CN1195057A - Guiding water earthquake-resistant water-proof compound wall construction method - Google Patents

Guiding water earthquake-resistant water-proof compound wall construction method Download PDF

Info

Publication number
CN1195057A
CN1195057A CN97106338A CN97106338A CN1195057A CN 1195057 A CN1195057 A CN 1195057A CN 97106338 A CN97106338 A CN 97106338A CN 97106338 A CN97106338 A CN 97106338A CN 1195057 A CN1195057 A CN 1195057A
Authority
CN
China
Prior art keywords
wall
water
tectosome
sponge
binder couse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN97106338A
Other languages
Chinese (zh)
Other versions
CN1082594C (en
Inventor
张忠雄
张百兴
张凯然
叶延馨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 97106338 priority Critical patent/CN1082594C/en
Publication of CN1195057A publication Critical patent/CN1195057A/en
Application granted granted Critical
Publication of CN1082594C publication Critical patent/CN1082594C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

A water-proof building engineering technique features that a porous material such as sponge is stuck on the surface of wall for underground or ground architectural body to use it as water guiding layer, and one or two layers of transparent plastic film are pasted on the surface of porous material to serve as isolating water-proof layer, whose bottom end is extended to drainage pipe or ditch. There is a gap at each side of spong block to serve as connecting layer, onto which part of complex wall material is directly pasted. The bricks are masoned on the surface of architectural body to form a complex wall.

Description

Guiding water earthquake-resistant water-proof compound wall construction method
The present invention relates to waterproofing technology underground and the ground tectosome, dependent territory wood construction waterproofing engineering field.
As everyone knows, the tectosome (reinforced concrete structure body of wall) on underground or ground in civil construction project, owing to be subjected to the surface water and phreatic long-term invasion and attack, tectosome easily produces crack or crack, and corrosion reinforcing bar, constantly aggravation month after month causes tectosome (reinforced concrete structure body of wall) to produce serious percolating water phenomenon throughout the year.Though waterproofing course is set at the tectosome external surface, as paste asphalt felt or coated water-repellent paint etc., but it is all of no avail, can not satisfy people's wish, its main cause is that groundwater table is higher, groundwater pressure is big (particularly the coastal south), and execution conditions and operating environment all do not allow to be not easy to perform the engineering of this anti-drainage facility yet.After this, people have adopted multiple wall construction, and the drainage groove or the gutter of guiding percolating water discharge promptly is set at subsurface structure body (reinforced concrete structure body of wall) inboard foundation, suspension column position, build brick wall by laying bricks or stones along limes marginis then, and this is the multiple wall of meaning.In fact this building is provided with dual body of wall, promptly as the tectosome (reinforced concrete structure body of wall) of exterior wall with as the multiple wall body of wall of interior wall, and the setting of multiple wall is percolating water phenomenon and clumsy draining situation thereof in order to shelter tectosome (reinforced concrete structure body of wall); Be actually to consideration attractive in appearance and be provided with multiple wall.The multiple wall that tradition is habitual, generally and between the tectosome (reinforced concrete structure body of wall) leave certain space length, be about about 10~20 centimetres, this also just brings some drawbacks, when design structure is brick multiple wall body of wall, there are cement bonded sand screenings bits or fragment brick to drop in this space unavoidably, because of easy-clear not stops up the gutter mortise, or block between tectosome and multiple wall, be to cause multiple wall that the phenomenon of percolating water also takes place.In addition, multiple wall construction in the past is complete and tectosome spaced-apart, though the reinforcement post can be set, wall construction is still not too firm again, nor shatter-proof.
The objective of the invention is to overcome the above-mentioned many shortcomings that exist in the previous waterproof construction method, the invention provides a kind of new job practices, its objective is unordered percolating water is discharged the directed vertically downward and in an orderly manner guiding of percolating water by micropore porous material such as sponge, another object of the present invention is to strengthen multiple wall construction, make multiple wall energy more firm, and vibration resistance.
Of the present invention mainly will levying to doing or do not doing the underground of waterproofing course or pasting micropore porous materials such as one deck such as sponge for guiding water layer on tectosome (reinforced concrete structure body of wall) wall surface on the ground, and the thin cloth of topped more thereon stickup one deck or two-layer transparent plastic is as isolating waterproofing course, and its lower end is then sagging and introduce what gutter or gutter; Suitable spacing is left in every sponge both sides, is called to strengthen the waterproof binder couse, and direct this articulamentum of gluing what of part material of multiple wall and connect to one with tectosome (reinforced concrete structure body of wall) is to strengthen the stability and the shock resistance of whole multiple wall; At tectosome (reinforced concrete structure body of wall) the most outstanding position, surface, promptly be next to the tectosome surface and be close proximity to and isolate the waterproofing course place and set about laying bricks and constitute multiple wall.
Reinforcement waterproof binder couse on the tectosome (reinforced concrete structure body of wall) is that stickup is painted on the waterproof binder couse that this binder couse forms comprehensively with heated bitumen, and is directly gluing in binder couse with the binding brick of the wall of writing in reply, and constituted the part of whole multiple wall; In addition, can adopt the job practices same, point of contact or linking belt are set, to cooperate the installation at positions such as water power, air-conditioning, medical pipeline and switch with binder couse.
Preferably transparent as the thin cloth of the plastics of isolating waterproofing course, can be convenient in work progress, can inspect the whether moisture clear and definite water power line switching position that reaches of sponge like this.The width of the thin cloth of transparent plastic waterproof should be slightly larger than the width as the sponge block of guiding water layer, and the both sides broadside of transparent plastic cloth is cladded the both sides of sponge block and seals.
Guiding water earthquake-resistant water-proof compound wall construction method of the present invention is compared with the waterproof construction method that tradition is habitually practised, and has following many advantages and effect.
1, owing to paste one deck micropore porous material such as sponge in underground or ground structure surface, the therefore unordered percolating water that the intrusion of the underground water and the surface water can be caused, by sponge make its vertically downward and directed in an orderly manner guiding discharge.
2, owing to be provided with the guiding water layer and isolate waterproofing course, therefore strengthened waterproof effect greatly in the stickup of tectosome surface; And draining processing mode of the present invention is very reliable.
3, answer the direct gluing what binder couse of wall and connect to one owing to part, thereby strengthened the steadiness and the shock resistance of whole multiple wall with tectosome.
4, building by laying bricks or stones owing to multiple wall near what tectosome surface, and the building by laying bricks or stones of habitual in the past multiple wall, because of being provided with between groove etc. and the tectosome, need leave suitable clearance space, therefore the present invention's conserve space greatly, increase empty interior usable floor area, that is improve its use value, and reduce the construction costs expense.
5, job practices of the present invention has easy to operately, and high efficient construction not only can be reduced the duration greatly, and can save Master Cost.
After now the concrete enforcement side of job practices of the present invention being described in detail in.
Be to carry out flame treatment on the asphalt roofing earlier on the waterproof aspect that applies the subsurface structure body of bituminous material (reinforced concrete structure body of wall), flame with flame projector is swept roasting working face trippingly, make slightly adhesivity of asphalt roofing, this moment immediately by on hang down to paste and cut the sponge block that cuts in advance, its size can be 150 * 0.6 centimetres (length * thickness), its thickness is looked and is leaked size and increase and decrease, spacing between every sponge both sides is about 30 centimetres, this part region area is referred to as binder couse, and is just directly gluing in this binder couse with the multiple wall material in rear section.Subsequently with the thin cloth of layer of transparent plastics the sponge surface by on hang down topped it, the upper end of the thin cloth of transparent plastic is gluing with pitch.The thin cloth of plastics should be used transparent, can be convenient to like this inspect topped inner case, and as whether moisture, the concavo-convex situation of pipeline switch position and structural plane.The size of the thin cloth of transparent plastic can be 180 centimetres width and 0.05 millimeter thickness, and it is bigger than the width of sponge block, and its both sides are left 15 centimetres broadside approximately, can clad the sponge block dual-side to seal.The thin cloth both sides of plastics broadside also need be gluing with heated bitumen.In order to strengthen waterproof effect, can the thin cloth of topped again stickup one deck plastics be the thin cloth of topped second layer transparent plastic also.Like this, on tectosome (reinforced concrete structure body of wall) surface, constituted as the spongy layer of guiding water layer with as the thin layer of cloth of the transparent plastic of isolating waterproofing course.From ground and underground unordered percolating water, the capillarity by the numerous micropores of spongy layer makes it discharge in directed in an orderly manner guiding vertically downward.In the lower end of the thin cloth of sponge block and plastics and to be located in, the gutter or the drainage groove of will guiding water discharging can be set.Also can be with its landing part, lower end clad in the guiding water pipe, the guiding water pipe can be used the PVC plastic pipe, and with its top cut-away, the sponge lower end clads this pipe, and this guiding water pipe can be embedded in the special-purpose ditch.It is comprehensive that heated bitumen is painted on above-mentioned binder couse, will answer wall and use the binding brick directly gluing in this binder couse, makes it to fuse with tectosome (reinforced concrete structure body of wall), to strengthen the whole steadiness and the shock resistance of wall again.At last, with the most outstanding position, tectosome surface, promptly strain to be close proximity to and isolate the waterproofing course place and set about laying bricks and constitute multiple wall in the tectosome surface.That the multiple wall of the integral body of construction after finishing has a very big steadiness and seismic resistance, and have better waterproof effect.
Be exposed to multiple wall or be installed on facilities such as the interior water power of multiple wall, air-conditioning, medical pipe wiretap if need to be provided with, then can spongy layer be cut borehole at these positions, the brushing heated bitumen, direct gluing fragment of brick, the method construction same with binder couse, this is referred to as point of contact or connecting band, and its function and binder couse are same, and point of contact, connecting band can play the support fixation effect.

Claims (4)

1, a kind of guiding water earthquake-resistant water-proof compound wall construction method, it is characterized by and doing or do not doing the underground of waterproofing course or pasting micropore porous materials such as one deck such as sponge for guiding water layer on tectosome (reinforced concrete structure body of wall) wall surface on the ground, and topped more thereon stickup one deck or two-layer transparent plastic canvas cloth be as isolating waterproofing course, and be then sagging and introduce in what gutter or the gutter in its lower end; Suitable spacing is left in every sponge both sides, is called to strengthen the waterproof binder couse, and the part material of multiple wall is directly gluing to connect to one in this binder couse with tectosome (reinforced concrete structure body of wall), to strengthen the stability and the shock resistance of whole multiple wall; At tectosome (reinforced concrete structure body of wall) the most outstanding position, surface, promptly be next to the tectosome surface and be close proximity to and isolate the waterproofing course place and set about laying bricks and constitute multiple wall.
2, guiding water earthquake-resistant water-proof compound wall construction method as claimed in claim 1, the reinforcement waterproof binder couse that it is characterized by on the tectosome (reinforced concrete structure body of wall) is that stickup is painted on the waterproof binder couse that this binder couse forms comprehensively with heated bitumen, and multiple wall is directly gluing in this binder couse with linking brick; And, point of contact or linking belt are set to link the same job practices of layer, to cooperate the installation at positions such as water power, air-conditioning, medical pipeline and switch.
3, guiding water earthquake-resistant water-proof compound wall construction method as claimed in claim 1, it is characterized by width as the transparent plastic cloth of isolating waterproofing course and be slightly larger than width as the sponge block of guiding water layer, the both sides broadside of transparent plastic cloth is cladded the both sides of sponge block and is sealed.
4, as claim 1 or 3 described guiding water earthquake-resistant water-proof compound wall construction methods, the suitable dimension that it is characterized by described sponge is about 150 * 0.6 centimetres (length * thickness), and the suitable dimension of described transparent plastic canvas cloth is the width about 180 centimetres and the thickness of 0.05 millimeter.
CN 97106338 1997-03-27 1997-03-27 Guiding water earthquake-resistant water-proof compound wall construction method Expired - Fee Related CN1082594C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 97106338 CN1082594C (en) 1997-03-27 1997-03-27 Guiding water earthquake-resistant water-proof compound wall construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 97106338 CN1082594C (en) 1997-03-27 1997-03-27 Guiding water earthquake-resistant water-proof compound wall construction method

Publications (2)

Publication Number Publication Date
CN1195057A true CN1195057A (en) 1998-10-07
CN1082594C CN1082594C (en) 2002-04-10

Family

ID=5168585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 97106338 Expired - Fee Related CN1082594C (en) 1997-03-27 1997-03-27 Guiding water earthquake-resistant water-proof compound wall construction method

Country Status (1)

Country Link
CN (1) CN1082594C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1139718C (en) * 2002-05-14 2004-02-25 何益寿 Channels and collaterals type water-proof drainage structure for underground engineering and its construction method
CN107401216A (en) * 2017-09-16 2017-11-28 李红星 A kind of housing basement's waterproof construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1139718C (en) * 2002-05-14 2004-02-25 何益寿 Channels and collaterals type water-proof drainage structure for underground engineering and its construction method
CN107401216A (en) * 2017-09-16 2017-11-28 李红星 A kind of housing basement's waterproof construction method

Also Published As

Publication number Publication date
CN1082594C (en) 2002-04-10

Similar Documents

Publication Publication Date Title
CN107190844B (en) The waterproof and water drainage system and construction method of a kind of basement bottom board and exterior wall
CN111945928A (en) Energy-saving heat-insulating wall and roof
CN1821503A (en) Water leak-proof structure for building floor or roof deformation seam
CN106284706A (en) The construction method of external wall outer insulation rock cotton board
CN110735499B (en) Parapet waterproof structure and construction method thereof
CN209457282U (en) Ground library top plate planted roof deformation joint structure
Tavares et al. Common pathologies in composite adobe and reinforced concrete constructions
TW200523438A (en) Prefab-type waterproofing structure and method for fabricating the waterproofing structure
CN108457429A (en) A kind of bituminized shingle and its laying method for pitched roof
CN111877646B (en) Landscape house miscellaneous-laying archaized roof system and construction method thereof
CN206928561U (en) A kind of waterproofing node of thermal-insulating decorative outer wall board and Side fascia
CN206571058U (en) A kind of UPVC building in the style of the ancients roofing nest watt
CN2876207Y (en) Water leakage proof structure of floor surface or roof surface deformed seam
CN1082594C (en) Guiding water earthquake-resistant water-proof compound wall construction method
CN212153924U (en) Parapet waterproof repairing structure
CN210857756U (en) Structure for conveniently repairing cement tile-imitated roof of traditional building
CN104818835B (en) Toilet threshold stone waterproof structure and construction method
CN112049349B (en) External wall heat preservation system
Ryan et al. Detailing for landscape architects: aesthetics, function, constructibility
CN111456484A (en) Roof waterproof repairing method for large-scale buildings in the ages
CN110847515A (en) Pitched roof structure and manufacturing method thereof
CN205189265U (en) Fine child asphalt felt tile roof waterproof system of colored glass of super abrupt slope degree
CN210152083U (en) Asphalt shingle pitched roof gutter node structure
CN201310093Y (en) Hidden drainage technology for water seepage in subterranean layer
CN210238954U (en) Parapet heat preservation structure with lightning rod

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Zhang Zhongxiong

Document name: Notification of Termination of Patent Right

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee