CN1221056A CN 98113070 CN98113070A CN1221056A CN 1221056 A CN1221056 A CN 1221056A CN 98113070 CN98113070 CN 98113070 CN 98113070 A CN98113070 A CN 98113070A CN 1221056 A CN1221056 A CN 1221056A
Authority
CN
China
Prior art keywords
internal wall
casing
wall protecting
tube
boots
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 98113070
Other languages
Chinese (zh)
Other versions
CN1089393C (en
Inventor
谢庆道
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Haitong Cci Capital Ltd
Original Assignee
谢庆道
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 谢庆道 filed Critical 谢庆道
Priority to CN 98113070 priority Critical patent/CN1089393C/en
Publication of CN1221056A publication Critical patent/CN1221056A/en
Application granted granted Critical
Publication of CN1089393C publication Critical patent/CN1089393C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A construction method for concrete cylinders buried into soft foundation and the pressed one-pass hole former feature that the cylinder boot is inserted into space between internal and external protecting sleeve tubes, whose lower end faces are in contact with external and internal supporting faces of cylinder boot and whose top end is connected with press cover. The top end of internal protecting sleeve tube is a conic tube, passes through the press cover and into press head, and is communicated with soil discharge hole. The cutting end is pressed into ground and the concrete is poured down. Finally, the protecting sleeve tubes are drawn up. Its advantages are forming hole while discharging soil, high construction speed, and simple structure.

Description

Be embedded in the job practices and the forced one-step pore-creating device of the concrete barrel of subgrade
The present invention relates to a kind of job practices and special-purpose forced one-step pore-creating device thereof that is embedded in the concrete barrel of subgrade.
The concrete barrel that is embedded in subgrade has multiple application in the underground construction engineering, the poured hollow pile in the foundation construction for example, the retaining wall of underground open caisson etc. all is a kind of concrete barrel that belongs to thin wall construction, the known forming method of this concrete barrel be at first protection casing is pressed into underground, then soil taking hole forming and put into core rod between protection casing is with core rod, form the tube hole, be at last in the tube hole, put reinforcing cage and concrete perfusion so that take out core rod and protection casing concrete barrel, this job practices has a large amount of engineering quantitys that fetches earth in pore forming process, both elongated engineering time, increased engineering cost again, concerning poured hollow pile, behind pile, also has the earth backing engineering quantity, this has not only further increased engineering time and expense, and because the soil layer construction behind the earth backing differs widely with the preceding original soil layer construction of construction, cause this soil layer to be negative value with the stiction between the poured hollow pile, obviously, this will weaken the supporting capacity of the poured hollow pile that uses as a kind of friction pile.
The objective of the invention is provides a kind of speed of application job practices and implement the forced one-step pore-creating device of this method special use efficiently for the concrete barrel that is embedded in subgrade.
This job practices that is embedded in the concrete barrel of subgrade is:
1., the tube boots that the lower end formed the tubular of cutting edge are inserted in the outer protection casing that is located at setting with in the tube hole between the internal wall protecting casing, and the lower surface of outer protection casing and internal wall protecting casing is contacted respectively with inner bearing face with the outer bearing surface on the bit, and the internal diameter of the inner bearing face of tube boots is slightly less than the internal diameter of internal wall protecting casing, should outer protection casing and the upper end of internal wall protecting casing be connected with gland, and the upper end of internal wall protecting casing forms the tapering pipe and passes gland and insert the application of force pressure head that places above the gland with the mudhole conducting in the application of force pressure head;
2., above-mentioned tube boots are placed construction location and on application of force pressure head, exert pressure, the tube boots promptly enter soil layer with outer protection casing and internal wall protecting casing, and the earth that quilt tube boots squeeze then enters in the internal wall protecting casing with the gap between the original soil layer that enters internal wall protecting casing along internal wall protecting casing and discharges by mudhole then;
3., treat a boots sink down into demarcate the degree of depth after, the perfusing hole of protection casing concrete perfusion to the tube hole outside being located at, and simultaneously outer protection casing and interior retaining wall pipe are upwards pulled out gradually, at this moment, the tube boots will leave a concrete barrel that tin Kong Bingtong perfusion forms and fuse and be embedded in the subgrade.
The internal wall protecting casing that also is connected among the forced one-step pore-creating utensil of implementing above-mentioned job practices special use has the outer protection casing that the upper end connects with gland and places outer protection casing with gland, and the upper end of internal wall protecting casing form the tapering pipe and pass gland insert place the gland top application of force pressure head with the mudhole conducting in the application of force pressure head, the tube boots that have a lower end to form the tubular of cutting edge are inserted in and are located at outer protection casing with in the tube hole between the internal wall protecting casing, outer bearing surface on these boots contacts with the lower surface of outer protection casing and internal wall protecting casing respectively with inner bearing face, and the internal diameter of the inner bearing face of tube boots is slightly less than the internal diameter of internal wall protecting casing, also is provided with perfusing hole on the outer protection casing.
Above-mentioned job practices comes down to utilize the forced one-step pore-creating device will be as the tube boots of concrete barrel bottom in being pressed into the process of subgrade, realize casting synchronously simultaneously, and therefore disposable formation have speed of application characteristics efficiently for the tube hole of concrete perfusion.
The forced one-step pore-creating device of above-mentioned special use is simple in structure, because the lower end of tube boots forms cutting edge, in the process of its sinking, between internal wall protecting casing is with the original soil layer that enters internal wall protecting casing, form the gap of passing through for the earth that is squeezed by the tube boots again dexterously, therefore, the resistance ratios that the tube boots sink is less, and the speed of pore-forming is just than comparatively fast.
Further illustrate detailed content of the present invention below in conjunction with drawings and Examples.
Accompanying drawing is the structure diagram of forced one-step pore-creating device.
The job practices of the concrete barrel that is embedded in subgrade described in the invention mainly comprises following content.
1., the tube boots 8 that the lower end formed the tubular of cutting edge 7 are inserted in the outer protection casing 2 that is located at setting with in the tube hole 9 between the internal wall protecting casing 3, and the lower surface of outer protection casing 2 and internal wall protecting casing 3 is contacted respectively with inner bearing face 11 with the outer bearing surface 10 on the tube boots 8, and the internal diameter of the inner bearing face 11 of tube boots 8 is slightly less than the internal diameter of internal wall protecting casing 3, should outer protection casing 2 and the upper end of internal wall protecting casing 3 is connected with gland 1, and the upper end of internal wall protecting casing 3 forms tapering pipe 4 and passes application of force pressure head 5 that gland 1 insertion places gland 1 top with interior mudhole 6 conductings of application of force pressure head 5.
2., above-mentioned tube boots 8 are placed construction location and on application of force pressure head 5, exert pressure, tube boots 8 promptly enter soil layer with outer protection casing 2 and internal wall protecting casing 3, and the earth that quilt tube boots 8 squeeze then enters in the internal wall protecting casing 3 with the gap between the original soil layer that enters internal wall protecting casing 3 along internal wall protecting casing 3 and discharges by mudhole 6 then;
3., treat a boots 8 sink down into demarcate the degree of depth after, the perfusing hole 12 of protection casing 2 concrete perfusion to tube hole 9 outside being located at, and simultaneously outer protection casing 2 and internal wall protecting casing 3 are upwards pulled out, at this moment, tube boots 8 will leave a hole 9 and fuse with the concrete barrel that perfusion forms and be embedded in the subgrade.
For the cylindrical shell of reinforced concrete structure, can before cover fitted tube boots 8, at first reinforcing cage be put in the tube hole 9, like this, reinforcing cage just can put in place in the process of pore-forming together synchronously with tube boots 8, shortens the engineering time.The tube boots 8 general prefabricated units that adopt concrete or steel concrete, being applied to the pressure that a boots 8 are sunk can be static pressure, it also can be vibration pressure, but with the Etech employing vibration force of outer protection casing 2 with internal wall protecting casing 3 pull-ups, so both helped concrete with outside, internal wall protecting casing 2, disengaging between 3, again concrete is played the effect of vibrating, in addition, outside, internal wall protecting casing 2,3 all do not pull out before the soil layer, outside also can continuing to utilize, internal wall protecting casing 2,3 overground part forms the overground part of concrete barrel by concrete perfusion.
For implement the custom-designed forced one-step pore-creating utensil of above-mentioned job practices the outer protection casing 2 that the upper end connects with gland 1 is arranged and places outer protection casing 2 among on the internal wall protecting casing 3 that also is connected with gland 1, and the upper end of internal wall protecting casing 3 forms tapering pipe 4 and passes gland 1 insertion and places the application of force pressure head 5 of gland 1 top with mudhole 6 conductings in the application of force pressure head 5, the tube boots 8 that have a lower end to form the tubular of cutting edge 7 are inserted in and are located at outer protection casing 2 with in the tube hole 9 between the internal wall protecting casing 3, outer bearing surface 10 on these boots 8 contacts with the lower surface of outer protection casing 2 and internal wall protecting casing 3 respectively with inner bearing face 11, and the internal diameter of the inner bearing face 10 of tube boots 8 is slightly less than the internal diameter of internal wall protecting casing, also is provided with perfusing hole 12 on the outer protection casing 2.
Outer protection casing 2 can adopt detachable syndeton with internal wall protecting casing 3 with being connected of gland 1, also can adopt not detachable syndeton, the internal diameter of the external diameter of outer protection casing 2 and internal wall protecting casing 3 is determined according to the wall thickness of concrete barrel, the section configuration of outer protection casing 2 and internal wall protecting casing 3 then designs according to the section configuration of concrete barrel, for the concrete barrel of circular cross section, generally be directly to adopt round steel pipe to make outer, internal wall protecting casing 2,3.

Claims (3)

1, a kind of job practices that is embedded in the concrete barrel of subgrade is characterized in that:
1., the tube boots (8) that the lower end formed the tubular of cutting edge (7) are inserted in tube hole (9) between the same internal wall protecting casing of outer protection casing (2) (3) that is located at setting, and the lower surface of outer protection casing (2) and internal wall protecting casing (3) is contacted respectively with inner bearing face (11) with the outer bearing surface (10) on the tube boots (8), and the internal diameter of the inner bearing face (11) of tube boots (8) is slightly less than the internal diameter of internal wall protecting casing (3), should outer protection casing (2) and the same gland in upper end (1) of internal wall protecting casing (3) is connected, and the upper end of internal wall protecting casing (3) forms tapering pipe (4) and passes gland (1) insertion and places application of force pressure head (5) above the gland (1) with interior mudhole (6) conducting of application of force pressure head (5).
2., above-mentioned tube boots (8) are placed construction location and on application of force pressure head (5), exert pressure, tube boots (8) promptly enter soil layer with outer protection casing (2) and internal wall protecting casing (3), are then entered in the internal wall protecting casing (3) with the gap between the original soil layer that enters internal wall protecting casing (3) along internal wall protecting casing (3) by an earth that boots (8) squeeze and discharge by mudhole (6) then;
3., treat a boots (8) sink down into demarcate the degree of depth after, the perfusing hole (12) of protection casing outside being located at (2) concrete perfusion to tube hole (9), and simultaneously outer protection casing (2) and internal wall protecting casing (3) are upwards pulled out, at this moment, tube boots (8) will leave a hole (9) and fuse with the concrete barrel that perfusion forms and be embedded in the subgrade.
2, the job practices that is embedded in the concrete barrel of subgrade according to claim 1 is characterized in that: tube boots (8) are being inserted in a hole (9) before, at first reinforcing cage are being put in the tube hole (9).
3, a kind of forced one-step pore-creating device of implementing claim 1 or 2 described job practices special uses, it is characterized in that: the internal wall protecting casing (3) that also same gland (1) is connected among having the outer protection casing (2) that the same gland in upper end (1) connects and placing outer protection casing (2), and the upper end of internal wall protecting casing (3) form tapering pipe (4) and pass gland (1) insert place gland (1) top application of force pressure head (5) with mudhole (6) conducting in the application of force pressure head (5), the tube boots (8) that have a lower end to form the tubular of cutting edge (7) are inserted in the tube hole (9) that is located between the same internal wall protecting casing of outer protection casing (2) (3), outer bearing surface (10) on these boots (8) contacts with the lower surface of outer protection casing (2) and internal wall protecting casing (3) respectively with inner bearing face (11), and the internal diameter of the inner bearing face (10) of tube boots (8) is slightly less than the internal diameter of internal wall protecting casing, also is provided with perfusing hole (12) on the outer protection casing (2).
CN 98113070 1998-11-24 1998-11-24 Construction method for concrete barrel embedded in subgrade and press-in type disposable holing apparatus Expired - Fee Related CN1089393C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 98113070 CN1089393C (en) 1998-11-24 1998-11-24 Construction method for concrete barrel embedded in subgrade and press-in type disposable holing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 98113070 CN1089393C (en) 1998-11-24 1998-11-24 Construction method for concrete barrel embedded in subgrade and press-in type disposable holing apparatus

Publications (2)

Publication Number Publication Date
CN1221056A true CN1221056A (en) 1999-06-30
CN1089393C CN1089393C (en) 2002-08-21

Family

ID=5222850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 98113070 Expired - Fee Related CN1089393C (en) 1998-11-24 1998-11-24 Construction method for concrete barrel embedded in subgrade and press-in type disposable holing apparatus

Country Status (1)

Country Link
CN (1) CN1089393C (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1296568C (en) * 2002-01-04 2007-01-24 张国梁 Construction method of concrete pile
CN101967824A (en) * 2010-09-27 2011-02-09 浙江大学 Large-diameter thin-wall cylindrical pile mesh combined structure with pile cap and construction method thereof
CN102268870A (en) * 2011-04-15 2011-12-07 傅健 Driven cast-in-place pile with soil discharge pipe
CN102677674A (en) * 2012-06-05 2012-09-19 张永忠 Vibrating concrete hole guarding pipe burying machine
CN103835286A (en) * 2014-04-01 2014-06-04 宁波市江东元典知识产权服务有限公司 Construction method and hole forming device special for concrete cylinder body buried in soft foundation
CN103835285A (en) * 2014-04-01 2014-06-04 宁波市江东元典知识产权服务有限公司 Construction method and special hole forming machine of concrete cylinder buried in soft foundation
CN103866764A (en) * 2014-04-01 2014-06-18 宁波市江东元典知识产权服务有限公司 Construction method for concrete cylinder embedded in soft foundation and pore forming device thereof
CN105401572A (en) * 2015-10-28 2016-03-16 谢庆道 Construction technique for environment-friendly cast-in-situ bored pile provided with wall protecting tube
CN105625438A (en) * 2016-01-14 2016-06-01 中国建筑股份有限公司 Steel plate and concrete diaphragm wall and construction method thereof
CN105649076A (en) * 2014-11-11 2016-06-08 五冶集团上海有限公司 Outer pile inner hole soil retaining flapper-type pile tip used for prestressed concrete pipe (PHC) pile sleeving construction

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1296568C (en) * 2002-01-04 2007-01-24 张国梁 Construction method of concrete pile
CN101967824A (en) * 2010-09-27 2011-02-09 浙江大学 Large-diameter thin-wall cylindrical pile mesh combined structure with pile cap and construction method thereof
CN102268870A (en) * 2011-04-15 2011-12-07 傅健 Driven cast-in-place pile with soil discharge pipe
CN102677674A (en) * 2012-06-05 2012-09-19 张永忠 Vibrating concrete hole guarding pipe burying machine
CN103866764A (en) * 2014-04-01 2014-06-18 宁波市江东元典知识产权服务有限公司 Construction method for concrete cylinder embedded in soft foundation and pore forming device thereof
CN103835285A (en) * 2014-04-01 2014-06-04 宁波市江东元典知识产权服务有限公司 Construction method and special hole forming machine of concrete cylinder buried in soft foundation
CN103835286A (en) * 2014-04-01 2014-06-04 宁波市江东元典知识产权服务有限公司 Construction method and hole forming device special for concrete cylinder body buried in soft foundation
CN103835286B (en) * 2014-04-01 2016-03-02 宁波市江东元典知识产权服务有限公司 A kind ofly be embedded in the construction method of the concrete barrel of subgrade and special perforating device thereof
CN103835285B (en) * 2014-04-01 2016-08-17 宁波市江东元典知识产权服务有限公司 It is embedded in the construction method of the concrete barrel of subgrade and special perforating device thereof
CN105649076A (en) * 2014-11-11 2016-06-08 五冶集团上海有限公司 Outer pile inner hole soil retaining flapper-type pile tip used for prestressed concrete pipe (PHC) pile sleeving construction
CN105649076B (en) * 2014-11-11 2019-03-15 五冶集团上海有限公司 A kind of stud inner hole earth-retaining flapper-type pile top for the dress construction of PHC pile protection
CN105401572A (en) * 2015-10-28 2016-03-16 谢庆道 Construction technique for environment-friendly cast-in-situ bored pile provided with wall protecting tube
CN105625438A (en) * 2016-01-14 2016-06-01 中国建筑股份有限公司 Steel plate and concrete diaphragm wall and construction method thereof
CN105625438B (en) * 2016-01-14 2018-01-23 中国建筑股份有限公司 A kind of construction method of steel plate concrete ground-connecting-wall

Also Published As

Publication number Publication date
CN1089393C (en) 2002-08-21

Similar Documents

Publication Publication Date Title
CN1089393C (en) Construction method for concrete barrel embedded in subgrade and press-in type disposable holing apparatus
CN202380463U (en) Grouting capsule type recyclable anchor cable
CN103835287B (en) A kind of construction method of compacted diameter-variable pile
CN100585092C (en) Forming method of pressing-resistant plucking-resistant pile base
CN101255691A (en) Construction method for complete casing tube thin wall filling pile and movable internal mold
CN210341897U (en) Novel prefabricated tubular pile structure
CN110747855A (en) Method for removing ultra-long pile by adopting double sleeves
CN2370066Y (en) Channel slip casting steel bar concrete hollow prefabricated pile
CN2352580Y (en) Single step hole forming apparatus by pressure for placing concrete pipe pile in soft earth foundation
CN206233232U (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN112695742B (en) Precast pile and grouting method
CN201232181Y (en) Permeable structure of rigid drainage pile
CN2443998Y (en) Hole forming machine for immersed tube of soft base engineering
CN1284588A (en) Corrugated formwork pipe for concrete pile
CN1186141A (en) Bored concrete piles and its construction
CN1021707C (en) Complete set of pipe pile
CN103835285A (en) Construction method and special hole forming machine of concrete cylinder buried in soft foundation
RU2026922C1 (en) Pile foundation and a method to erect it
CN110747854A (en) Double-sleeve pile pulling device for pulling out ultra-long pile in limited space
CN1048781C (en) Forced construction technology for bored concrete pile
CN220768027U (en) Screw pile construction structure and screw pile
CN1109129A (en) Construction process for screw pouring piles
CN213456179U (en) Core tube assembly for drilling high-depth soil with water content
CN215977236U (en) Punching bored concrete pile foundation
CN2560684Y (en) Cast-in-place concrete thin wall tubular pile machine

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HAIGUANG INTERNATIONAL CONSTRUCTION ENGINEERING I

Free format text: FORMER OWNER: XIE QINGDAO

Effective date: 20061208

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20061208

Address after: 310009, 208 Tai Ching street, Shangcheng District, Zhejiang, Hangzhou

Patentee after: Sea light international construction engineering investment management (Hangzhou) Co., Ltd.

Address before: 310012, 9-2-502 village, Wen two street, Hangzhou, Zhejiang

Patentee before: Xie Qingdao

ASS Succession or assignment of patent right

Owner name: XIE QINGDAO

Free format text: FORMER OWNER: HAIGUANG INTERNATIONAL CONSTRUCTION ENGINEERING INVESTMENT MANAGEMENT ( HANGZHOU ) CO.,LTD.

Effective date: 20071019

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20071019

Address after: 310012, 9-2-502 village, Wen two street, Hangzhou, Zhejiang

Patentee after: Xie Qingdao

Address before: 310009, 208 Tai Ching street, Shangcheng District, Zhejiang, Hangzhou

Patentee before: Sea light international construction engineering investment management (Hangzhou) Co., Ltd.

ASS Succession or assignment of patent right

Owner name: ZHEJIANG HAITONG INVESTMENT MANAGEMENT CO., LTD.

Free format text: FORMER OWNER: XIE QINGDAO

Effective date: 20080104

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20080104

Address after: Room 26, No. 408, Zijin Road, Shangcheng District, Zhejiang, Hangzhou

Patentee after: Zhejiang Haitong Cci Capital Ltd

Address before: 9-2-502, garden village, Wen two street, Zhejiang, Hangzhou

Patentee before: Xie Qingdao

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20020821