CN1190566C - 导洞一隔离桩墙法防护邻近构造物沉降的方法 - Google Patents
导洞一隔离桩墙法防护邻近构造物沉降的方法 Download PDFInfo
- Publication number
- CN1190566C CN1190566C CN 02158586 CN02158586A CN1190566C CN 1190566 C CN1190566 C CN 1190566C CN 02158586 CN02158586 CN 02158586 CN 02158586 A CN02158586 A CN 02158586A CN 1190566 C CN1190566 C CN 1190566C
- Authority
- CN
- China
- Prior art keywords
- tunnel
- pilot tunnel
- pile
- underground
- piling wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02158586 CN1190566C (zh) | 2002-12-26 | 2002-12-26 | 导洞一隔离桩墙法防护邻近构造物沉降的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02158586 CN1190566C (zh) | 2002-12-26 | 2002-12-26 | 导洞一隔离桩墙法防护邻近构造物沉降的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1419020A CN1419020A (zh) | 2003-05-21 |
CN1190566C true CN1190566C (zh) | 2005-02-23 |
Family
ID=4753136
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 02158586 Expired - Fee Related CN1190566C (zh) | 2002-12-26 | 2002-12-26 | 导洞一隔离桩墙法防护邻近构造物沉降的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1190566C (zh) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101012640B1 (ko) * | 2009-03-06 | 2011-02-09 | 주식회사 엔티에스이앤씨 | 지하터널용 구조물 설치방법 |
CN102966356A (zh) * | 2012-12-07 | 2013-03-13 | 河海大学 | 一种地震作用下液化场地运营隧道上浮变形的控制方法 |
CN103089272B (zh) * | 2013-02-07 | 2016-04-27 | 上海市政工程设计研究总院(集团)有限公司 | 一种位于山体坡脚隧道的建造方法 |
CN103321230B (zh) * | 2013-07-12 | 2016-03-09 | 上海隧道工程有限公司 | 在运行浅埋地铁长距离穿越场地中的深大基坑开挖方法 |
CN106285715B (zh) * | 2016-10-26 | 2018-06-08 | 中铁十一局集团城市轨道工程有限公司 | 土压平衡盾构机近距离侧穿初支暗挖隧道的施工方法 |
CN107574830A (zh) * | 2017-09-08 | 2018-01-12 | 中铁十六局集团地铁工程有限公司 | 一种地铁车站结合管廊施工的降水方法 |
CN108868780B (zh) * | 2018-05-19 | 2019-12-03 | 中电建十一局工程有限公司 | 一种泥石流地层隧洞开挖的方法 |
CN108798681B (zh) * | 2018-06-15 | 2023-08-29 | 中铁第一勘察设计院集团有限公司 | 中洞法零距离穿越既有地铁车站的托换体系及其施工方法 |
CN113738380A (zh) * | 2021-09-23 | 2021-12-03 | 北京市政建设集团有限责任公司 | 一种盾构隧道与暗挖地铁车站并行建造的方法 |
-
2002
- 2002-12-26 CN CN 02158586 patent/CN1190566C/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN1419020A (zh) | 2003-05-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108643231B (zh) | 一种中心城区地铁车站半幅结构顶板盖挖施工方法 | |
CN109914456B (zh) | 一种桥梁与地铁隧道毗邻同建时的设计施工方法 | |
CN202707075U (zh) | 基于柱拱法施工成型的地铁大跨度车站主体结构 | |
CN102748040B (zh) | 地铁大跨度车站主体结构及其柱拱法施工方法 | |
CN110159294B (zh) | 一种高陡地形桥隧相接段接长明洞施工方法 | |
CN111101540B (zh) | 一种明挖隧道上穿既有电力隧道施工方法 | |
Godavarthi et al. | Contiguous pile wall as a deep excavation supporting system | |
CN1190566C (zh) | 导洞一隔离桩墙法防护邻近构造物沉降的方法 | |
Stirbys et al. | Los Angeles metro rail project–geologic and geotechnical design and construction constraints | |
CN112983461A (zh) | 坡积体中偏压隧道洞口的施工方法 | |
Sandene et al. | A case study on the effects of anchor drilling in soft, low sensitive clay and sandy, silty soils | |
CN209523759U (zh) | 一种超浅埋隧道结构 | |
CN211666727U (zh) | 隧道超长管棚施工加固围岩施工装置 | |
CN212612517U (zh) | 一种受限空间深基坑微型钢管桩复合支护结构 | |
CN208266895U (zh) | 海底隧道分仓施工的回筑围堰 | |
Mangushev et al. | Construction of deep foundation ditch under a reconstructed multi-storey building on the main avenue of St. Petersburg | |
CN111663538A (zh) | 净空受限区复杂地质下深基坑微型钢管桩支护的施工方法 | |
Mouratidis | The “cut-and-cover” and “cover-and-cut” techniques in highway engineering | |
CN112049117A (zh) | 一种土岩二元基坑支护结构体系 | |
Bezrodny et al. | Preservation of urban historic centers | |
Feng et al. | Discussion on construction technology of deep foundation pit support in construction engineering | |
Mangushev et al. | Practical restoration-related experience with creation of basement level and underground parking into and near architectural monuments in down-town of Saint-Petersburg | |
Altuntas et al. | Secant pile wall design and construction in Manhattan, New York | |
CN105350543A (zh) | 深基坑单通道开挖方法 | |
Gordon et al. | HERITAGE FAÇADE SUPPORT AND EXCAVATION SHORING–A MICROPILE CASE HISTORY |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: BEIJING URBAN CONSTRUCTION DESIGN DEVELOPMENT GROU Free format text: FORMER NAME: BEIJING CITY BUILDING DESIGN RESEARCH INST CO., LTD. |
|
CP01 | Change in the name or title of a patent holder |
Address after: 100037 Beijing city Xicheng District Fucheng Gate No. 5 North Street Patentee after: BEIJING URBAN CONSTRUCTION DESIGN & DEVELOPMENT GROUP CO., LIMITED Patentee after: Zhongtie Tunnel Group Co., Ltd. Address before: 100037 Beijing city Xicheng District Fucheng Gate No. 5 North Street Patentee before: Beijing City Building Design Research Inst Co., Ltd. Patentee before: Zhongtie Tunnel Group Co., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20050223 Termination date: 20201226 |