CN117819702A - Module combined type nutrient supply control method in sewage treatment process - Google Patents

Module combined type nutrient supply control method in sewage treatment process Download PDF

Info

Publication number
CN117819702A
CN117819702A CN202410252090.7A CN202410252090A CN117819702A CN 117819702 A CN117819702 A CN 117819702A CN 202410252090 A CN202410252090 A CN 202410252090A CN 117819702 A CN117819702 A CN 117819702A
Authority
CN
China
Prior art keywords
control module
nutrient supply
nutrient
control
dosing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202410252090.7A
Other languages
Chinese (zh)
Other versions
CN117819702B (en
Inventor
袁飞
张孜渊
夏宇晖
马一行
鲍君
卫鸣志
肖瑶
王彬沣
张剑辉
田汇丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liyang Water Group Co ltd
Shanghai Fengjin Environmental Construction Management Co ltd
SHANGHAI ENVIRONMENTAL PROTECTION (GROUP) CO Ltd
Original Assignee
Liyang Water Group Co ltd
Shanghai Fengjin Environmental Construction Management Co ltd
SHANGHAI ENVIRONMENTAL PROTECTION (GROUP) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liyang Water Group Co ltd, Shanghai Fengjin Environmental Construction Management Co ltd, SHANGHAI ENVIRONMENTAL PROTECTION (GROUP) CO Ltd filed Critical Liyang Water Group Co ltd
Priority to CN202410252090.7A priority Critical patent/CN117819702B/en
Publication of CN117819702A publication Critical patent/CN117819702A/en
Application granted granted Critical
Publication of CN117819702B publication Critical patent/CN117819702B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/006Regulation methods for biological treatment
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/005Processes using a programmable logic controller [PLC]
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/02Temperature
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/04Oxidation reduction potential [ORP]
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/08Chemical Oxygen Demand [COD]; Biological Oxygen Demand [BOD]
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/14NH3-N
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/15N03-N
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/22O2
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2305/00Use of specific compounds during water treatment
    • C02F2305/06Nutrients for stimulating the growth of microorganisms
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Molecular Biology (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Microbiology (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)

Abstract

The invention discloses a sewage treatment module combined nutrient supply control method and a system, wherein the method comprises the following steps: obtaining technological processes of different sewage treatment technologies; determining a nutrient supply control mode according to the process flow; and determining the number and the dosing positions of dosing pumps, the type of monitoring instruments and the installation positions of the dosing pumps in the nutrient supply intelligent control system according to the nutrient supply control mode. The scheme can adopt different nutrient supply modes for different sewage treatment processes, and meets the control requirements of refinement and intellectualization.

