CN117498470A - 基于监控系统agc一键低负荷调节的方法 - Google Patents
基于监控系统agc一键低负荷调节的方法 Download PDFInfo
- Publication number
- CN117498470A CN117498470A CN202311383329.6A CN202311383329A CN117498470A CN 117498470 A CN117498470 A CN 117498470A CN 202311383329 A CN202311383329 A CN 202311383329A CN 117498470 A CN117498470 A CN 117498470A
- Authority
- CN
- China
- Prior art keywords
- load
- unit
- active
- agc
- low
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000012544 monitoring process Methods 0.000 title claims abstract description 11
- 230000001105 regulatory effect Effects 0.000 abstract description 5
- 230000001276 controlling effect Effects 0.000 abstract description 2
- 238000010248 power generation Methods 0.000 description 14
- 230000008859 change Effects 0.000 description 3
- 238000011217 control strategy Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011056 performance test Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000010349 pulsation Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
- H02J3/48—Controlling the sharing of the in-phase component
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00001—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00002—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/04—Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
- H02J3/06—Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
- H02J3/144—Demand-response operation of the power transmission or distribution network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/26—Arrangements for eliminating or reducing asymmetry in polyphase networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
- H02J3/466—Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Human Computer Interaction (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明公开了一种基于监控系统AGC一键低负荷调节的方法,包括全厂AGC控制系统,所述全厂AGC控制系统包括至少一组正常并网机组单机AGC控制系统,至少一组所述机组单机AGC控制系统按照当前全厂总有功的负荷进行平均分配有功值;所述的方法包括:若只需要某台或某几台机组设定在需要的负荷时,退出单台机组低负荷有功设定模式,手动设定对应机组的有功值,当前全厂总有功的负荷减去手动设定机组的有功值后,剩余的有功值由其余机组进行平均分配并在负荷曲线模式下进行控制;本发明完善了电站多年来监控系统低负荷自动调节方式,增加了低负荷调节功能。
Description
技术领域
本发明涉及电厂控制技术领域,特别是一种基于监控系统AGC一键低负荷调节的方法。
背景技术
为了维持电网稳定,电网调度需要根据电网中的负荷变化而改变电网中的发电总出力,使得发电的总出力与用电负荷平衡。为了便于电网利用电厂来对电网的日负荷变化进行调节,一些电厂发电出力由电网直接管理调配。目前直接管理调配电厂存在的普遍现象:为保证机组安全稳定运行,电网对机组的调节只能在稳定运行范围,但由于网架潮流等的影响,低负荷运行情况常见,但这部分只能人工手动调节,存在自动化调节的盲区。
AGC即自动发电控制,是指按预先设定的要求和条件,自动控制电站的有功功率来满足电力系统需要的技术,它是在水轮发电机组自动控制的基础上,实现全电站自动化的一种方式。水电站AGC控制策略包括负荷控制方式、负荷分配原则、与一次调频的协调控制策略、与水位的控制策略、自动退出及躲避振动区的策略等。
以某南方电网发电厂为例,AGC调节逻辑如图1所示。正常情况下,全厂AGC投入“有功给定、南调”模式,正常并网机组单机AGC选择加入“◇”投入,南网总调根据电网制定的发电计划下发全厂有功设定值,厂站AGC接收到南网下发值后,根据当前投入单机AGC的机组进行合理分配。受网架断面潮流影响,南网总调部分情况下要求机组未达稳定运行区域下限时电站机组并网运行,此时部分机组在低于单机AGC投入条件下长时间运行,此时需要将全厂AGC退出“南调”模式,手动跟踪发电计划。
当前的调节方法存在问题:
1、操作频繁:当前情况下,机组低负荷调节必须人工干预,为保证机组总有功不偏离发电计划运行,运行人员通常按每分钟调节一次的频率进行手动设定,且除了调节总有功还需根据机组单机低负荷运行时长调节单机有功功率,存在调节周期长、调节频次高、易发生误操作等风险。
2、易发生负荷偏离:近年来,人为干预也多次发生达到南网总调考核值被考核的情况,人为干预频次高、调节要求100%准确、操作繁琐,电能质量无法保证,未达电站自动化、智能化建设预期。
发明内容
为解决现有技术中存在的问题,本发明的目的是提供一种基于监控系统AGC一键低负荷调节的方法,本发明完善了电站多年来监控系统低负荷自动调节方式,增加了低负荷调节功能。
为实现上述目的,本发明采用的技术方案是:一种基于监控系统AGC一键低负荷调节的方法,包括全厂AGC控制系统,所述全厂AGC控制系统包括至少一组正常并网机组单机AGC控制系统,至少一组所述机组单机AGC控制系统按照当前全厂总有功的负荷进行平均分配有功值;所述的方法包括:
若只需要某台或某几台机组设定在需要的负荷时,退出单台机组低负荷有功设定模式,手动设定对应机组的有功值,当前全厂总有功的负荷减去手动设定机组的有功值后,剩余的有功值由其余机组进行平均分配并在负荷曲线模式下进行控制。
作为本发明的进一步改进,通过增加“低负荷运行”投入/退出软压板,每台机组对应增加低负荷单机AGC投入/退出软压板实现机组单机AGC控制系统投入或退出全厂AGC控制系统,并在每台机组增加一个低负荷情况下有功设定值手动下达的界面。
本发明的有益效果是:
1、本发明极大减少电站运行人员的操作量,提高电站自动化水平,避免人为因素造成电能质量不达标。
2、本发明的一键式操作可以快捷实现电网调节需要,提高响应及时性、负荷跟踪的准确性,有利于本质安全性电网建设。
附图说明
图1现有的AGC调节逻辑示意图;
图2为本发明实施例中的AGC调节逻辑示意图。
具体实施方式
下面结合附图对本发明的实施例进行详细说明。
实施例
稳定运行区域:根据机组压力脉动、振动、摆度、噪声以及温升等现场性能试结果,机组若长时间安全稳定运行时,有功区间值范围,已提前报送南网。
低负荷运行区域:机组有功低于稳定运行区域下限,若长时间运行时,对机组的安全、性能不利的负荷区域。
全厂AGC两种调节模式:
“有功设定值”:跟随南网/电站下发的有功设定值,且至少有一台机组加入AGC,对加入单机AGC的机组进行负荷调节。
“负荷曲线”:跟随发电计划曲线当前值,且至少有一台机组加入AGC,对加入单机AGC的机组进行负荷调节。
如图2所示,一种基于监控系统AGC一键低负荷调节的方法,包括全厂AGC控制系统,所述全厂AGC控制系统包括至少一组正常并网机组单机AGC控制系统,至少一组所述机组单机AGC控制系统按照当前全厂总有功的负荷进行平均分配有功值;所述的方法包括:
若只需要某台或某几台机组设定在需要的负荷时,退出单台机组低负荷有功设定模式,手动设定对应机组的有功值,当前全厂总有功的负荷减去手动设定机组的有功值后,剩余的有功值由其余机组进行平均分配并在负荷曲线模式下进行控制。
本实施例原有基础上增加“低负荷运行”投入/退出软压板,每台机组对应增加低负荷单机AGC投入/退出软压板,并在每台机组增加一个低负荷情况下有功设定值手动下达的界面。
当机组全部或部分进入低负荷运行区域,全厂AGC可通过“全厂AGC”投入/退出一键操作。投入“低负荷运行”软压板,自动实现一键投入“负荷曲线、站调”模式,且并网机组单机AGC自动投入,可以强制电厂全厂总有功严格跟踪发电计划,此时所有机组按照当前负荷进行平均分配,若只需要某台或某几台机组设定在需要的负荷时,可退出单台机组低负荷“有功设定”软压板,手动设定这台机组的有功值,其余机组由于仍然在负荷曲线模式下控制,始终可以保证全厂的有功严格跟随发电计划不会造成偏移。
在本实施中,当投入“低负荷”运行压板,每台机组就不再受功率下限的限制,发电计划改变的时候(一般每15分钟调减速率固定,不会超过50MW/min),全厂投入“计划曲线”模式,是保证全厂的设定值是严格跟踪发电计划,再平均分配到各台机组。
列1:当前全厂按计划需要减200MW,根据当前开机台数5台,这时会AGC自动下发设定每台机组在当前机组功率基础上调减40MW的命令。
如果不想让这台机组减少40MW,可以退出这台机的单机AGC从而其就不会参与调节,不会分配40MW,而是给其他4台机组下发50MW的调减命令。
如果要对这台机设定到想要的一个目标值,可以投入新增的单机软压板,设定一个目标值,有功功率会自动按照设定的值按固定速率(每次增减50MW,到位后再继续自动设置下一个点)调整到位,调减过程中多余的部分会平均分配到其他机组上面去。
现有的监控系统AGC的功能主要是全厂的功率按计划,其就负责平均分配到每台机组上去。其不能设定到低于单台机组功率下限。
列2:假设全厂当前有4台机组并网运行,全厂出力按照发电计划由2500MW调减至1600MW,此时水头208m(对应单台机组AGC运行区间479MW~700MW),在此期间电网要求需保持4台机组运行,且进入低负荷运行机组必须在一个特定功率比如300MW。此时投入一键低负荷压板,程序内部会调取208m水头的单机AGC运行区间数据库,根据当前全厂负荷计算得到最优分配方案(2台机组在300MW,其余2台机组在500MW为最优方式),此时会自动将2台机组由625MW按照50MW的步长减少至300MW,其余两台机组配合调节,四台机组调节到位后。再在此基础上继续减少50MW,直接四台机组都调整到目标值。
以上所述实施例仅表达了本发明的具体实施方式,其描述较为具体和详细,但并不能因此而理解为对本发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。
Claims (2)
1.一种基于监控系统AGC一键低负荷调节的方法,包括全厂AGC控制系统,所述全厂AGC控制系统包括至少一组正常并网机组单机AGC控制系统,至少一组所述机组单机AGC控制系统按照当前全厂总有功的负荷进行平均分配有功值;其特征在于,所述的方法包括:
若只需要某台或某几台机组设定在需要的负荷时,退出单台机组低负荷有功设定模式,手动设定对应机组的有功值,当前全厂总有功的负荷减去手动设定机组的有功值后,剩余的有功值由其余机组进行平均分配并在负荷曲线模式下进行控制。
2.根据权利要求1所述的基于监控系统AGC一键低负荷调节的方法,其特征在于,通过增加“低负荷运行”投入/退出软压板,每台机组对应增加低负荷单机AGC投入/退出软压板实现机组单机AGC控制系统投入或退出全厂AGC控制系统,并在每台机组增加一个低负荷情况下有功设定值手动下达的界面。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311383329.6A CN117498470A (zh) | 2023-10-24 | 2023-10-24 | 基于监控系统agc一键低负荷调节的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311383329.6A CN117498470A (zh) | 2023-10-24 | 2023-10-24 | 基于监控系统agc一键低负荷调节的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN117498470A true CN117498470A (zh) | 2024-02-02 |
Family
ID=89669956
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202311383329.6A Pending CN117498470A (zh) | 2023-10-24 | 2023-10-24 | 基于监控系统agc一键低负荷调节的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN117498470A (zh) |
-
2023
- 2023-10-24 CN CN202311383329.6A patent/CN117498470A/zh active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018205315A1 (zh) | 一种新能源站参与一次调频的快速功率协调控制方法 | |
CN108306312B (zh) | 一种风电场一次调频控制方法 | |
CN114389272B (zh) | 一种应用于风光储新能源电站的多模式协调控制方法 | |
CN111416365B (zh) | 风电场与常规调频机组异步协同最优agc控制系统 | |
CN109412210B (zh) | 一种风电机组有功功率精细化调节方法 | |
CN102856931A (zh) | 风电场有功功率的动态分群控制方法 | |
CN112821426A (zh) | 一种火力发电厂负荷优化分配及agc快速响应系统及方法 | |
CN114336592B (zh) | 一种基于模型预测控制的风电场agc控制方法 | |
CN114597963A (zh) | 一种水电站开停机机组通过agc快速穿越振动区的方法 | |
CN113991706A (zh) | 一种主动支撑型光伏电站一体化功率控制系统及方法 | |
CN116154877B (zh) | 一种优化新能源场站集群调频参数的方法 | |
CN117498470A (zh) | 基于监控系统agc一键低负荷调节的方法 | |
CN107273673B (zh) | 一种考虑平抑风电波动的空调冷水机组群控方法 | |
CN115549100A (zh) | 一种水电站agc负荷分配系统及运行方式 | |
CN111878888B (zh) | 厂级热电机组联合供热方式下的控制调节系统及方法 | |
CN111953247B (zh) | 一种水电机组功率精细调节控制方法及装置 | |
CN114268135A (zh) | 一种适应调频、深度调峰的电锅炉储能控制方法 | |
CN115473282A (zh) | 一种梯级水电与光伏互补发电系统及控制方法 | |
CN114123248A (zh) | 以新能源一次调频优先的电网调频运行控制方法及系统 | |
CN108155675B (zh) | 基于预测信息与运行状态的风电场群功率优化调度方法 | |
CN105244921A (zh) | 含风火水光气的电力系统调度中的备用容量优化分配方法 | |
CN110707757A (zh) | 一种基于新能源消纳的多类型能源分层协调控制方法 | |
CN113131531A (zh) | 适用于电网不同运行工况下的调节备用共享方法和系统 | |
CN117639111B (zh) | 一种基于梯级径流式水电的光伏波动平滑控制方法与系统 | |
CN114172215B (zh) | 一种水电站功率调节方法、装置及存储介质 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |