough deadweight of bearing capacity brace summer body and working load under when construction bridge in order to make, and needs before the construction flatten and consolidation process ground under the bridge, increases operating expenses, has delayed construction speed, and if deal with improperly, has easily caused beam body cracking; (3) owing to all adopt field fabrication, be difficult to accomplish standardization, standardization, mechanized construction, be unfavorable for total quality control, the construction period is longer.
Summary of the invention
The objective of the invention is according to above-mentioned the deficiencies in the prior art part, a kind of job practices that is applicable to channel beam is provided, it is the job practices of the vertical assembly unit of prefabricated subsection, plant equipment such as this job practices employing bridge formation machine are carried out assembly unit, do not need support to be set from ground, corresponding also the needs flattens and consolidation process ground under the bridge, is convenient to carry out standardization, standardization, mechanized construction.
The object of the invention realizes being finished by following technical scheme: a kind of job practices of channel beam is characterized in that: A. elder generation prefabricate channel beam, a promptly prefabricated as required sections channel beam; B. at the scene, on lifting appliances such as bridge formation machine, the channel beam of prefabricate is assembled into whole channel beam; C. prestressing tendon in the stretch-draw channel beam; D. the prestressing tendon to stretch-draw carries out the mud jacking sealing off and covering anchorage.
Advantage of the present invention is that (1) owing to do not need from ground support to be set, construction can not produce considerable influence to urban environment and traffic above-ground; (2) do not need ground under the bridge is flattened and consolidation process, saved unnecessary operating expenses and shortened the duration; (3) be convenient to carry out standardization, standardization, mechanized construction, be easy to control construction quality and duration.
Summary of drawings
Accompanying drawing 1 is structural representation of the present invention.
Concrete technical scheme
Feature of the present invention and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, so that technician's of the same trade understanding:
As shown in Figure 1, always representing respectively in the accompanying drawing: prefabricate channel beam 1, shear connector, location tongue and groove 2 with reference to label 1-2.
Embodiment:
As shown in Figure 1, A. is earlier at factory's longitudinal divisions pregroove marks ellbeam, a section promptly prefabricated as required channel beam; B. on the bridge formation machine, shear connector and the location tongue and groove 2 of prefabricated channel beam by its end is assembled into whole channel beam; C. prestressing tendon in the stretch-draw channel beam; D. the prestressing tendon to stretch-draw carries out the mud jacking sealing off and covering anchorage.F. whole channel beam is fallen frame on spanning.

Claims (1)

1. the job practices of a longitudinally assembling prefabricated subsection of channel beam is characterized in that, steps in sequence is: A. is longitudinal divisions pregroove marks ellbeam at first; B. on lifting appliance, the channel beam of prefabricate is assembled into whole channel beam; C. prestressing tendon in the stretch-draw channel beam; D. last prestressing tendon to stretch-draw carries out the mud jacking sealing off and covering anchorage.
CN 02137151 2002-09-26 2002-09-26 Construction method for longitudinally assembling prefabricated subsection of channel beam Expired - Fee Related CN1200170C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02137151 CN1200170C (en) 2002-09-26 2002-09-26 Construction method for longitudinally assembling prefabricated subsection of channel beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02137151 CN1200170C (en) 2002-09-26 2002-09-26 Construction method for longitudinally assembling prefabricated subsection of channel beam

Publications (2)

Publication Number Publication Date
CN1485498A CN1485498A (en) 2004-03-31
CN1200170C true CN1200170C (en) 2005-05-04

Family

ID=34146891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02137151 Expired - Fee Related CN1200170C (en) 2002-09-26 2002-09-26 Construction method for longitudinally assembling prefabricated subsection of channel beam

Country Status (1)

Country Link
CN (1) CN1200170C (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1710207B (en) * 2005-07-11 2010-11-03 上海市政工程设计研究院 Steel strand back-tension prestressed channel mudjacking method
CN101666069B (en) * 2009-09-09 2013-01-23 中建三局建设工程股份有限公司 Construction technology for stretching notch by cast-in-situ prestress box beam
CN102720133B (en) * 2011-03-31 2014-03-05 江苏恩纳斯重工机械有限公司 Ultralow segment lifting bridge girder erection machine with one anchored end
CN102587287B (en) * 2012-03-29 2014-07-16 海波重型工程科技股份有限公司 Construction method for integral lifting of single channel girders of single-span channel girder bridge
CN104099866A (en) * 2014-06-23 2014-10-15 中铁大桥勘测设计院集团有限公司 Prestressed concrete continuous beam channel railway deck
CN105544385B (en) * 2015-12-04 2017-07-28 郑州大学 A kind of seam construction of prefabricated subsection formula concrete-bridge
CN105603880A (en) * 2016-01-25 2016-05-25 中交二公局第一工程有限公司 Assembly method of segmental box beam with reserved pressure grouting hole
CN107119548A (en) * 2017-06-13 2017-09-01 林再颐 A kind of channel change bridge for having anti-high wind ability
CN111608084B (en) * 2020-05-29 2022-03-29 中国铁建大桥工程局集团有限公司 Integral prefabrication and assembly construction method for reinforced concrete arch bridge arch ring segments

Also Published As

Publication number Publication date
CN1485498A (en) 2004-03-31

Similar Documents

Publication Publication Date Title
CN102154992B (en) Dislocation installation method of corrugated steel web
CN1200170C (en) Construction method for longitudinally assembling prefabricated subsection of channel beam
CN105484157A (en) Positioning device and construction method of capping beam of prefabricated bridge
CN107386127A (en) A kind of bridge pier assembly device
CN201169752Y (en) Steel structure anchoring steering system of external prestress for reinforcing old bridge
CN108193607A (en) It is a kind of to reinforce with prefabricated PC truss and its construction method
CN103966956B (en) A kind of hood type concrete filled steel tube reinforces single-column Bridge Pier Construction device and construction method
CN108411769A (en) A kind of assembled device of prefabricated pier shaft and prefabricated bent cap
CN107090908A (en) A kind of new vertical prefabricated components joint connecting method
CN106703292A (en) Prefabricated concrete column of assembly strip steel connector and construction method thereof
CN109024288A (en) A method of using precast concrete pad erecting steel truss girder
CN111926824B (en) Construction method of row pile wall enclosure structure
CN206844316U (en) A kind of assembled steel reinforced concrete column with well and post splicing node
CN106013200B (en) A kind of prefabricated assembled strip footing and construction technology
CN104847055A (en) Grouting-free adhesive-bonded prestressed steel bar and preparation and construction method thereof
CN1216207C (en) Construction method of hanging module and cast-in-situ for ballast slab of channel beam
CN209615835U (en) A kind of self-propelled tamping equipment
CN208697691U (en) A kind of prefabricated trolley of pipe gallery
CN109914476A (en) A kind of construction technology of cast-in-place city integrated piping lane
CN110016992A (en) A kind of assembled primary-secondary beam mounting structure and installation method
CN214828502U (en) Prefabricated steel reinforcement cage hoist and mount construction equipment of culvert
CN211080251U (en) Structure for replacing support by utilizing structural bottom plate when diaphragm wall is used for separating enclosure
CN214883072U (en) Reinforced concrete arch culvert reinforcing structure with enlarged cross section
CN1200171C (en) Construction method for prefabricating ballast slab of channel beam partitionally
CN206902719U (en) Preassembling support beam combines support system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050504

Termination date: 20140926

EXPY Termination of patent right or utility model