Description

Module combined type nutrient supply control method in sewage treatment process
Technical Field
The invention relates to the technical field of sewage treatment, in particular to a module combined type nutrient supply control method and an intelligent nutrient supply control system in the sewage treatment process.
Background
Biological method-based sewage treatment processes are technologies that utilize microorganisms to degrade pollutants in wastewater. Nutrient supplementation is often required during biological treatment to ensure microbial metabolism and growth. The nutrient supply modes required by different sewage treatment processes are different. The existing nutrient supply method or system cannot accurately control the nutrient supply amount, and cannot be completely suitable for various sewage treatment processes.
Disclosure of Invention
In order to improve the applicability of nutrient supply control in multiple application scenes, the scheme builds a multi-module combined nutrient supply control method and a nutrient supply intelligent control system based on an artificial intelligent algorithm aiming at multiple types of biological denitrification process flows of sewage treatment.
According to a first aspect of the present invention, there is provided a module-combined nutrient supply control method in a sewage treatment process, comprising: obtaining technological processes of different sewage treatment technologies; determining a nutrient supply control mode according to the process flow; and determining the number and the dosing positions of dosing pumps, the type of monitoring instruments and the installation positions of the dosing pumps in the nutrient supply intelligent control system according to the nutrient supply control mode.
Optionally, in the module combined type nutrient supply control method in the sewage treatment process provided by the invention, the nutrient supply control mode comprises that the front control module independently controls the nutrient supply amount, the rear control module unit controls the nutrient supply amount, and the front control module and the rear control module jointly control the nutrient supply amount.
Optionally, in the method for controlling module combined nutrient supply in sewage treatment provided by the invention, if the process flow of the sewage treatment process only comprises a primary denitrification system, the control module controls nutrient supply in the sewage treatment process before use; if the process flow of the sewage treatment process comprises a primary denitrification system and a secondary or multiple denitrification system, respectively using a front control module and a rear control module to control nutrient supply of the primary denitrification system and the secondary or multiple denitrification system; if the process flow of the sewage treatment process only comprises a single anoxic tank, the post-use control module controls the nutrient supply of the single anoxic tank.
Optionally, in the method for controlling module combined nutrient replenishment in the sewage treatment process provided by the invention, the sewage treatment process is any one of an AAO process, an oxidation ditch process, a Barton process, a multistage AO process, a denitrification filter tank, an SBR and a derivative process thereof.
Optionally, in the module combined nutrient supply control method in the sewage treatment process provided by the invention, when the nutrient supply process of the oxidation ditch process or the AAO process is controlled by adopting the front control module, a dosing pipeline of the dosing pump is connected to the anoxic tank;
when the front control module and the rear control module are adopted to control the nutrient supply process of the Bayton cycle process or the multistage AO process, the dosing pipelines of the two dosing pumps are respectively connected to the anoxic tank of the primary denitrification system and the anoxic tank of the secondary or multistage denitrification system;
when the rear control module is adopted to control the nutrient replenishing process of the denitrification filter, a dosing pipeline of a dosing pump is connected to the denitrification filter;
when the front control module is adopted to control the nutrient replenishing process of the SBR and the derivative process thereof, a dosing pipeline of the dosing pump is connected to a water inlet pipeline of the SBR pool.
Optionally, in the module combined type nutrient supply control method in the sewage treatment process provided by the invention, when the front control module and the rear control module are adopted to control the nutrient supply process of the Bayton cycle process or the multi-stage AO process, the two dosing pumps respectively receive the dosing amounts output by the front control module and the rear control module.
Optionally, in the method for controlling nutrient replenishment in a module combination type in a sewage treatment process provided by the invention, when a front control module is adopted to control the nutrient replenishment process of an oxidation ditch process or an AAO process, a sludge concentration meter, a dissolved oxygen meter and NH are adopted 3 Instrument, NO 3 The instrument and the thermometer are arranged in the aerobic tank, and the oxidation-reduction potential instrument is arranged in the anoxic tank;
when the front control module and the rear control module are adopted to control the nutrient replenishing process of the Bayton cycle process or the multistage AO process, a TN instrument is arranged in an anoxic tank of a primary denitrification system, and a monitoring instrument and NH are arranged 3 The instrument is arranged in an aerobic tank of a primary denitrification system to remove NO 3 The instrument is respectively arranged at the inlet of the anoxic tank and the outlet of the aerobic tank of the secondary or multistage denitrification system;
when the post control module is adopted to control the nutrient replenishing process of the denitrification filter, NO is added 3 The meters are respectively arranged at the inlet and the outlet of the denitrification filter;
