CN117556992B - BIM-based project visual management method and system - Google Patents

BIM-based project visual management method and system Download PDF

Info

Publication number
CN117556992B
CN117556992B CN202311554537.8A CN202311554537A CN117556992B CN 117556992 B CN117556992 B CN 117556992B CN 202311554537 A CN202311554537 A CN 202311554537A CN 117556992 B CN117556992 B CN 117556992B
Authority
CN
China
Prior art keywords
user
area
decided
information
decision
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202311554537.8A
Other languages
Chinese (zh)
Other versions
CN117556992A (en
Inventor
薛丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yancheng Institute of Technology
Original Assignee
Yancheng Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yancheng Institute of Technology filed Critical Yancheng Institute of Technology
Priority to CN202311554537.8A priority Critical patent/CN117556992B/en
Publication of CN117556992A publication Critical patent/CN117556992A/en
Application granted granted Critical
Publication of CN117556992B publication Critical patent/CN117556992B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T15/003D [Three Dimensional] image rendering
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Computer Graphics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Geometry (AREA)
  • Software Systems (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Processing Or Creating Images (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a visual management method and a visual management system for engineering projects based on BIM, wherein the method comprises the following steps: step S1: building a visual model of the engineering project site based on a BIM technology; step S2: displaying the visual model to a user; step S3: the method comprises the steps of assisting a user in inputting an on-site command decision based on a visual model; step S4: and finding out the command decision in the engineering project site. According to the BIM-based project visual management method and system, the visual model of the project site is built based on the BIM technology, the project site is restored in a 1:1 three-dimensional mode, management staff can remotely manage the project site through the visual model, so that labor cost is reduced, the project site can be checked through the visual model at a global angle, scientific management is performed, and management efficiency is comprehensively improved.

Description

BIM-based project visual management method and system
Technical Field
The invention relates to the technical field of computer data processing, in particular to a BIM-based project visual management method and system.
Background
To ensure safe, efficient and stable construction of an engineering project, it is necessary to perform various management on site of the engineering project, such as: security management, progress management, quality management, etc. The field management needs to comprehensively coordinate manpower, materials, equipment, information and the like involved in the project implementation process. Generally, on-site management of engineering projects requires a large number of management staff, and the labor cost is high; in addition, global awareness of project management is also very important for project construction, and management staff rarely manage the project on site from a global perspective, so that management efficiency is reduced to a certain extent. Accordingly, there is a need for a solution that addresses at least some of the problems of the prior art.
Disclosure of Invention
The invention aims to provide a visual management method for engineering projects based on BIM, which is characterized in that a visual model of an engineering project site is built based on BIM technology, the engineering project site is restored in a 1:1 three-dimensional mode, management staff can remotely manage the engineering project site through the visual model, labor cost is reduced, the engineering project site can be checked from a global angle through the visual model for management, and management efficiency is improved.
The project visualization management method based on BIM provided by the embodiment of the invention comprises the following steps:
step S1: building a visual model of the engineering project site based on a BIM technology;
Step S2: displaying the visual model to a user;
Step S3: the method comprises the steps of assisting a user in inputting an on-site command decision based on a visual model;
step S4: and finding out the command decision in the engineering project site.
Preferably, step S3: assisting a user in inputting on-site command decisions based on a visual model, comprising:
searching for a first abnormal event in the visual model based on a preset first event searching template;
when the attempt is successful, displaying a first abnormal event to the user;
waiting for a preset first time length to obtain a user portrait of a user;
Generating a second event search template based on the user profile;
attempting to search for a second abnormal event within the first abnormal event based on the second event search template;
when the attempt is successful, acquiring an incident area of the second abnormal event in the visual model;
Defining a first to-be-decided area of the incident area in the visual model based on the first area defining condition;
displaying a first area to be decided to a user;
Waiting for a preset second time length, and acquiring area information in a first area to be decided, command information input by a user in the latest second time length and a preset decision knowledge base;
Generating command decision suggestions based on the region information, the command information and the decision knowledge base;
Displaying command decision suggestions to a user;
Receiving an on-site command decision input by a user based on command decision suggestion;
wherein generating a second event search template based on the user profile comprises:
carrying out vectorization processing on the user portrait to obtain a portrait vector;
determining a second event search template corresponding to the portrait vector from a preset event search template library;
wherein the first region demarcation conditions include:
The area to be decided completely contains the event area;
A first association relationship exists between a plurality of model areas except the event area in the to-be-decided area and the event area;
the plurality of model areas have a second association relationship between each other.
Preferably, generating the commanding decision suggestion based on the region information, the commanding information and the decision knowledge base includes:
vectorizing the regional information and the command information to obtain an information vector;
and determining command decision suggestions corresponding to the information vectors from a decision knowledge base.
Preferably, the visual management method for the engineering project based on BIM further comprises the following steps:
Acquiring a moving track in a first time preset recently by a user;
Mapping the moving track into a visual model to obtain a map track;
Based on the second region demarcation conditions, demarcating a second region to be decided of the map track in the visual model;
displaying a second area to be decided to the user;
Waiting for a preset third time length, and acquiring a local intention area selected in the inner frame of the second to-be-decided area in the latest third time length of the user;
Planning the shortest path of the end point of the moving track to the local intention area in the visual model;
when the path length of the shortest path is smaller than or equal to a preset length threshold value, displaying the shortest path to a user;
otherwise, attempting to acquire the shouting resource information of the local intention area;
When the attempt is successful, based on the shouting resource information, a shouting operation table is generated, and the shouting operation table is displayed to the user;
Otherwise, displaying the shortest path to the user;
Wherein the second region demarcation conditions include:
The vector included angle between the first direction vector and the second direction vector falls in a preset included angle interval; the first direction vector is constructed based on the starting point of the moving track and the straight line direction from the starting point to the end point; the first direction vector is constructed based on the starting point of the moving track and the straight line direction from the starting point to the region center point of the second region to be decided;
the model content type set in the second area to be decided is matched and matched with a preset standard model content type set;
and a third abnormal event occurs in a second time which is preset recently in the second area to be decided.
Preferably, the visual management method for the engineering project based on BIM further comprises the following steps:
Acquiring decision dynamic information of the on-site command decision;
and displaying the decision dynamic information to a user.
The project visualization management system based on BIM provided by the embodiment of the invention comprises:
The building module is used for building a visual model of the engineering project site based on the BIM technology;
the first display module is used for displaying the visual model to a user;
the first auxiliary module is used for assisting a user to input an on-site command decision based on the visual model;
and the issuing module is used for issuing the command decision of the field in the field of the engineering project.
Preferably, the first assistance module assists the user in entering the on-site command decision based on the visualization model, comprising:
searching for a first abnormal event in the visual model based on a preset first event searching template;
when the attempt is successful, displaying a first abnormal event to the user;
waiting for a preset first time length to obtain a user portrait of a user;
Generating a second event search template based on the user profile;
attempting to search for a second abnormal event within the first abnormal event based on the second event search template;
when the attempt is successful, acquiring an incident area of the second abnormal event in the visual model;
Defining a first to-be-decided area of the incident area in the visual model based on the first area defining condition;
displaying a first area to be decided to a user;
Waiting for a preset second time length, and acquiring area information in a first area to be decided, command information input by a user in the latest second time length and a preset decision knowledge base;
Generating command decision suggestions based on the region information, the command information and the decision knowledge base;
Displaying command decision suggestions to a user;
Receiving an on-site command decision input by a user based on command decision suggestion;
wherein generating a second event search template based on the user profile comprises:
carrying out vectorization processing on the user portrait to obtain a portrait vector;
determining a second event search template corresponding to the portrait vector from a preset event search template library;
wherein the first region demarcation conditions include:
The area to be decided completely contains the event area;
A first association relationship exists between a plurality of model areas except the event area in the to-be-decided area and the event area;
the plurality of model areas have a second association relationship between each other.
Preferably, the first auxiliary module generates a command decision suggestion based on the region information, the command information and the decision knowledge base, including:
vectorizing the regional information and the command information to obtain an information vector;
and determining command decision suggestions corresponding to the information vectors from a decision knowledge base.
Preferably, the visual management system of engineering projects based on BIM further comprises:
A second auxiliary module for including:
Acquiring a moving track in a first time preset recently by a user;
Mapping the moving track into a visual model to obtain a map track;
Based on the second region demarcation conditions, demarcating a second region to be decided of the map track in the visual model;
displaying a second area to be decided to the user;
Waiting for a preset third time length, and acquiring a local intention area selected in the inner frame of the second to-be-decided area in the latest third time length of the user;
Planning the shortest path of the end point of the moving track to the local intention area in the visual model;
when the path length of the shortest path is smaller than or equal to a preset length threshold value, displaying the shortest path to a user;
otherwise, attempting to acquire the shouting resource information of the local intention area;
When the attempt is successful, based on the shouting resource information, a shouting operation table is generated, and the shouting operation table is displayed to the user;
Otherwise, displaying the shortest path to the user;
Wherein the second region demarcation conditions include:
The vector included angle between the first direction vector and the second direction vector falls in a preset included angle interval; the first direction vector is constructed based on the starting point of the moving track and the straight line direction from the starting point to the end point; the first direction vector is constructed based on the starting point of the moving track and the straight line direction from the starting point to the region center point of the second region to be decided;
the model content type set in the second area to be decided is matched and matched with a preset standard model content type set;
and a third abnormal event occurs in a second time which is preset recently in the second area to be decided.
The project visual management system based on BIM is characterized by further comprising:
A second display module for including:
Acquiring decision dynamic information of the on-site command decision;
and displaying the decision dynamic information to a user.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. The objectives and other advantages of the invention will be realized and attained by the structure particularly pointed out in the written description and claims thereof as well as the appended drawings.
The technical scheme of the invention is further described in detail through the drawings and the embodiments.
Drawings
The accompanying drawings are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate the invention and together with the embodiments of the invention, serve to explain the invention. In the drawings:
FIG. 1 is a schematic diagram of a BIM-based project visualization management method in an embodiment of the invention;
FIG. 2 is a schematic diagram of a BIM-based project visualization management system in an embodiment of the invention.
Detailed Description
The preferred embodiments of the present invention will be described below with reference to the accompanying drawings, it being understood that the preferred embodiments described herein are for illustration and explanation of the present invention only, and are not intended to limit the present invention.
The embodiment of the invention provides a BIM-based project visual management method, which comprises the following steps as shown in fig. 1:
Step S1: building a visual model of the engineering project site based on a BIM technology; the engineering project site can be a building construction site, a bridge construction site and the like; when a visual model of the project site is built based on the BIM technology, the project site is restored in a 1:1 three-dimensional mode, and site construction pictures, equipment running state information, constructor positions and the like of the project site are displayed in the visual model;
step S2: displaying the visual model to a user; the user is a manager on the engineering project site;
step S3: the method comprises the steps of assisting a user in inputting an on-site command decision based on a visual model; when a user views the visual model, assisting the user in inputting an on-site command decision, wherein the on-site command decision is a decision for the user to command the engineering project on site;
step S4: and finding out the command decision in the engineering project site. After issuing, the method is carried out on site.
The method is based on BIM technology, a visual model of the project site is built, the project site is restored in 1:1 three-dimensional mode, management staff can remotely manage the project site through the visual model, labor cost is reduced, the project site can be checked from a global angle through the visual model, scientific management is carried out, and management efficiency is improved.
In one embodiment, step S3: assisting a user in inputting on-site command decisions based on a visual model, comprising:
Searching for a first abnormal event in the visual model based on a preset first event searching template; the first abnormal event is as follows: the constructor is in dangerous construction, the field device fails, and the like, and the first event searching template is a template for searching out the first abnormal event, such as: searching whether a constructor is not tied with a safety rope in the high-altitude operation and wearing a safety helmet according to the specification in the site construction picture;
When the attempt is successful, displaying a first abnormal event to the user; when searching, the abnormal situation occurs in the scene, and the abnormal situation needs to be checked by a user and displayed to the user;
waiting for a preset first time length to obtain a user portrait of a user; the first duration may be, for example: 10 minutes; during the period of waiting for the first duration, the user can approximately check the abnormality occurring on the scene, comprehensively understand the abnormality, and select the first abnormal event which the user wants to decide to command; the user portrayal comprises: user responsibilities [ e.g.: tubular construction safety, etc. ], user preferences [ for example: like to conduct safety command, etc.;
Generating a second event search template based on the user profile;
attempting to search for a second abnormal event within the first abnormal event based on the second event search template; the second abnormal event is a first abnormal event which is suitable for users to make decisions and deal with processing in the first abnormal event;
When the attempt is successful, acquiring an incident area of the second abnormal event in the visual model; the occurrence area is an area where the second abnormal event occurs in the visual model, for example: the second abnormal event is that personnel in the area A of the scaffold are not tied with safety ropes, and the accident area is the area A of the scaffold;
Defining a first to-be-decided area of the incident area in the visual model based on the first area defining condition; the first area to be decided is an area which needs to be seen in the visual model when the user decides and deals with the second abnormal event;
displaying a first area to be decided to a user; at this time, the user can check the first area to be decided to conduct decision command;
Waiting for a preset second time length, and acquiring area information in a first area to be decided, command information input by a user in the latest second time length and a preset decision knowledge base; the second duration may be, for example: 15 minutes; the area information includes: personnel positions, personnel positions and the like in the first area to be decided; the command information includes: the user inputs command instructions based on the visual model, such as: scheduling the high-altitude operators to leave a dangerous area and the like; the decision knowledge base has a large amount of decision knowledge, and the decision knowledge is used for generating command decision advice and can be collected and set in advance by technicians; waiting for a second time length, giving the user self-independent thinking time, and then suggesting to improve the rationality;
Generating command decision suggestions based on the region information, the command information and the decision knowledge base;
Displaying command decision suggestions to a user;
Receiving an on-site command decision input by a user based on command decision suggestion;
wherein generating a second event search template based on the user profile comprises:
carrying out vectorization processing on the user portrait to obtain a portrait vector;
Determining a second event search template corresponding to the portrait vector from a preset event search template library; the event search template library has a second event search template corresponding to a different image vector, for example: the user portraits are field management security transactions, and then a second event search template corresponding to the vectorized image vector is a search security event;
wherein the first region demarcation conditions include:
the area to be decided completely contains the event area; firstly, ensuring that a user can completely check an incident area;
A first association relationship exists between a plurality of model areas except the event area in the to-be-decided area and the event area; the first association relationship is, for example: the position areas are communicated with each other, the same group of constructors construct the areas together, and the like; when the first region defining condition is met, a user can check the model region, and schedule personnel in the model region to go to the accident region for temporary intervention;
The plurality of model areas have a second association relationship between each other. The second association relationship may be, for example: one model area is a construction material storage area of another model area, etc.; when the first region defining condition is met, a user can view the model region, and the command on the site can be more comprehensively conducted.
In one embodiment, generating a conductor decision suggestion based on the region information, the conductor information, and the decision knowledge base includes:
vectorizing the regional information and the command information to obtain an information vector;
And determining command decision suggestions corresponding to the information vectors from a decision knowledge base. Such as: the area information and the command information are that the area A is an unsafe area, the area B is a safe area, the command information is that people shouting to fall into the area A go to the area B, and the command decision corresponding to the vectorized information vector is suggested to adopt an integral system to deduct the safety score for the people entering the area A.
In one embodiment, the project visualization management method based on BIM further comprises:
Acquiring a moving track in a first time preset recently by a user; the first time may be, for example: 120 seconds;
mapping the moving track into a visual model to obtain a map track; mapping is carried out according to the map position corresponding to the actual position of the moving track in the field in the visual model during mapping;
based on the second region demarcation conditions, demarcating a second region to be decided of the map track in the visual model; the second area to be decided is the area which is currently required to be managed by the user;
displaying a second area to be decided to the user;
Waiting for a preset third time length, and acquiring a local intention area selected in the inner frame of the second to-be-decided area in the latest third time length of the user; the third duration may be, for example: 5 minutes; during the waiting for the third duration, the user may frame a local intent region selected from the group consisting of the local intent regions that have been desired to be administered;
Planning the shortest path of the end point of the moving track to the local intention area in the visual model;
when the path length of the shortest path is smaller than or equal to a preset length threshold value, displaying the shortest path to a user; the length threshold may be, for example: 120 meters; when the path length is smaller, prompting the user to go to the site for field administration;
otherwise, attempting to acquire the shouting resource information of the local intention area; the shouting resource information is contact phones of people in the local intention area and the like;
When the attempt is successful, based on the shouting resource information, a shouting operation table is generated, and the shouting operation table is displayed to the user; the shouting operation list is the contact telephone of the person in the local intention area, and the user can dial out by selecting one contact telephone;
Otherwise, displaying the shortest path to the user; if the shouting resource information cannot be obtained, prompting the user to go to the site for site administration;
Wherein the second region demarcation conditions include:
The vector included angle between the first direction vector and the second direction vector falls in a preset included angle interval; the first direction vector is constructed based on the starting point of the moving track and the straight line direction from the starting point to the end point; the first direction vector is constructed based on the starting point of the moving track and the straight line direction from the starting point to the region center point of the second region to be decided; the included angle interval may be, for example: 0 to 50 degrees; when the regional demarcation condition is met, the user is expected to go to a second region to be decided;
The model content type set in the second area to be decided is matched and matched with a preset standard model content type set; the model content types are concentrated with the types of the respective model contents in the second to-be-decided area, for example: the personnel construction type, construction progress and the like; when the model content type set matches the standard model content type set, the user is required to take jurisdiction on behalf of the second to-be-decided area, such as: the standard model content type set comprises a construction type of dangerous operation and a construction progress of 50% [ management staff is required to control the quality ] in the process;
and a third abnormal event occurs in a second time which is preset recently in the second area to be decided. The second time may be, for example: for 30 days; and a third abnormal event occurs in the second time in the second area to be decided, which means that the second area to be decided needs to be paid attention.
In the embodiment of the invention, if a user occasionally walks on site, the intelligent terminal is taken out, and the system can adaptively prompt the management efficiency of the user on site.
In one embodiment, the project visualization management method based on BIM further comprises:
acquiring decision dynamic information of the on-site command decision; the decision dynamic information is the execution progress of the on-site command decision, and the like.
And displaying the decision dynamic information to a user.
The embodiment of the invention provides a BIM-based project visualization management system, which is shown in fig. 2 and comprises the following steps:
the building module 1 is used for building a visual model of an engineering project site based on a BIM technology;
a first display module 2 for displaying the visual model to a user;
The first auxiliary module 3 is used for assisting a user to input an on-site command decision based on the visual model;
And the issuing module 4 is used for issuing the discovery command decision in the engineering project site.
The first assistance module 3 assists the user in entering live command decisions based on the visualization model, comprising:
searching for a first abnormal event in the visual model based on a preset first event searching template;
when the attempt is successful, displaying a first abnormal event to the user;
waiting for a preset first time length to obtain a user portrait of a user;
Generating a second event search template based on the user profile;
attempting to search for a second abnormal event within the first abnormal event based on the second event search template;
when the attempt is successful, acquiring an incident area of the second abnormal event in the visual model;
Defining a first to-be-decided area of the incident area in the visual model based on the first area defining condition;
displaying a first area to be decided to a user;
Waiting for a preset second time length, and acquiring area information in a first area to be decided, command information input by a user in the latest second time length and a preset decision knowledge base;
Generating command decision suggestions based on the region information, the command information and the decision knowledge base;
Displaying command decision suggestions to a user;
Receiving an on-site command decision input by a user based on command decision suggestion;
wherein generating a second event search template based on the user profile comprises:
carrying out vectorization processing on the user portrait to obtain a portrait vector;
determining a second event search template corresponding to the portrait vector from a preset event search template library;
wherein the first region demarcation conditions include:
The area to be decided completely contains the event area;
A first association relationship exists between a plurality of model areas except the event area in the to-be-decided area and the event area;
the plurality of model areas have a second association relationship between each other.
The first auxiliary module 3 generates a command decision suggestion based on the region information, the command information and the decision knowledge base, and includes:
vectorizing the regional information and the command information to obtain an information vector;
and determining command decision suggestions corresponding to the information vectors from a decision knowledge base.
BIM-based project visual management system, still include:
A second auxiliary module for including:
Acquiring a moving track in a first time preset recently by a user;
Mapping the moving track into a visual model to obtain a map track;
Based on the second region demarcation conditions, demarcating a second region to be decided of the map track in the visual model;
displaying a second area to be decided to the user;
Waiting for a preset third time length, and acquiring a local intention area selected in the inner frame of the second to-be-decided area in the latest third time length of the user;
Planning the shortest path of the end point of the moving track to the local intention area in the visual model;
when the path length of the shortest path is smaller than or equal to a preset length threshold value, displaying the shortest path to a user;
otherwise, attempting to acquire the shouting resource information of the local intention area;
When the attempt is successful, based on the shouting resource information, a shouting operation table is generated, and the shouting operation table is displayed to the user;
Otherwise, displaying the shortest path to the user;
Wherein the second region demarcation conditions include:
The vector included angle between the first direction vector and the second direction vector falls in a preset included angle interval; the first direction vector is constructed based on the starting point of the moving track and the straight line direction from the starting point to the end point; the first direction vector is constructed based on the starting point of the moving track and the straight line direction from the starting point to the region center point of the second region to be decided;
the model content type set in the second area to be decided is matched and matched with a preset standard model content type set;
and a third abnormal event occurs in a second time which is preset recently in the second area to be decided.
BIM-based project visual management system, still include:
A second display module for including:
Acquiring decision dynamic information of the on-site command decision;
and displaying the decision dynamic information to a user.
It will be apparent to those skilled in the art that various modifications and variations can be made to the present invention without departing from the spirit or scope of the invention. Thus, it is intended that the present invention also include such modifications and alterations insofar as they come within the scope of the appended claims or the equivalents thereof.

Claims (8)

1. The visual management method for the engineering project based on the BIM is characterized by comprising the following steps of:
step S1: building a visual model of the engineering project site based on a BIM technology;
Step S2: displaying the visual model to a user;
Step S3: the method comprises the steps of assisting a user in inputting an on-site command decision based on a visual model;
Step S4: discovering a command decision in the engineering project site;
Step S3: assisting a user in inputting on-site command decisions based on a visual model, comprising:
searching for a first abnormal event in the visual model based on a preset first event searching template;
when the attempt is successful, displaying a first abnormal event to the user;
waiting for a preset first time length to obtain a user portrait of a user;
Generating a second event search template based on the user profile;
attempting to search for a second abnormal event within the first abnormal event based on the second event search template;
when the attempt is successful, acquiring an incident area of the second abnormal event in the visual model;
Defining a first to-be-decided area of the incident area in the visual model based on the first area defining condition;
displaying a first area to be decided to a user;
Waiting for a preset second time length, and acquiring area information in a first area to be decided, command information input by a user in the latest second time length and a preset decision knowledge base;
Generating command decision suggestions based on the region information, the command information and the decision knowledge base;
Displaying command decision suggestions to a user;
Receiving an on-site command decision input by a user based on command decision suggestion;
wherein generating a second event search template based on the user profile comprises:
carrying out vectorization processing on the user portrait to obtain a portrait vector;
determining a second event search template corresponding to the portrait vector from a preset event search template library;
wherein the first region demarcation conditions include:
The area to be decided completely contains the event area;
A first association relationship exists between a plurality of model areas except the event area in the to-be-decided area and the event area;
the plurality of model areas have a second association relationship between each other.
2. The bid-based project visualization management method of claim 1, wherein generating a conductor decision suggestion based on the region information, the conductor information, and the decision knowledge base comprises:
vectorizing the regional information and the command information to obtain an information vector;
and determining command decision suggestions corresponding to the information vectors from a decision knowledge base.
3. The visual management method for project based on BIM according to claim 1, further comprising:
Acquiring a moving track in a first time preset recently by a user;
Mapping the moving track into a visual model to obtain a map track;
Based on the second region demarcation conditions, demarcating a second region to be decided of the map track in the visual model;
displaying a second area to be decided to the user;
Waiting for a preset third time length, and acquiring a local intention area selected in the inner frame of the second to-be-decided area in the latest third time length of the user;
Planning the shortest path of the end point of the moving track to the local intention area in the visual model;
when the path length of the shortest path is smaller than or equal to a preset length threshold value, displaying the shortest path to a user;
otherwise, attempting to acquire the shouting resource information of the local intention area;
When the attempt is successful, based on the shouting resource information, a shouting operation table is generated, and the shouting operation table is displayed to the user;
Otherwise, displaying the shortest path to the user;
Wherein the second region demarcation conditions include:
The vector included angle between the first direction vector and the second direction vector falls in a preset included angle interval; the first direction vector is constructed based on the starting point of the moving track and the straight line direction from the starting point to the end point; the first direction vector is constructed based on the starting point of the moving track and the straight line direction from the starting point to the region center point of the second region to be decided;
the model content type set in the second area to be decided is matched and matched with a preset standard model content type set;
and a third abnormal event occurs in a second time which is preset recently in the second area to be decided.
4. The visual management method for project based on BIM according to claim 1, further comprising:
Acquiring decision dynamic information of the on-site command decision;
and displaying the decision dynamic information to a user.
5. A Building Information Modeling (BIM) -based project visualization management system, comprising:
The building module is used for building a visual model of the engineering project site based on the BIM technology;
the first display module is used for displaying the visual model to a user;
the first auxiliary module is used for assisting a user to input an on-site command decision based on the visual model;
The issuing module is used for in-situ discovery of the engineering project for command decision;
The first assistance module assists the user in entering live conductor decisions based on the visualization model, comprising:
searching for a first abnormal event in the visual model based on a preset first event searching template;
when the attempt is successful, displaying a first abnormal event to the user;
waiting for a preset first time length to obtain a user portrait of a user;
Generating a second event search template based on the user profile;
attempting to search for a second abnormal event within the first abnormal event based on the second event search template;
when the attempt is successful, acquiring an incident area of the second abnormal event in the visual model;
Defining a first to-be-decided area of the incident area in the visual model based on the first area defining condition;
displaying a first area to be decided to a user;
Waiting for a preset second time length, and acquiring area information in a first area to be decided, command information input by a user in the latest second time length and a preset decision knowledge base;
Generating command decision suggestions based on the region information, the command information and the decision knowledge base;
Displaying command decision suggestions to a user;
Receiving an on-site command decision input by a user based on command decision suggestion;
wherein generating a second event search template based on the user profile comprises:
carrying out vectorization processing on the user portrait to obtain a portrait vector;
determining a second event search template corresponding to the portrait vector from a preset event search template library;
wherein the first region demarcation conditions include:
The area to be decided completely contains the event area;
A first association relationship exists between a plurality of model areas except the event area in the to-be-decided area and the event area;
the plurality of model areas have a second association relationship between each other.
6. The BIM-based project visualization management system of claim 5, wherein the first assistance module generates a command decision suggestion based on the regional information, the command information, and the decision knowledge base, comprising:
vectorizing the regional information and the command information to obtain an information vector;
and determining command decision suggestions corresponding to the information vectors from a decision knowledge base.
7. The BIM-based project visualization management system of claim 5, further comprising:
A second auxiliary module for including:
Acquiring a moving track in a first time preset recently by a user;
Mapping the moving track into a visual model to obtain a map track;
Based on the second region demarcation conditions, demarcating a second region to be decided of the map track in the visual model;
displaying a second area to be decided to the user;
Waiting for a preset third time length, and acquiring a local intention area selected in the inner frame of the second to-be-decided area in the latest third time length of the user;
Planning the shortest path of the end point of the moving track to the local intention area in the visual model;
when the path length of the shortest path is smaller than or equal to a preset length threshold value, displaying the shortest path to a user;
otherwise, attempting to acquire the shouting resource information of the local intention area;
When the attempt is successful, based on the shouting resource information, a shouting operation table is generated, and the shouting operation table is displayed to the user;
Otherwise, displaying the shortest path to the user;
Wherein the second region demarcation conditions include:
The vector included angle between the first direction vector and the second direction vector falls in a preset included angle interval; the first direction vector is constructed based on the starting point of the moving track and the straight line direction from the starting point to the end point; the first direction vector is constructed based on the starting point of the moving track and the straight line direction from the starting point to the region center point of the second region to be decided;
the model content type set in the second area to be decided is matched and matched with a preset standard model content type set;
and a third abnormal event occurs in a second time which is preset recently in the second area to be decided.
8. The BIM-based project visualization management system of claim 5, further comprising:
A second display module for including:
Acquiring decision dynamic information of the on-site command decision;
and displaying the decision dynamic information to a user.
CN202311554537.8A 2023-11-21 2023-11-21 BIM-based project visual management method and system Active CN117556992B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311554537.8A CN117556992B (en) 2023-11-21 2023-11-21 BIM-based project visual management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311554537.8A CN117556992B (en) 2023-11-21 2023-11-21 BIM-based project visual management method and system

Publications (2)

Publication Number Publication Date
CN117556992A CN117556992A (en) 2024-02-13
CN117556992B true CN117556992B (en) 2024-05-10

Family

ID=89812225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311554537.8A Active CN117556992B (en) 2023-11-21 2023-11-21 BIM-based project visual management method and system

Country Status (1)

Country Link
CN (1) CN117556992B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106447584A (en) * 2016-09-22 2017-02-22 东南大学 Highway network operation-oriented decision support system and using method thereof
CN106595565A (en) * 2017-01-17 2017-04-26 中山大学 BIM-based intelligent monitoring system
CN108615204A (en) * 2018-05-06 2018-10-02 北京工业大学 A kind of building based on BIM and UWB faces side hole safety management system and method
CN109447048A (en) * 2018-12-25 2019-03-08 苏州闪驰数控系统集成有限公司 A kind of artificial intelligence early warning system
CN111950975A (en) * 2020-07-08 2020-11-17 广州中建亿信科技有限公司 BIM technology-based multi-organization coordination management cloud platform for construction engineering project
CN114840622A (en) * 2022-04-20 2022-08-02 浙江优控云科技有限公司 Method and system for constructing and managing digital pipe network
CN115497040A (en) * 2022-09-14 2022-12-20 南京晓庄学院 Construction site safety management aid decision-making system based on image recognition
US11704449B1 (en) * 2022-05-12 2023-07-18 Beijing Longruan Technologies Inc. Construction method of mine intelligent management and control platform based on geological survey guarantee system
CN116882729A (en) * 2023-05-22 2023-10-13 天津华电南疆热电有限公司 Security management platform based on 5g wisdom power plant
CN116882722A (en) * 2023-07-06 2023-10-13 盐城工学院 Intelligent building site management method and system based on Internet of things
CN116894613A (en) * 2023-09-11 2023-10-17 中国民航科学技术研究院 Visual management system and method applied to airport

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11328102B2 (en) * 2018-03-29 2022-05-10 Aecom Digital design tools for building construction

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106447584A (en) * 2016-09-22 2017-02-22 东南大学 Highway network operation-oriented decision support system and using method thereof
CN106595565A (en) * 2017-01-17 2017-04-26 中山大学 BIM-based intelligent monitoring system
CN108615204A (en) * 2018-05-06 2018-10-02 北京工业大学 A kind of building based on BIM and UWB faces side hole safety management system and method
CN109447048A (en) * 2018-12-25 2019-03-08 苏州闪驰数控系统集成有限公司 A kind of artificial intelligence early warning system
CN111950975A (en) * 2020-07-08 2020-11-17 广州中建亿信科技有限公司 BIM technology-based multi-organization coordination management cloud platform for construction engineering project
CN114840622A (en) * 2022-04-20 2022-08-02 浙江优控云科技有限公司 Method and system for constructing and managing digital pipe network
US11704449B1 (en) * 2022-05-12 2023-07-18 Beijing Longruan Technologies Inc. Construction method of mine intelligent management and control platform based on geological survey guarantee system
CN115497040A (en) * 2022-09-14 2022-12-20 南京晓庄学院 Construction site safety management aid decision-making system based on image recognition
CN116882729A (en) * 2023-05-22 2023-10-13 天津华电南疆热电有限公司 Security management platform based on 5g wisdom power plant
CN116882722A (en) * 2023-07-06 2023-10-13 盐城工学院 Intelligent building site management method and system based on Internet of things
CN116894613A (en) * 2023-09-11 2023-10-17 中国民航科学技术研究院 Visual management system and method applied to airport

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
BIM技术在项目管理实施阶段的应用方法研究;李修强;;内燃机与配件;20180515(09);206-208 *
城市道路交通安全管理决策支持系统;严海;杨天军;关宏志;;长安大学学报(自然科学版);20080315(02);84-88 *

Also Published As

Publication number Publication date
CN117556992A (en) 2024-02-13

Similar Documents

Publication Publication Date Title
KR102244978B1 (en) Method, apparatus and computer program for training artificial intelligence model that judges danger in work site
CN108924745B (en) Fire-fighting evacuation rescue guiding method and system, storage medium and mobile terminal
CN109271881A (en) Personnel safety management-control method, device and server in a kind of substation
CN113128961B (en) Wisdom building site management cloud platform system
CN102611986B (en) For the apparatus and method for the route information for providing user in mobile communication system
EP4155672A2 (en) Method and apparatus for generating high-precision map, electronic device and storage medium
CN115545359B (en) Dynamic intelligent evacuation method and device for complex building fire
CN108765825A (en) Safety protecting method, device, terminal device and computer readable storage medium
CN110061755B (en) Operation assisting method and system, wearable device and engineering vehicle
CN117556992B (en) BIM-based project visual management method and system
CN113569718A (en) Reminding method, device, equipment, system and storage medium
CN113592171B (en) Building template support system safety prediction method, medium, device and computing equipment based on augmented reality technology
CN115774595B (en) Emergency task display method and device
CN106452815B (en) A kind of informatization management method, apparatus and system
Naticchia et al. BIM-Based holonic system for real-time pathfinding in building emergency scenario
CN105956434A (en) Screen locking/unlocking method and device of intelligent terminal
CN115797824A (en) Unmanned aerial vehicle power construction violation identification method and device based on artificial intelligence
CN113657856B (en) Boarding information confirmation method and device
CN112561276B (en) Job operation risk demonstration method and device, storage medium and electronic device
CN114721344A (en) Intelligent decision method and system based on digital twin DaaS platform
CN107403275A (en) Lift method for prewarning risk and device
CN109934752B (en) Housing information management method and device
CN105263004A (en) Active application-type safety protection method based on camera monitoring system
CN111242447A (en) Fire hazard assessment method, device, equipment and computer readable storage medium
KR102577293B1 (en) Method, apparatus and program for providing job site personnel management and job site monitoring platform using beacons

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant