Efficient suspended ceiling installation method Download PDFInfo
- Publication number
- CN117661772A CN117661772A CN202311794582.0A CN202311794582A CN117661772A CN 117661772 A CN117661772 A CN 117661772A CN 202311794582 A CN202311794582 A CN 202311794582A CN 117661772 A CN117661772 A CN 117661772A
- Authority
- CN
- China
- Prior art keywords
- suspended ceiling
- movable
- fixed
- component
- bone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 42
- 238000000034 method Methods 0.000 title claims abstract description 32
- 238000012423 maintenance Methods 0.000 claims abstract description 6
- 210000000988 bone and bone Anatomy 0.000 claims description 58
- 238000007789 sealing Methods 0.000 claims description 47
- 229910052602 gypsum Inorganic materials 0.000 claims description 28
- 239000010440 gypsum Substances 0.000 claims description 28
- 239000002002 slurry Substances 0.000 claims description 18
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 230000000694 effects Effects 0.000 description 4
- 230000008569 process Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 230000001066 destructive effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
- E04B9/12—Connections between non-parallel members of the supporting construction
- E04B9/16—Connections between non-parallel members of the supporting construction the members lying in different planes
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/18—Means for suspending the supporting construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/22—Connection of slabs, panels, sheets or the like to the supporting construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/30—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by edge details of the ceiling; e.g. securing to an adjacent wall
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Residential Or Office Buildings (AREA)
Abstract
The invention discloses a method for installing a high-efficiency suspended ceiling, which comprises the following steps: (1) preparing a ceiling member: the suspended ceiling components are divided into fixed suspended ceiling components and movable suspended ceiling components; (2) The main joists are parallelly fixed on the ceiling through the hanging rods; (3) Hanging the fixed suspended ceiling component on the main keel through the connecting piece; (4) installing a movable ceiling component: placing the movable suspended ceiling component below the installation position, inclining the movable suspended ceiling component, and then moving the movable suspended ceiling component upwards to the position above the installation position; the movable suspended ceiling components are arranged in a horizontal state, the movable suspended ceiling components are moved downwards, and the fixed suspended ceiling components on two sides support the middle movable suspended ceiling components; and splicing all the movable suspended ceiling components in the corresponding installation positions according to the operation. The suspended ceiling installation method can simplify the installation operation, improve the installation efficiency, facilitate the maintenance of electrical equipment on the suspended ceiling, and avoid the replacement of components of the suspended ceiling structure.
Description
Technical Field
The invention relates to a suspended ceiling installation method, in particular to a high-efficiency suspended ceiling installation method.
Background
Many indoor ceilings of buildings are decorated by adopting suspended ceilings, and particularly, the indoor suspended ceilings of public buildings have the decoration effect and meet the requirements of environmental protection, health, sound insulation and the like.
The traditional gypsum suspended ceiling mainly comprises a suspender, a main keel, a subsidiary keel, a keel connecting piece for connecting the main keel and the subsidiary keel, a gypsum board and the like; during construction, the suspender and the main joist are installed firstly, then the auxiliary joist and the gypsum board are hung on the main joist through the joist connecting piece, and finally the joint is filled and trowelled.
The existing installation method of the suspended ceiling structure has the following problems:
1. because each plate needs to be hung with the main joist through the auxiliary joist, the construction workload is large, and the installation speed is low.
2. When the last plate is installed, as the surrounding plates are installed, a mounting hole is needed to be formed in the last plate, so that a worker can install the plate through the mounting hole, and finally, the mounting hole is filled, so that the operation is very complicated.
3. Because the plate hangs with main joist through the auxiliary joist and is connected, suspended structure hides in the inside moreover, when meeting the condition that needs to carry out dismouting (for example overhauls the electrical equipment on suspended ceiling) to part plate, the operation degree of difficulty is very big, in the dismouting in-process moreover, causes the damage of suspended ceiling structure easily, unable used repeatedly, needs to be changed, and later maintenance cost is higher.
Disclosure of Invention
The invention aims to overcome the problems, and provides a high-efficiency suspended ceiling installation method which can not only omit the connection step of part of plates and a main keel, but also simplify the installation operation and improve the installation efficiency; and the corresponding plate can be directly opened as required without destructive dismantling in the follow-up process so as to overhaul the electrical equipment on the suspended ceiling, and the method is very convenient and does not need to replace parts of the suspended ceiling structure.
The aim of the invention is achieved by the following technical scheme:
the high-efficiency suspended ceiling installation method comprises the following steps:
(1) Preparing a ceiling member: the suspended ceiling component is divided into a fixed suspended ceiling component and a movable suspended ceiling component, wherein the fixed suspended ceiling component is directly suspended with the main joist, the movable suspended ceiling component is supported on the fixed suspended ceiling component but not directly suspended with the main joist, the edge of the fixed suspended ceiling component is provided with a bearing part for supporting the movable suspended ceiling component, and the edge of the movable suspended ceiling component is provided with a lap joint part for lap joint on the bearing part of the fixed suspended ceiling component;
(2) And (3) installing a main keel: the main joists are parallelly fixed on the ceiling through the hanging rods;
(3) Installing and fixing a suspended ceiling component: according to a preset arrangement scheme of the fixed suspended ceiling component and the movable suspended ceiling component on the suspended ceiling, the fixed suspended ceiling component is mounted, and particularly is suspended on the main joist through a connecting piece;
(4) Installing a movable suspended ceiling component: according to a preset arrangement scheme of a fixed suspended ceiling member and a movable suspended ceiling member on the suspended ceiling, on the basis that the fixed suspended ceiling member is installed, a vacant installation position is formed at the position where the movable suspended ceiling member is required to be installed, two fixed suspended ceiling members are arranged on two sides of the vacant installation position, the movable suspended ceiling member is placed below the installation position between the two fixed suspended ceiling members during installation, the movable suspended ceiling member is inclined, so that the vertical distance between two lap joint parts of the movable suspended ceiling member is smaller than the interval between the two fixed suspended ceiling members, and the movable suspended ceiling member is moved upwards until the movable suspended ceiling member is positioned above the installation position; the movable suspended ceiling component is arranged in a horizontal state, and the movable suspended ceiling component is moved downwards until two lap joint parts of the movable suspended ceiling component are respectively lapped on opposite bearing parts of the two fixed suspended ceiling components, and the fixed suspended ceiling components on two sides bear the middle movable suspended ceiling component; and splicing all movable suspended ceiling components in corresponding installation positions according to the operation until the installation work of the whole suspended ceiling is completed.
The invention also comprises a piece trowelling treatment step: and performing the seam trowelling treatment between the adjacent fixed suspended ceiling components and the movable suspended ceiling components which need to be performed with the seam trowelling treatment. In the process of joint trowelling, if the part of the movable suspended ceiling component is required to be reserved as a part which can be freely disassembled and assembled such as an overhaul port, joint processing is not performed, and thus the movable suspended ceiling component can be opened to overhaul the suspended ceiling.
In a preferred embodiment of the present invention, in a suspended ceiling where a movable suspended ceiling member is reserved as an access opening, the method further comprises the step of opening the access opening: when the movable suspended ceiling component is required to be opened, the movable suspended ceiling component is lifted upwards, and is inclined, so that the vertical distance between two lap joint parts of the movable suspended ceiling component is smaller than the distance between the two fixed suspended ceiling components; and (5) taking down the movable suspended ceiling component to expose the overhaul notch.
In a preferred embodiment of the present invention, the arrangement of the fixed suspended ceiling member and the movable suspended ceiling member on the ceiling is as follows: the fixed suspended ceiling components and the movable suspended ceiling components are arranged alternately. Therefore, the number of the fixed suspended ceiling components can be reduced as much as possible, so that the assembly efficiency is improved, and the cost is reduced.
In a preferred embodiment of the present invention, the arrangement of the fixed suspended ceiling member and the movable suspended ceiling member on the ceiling is as follows: the movable suspended ceiling components are arranged at the positions where the maintenance holes are required to be reserved, and the fixed suspended ceiling components are arranged at the other positions.
In a preferred scheme of the invention, in the step (1), the fixed suspended ceiling component comprises a plate, a false keel and edge sealing bones, wherein the false keel is provided with two ends which are respectively fixed at one direction of the plate, and the edge sealing bones are respectively provided with two ends which are respectively fixedly connected at the other direction of the plate; the bearing part is arranged on one side of the auxiliary keel, which is outside the auxiliary keel; the manufacturing method of the fixed suspended ceiling component comprises the following steps:
placing the auxiliary keels and the edge sealing bones in a die cavity of a forming die, wherein two opposite auxiliary keels and two opposite edge sealing bones form a rectangular structure; the auxiliary keels and the edge sealing bones are provided with embedded feet;
pouring gypsum slurry into a mold cavity of a forming mold, filling the mold cavity by the gypsum slurry, and covering the auxiliary keel and the embedded feet of the edge sealing bone;
after the gypsum slurry is solidified into a gypsum board body, the auxiliary keel and the edge sealing rib form an integrated structure, and the integrated fixed suspended ceiling component is obtained.
Further, the supporting part of the auxiliary keel extends outwards horizontally and then extends downwards to be attached to the side face of the end part of the plate.
In a preferred embodiment of the present invention, in the step (1), the movable suspended ceiling member includes a plate, a lap joint bone and a seal edge bone, where the lap joint bone is provided with two ends respectively fixed at two ends of the corresponding plate in one direction, and the seal edge bone is provided with two ends respectively fixed at two ends of the plate in the other direction; the lap joint bone is provided with the lap joint part; the manufacturing method of the movable suspended ceiling component comprises the following steps:
placing a bone setting and edge sealing bone in a die cavity of a forming die, wherein two opposite auxiliary keels and two opposite edge sealing bones form a rectangular structure; the bone-setting device is characterized in that a force-aid connecting part is arranged on the bone-setting device, and the force-aid connecting part is positioned below the end part of the edge-sealing bone; the bone-setting and edge-sealing bones are provided with embedded feet;
pouring gypsum slurry into a mold cavity of a forming mold, filling the mold cavity with the gypsum slurry, and covering pre-embedded feet of the bone-setting and edge-sealing bones;
after the gypsum slurry is solidified into a gypsum board body, the bone-setting and edge-sealing bones form an integrated structure, and the integrated movable suspended ceiling component is obtained.
Further, one of the side surfaces of the lap joint part of the lap joint is attached to the side surface of the end part corresponding to the edge sealing bone, and the lap joint part of the lap joint at two ends is limited on the bearing part of the auxiliary keel by the end part of the edge sealing bone, so that the movable suspended ceiling component can be spliced between the two fixed suspended ceiling components more stably.
Further, two embedded feet are arranged for setting the bone, one embedded foot is positioned below the force-borrowing connecting part, and the other embedded foot is positioned below the lap joint part.
Compared with the prior art, the invention has the following beneficial effects:
1. according to the high-efficiency suspended ceiling installation method, only the fixed suspended ceiling components are hung on the main keels, and the movable suspended ceiling components are directly hung on the two fixed suspended ceiling components, so that the step of connecting the movable suspended ceiling components with the main keels is omitted, the installation operation is greatly simplified, the installation difficulty is reduced, and the installation efficiency is improved.
2. Through slightly inclining movable furred ceiling component, can overlap joint this movable furred ceiling component on two adjacent fixed furred ceiling components, even when installing last plate, need not to open the trompil on the plate, it is very convenient to install.
3. Through with activity furred ceiling component overlap joint on two adjacent fixed furred ceiling components, be particularly useful for installing in the position that needs to overhaul, can open the activity furred ceiling component that corresponds alone as required, need not to carry out destructive demolishs, very convenient and need not to change the part of furred ceiling structure, later maintenance cost is lower.
4. Because the movable suspended ceiling component does not need to be directly connected with the main keel, namely, a connecting part is not needed, the structural layout of the hidden frame keel can be adopted, the main framework of the movable suspended ceiling component is embedded in the gypsum board for hiding, and the movable suspended ceiling component has the advantages of saving materials, reducing weight and the like.
Drawings
FIG. 1 is a plan cross-sectional view of a suspended ceiling structure installed using the high efficiency suspended ceiling installation method of the present invention.
Fig. 2 is a schematic perspective view of a suspended ceiling structure installed by the method for installing a high-efficiency suspended ceiling according to the present invention.
Fig. 3 is a schematic view of a partial perspective view of a suspended ceiling structure installed using the method for installing a high efficiency suspended ceiling of the present invention.
Fig. 4 is a schematic perspective view of the cross runner of the present invention.
Fig. 5 is a schematic perspective view of the bone-joining structure of the present invention.
Detailed Description
In order that those skilled in the art will well understand the technical solutions of the present invention, the following describes the present invention further with reference to examples and drawings, but the embodiments of the present invention are not limited thereto.
Referring to fig. 1 to 5, the method for installing the high-efficiency suspended ceiling of the present embodiment includes the following steps:
(1) Preparing a ceiling member: the suspended ceiling components are divided into fixed suspended ceiling components and movable suspended ceiling components; wherein, fixed furred ceiling component hangs directly with main joist 1, and the activity furred ceiling component supports on fixed furred ceiling component and does not hang directly with main joist 1.
(2) And (3) installing a main keel: the main runners 1 are secured in parallel to the ceiling by means of hanger rods 2.
The fixed suspended ceiling component comprises an auxiliary keel 4, edge sealing ribs 5 and a plate 6, wherein the auxiliary keel 4 is provided with two ends which are respectively fixed at two ends of the plate 6 in one direction; a bearing part 4-1 is arranged on one side of the auxiliary keel 4, which is outside; the edge sealing bones 5 are provided with two ends which are respectively and fixedly connected with the other direction of the plate 6; the movable suspended ceiling component comprises a lap joint 7, an edge sealing bone 5 and a plate 6, wherein the lap joint bone 7 is provided with two ends which are respectively fixed at two ends of the corresponding plate 6 in one direction; the lap joint bone 7 is provided with a lap joint part 7-1 for lap joint on the bearing part 4-1; the edge sealing bones 5 are provided with two ends which are respectively and fixedly connected with the other direction of the plate 6.
(3) Installing and fixing a suspended ceiling component: according to the preset arrangement scheme of the fixed suspended ceiling components and the movable suspended ceiling components on the suspended ceiling, the fixed suspended ceiling components are mounted, and particularly, the fixed suspended ceiling components are suspended on the main joist 1 through the connecting pieces 3.
(4) Installing a movable suspended ceiling component: according to a preset arrangement scheme of a fixed suspended ceiling member and a movable suspended ceiling member on the suspended ceiling, on the basis that the fixed suspended ceiling member is installed, a vacant installation position is formed at the position where the movable suspended ceiling member is required to be installed, two fixed suspended ceiling members are arranged on two sides of the vacant installation position, the movable suspended ceiling member is placed below the installation position between the two fixed suspended ceiling members during installation, the movable suspended ceiling member is inclined, so that the vertical distance between two lap joint parts 7-1 of the movable suspended ceiling member is smaller than the interval between the two fixed suspended ceiling members, and the movable suspended ceiling member is moved upwards until the movable suspended ceiling member is positioned above the installation position; the movable suspended ceiling component is arranged in a horizontal state, and the movable suspended ceiling component is moved downwards until two lap joint parts 7-1 of the movable suspended ceiling component are respectively lapped on opposite bearing parts 4-1 of the two fixed suspended ceiling components, and the fixed suspended ceiling components on two sides bear the middle movable suspended ceiling component.
And splicing all movable suspended ceiling components in corresponding installation positions according to the operation until the installation work of the whole suspended ceiling is completed.
Further, the method also comprises the step of trowelling the seam: and performing the seam trowelling treatment between the adjacent fixed suspended ceiling components and the movable suspended ceiling components which need to be performed with the seam trowelling treatment. In the process of joint trowelling, if the part of the movable suspended ceiling component is required to be reserved as a part which can be freely disassembled and assembled such as an overhaul port, joint processing is not performed, and thus the movable suspended ceiling component can be opened to overhaul the suspended ceiling.
Further, in the suspended ceiling where the movable suspended ceiling member is reserved as the access opening, the method further includes the step of opening the access opening: when the movable suspended ceiling component is required to be opened, the movable suspended ceiling component is lifted upwards, and is inclined, so that the vertical distance between the two lap joint parts 7-1 of the movable suspended ceiling component is smaller than the distance between the two fixed suspended ceiling components.
The movable ceiling member is removed to expose the access opening for access to electrical equipment on the ceiling.
Further, the arrangement scheme of the fixed suspended ceiling component and the movable suspended ceiling component on the suspended ceiling is as follows: the fixed suspended ceiling components and the movable suspended ceiling components are arranged alternately. Therefore, the number of the fixed suspended ceiling components can be reduced as much as possible, so that the assembly efficiency is improved, and the cost is reduced.
Further, the arrangement scheme of the fixed suspended ceiling component and the movable suspended ceiling component on the suspended ceiling is as follows: the movable suspended ceiling components are arranged at the positions where the maintenance holes are required to be reserved, and the fixed suspended ceiling components are arranged at the other positions.
Referring to fig. 1-2, the support portion 4-1 of the auxiliary keel 4 extends horizontally and outwards and then extends downwards to be attached to the side surface of the end portion of the plate 6.
Specifically, the manufacturing method of the fixed suspended ceiling component comprises the following steps:
placing the auxiliary keels 4 and the edge sealing bones 5 in a die cavity of a forming die, wherein the two opposite auxiliary keels 4 and the two opposite edge sealing bones 5 form a rectangular structure; the auxiliary keel 4 and the edge sealing rib 5 are respectively provided with embedded feet 8.
Pouring gypsum slurry into a die cavity of the forming die, filling the die cavity with the gypsum slurry, and covering the auxiliary keel 4 and the embedded feet 8 of the edge sealing bone 5.
After the gypsum slurry is solidified into a gypsum board body, the auxiliary keel 4 and the edge sealing rib 5 form an integrated structure, and the integrated fixed suspended ceiling component is obtained.
Specifically, the manufacturing method of the movable suspended ceiling component comprises the following steps:
placing a bone setting 7 and a sealing bone 5 in a die cavity of a forming die, wherein two opposite auxiliary keels 4 and two opposite sealing bones 5 form a rectangular structure; the lap joint bone 7 is provided with a force-aid connecting part 7-2, and the force-aid connecting part 7-2 is positioned below the end part of the edge sealing bone 5; the lap joint bone 7 and the edge sealing bone 5 are provided with embedded feet 8.
Pouring gypsum slurry into a die cavity of the forming die, filling the die cavity with the gypsum slurry, and covering the overlap joint bones 7 and the embedded feet 8 of the edge sealing bones 5.
After the gypsum slurry is solidified into a gypsum board body, the lap joint bone 7 and the edge sealing bone 5 form an integrated structure, and the integrally formed movable suspended ceiling component is obtained.
Referring to fig. 3 and 5, one side of the lap joint 7-1 of the lap joint 7 is attached to the side of the end corresponding to the edge sealing bone 5, and the lap joint 7-1 of the lap joint 7 at two ends is limited on the bearing part 4-1 of the auxiliary keel 4 by the end of the edge sealing bone 5, so that the movable suspended ceiling component can be spliced between the two fixed suspended ceiling components more stably.
Referring to fig. 3 and 5, two pre-buried feet 8 of the lap joint 7 are provided, one pre-buried foot 8 is located below the force-assistance connecting portion 7-2, and the other pre-buried foot 8 is located below the lap joint portion 7-1.
The foregoing is illustrative of the present invention, and is not to be construed as limiting thereof, but rather as various changes, modifications, substitutions, combinations, and simplifications which may be made without departing from the spirit and principles of the invention are intended to be included within the scope of the invention.