when the front control module is adopted to control the nutrient replenishing process of the SBR and the derivative process thereof, NH is added 3 Meters or NO 3 The instrument and TN instrument are arranged in the SBR pool.
According to a second aspect of the present invention, there is provided an intelligent control system for nutrient replenishment, comprising: the system comprises an upper computer, a server, a PLC control cabinet, a dosing pump and a monitoring instrument, wherein the upper computer is connected with the server, the PLC control cabinet is respectively connected with the server, the dosing pump and the monitoring instrument, an algorithm engine is arranged in the server, the system comprises a front control module and/or a rear control module and a database, and a nutrient supply control mode of the algorithm engine is determined according to a process flow of a sewage treatment process; the number and the dosing positions of the dosing pumps, the type of the monitoring instrument and the installation position are determined according to the nutrient supply control mode.
Optionally, in the intelligent control system for nutrient supply provided by the invention, the PLC control cabinet is configured to upload monitoring data of the monitoring instrument to the algorithm engine, and issue nutrient supply output by the algorithm engine to the dosing pump, so that the dosing pump doses nutrients in a sewage treatment process; the front control module and/or the rear control module are/is used for predicting the nutrient supply according to the water inflow data, iteratively correcting the predicted nutrient supply according to the water outflow index and the process parameter, and outputting the corrected nutrient supply.
Optionally, in the intelligent control system for nutrient replenishment provided by the invention, an artificial input port is reserved on an upper computer interface and is used for receiving the manually input internal reflux ratio, the five-day biochemical oxygen demand, the nutrient COD equivalent and the organic fraction ratio of the sludge and transmitting the internal reflux ratio, the five-day biochemical oxygen demand, the nutrient COD equivalent and the organic fraction ratio of the sludge to the algorithm engine.
According to the module combined type nutrient supply control method and the nutrient supply intelligent control system in the sewage treatment process, different nutrient supply control modes are set for different sewage treatment processes, and the algorithm engine adopts the design that the front control module and the rear control module independently operate and can operate in a combined mode, so that the applicability of nutrient supply control in multiple application scenes can be improved.
The foregoing description is only an overview of the present invention, and is intended to be implemented in accordance with the teachings of the present invention in order that the same may be more clearly understood and to make the same and other objects, features and advantages of the present invention more readily apparent.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. Also, like reference numerals are used to designate like parts throughout the figures. In the drawings:
FIG. 1 illustrates a schematic flow diagram of a modular combined nutrient supply control method 100 in a wastewater treatment process according to one embodiment of the invention;
FIG. 2 shows a schematic diagram of a nutrient supply intelligent control system according to one embodiment of the invention;
FIG. 3 illustrates a schematic diagram of nutrient supply control of an oxidation ditch or AAO process, according to one embodiment of the invention;
FIG. 4 shows a schematic diagram of nutrient supply control of the Bayton process in accordance with one embodiment of the invention;
FIG. 5 illustrates a nutrient replenishment control schematic diagram for a multi-stage AO process in accordance with one embodiment of the present invention;
FIG. 6 shows a schematic diagram of nutrient supply control for a denitrification filter in accordance with one embodiment of the invention;
FIG. 7 shows a schematic diagram of nutrient supply control for an SBR process according to one embodiment of the invention.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art.
Common sewage treatment processes include an AO process, an oxidation ditch process, a Barton process, a multistage AO process, an SBR (styrene butadiene rubber) and derivative processes thereof, a denitrification filter and the like. The above-mentioned sewage treatment process requires a nutrient supply control system to control the nutrient supply amount in the sewage treatment process.
In one embodiment of the invention, the nutrient supply intelligent control system is designed according to a mode that the front control module and the rear control module independently operate, and the front denitrification system and the rear denitrification system are correspondingly controlled by the front control module and the rear control module respectively.
The reaction tanks for supplying needed nutrients are different due to different technological processes of different sewage treatment technologies. Therefore, the scheme provides a module combined nutrient supply control method in the sewage treatment process, and nutrient supply can be set in different nutrient supply control modes according to different processes.
Fig. 1 shows a schematic flow diagram of a modular combined nutrient supply control method 100 in a wastewater treatment process according to one embodiment of the invention. As shown in fig. 1, step S110 is first performed to obtain the process flows of different sewage treatment processes.
For example, the AAO process comprises an anaerobic section, an anoxic section and an aerobic tank section, sewage and return sludge firstly enter the anaerobic tank to be completely mixed, part of BOD is removed, phosphorus is released by phosphorus-accumulating microorganisms in the return sludge, then the sewage flows into the anoxic tank, denitrifying bacteria take non-decomposed carbon-containing organic matters in the sewage as nutrients, and nitrate radical which flows in the aerobic tank through internal return is reduced into nitrogen to be released. Finally, sewage enters an aerobic tank, ammonia Nitrogen (NH) 3 -N) performing nitration reaction to generate nitrate radical, simultaneously oxidizing and decomposing organic matters to supply energy to phosphorus-absorbing microorganisms, enriching phosphorus in the microorganisms, and discharging the phosphorus-enriched microorganisms in the form of phosphorus-enriched sludge after precipitation and separation.
The oxidation ditch technology is a circulation flow aeration ditch connected end to end, a continuous ring type reaction tank is used as a biological reaction tank, and the concentration of dissolved oxygen is formed into a concentration gradient along the length direction of the tank by utilizing the plug flow characteristic, so that aerobic, anoxic and anaerobic conditions are formed.
The Bayton cycle (Bacton) process and the multistage AO process are characterized in that one or more denitrification systems are additionally arranged at the rear end of the traditional AAO process to realize multiple denitrification, so that the total nitrogen index of the effluent quality is reduced to a lower level. In the Barton process and the multistage AO process, a denitrification system additionally arranged at the rear section of the biological pond and a denitrification system arranged at the front section of the biological pond run relatively independently.
The core of the SBR sequence intermittent activated sludge process and the derivative processes CASS and CAST is an SBR reaction tank, a sludge reflux system is not arranged, DO and BOD5 concentration gradients exist in the reaction tank, the anaerobic anoxic and aerobic sections are simultaneously arranged in a tank body, and the activated sludge expansion is effectively controlled through intermittent aeration, so that the method is particularly suitable for occasions with large intermittent discharge and flow change.
The denitrification filter is a biological filter with denitrification and denitrification functions, and only comprises an anoxic tank, so that three pollutants including suspended matters, total phosphorus and total nitrogen can be removed at the same time.
Step S120 is then performed to determine a nutrient supply control mode according to the process flow.
The nutrient supply control mode comprises that the front control module independently controls the nutrient supply quantity, the rear control module unit controls the nutrient supply quantity, and the front control module and the rear control module jointly control the nutrient supply quantity. Different control modes need to be selected according to different process flows.
Specifically, if the process flow of the sewage treatment process only comprises a primary denitrification system, the pre-use control module controls nutrient replenishment in the sewage treatment process.
If the process flow of the sewage treatment process comprises a primary denitrification system and a secondary or multiple denitrification system, the front control module and the rear control module are respectively used for controlling nutrient supply of the primary denitrification system and the secondary or multiple denitrification system.
If the process flow of the sewage treatment process only comprises a single anoxic tank, the post-use control module controls the nutrient supply of the single anoxic tank.
For example, a pre-control module is used to control nutrient make-up for an oxidation ditch or AAO process that contains only one denitrification system. For the Bayton process comprising a primary denitrification system, a secondary denitrification system and a multi-stage AO process comprising a primary denitrification system and a multi-time denitrification system, a front control module and a rear control module are adopted to respectively control nutrient supply of the primary denitrification system and the secondary/multi-time denitrification system. The denitrification filter is controlled by a rear control module only, and the SBR and the derivative process thereof are controlled by a front control module only.
And finally, executing step S130, and determining the number and the dosing positions of the dosing pumps and the type and the installation position of the monitoring instruments in the intelligent nutrient supply control system according to the nutrient supply control mode.
For example, when a pre-control module is used to control the nutrient replenishment process of the oxidation ditch process or the AAO process, the dosing line of the dosing pump is connected to the anoxic tank.
When the front control module and the rear control module are adopted to control the nutrient supply process of the Bayton cycle process or the multistage AO process, the dosing pipelines of the two dosing pumps are respectively connected to the anoxic tank of the primary denitrification system and the anoxic tank of the secondary or multistage denitrification system.
When the front control module and the rear control module are adopted to control the nutrient replenishing process of the Bayton process or the multistage AO process, the two dosing pumps respectively receive the dosing amounts output by the front control module and the rear control module.
When the rear control module is adopted to control the nutrient replenishing process of the denitrification filter, a dosing pipeline of a dosing pump is connected to the denitrification filter. When the front control module is adopted to control the nutrient replenishing process of the SBR and the derivative process thereof, a dosing pipeline of the dosing pump is connected to a water inlet pipeline of the SBR pool.
The meters and the mounting locations of the meters required for different process flows are also different. For example, when the nutrient supplying process of the oxidation ditch process or the AAO process is controlled by using the front control module, a sludge concentration meter, a dissolved oxygen meter, an ammonia nitrogen meter (NH 3 Meter), nitrate nitrogen meter (NO) 3 The instrument) and the thermometer are arranged in the aerobic tank, and the oxidation-reduction potential instrument is arranged in the anoxic tank.
When the front control module and the rear control module are adopted to control the nutrient replenishing process of the Bayton cycle process or the multistage AO process, a TN instrument is arranged in an anoxic tank of a primary denitrification system, and a monitoring instrument and NH are arranged 3 The instrument is arranged in an aerobic tank of a primary denitrification system to remove NO 3 The instrument is respectively arranged at the inlet of the anoxic tank and the outlet of the aerobic tank of the two-stage or multi-stage denitrification system.
When the post control module is adopted to control the nutrient replenishing process of the denitrification filter, NO is added 3 The instrument is respectively arranged at the inlet and the outlet of the denitrification filter.
When the front control module is adopted to control the nutrient replenishing process of the SBR and the derivative process thereof, NH is added 3 Meters or NO 3 The instrument and TN instrument are arranged in the SBR pool.
Wherein NH is 3 The instrument is used for detecting the ammonia nitrogen concentration in water, and NO 3 The instrument is used for detecting the nitrate nitrogen concentration in water, and the TN instrument is used for measuring the total nitrogen concentration in water.
FIG. 2 shows a schematic diagram of a nutrient supply intelligent control system according to one embodiment of the invention. As shown in fig. 2, the nutrient supply intelligent control system includes: the device comprises an upper computer, a server, a PLC control cabinet, a dosing pump and a monitoring instrument, wherein the upper computer is connected with the server, and the PLC control cabinet is respectively connected with the server, the dosing pump and the monitoring instrument. The server is internally provided with an algorithm engine, and comprises a front control module and/or a rear control module and a database, wherein the nutrient supply control mode of the algorithm engine is determined according to the process flow of the sewage treatment process; the number and the dosing positions of the dosing pumps, the type of the monitoring instrument and the mounting position are determined according to the nutrient supply control mode.
For example, when the sewage treatment process is SBR and derived process or AAO process/oxidation ditch process, the algorithm engine only comprises a front control module, and at this time, the front control module is configured to predict the nutrient supply according to the water intake data of the anoxic tank or SBR tank, and correct the predicted nutrient supply according to the total nitrogen index of the effluent of the anoxic tank and the monitoring instrument data.
When the sewage treatment process is a denitrification filter, the algorithm engine only comprises a rear control module, and at the moment, the rear control module is used for predicting the nutrient supply according to the difference value between the water inlet nitrate nitrogen data and the water outlet nitrate nitrogen data of the denitrification filter and correcting the predicted nutrient supply according to the water outlet nitrate nitrogen index;
when the sewage treatment process is a Bayton cycle process or a multi-stage AO process, the algorithm engine comprises a front control module and a rear control module, and at the moment, the front control module is used for predicting the nutrient supply quantity of the primary denitrification system according to the water inflow, the internal reflux ratio and the external reflux ratio, calculating the nutrient supply time, and correcting the nutrient supply quantity of the primary denitrification system according to the total nitrogen index of the effluent of the front anoxic tank and the data of the monitoring instrument; the rear control module is used for predicting the nutrient supply quantity of the secondary or multiple denitrification system according to the difference value between the water and nitrogen output data of the front aerobic tank and the water and nitrogen output indexes of the front aerobic tank, and correcting the nutrient supply quantity of the secondary or multiple denitrification system according to the difference value between the water and nitrogen output data of the rear aerobic tank and the water and nitrogen output indexes of the rear aerobic tank and the process parameters.
Wherein, the upper computer interface is reserved with a manual input port for receiving the manual input internal reflux ratio, five-day biochemical oxygen demand (BOD 5), nutrient COD equivalent and sludge organic fraction ratio (MLVSS/MLSS). The front control module and/or the rear control module are/is used for predicting the nutrient supply according to the water inflow data, iteratively correcting the predicted nutrient supply according to the water outflow index and the process parameter, and outputting the corrected nutrient supply.
The PLC control cabinet can control each instrument (such as a water inflow COD instrument and NH) 3 -N meter, flowmeter, TN total nitrogen meter of anoxic tank, ORP oxidation-reduction potential meter, NH of aerobic tank 3 -N nitrogen meter, MLSS sludge concentration meter, DO dissolved oxygen meter) monitor data are uploaded to the algorithm engine, and nutrient supply output by the algorithm engine is sent to the dosing pump so that the dosing pump can dose nutrients in the sewage treatment process.
The system can carry out offline special training according to the characteristic parameters of different sewage treatment plants, so that the intelligent control model is more suitable for the actual running of the sewage treatment plants. After the off-line special training is finished, the second stage on-line training is carried out, and on-line running training is started by accessing on-site input/output signals and setting characteristic parameters. Along with the gradual maturity of second stage training, the system can smoothly take over the manual feeding nutrient work under the premise of not influencing the water outlet index, and the system enters the third stage to stabilize intelligent operation and regularly perform online data training according to background setting.
FIG. 3 illustrates a schematic diagram of nutrient supply control of an oxidation ditch or AAO process, according to one embodiment of the invention. As shown in FIG. 3, a front control module employing an algorithm engineConnect PLC switch board, PLC switch board connects charge pump and a plurality of instrument. The dosing pipeline of the dosing pump is connected to the anoxic tank. Sludge concentration meter, dissolved oxygen meter and NH 3 Instrument, NO 3 The instrument and the thermometer are arranged in the aerobic tank, and the oxidation-reduction potential instrument (ORP instrument) is arranged in the anoxic tank.
Fig. 4 shows a schematic diagram of nutrient supply control of the pavilion process according to one embodiment of the invention. As shown in fig. 4, the front control module and the rear control module of the algorithm engine are connected with the PLC control cabinet, and are connected with the PLC control cabinet through two dosing pumps, and the dosing pipelines of the two dosing pumps are respectively connected to the front anoxic tank and the rear anoxic tank. TN instrument sets up in preceding anoxic tank, monitor instrument and NH 3 The instrument is arranged in the front aerobic tank, and two NO's are arranged in the front aerobic tank 3 The instrument is respectively arranged at the inlet of the rear anoxic tank and the outlet of the rear aerobic tank.
FIG. 5 illustrates a nutrient replenishment control schematic diagram for a multi-stage AO process in accordance with one embodiment of the present invention. As shown in fig. 5, the front control module and the rear control module of the algorithm engine are connected with the PLC control cabinet, and are connected with the PLC control cabinet through two dosing pumps, and the dosing pipelines of the two dosing pumps are respectively connected to the front anoxic tank of the primary denitrification system and the rear anoxic tank of the rear multistage denitrification system. TN instrument is arranged in the front anoxic tank of the primary denitrification system, and the monitoring instrument and NH are arranged 3 The instrument is arranged in a front aerobic tank of the primary denitrification system, and a plurality of NO 3 The meters are respectively arranged at the inlet of the rear anoxic tank and the outlet of the rear aerobic tank of the multistage denitrification system.
FIG. 6 shows a schematic diagram of nutrient supply control for a denitrification filter in accordance with one embodiment of the invention. As shown in fig. 6, a rear control module of the algorithm engine is connected with a PLC control cabinet, a dosing pump is connected with the PLC control cabinet, and a dosing pipeline of the dosing pump is connected to the denitrification filter tank. Two NO' s 3 The instrument is respectively arranged at the inlet and the outlet of the denitrification filter.
FIG. 7 shows a schematic diagram of nutrient supply control for an SBR process according to one embodiment of the invention. As shown in FIG. 7, a front control module of an algorithm engine is connected with a PLC control cabinet, and a dosing pump is connected withAnd a dosing pipeline of the dosing pump is connected to a water inlet pipeline of the SBR pool. NH (NH) 3 Meters or NO 3 The instrument and TN instrument are arranged in the SBR pool.
According to the module combined type nutrient supply control method and the nutrient supply intelligent control system in the sewage treatment process, different nutrient supply control modes are set for different sewage treatment processes, and the algorithm engine adopts the design that the front control module and the rear control module independently operate and can operate in a combined mode, so that the applicability of nutrient supply control in multiple application scenes can be improved.
In the description provided herein, numerous specific details are set forth. However, it is understood that embodiments of the invention may be practiced without these specific details. In some instances, well-known methods, structures and techniques have not been shown in detail in order not to obscure an understanding of this description.
Furthermore, those skilled in the art will appreciate that while some embodiments described herein include some features but not others included in other embodiments, combinations of features of different embodiments are meant to be within the scope of the invention and form different embodiments.
As used herein, unless otherwise specified the use of the ordinal terms "first," "second," "third," etc., to describe a general object merely denote different instances of like objects, and are not intended to imply that the objects so described must have a given order, either temporally, spatially, in ranking, or in any other manner.
While the invention has been described with respect to a limited number of embodiments, those skilled in the art, having benefit of the above description, will appreciate that other embodiments are contemplated within the scope of the invention as described herein. Furthermore, it should be noted that the language used in the specification has been principally selected for readability and instructional purposes, and may not have been selected to delineate or circumscribe the inventive subject matter.
Accordingly, many modifications and variations will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the appended claims. The disclosure of the present invention is intended to be illustrative, but not limiting, of the scope of the invention, which is defined by the appended claims.

Claims (8)

1. A method for controlling the supply of nutrients by a modular combination in a wastewater treatment process, comprising the steps of:
obtaining technological processes of different sewage treatment technologies;
determining a nutrient supply control mode according to the process flow, wherein the nutrient supply control mode comprises that a front control module independently controls the nutrient supply amount, a rear control module unit controls the nutrient supply amount and the front control module and the rear control module jointly control the nutrient supply amount, and the nutrient supply control mode comprises the following steps: if the process flow of the sewage treatment process only comprises a primary denitrification system, controlling nutrient supply in the sewage treatment process by using a pre-use control module;
if the process flow of the sewage treatment process comprises a primary denitrification system and a secondary or multiple denitrification system, respectively using a front control module and a rear control module to control nutrient supply of the primary denitrification system and the secondary or multiple denitrification system;
if the process flow of the sewage treatment process only comprises a single anoxic tank, the post-use control module controls the nutrient supply of the single anoxic tank;
and determining the number and the dosing positions of dosing pumps, the type of monitoring instruments and the installation positions of the dosing pumps in the nutrient supply intelligent control system according to the nutrient supply control mode.
2. The method for controlling the supply of nutrients in a combined mode in a sewage treatment process according to claim 1, wherein the sewage treatment process is any one of an AAO process, an oxidation ditch process, a pavilion process, a multistage AO process, a denitrification filter, SBR and a derivative process thereof.
3. The method for controlling the supply of nutrients in a modular manner in a sewage treatment process according to claim 2, wherein the step of determining the number and the positions of the dosing pumps, the types of the monitoring instruments and the installation positions of the dosing pumps in the intelligent control system according to the supply control mode of the nutrients comprises the steps of:
when the front control module is adopted to control the nutrient supplying process of the oxidation ditch process or the AAO process, a dosing pipeline of a dosing pump is connected to the anoxic tank;
when the front control module and the rear control module are adopted to control the nutrient supply process of the Bayton cycle process or the multistage AO process, the dosing pipelines of the two dosing pumps are respectively connected to the anoxic tank of the primary denitrification system and the anoxic tank of the secondary or multistage denitrification system;
when the rear control module is adopted to control the nutrient replenishing process of the denitrification filter, a dosing pipeline of a dosing pump is connected to the denitrification filter;
when the front control module is adopted to control the nutrient replenishing process of the SBR and the derivative process thereof, a dosing pipeline of the dosing pump is connected to a water inlet pipeline of the SBR pool.
4. The method of claim 3, wherein when the front control module and the rear control module are used to control the nutrient supply process of the baton process or the multistage AO process, the two dosing pumps receive the dosing amounts output by the front control module and the rear control module, respectively.
5. The method for controlling the supply of nutrients in a modular manner in a sewage treatment process according to claim 3, wherein the step of determining the number and the positions of the dosing pumps, the types of the monitoring instruments and the installation positions of the intelligent control system for supplying nutrients according to the supply control method comprises the steps of:
when the front control module is adopted to control the nutrient replenishing process of the oxidation ditch process or the AAO process, the sludge concentration meter, the dissolved oxygen meter and the NH are adopted 3 Instrument, NO 3 The instrument and the thermometer are arranged wellIn the oxygen tank, an oxidation-reduction potential meter (ORP meter) is arranged in the anoxic tank;
when the front control module and the rear control module are adopted to control the nutrient replenishing process of the Bayton cycle process or the multistage AO process, a TN instrument is arranged in an anoxic tank of a primary denitrification system, and a monitoring instrument and NH are arranged 3 The instrument is arranged in an aerobic tank of a primary denitrification system to remove NO 3 The instrument is respectively arranged at the inlet of the anoxic tank and the outlet of the aerobic tank of the secondary or multistage denitrification system;
when the post control module is adopted to control the nutrient replenishing process of the denitrification filter, NO is added 3 The meters are respectively arranged at the inlet and the outlet of the denitrification filter;
when the front control module is adopted to control the nutrient replenishing process of the SBR and the derivative process thereof, NH is added 3 Meters or NO 3 The instrument and TN instrument are arranged in the SBR pool.
6. An intelligent control system for nutrient replenishment, comprising: the system comprises an upper computer, a server, a PLC control cabinet, a dosing pump and a monitoring instrument, wherein the upper computer is connected with the server, the PLC control cabinet is respectively connected with the server, the dosing pump and the monitoring instrument, and the system is characterized in that an algorithm engine is arranged in the server and comprises a front control module and/or a rear control module and a database, and the nutrient supply control mode of the algorithm engine is determined according to the process flow of a sewage treatment process; the number and the dosing positions of the dosing pumps, the type of the monitoring instrument and the installation position are determined according to the nutrient supply control mode.
7. The intelligent control system for nutrient supply according to claim 6, wherein the PLC control cabinet is configured to upload monitoring data of the monitoring instrument to the algorithm engine, and issue the nutrient supply output by the algorithm engine to the dosing pump, so that the dosing pump doses nutrients in a sewage treatment process; the front control module and/or the rear control module are/is used for predicting the nutrient supply according to the water inflow data, iteratively correcting the predicted nutrient supply according to the water outflow index and the process parameter, and outputting the corrected nutrient supply.
8. The intelligent control system for nutrient replenishment as recited in claim 6, wherein the upper computer interface is reserved with a manual input port for receiving a manually input internal reflux ratio, five-day biochemical oxygen demand, nutrient COD equivalent and sludge organic fraction ratio and transmitting to the algorithm engine.
CN202410252090.7A 2024-03-06 2024-03-06 Module combined type nutrient supply control method in sewage treatment process Active CN117819702B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410252090.7A CN117819702B (en) 2024-03-06 2024-03-06 Module combined type nutrient supply control method in sewage treatment process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410252090.7A CN117819702B (en) 2024-03-06 2024-03-06 Module combined type nutrient supply control method in sewage treatment process

Publications (2)

Publication Number Publication Date
CN117819702A true CN117819702A (en) 2024-04-05
CN117819702B CN117819702B (en) 2024-05-03

Family

ID=90506267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410252090.7A Active CN117819702B (en) 2024-03-06 2024-03-06 Module combined type nutrient supply control method in sewage treatment process

Country Status (1)

Country Link
CN (1) CN117819702B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006158384A (en) * 2005-08-15 2006-06-22 Yukie Matsumoto Method for preparation of culture solution for hydroponic culture and method for supplying minor element
CN104229958A (en) * 2014-08-13 2014-12-24 上海环保工程成套有限公司 Full-automatic intelligent dosing system
CN104671417A (en) * 2015-02-15 2015-06-03 河北省环境科学研究院 Novel combined bio-floating bed
CN106385929A (en) * 2016-08-30 2017-02-15 湖南文理学院 Automatic nutrient solution supply system and method for soil of plants
CN110790381A (en) * 2019-11-28 2020-02-14 北京协同创新智慧水务有限公司 Full-flow intelligent control system based on AAO sewage treatment process
CN114735824A (en) * 2022-04-25 2022-07-12 扬州大学 Process and system for treating domestic sewage by partial nitrification-denitrification-shortcut autotrophic denitrification anaerobic ammonia oxidation
US20230263141A1 (en) * 2020-06-24 2023-08-24 Bariflolabs Private Limited Intelligent waterbody management system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006158384A (en) * 2005-08-15 2006-06-22 Yukie Matsumoto Method for preparation of culture solution for hydroponic culture and method for supplying minor element
CN104229958A (en) * 2014-08-13 2014-12-24 上海环保工程成套有限公司 Full-automatic intelligent dosing system
CN104671417A (en) * 2015-02-15 2015-06-03 河北省环境科学研究院 Novel combined bio-floating bed
CN106385929A (en) * 2016-08-30 2017-02-15 湖南文理学院 Automatic nutrient solution supply system and method for soil of plants
CN110790381A (en) * 2019-11-28 2020-02-14 北京协同创新智慧水务有限公司 Full-flow intelligent control system based on AAO sewage treatment process
US20230263141A1 (en) * 2020-06-24 2023-08-24 Bariflolabs Private Limited Intelligent waterbody management system
CN114735824A (en) * 2022-04-25 2022-07-12 扬州大学 Process and system for treating domestic sewage by partial nitrification-denitrification-shortcut autotrophic denitrification anaerobic ammonia oxidation

Also Published As

Publication number Publication date
CN117819702B (en) 2024-05-03

Similar Documents

Publication Publication Date Title
Orhon et al. Mechanism and design of sequencing batch reactors for nutrient removal
JP3961835B2 (en) Sewage treatment plant water quality controller
CN111847634A (en) Aeration and carbon source adding optimization control system and method for sludge-membrane composite sewage treatment process
KR100638158B1 (en) Sewage treatment system
CN203630652U (en) Control system for reflux quantity of AAO sewage dephosphorization and denitrification process
CN103112949B (en) SBR (sequencing batch reactor) semi-short-distance nitrification process control method
CN112875859A (en) Sewage nitrogen and phosphorus removal control system based on AOA technology
CN112794444B (en) A 2 Optimization method of reflux ratio of O biological nitrogen and phosphorus removal
CN111039383A (en) Carbon source adding method and system
CN110078213B (en) Device and method for strengthening stable operation of anaerobic ammonia oxidation treatment of municipal sewage by SBR/anaerobic baffle reactor
JP2004275826A (en) Sewage treatment plant water quality monitoring and controlling device
CN216997850U (en) Carbon source adding device for AAO process sewage treatment
JP4008694B2 (en) Sewage treatment plant water quality controller
CN106348440A (en) Method for measuring flora denitrification contribution rate and activity of full-autotrophic denitrification process
CN116589096A (en) Multi-mode AAO-MBR (anaerobic-anoxic-oxic-Membrane biological reactor) technical process control system and method
CN117819702B (en) Module combined type nutrient supply control method in sewage treatment process
JP2006315004A (en) Water quality control unit for sewage disposal plant
Wichern et al. Efficiency of the Activated Sludge Model no. 3 for German wastewater on six different WWTPs
CN110436626A (en) A kind of Anammox coupling denitrification Composite denitrification system and quick start method
CN116477776A (en) Front-phosphorus-removal rear-endogenous denitrification coupling MBR sewage treatment system and technology
JPH07115025B2 (en) Bulking control method using SVI
Carrio et al. Practical considerations for design of a step-feed biological nutrient removal system
JP3999869B2 (en) Biological water treatment equipment
KR20040017193A (en) Advanced treatment apparaters and method of sewage water .
KR20150072475A (en) Automatic-Controlled System for Treating WasteWater

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant