CN1214395A CN 98117956 CN98117956A CN1214395A CN 1214395 A CN1214395 A CN 1214395A CN 98117956 CN98117956 CN 98117956 CN 98117956 A CN98117956 A CN 98117956A CN 1214395 A CN1214395 A CN 1214395A
Authority
CN
China
Prior art keywords
impact
wave
foundation
rolling
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 98117956
Other languages
Chinese (zh)
Inventor
杨世基
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing New Road S. T. Development Co., Ltd.
Original Assignee
杨世基
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 杨世基 filed Critical 杨世基
Priority to CN 98117956 priority Critical patent/CN1214395A/en
Publication of CN1214395A publication Critical patent/CN1214395A/en
Pending legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention is new technology for foundation treatment and road bed reinforcement, and its key point is continuous impact rolling operation on foundation or road bed. With the increase of the number of compact rolling times, foundation or the road bed is densified from top to bottom to form a reinforced layer to meet the requirement in bearing and stability of foundation or road bed. The technical method is simple, fast, and low in engineering cost.

Description

Impact rolling to reinforce wet and depressive loess foundation and embankment
Adopting impact densifying-machine impact-rolling collapsible loess foundation and embankment is new technology, the new technology of ground processing and subgrade strengthening.
Collapsible loess is meant under native gravity pressure or native gravity pressure and additonal pressure effect, structure is destroyed and the remarkable loess of sinking that adds of generation rapidly after being subjected to water-soaked, China mainly be distributed in the Huanghe valley and to the north of the each province, grow the most with the loess of middle Yellow River regions.It is to eliminate its settlement by soaking that collapsible loess foundation is handled main purpose, has also improved bearing capacity of foundation soil simultaneously, reduces foundation deformation.Adopt the different disposal method according to settlement by soaking soil layer different-thickness and water content, commonly used have soil or cushion lime method, soil or lime soil pile method, dynamic compaction, tamping, vibro-replacement stone column method, pile foundation and a presoaking etc.Adopt impact densifying-machine on loess natural ground top layer, determine different impact-rolling passes, reach the ground processing intent according to the ground processing requirements.Roadbed after filled-up ground or the vibratory compaction is carried out impact-rolling continuously, according to the settlement amount after construction requirement that embankment is filled, can determine to reach roadbed settlement after construction rate less than 1 ‰, avoid the crushing pass of filled-up ground relative settlement, realize that Xin Xiuluji builds the road surface continuously and do not produce deformation failure, improve the subgrade and pavement bulk strength, keep the good excellent service level of surface evenness.
In recent years a kind of high-energy of the new development of South Africa Lan Pai company hits towards the formula compacting machine, in cubic metre of earth and stone compacting operation, has broken through traditional mode that rolls, and has improved compaction capacity greatly.This machine grinds to roll by the impact energy size and is divided into triangle, square, pentagon, hexagon, is respectively 25KJ, 20KJ, four kinds of models of 15KJ, 10KJ, and stone roller rolls the bight and is circular-arc, by wheeled tractor traction carrying out rolling operation.Stone roller rolls heavy 12 tons, stands on ground for one jiao when impacting stone roller, when rolling forward, produces the huge impact ripple, owing to grind order bump ground, limit, it is evenly closely knit that the soil body is rolled.This machine is with the travel speed rolling operation of 12~15km per hour, promptly impact and grind per minute impact ground 80~100 times, be equivalent to the low frequency large amplitude shock compaction soil body, and periodically impact ground, producing strong shock wave propagates to underground deep layer, have the propagation of seismic wave characteristic, its compacting depth can increase progressively with number of rolling.Adopt the blue 25KJ impact densifying-machine of sending in South Africa, the basal surface that satisfies the need in speedway collapsible loess location, Xuanhua, Hebei to Datong District is filled out preceding impact-rolling, and utilize collapsible loess filling roadbed, in conjunction with the measure of roadbed comprehensive draining, reach and eliminate the loess foundation saturated yielding, reduce the embankment settlement amount after construction to greatest extent and avoid the roadbed differential deformation, improve loess subgrade road surface bulk strength.Show that through various test-based examinations loess foundation undisturbed soil dry density is 1.34g/cm 3, water content 8.1~12.5%, behind the impact-rolling 40 times, dry density is 1.82g/cm in the 60cm of the face of land 3, dry density is 1.70g/cm in the 110cm 3, coefficient of collapsibility is reduced to 0.0022 and 0.0011 by 0.0713 of ground undisturbed soil, has eliminated settlement by soaking.The average elasticity modulus has reached more than the 80MPa in the soil matrix 1m under the face of land, under the roadbed bottom surface in the 1m through the crushing compacting, form continuous, even, closely knit reinforcing hard formation, its technical indicator has surpassed roadbed standard on the roadbed, meets the requirement of loess foundation strengthening quality fully.Through relatively tamping and dynamic compaction are high 2~3 times than impact-rolling method processing collapsible loess foundation cost.And impact-rolling method speed of application is fast, quality good, greatly the reduction of erection time.

Claims (1)

  1. Impact rolling to reinforce wet and depressive loess foundation and embankment are a kind of innovative technologies of ground processing and subgrade strengthening.Its main points are to adopt the high energy impact events compacting machine, on ground or roadbed, carry out working continuously of impact-rolling,, make crushing soil layer grinding compacting from top to bottom along with the increase of impact-rolling pass, form the artificial thick-layer back-up coat of handling, reach and satisfy ground design bearing capacity and stable requirement.
    During the impact compactor operation, the energy that vertical impact energy is passed to ground on the half space surface is united propagation by compressional wave (P ripple), shearing wave (S ripple) and R wave (R ripple).The particle movement of compressional wave is to belong to a kind of push-and-pull campaign that is parallel to the wave surface direction, and it makes the grogs dislocation; The particle movement of shearing wave causes the lateral displacement with wave surface direction quadrature; The particle movement of R wave then is made up of level and vertical component.The horizontal component of shearing wave and R wave makes between soil particle is cut, and it is closely knit that soil is obtained.The tamp standards of its shock compaction function reflection is greater than revising the Pu Shi tamp standards at present in the world, and the high energy impact events principle of work and power that is produced is identical with strong rammer, but technology is simple, construction fast evenly, saving of work and time is better than present method for processing foundation, reduces engineering cost greatly.
CN 98117956 1998-09-09 1998-09-09 Impact rolling to reinforce wet and depressive loess foundation and embankment Pending CN1214395A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 98117956 CN1214395A (en) 1998-09-09 1998-09-09 Impact rolling to reinforce wet and depressive loess foundation and embankment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 98117956 CN1214395A (en) 1998-09-09 1998-09-09 Impact rolling to reinforce wet and depressive loess foundation and embankment

Publications (1)

Publication Number Publication Date
CN1214395A true CN1214395A (en) 1999-04-21

Family

ID=5225784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 98117956 Pending CN1214395A (en) 1998-09-09 1998-09-09 Impact rolling to reinforce wet and depressive loess foundation and embankment

Country Status (1)

Country Link
CN (1) CN1214395A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100373013C (en) * 2006-02-09 2008-03-05 西安理工大学 Treatment method for thick collapsed loess foundation
CN101929153A (en) * 2010-09-02 2010-12-29 中国十五冶金建设有限公司 Slotted irrigation soil covering collapsible earth roadbed impact processing water supplement method
CN102051847A (en) * 2010-12-16 2011-05-11 河南省新开元路桥工程咨询有限公司 Method for treating collapsible loess foundation by dynamic compaction
CN103790166A (en) * 2014-01-25 2014-05-14 西安科技大学 Method for treating foundation of loess area saturated zone slope filling and digging joint part
CN104652405A (en) * 2015-01-16 2015-05-27 西北大学 Foundation for rural adobe house in loess area and treatment method for foundation
CN112160313A (en) * 2020-09-29 2021-01-01 西安工业大学 Undisturbed Q4Loess or remolded Q4Loess reinforcing method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100373013C (en) * 2006-02-09 2008-03-05 西安理工大学 Treatment method for thick collapsed loess foundation
CN101929153A (en) * 2010-09-02 2010-12-29 中国十五冶金建设有限公司 Slotted irrigation soil covering collapsible earth roadbed impact processing water supplement method
CN102051847A (en) * 2010-12-16 2011-05-11 河南省新开元路桥工程咨询有限公司 Method for treating collapsible loess foundation by dynamic compaction
CN103790166A (en) * 2014-01-25 2014-05-14 西安科技大学 Method for treating foundation of loess area saturated zone slope filling and digging joint part
CN103790166B (en) * 2014-01-25 2017-03-22 西安科技大学 Method for treating foundation of loess area saturated zone slope filling and digging joint part
CN104652405A (en) * 2015-01-16 2015-05-27 西北大学 Foundation for rural adobe house in loess area and treatment method for foundation
CN112160313A (en) * 2020-09-29 2021-01-01 西安工业大学 Undisturbed Q4Loess or remolded Q4Loess reinforcing method

Similar Documents

Publication Publication Date Title
CN108589688B (en) Construction method for coral sand foundation deep vibration-impact combined with shallow water spraying impact rolling reinforcement
CN106283944B (en) The method for pressing washer stone and/or block stone to reinforce shallow layer soft ground
CN107100049A (en) A kind of clay improves the construction method of CHARACTERISTICS OF TAILINGS SAND roadbed filling
CN103510504B (en) High saturated uneven reclaimed ground processing method
CN101122128B (en) Construction method of impacting and rolling
CN101831851B (en) Construction method of red sandstone roadbed
CN103711114A (en) Foundation treatment method
CN104131530B (en) Levee revetment structure under rapid and soft foundation severe environment
CN102605698A (en) Construction method for reinforcing and rolling soft soil subgrade by aid of impact-type road roller
CN101220589A (en) Soil engineering bag and method for dynamically squeezing and synthetically reinforcing soft groundwork
CN1214395A (en) Impact rolling to reinforce wet and depressive loess foundation and embankment
CN108301393B (en) Watering impact rolling construction method for shallow hydraulic fill coral sand foundation
CN103993533A (en) Comprehensive compacting method for highfill embankment in loess area
Miao et al. Application of dynamic compaction in highway: a case study
CN107513992A (en) A kind of shallow surface solidifying agent consolidation continuous construction method of mud
CN103758109B (en) For setting and the processing method of the draining rotary churning pile ground of underconsolidated soil
CN217078704U (en) Steel slag pile composite foundation structure
CN213978463U (en) Special-shaped vibration roller with convex blocks
CN113235552B (en) Method for filling roadbed by using large-diameter broken stone through dynamic compaction
CN101451356A (en) Five in one pre-expansion ecological pile body processing foundation method
CN1168437A (en) Reinforcement of mollisol foundation through impact rolling and drainage concretion
CN112411318A (en) Special-shaped vibration roller with convex blocks
CN103015438A (en) Collapsible loess subgrade landslide treatment method
CN100365210C (en) Construction method for positioning and compacting subgrade
CN115305896B (en) Sand filling body and liquefiable foundation strengthening method

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C53 Correction of patent for invention or patent application
COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: YANG SHIJI TO: BEIJING XINLUE TECHNOLOGY DEVELOPMENT CO., LTD.

CP03 Change of name, title or address

Address after: 100088 Beijing city Xitucheng Road No. 8 kindergarten office floor

Applicant after: Beijing New Road S. T. Development Co., Ltd.

Address before: 100088 Beijing city Xitucheng Road No. 8 road of science Wang Hui.

Applicant before: Yang Shiji

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Management Department of Xuan Da expressway, Hebei Province