CN101929153A - Slotted irrigation soil covering collapsible earth roadbed impact processing water supplement method - Google Patents
Slotted irrigation soil covering collapsible earth roadbed impact processing water supplement method Download PDFInfo
- Publication number
- CN101929153A CN101929153A CN 201010270258 CN201010270258A CN101929153A CN 101929153 A CN101929153 A CN 101929153A CN 201010270258 CN201010270258 CN 201010270258 CN 201010270258 A CN201010270258 A CN 201010270258A CN 101929153 A CN101929153 A CN 101929153A
- Authority
- CN
- China
- Prior art keywords
- water
- ditch
- ditches
- soil
- filled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention relates to the constructional engineering technology, in particular to a slotted irrigation soil covering earth roadbed impact processing water supplement method, and the method is characterized in that: firstly, water ditches with the width of 1.2m and the depth of 0.80m are dig at intervals of 5m along the direction vertical to a roadbed, the dig earthwork is placed between two ditches, water is injected to the water ditches from one end of each of the water ditches until the water ditches are filled with water, soil layers are soaked, and the water ditches are filled after the water permeates completely; and then a water ditch with the width of 1.2m and the depth of 0.5m is dig between every two filled water ditches, then water is injected to the ditches to soak, after the water permeates completely, the ditches are filled, water is sprinkled and soil is covered on the surface of the roadbed at night; and the method has simple and convenient operation and high mechanization degree, does not need line-putting ditch by ditch, the water supplement is uniform, the soil is humidified completely, the effect is rather ideal, and the method is mainly applicable to roadbed impact processing water supplement construction in northwest arid areas.
Description
The ㈠ technical field: the present invention relates to architectural engineering technology, especially a kind of slotted irrigation soil covering collapsible earth roadbed impact is handled method for supplementing water.
The ㈡ background technology: in the highway construction project construction, common collapsible soil roadbed processing method has multiple, adopts impact road roller shock treatment work efficiency height, and is economical and practical, is a kind of novel process technology that occurs in recent years.Must replenish moisture content to foundation soil before the shock treatment, sprinkle water the in advance method of the vexed soil or the water filling of digging pit of general employing, it is fully moistening to make the roadbed collapsible soil handle the interior soil of depth bounds (the general following 120cm in the face of land is dark), and shock treatment just can obtain optimum efficiency.Adopt the method for the vexed soil of surface watering simple to operate, top layer moisturizing effect is obvious, but-the following soil layer moisturizing of 50cm poor effect; The dig pit method of moisturizing of employing is to keep at a certain distance away to adopt artificial or mechanical equivalent of light excavation quincuncial arrangement heatable adobe sleeping platform, water filling is soaked in heatable adobe sleeping platform, the method moisturizing needs to combine with the top layer vexed soil phase of sprinkling water, the moisturizing effect than the watering of independent top layer better, but still not very good, and operation is complicated, needs by unwrapping wire location, hole, and need connect than long water pipe, water could be annotated in each hole.
The ㈢ summary of the invention: purpose of the present invention is exactly to solve the simple mode that adopts the vexed soil of surface watering, deep layer soil property moisturizing poor effect, though and the water flooding regime moisturizing effect of digging pit has improvement, but still it is undesirable, and operation is complicated, problems such as water filling inconvenience provide a kind of slotted irrigation soil covering collapsible earth roadbed impact to handle method for supplementing water.
Concrete scheme of the present invention is characterized in that: at first excavate wide 1.2m, dark 0.80m ditch along vertical roadbed direction by the 5m spacing, the earthwork of excavation is stored between two ditches, one end water filling in the ditch from the ditch, make water fill with the ditch, soak soil layer, treat after water has permeated the ditch to be filled and led up; Dig 1.2m, dark 0.5m ditch then in the middle of ditch that every twice are filled and led up, water filling is soaked in ditch again, fills and leads up the ditch after water has permeated, and evening is at the road bed vexed soil of sprinkling water.
The method that the present invention adopts ditching to combine with the top layer watering, but mechanized is easy and simple to handle, need be by the hole unwrapping wire, moisturizing is even, and is fully moistening, and the moisturizing effect is very good, can make the collapsible soil shock treatment obtain optimum efficiency.
The ㈣ description of drawings:
Fig. 1 is that secondary ditching roadbed of the present invention is partly led (cuing open) view;
Fig. 2 is a partly vertical view of secondary ditching roadbed of the present invention.
Among the figure: 1-roadbed ground, 2-deep water ditch, 3-shallow gully.
The ㈤ specific embodiment:
Adopt the inventive method to carry out impact processing water supplement in certain highway section, concrete operation method is: adopt excavator, at first excavate wide 1.2m, dark 0.80m deep water ditch 2 by the 5m spacing along vertical roadbed direction, the earthwork of excavation is stored between two ditches, from the water filling in deep water ditch 2 of deep water ditch 2 one ends, make water fill with deep water ditch 2, soak soil layer, treat after water has permeated the ditch to be filled and led up; Dig 1.2m, dark 0.5m shallow gully 3 then in the middle of ditch that every twice are filled and led up, water filling is soaked in shallow gully again, fills and leads up shallow gully after water has permeated, and evening is at the road bed vexed soil of sprinkling water.Combine with the top layer vexed soil phase of sprinkling water by twice ditching of the inventive method is soaked, can make the dark soil layer of roadbed 0~1.5m all obtain abundant moisturizing, can carry out shock treatment in second day.
Claims (1)
1. a slotted irrigation soil covering collapsible earth roadbed impact is handled method for supplementing water, it is characterized in that: at first excavate wide 1.2m, dark 0.80m ditch by the 5m spacing along vertical roadbed direction, the earthwork of excavation is stored between two ditches, one end water filling in the ditch from the ditch, make water fill with the ditch, soak soil layer, treat after water has permeated the ditch to be filled and led up; Dig 1.2m, dark 0.5m ditch then in the middle of ditch that every twice are filled and led up, water filling is soaked in ditch again, fills and leads up the ditch after water has permeated, and evening is at the road bed vexed soil of sprinkling water.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102702585A CN101929153B (en) | 2010-09-02 | 2010-09-02 | Slotted irrigation soil covering collapsible earth roadbed impact processing water supplement method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102702585A CN101929153B (en) | 2010-09-02 | 2010-09-02 | Slotted irrigation soil covering collapsible earth roadbed impact processing water supplement method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101929153A true CN101929153A (en) | 2010-12-29 |
CN101929153B CN101929153B (en) | 2011-09-07 |
Family
ID=43368555
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010102702585A Expired - Fee Related CN101929153B (en) | 2010-09-02 | 2010-09-02 | Slotted irrigation soil covering collapsible earth roadbed impact processing water supplement method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101929153B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102425149A (en) * | 2011-09-02 | 2012-04-25 | 中铁十七局集团第二工程有限公司 | Punching water supplement-based method for treating foundation by adopting dynamic compaction |
CN105970911A (en) * | 2016-07-01 | 2016-09-28 | 王继忠 | Treatment method for large-thickness collapsible loess |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1214395A (en) * | 1998-09-09 | 1999-04-21 | 杨世基 | Impact rolling to reinforce wet and depressive loess foundation and embankment |
JP3561794B2 (en) * | 1998-08-28 | 2004-09-02 | 大成建設株式会社 | Ground improvement method for super soft ground. |
CN1970886A (en) * | 2006-11-28 | 2007-05-30 | 惠中华 | Water-utilization vibration construction method and device |
CN101608419A (en) * | 2009-07-21 | 2009-12-23 | 中铁二十一局集团有限公司 | Desert area migratory dune land railway bed construction method |
-
2010
- 2010-09-02 CN CN2010102702585A patent/CN101929153B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3561794B2 (en) * | 1998-08-28 | 2004-09-02 | 大成建設株式会社 | Ground improvement method for super soft ground. |
CN1214395A (en) * | 1998-09-09 | 1999-04-21 | 杨世基 | Impact rolling to reinforce wet and depressive loess foundation and embankment |
CN1970886A (en) * | 2006-11-28 | 2007-05-30 | 惠中华 | Water-utilization vibration construction method and device |
CN101608419A (en) * | 2009-07-21 | 2009-12-23 | 中铁二十一局集团有限公司 | Desert area migratory dune land railway bed construction method |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102425149A (en) * | 2011-09-02 | 2012-04-25 | 中铁十七局集团第二工程有限公司 | Punching water supplement-based method for treating foundation by adopting dynamic compaction |
CN102425149B (en) * | 2011-09-02 | 2013-11-06 | 中铁十七局集团第二工程有限公司 | Punching water supplement-based method for treating foundation by adopting dynamic compaction |
CN105970911A (en) * | 2016-07-01 | 2016-09-28 | 王继忠 | Treatment method for large-thickness collapsible loess |
CN105970911B (en) * | 2016-07-01 | 2018-12-28 | 王继忠 | A kind of processing method of big thickness collapsible loess |
Also Published As
Publication number | Publication date |
---|---|
CN101929153B (en) | 2011-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204112347U (en) | Rock side slope self filling type grass planting device | |
CN201826318U (en) | Simple ecological slope protecting structure for loose soil of road | |
CN204780764U (en) | Ecological wallboard formula barricade shore protection with ribbing of environment friendly | |
CN105887757A (en) | Ecological slope protection composite retaining wall structure and construction method | |
CN102966072A (en) | Construction method for treating widened and heightened engineering joint surfaces of dikes on soft clay foundation | |
CN104878719A (en) | Mutually-embedded reinforced ecological retaining wall construction method | |
CN109736257A (en) | It is a kind of for constructing the double river structures and its construction method of ecological circulation water system | |
CN106120822B (en) | A kind of method for protecting support and device that prevent mud stone from coming down | |
CN205134303U (en) | Compound reinforced structure of soft base of ecological bamboo raft among road engineering of field | |
CN205444395U (en) | Be equipped with drain pipe in hole of permeating water on pipe wall | |
CN103061310B (en) | Ecological habitat revetment | |
CN102425175B (en) | Reinforcement protective structure of large spoil disposal area in mountainous area | |
CN205035768U (en) | Enrockment concrete permeable dike | |
CN101929153B (en) | Slotted irrigation soil covering collapsible earth roadbed impact processing water supplement method | |
CN207469269U (en) | A kind of hydraulic engineering High strength geogrid structure class ecological revetment | |
CN204139199U (en) | For the gear protection structure of levelling of the land | |
CN106688800B (en) | Water-retaining and fertilizer-retaining land reclamation method for tailing pond | |
CN109853590B (en) | Device for infiltrating foreign soil base layer on rock steep slope surface by utilizing rainfall and construction method | |
CN204803902U (en) | Log slope protection structure | |
CN102071695A (en) | Protection construction of vegetation concrete side slope | |
CN202073069U (en) | Waterproof revetment of artificial lake | |
CN102031742A (en) | roadbed longitudinal crack treatment method based on convex tenon type cement grouting geomembrane belt | |
CN206143783U (en) | Prevent supporting device on mud stone landslide | |
CN205296069U (en) | Cast -in -place ecological concrete bank protection of living type of planting | |
CN104895008B (en) | The construction method of environmentally friendly ecology wallboard type with ribbing barricade shore protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110907 Termination date: 20210902 |
|
CF01 | Termination of patent right due to non-payment of annual fee |