Claims (10)
1. The method for installing the high-efficiency suspended ceiling is characterized by comprising the following steps of:
(1) Preparing a ceiling member: the suspended ceiling component is divided into a fixed suspended ceiling component and a movable suspended ceiling component, wherein the fixed suspended ceiling component is directly suspended with the main joist, the movable suspended ceiling component is supported on the fixed suspended ceiling component but not directly suspended with the main joist, the edge of the fixed suspended ceiling component is provided with a bearing part for supporting the movable suspended ceiling component, and the edge of the movable suspended ceiling component is provided with a lap joint part for lap joint on the bearing part of the fixed suspended ceiling component;
(2) And (3) installing a main keel: the main joists are parallelly fixed on the ceiling through the hanging rods;
(3) Installing and fixing a suspended ceiling component: according to a preset arrangement scheme of the fixed suspended ceiling component and the movable suspended ceiling component on the suspended ceiling, the fixed suspended ceiling component is mounted, and particularly is suspended on the main joist through a connecting piece;
(4) Installing a movable suspended ceiling component: according to a preset arrangement scheme of a fixed suspended ceiling member and a movable suspended ceiling member on the suspended ceiling, on the basis that the fixed suspended ceiling member is installed, a vacant installation position is formed at the position where the movable suspended ceiling member is required to be installed, two fixed suspended ceiling members are arranged on two sides of the vacant installation position, the movable suspended ceiling member is placed below the installation position between the two fixed suspended ceiling members during installation, the movable suspended ceiling member is inclined, so that the vertical distance between two lap joint parts of the movable suspended ceiling member is smaller than the interval between the two fixed suspended ceiling members, and the movable suspended ceiling member is moved upwards until the movable suspended ceiling member is positioned above the installation position; the movable suspended ceiling component is arranged in a horizontal state, and the movable suspended ceiling component is moved downwards until two lap joint parts of the movable suspended ceiling component are respectively lapped on opposite bearing parts of the two fixed suspended ceiling components, and the fixed suspended ceiling components on two sides bear the middle movable suspended ceiling component;
and splicing all movable suspended ceiling components in corresponding installation positions according to the operation until the installation work of the whole suspended ceiling is completed.
2. The method of installing a high efficiency suspended ceiling of claim 1, further comprising the step of seam troweling: and performing the seam trowelling treatment between the adjacent fixed suspended ceiling components and the movable suspended ceiling components which need to be performed with the seam trowelling treatment.
3. The method of installing a high efficiency suspended ceiling of claim 1, wherein in a suspended ceiling where a movable suspended ceiling component is reserved as an access opening, further comprising the step of opening the access opening: when the movable suspended ceiling component is required to be opened, the movable suspended ceiling component is lifted upwards, and is inclined, so that the vertical distance between two lap joint parts of the movable suspended ceiling component is smaller than the distance between the two fixed suspended ceiling components;
and (5) taking down the movable suspended ceiling component to expose the overhaul notch.
4. The method of claim 1, wherein the arrangement of the fixed and movable suspended ceiling elements on the ceiling is: the fixed suspended ceiling components and the movable suspended ceiling components are arranged alternately.
5. The method of claim 1, wherein the arrangement of the fixed and movable suspended ceiling elements on the ceiling is: the movable suspended ceiling components are arranged at the positions where the maintenance holes are required to be reserved, and the fixed suspended ceiling components are arranged at the other positions.
6. The method according to claim 1, wherein in the step (1), the fixed suspended ceiling member comprises a plate, a cross runner and edge sealing ribs, the cross runner is provided with two ends respectively fixed at one direction of the plate, and the edge sealing ribs are provided with two ends respectively fixed at the other direction of the plate; the bearing part is arranged on one side of the auxiliary keel, which is outside the auxiliary keel; the manufacturing method of the fixed suspended ceiling component comprises the following steps:
placing the auxiliary keels and the edge sealing bones in a die cavity of a forming die, wherein two opposite auxiliary keels and two opposite edge sealing bones form a rectangular structure; the auxiliary keels and the edge sealing bones are provided with embedded feet;
pouring gypsum slurry into a mold cavity of a forming mold, filling the mold cavity by the gypsum slurry, and covering the auxiliary keel and the embedded feet of the edge sealing bone;
after the gypsum slurry is solidified into a gypsum board body, the auxiliary keel and the edge sealing rib form an integrated structure, and the integrated fixed suspended ceiling component is obtained.
7. The method according to claim 1, wherein in the step (1), the movable suspended ceiling member comprises a plate, a lap joint rib and a banding rib, wherein the lap joint rib is provided with two ends respectively fixed at one direction of the corresponding plate, and the banding rib is provided with two ends respectively fixed at the other direction of the plate; the lap joint bone is provided with the lap joint part; the manufacturing method of the movable suspended ceiling component comprises the following steps:
placing a bone setting and edge sealing bone in a die cavity of a forming die, wherein two opposite auxiliary keels and two opposite edge sealing bones form a rectangular structure; the bone-setting device is characterized in that a force-aid connecting part is arranged on the bone-setting device, and the force-aid connecting part is positioned below the end part of the edge-sealing bone; the bone-setting and edge-sealing bones are provided with embedded feet;
pouring gypsum slurry into a mold cavity of a forming mold, filling the mold cavity with the gypsum slurry, and covering pre-embedded feet of the bone-setting and edge-sealing bones;
after the gypsum slurry is solidified into a gypsum board body, the bone-setting and edge-sealing bones form an integrated structure, and the integrated movable suspended ceiling component is obtained.
8. The method of claim 6, wherein the support portion of the cross runner extends horizontally outward and then downward to attach to the side of the end of the panel.
9. The method of claim 7, wherein one of the sides of the overlapping portion of the bone is attached to the side of the end portion of the edge-sealing bone, and the end portion of the edge-sealing bone positions the overlapping portion of the bone at both ends on the support portion of the cross runner.
10. The method of claim 7, wherein two pre-buried feet are provided, one of the pre-buried feet is located below the force-applying connection portion, and the other pre-buried foot is located below the overlap portion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311794582.0A CN117661772A (en) | 2023-12-25 | 2023-12-25 | Efficient suspended ceiling installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311794582.0A CN117661772A (en) | 2023-12-25 | 2023-12-25 | Efficient suspended ceiling installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN117661772A true CN117661772A (en) | 2024-03-08 |
Family
ID=90071339
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202311794582.0A Pending CN117661772A (en) | 2023-12-25 | 2023-12-25 | Efficient suspended ceiling installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN117661772A (en) |
-
2023
- 2023-12-25 CN CN202311794582.0A patent/CN117661772A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2015016426A1 (en) | Apparatus for finishing wall | |
CN112064856B (en) | Suspended ceiling pre-hanging piece and floor structure of building with same | |
CN203066412U (en) | Installing component of plug-in quickly-installed boards | |
CN117661772A (en) | Efficient suspended ceiling installation method | |
CN108385895A (en) | A kind of fast-assembling walling system | |
CN110056115B (en) | Using method of ceiling assembled metal keel structure | |
CN208844782U (en) | A kind of fast-assembling walling system and hangar system | |
CN221741738U (en) | Detachable suspended ceiling structure with embedded hidden frame keels | |
CN212427881U (en) | Wall surface hanging integral external corner system | |
CN205917951U (en) | Light trough furred ceiling falls a grade device | |
CN111962791B (en) | Wall surface hanging external corner system | |
CN109653405B (en) | Template device and supporting method for concrete partition wall, floor and disassembly-free panel | |
CN210887736U (en) | Ceiling assembled metal keel structure | |
CN209779999U (en) | Aluminum template keel structure for supporting | |
CN207844823U (en) | A kind of parallel elevator decoration board mounting structure and staircase | |
CN207827663U (en) | A kind of single-row staircase decorative board mounting structure and staircase | |
CN113622581A (en) | Special-shaped ceiling formed by combining triangular grating splicing units and installation method | |
CN207092451U (en) | A kind of faced wall mounting structure | |
CN111395629A (en) | Anti-deformation ceiling structure and ceiling hanging method thereof | |
CN219931379U (en) | Fixed keel for suspended ceiling | |
CN214302269U (en) | Connecting node of external wall panel and building main structure | |
CN213390829U (en) | Embedded ceiling board of building operation | |
CN220600684U (en) | Hanging device for air duct erection | |
CN110130601A (en) | Integrated decoration keeps the temperature assembled exterior-protecting wall panel and its installation method | |
CN217897121U (en) | Assembled kitchen wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |