CN117419684A - On-site supervision and settlement monitoring integrated device for building engineering and monitoring method thereof - Google Patents

On-site supervision and settlement monitoring integrated device for building engineering and monitoring method thereof Download PDF

Info

Publication number
CN117419684A
CN117419684A CN202311521859.2A CN202311521859A CN117419684A CN 117419684 A CN117419684 A CN 117419684A CN 202311521859 A CN202311521859 A CN 202311521859A CN 117419684 A CN117419684 A CN 117419684A
Authority
CN
China
Prior art keywords
rod
fixedly connected
frame
hole
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202311521859.2A
Other languages
Chinese (zh)
Other versions
CN117419684B (en
Inventor
赵强
胡艳平
李小刚
郭明浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zengjia Engineering Management Co ltd
Original Assignee
Zhejiang Zengjia Engineering Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zengjia Engineering Management Co ltd filed Critical Zhejiang Zengjia Engineering Management Co ltd
Priority to CN202311521859.2A priority Critical patent/CN117419684B/en
Priority claimed from CN202311521859.2A external-priority patent/CN117419684B/en
Publication of CN117419684A publication Critical patent/CN117419684A/en
Application granted granted Critical
Publication of CN117419684B publication Critical patent/CN117419684B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C5/00Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
    • G01C5/04Hydrostatic levelling, i.e. by flexibly interconnected liquid containers at separated points
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Transmission Devices (AREA)

Abstract

The invention relates to the technical field of settlement monitoring and discloses an integrated device for monitoring settlement on a construction engineering site and a monitoring method thereof, wherein the integrated device comprises a level, a hanging rod is hinged to the bottom of the level, a positioning disc is inserted into the surface of the hanging rod, a connecting rod is fixedly connected to the inner wall of the positioning disc, a supporting rod is sleeved on the surface of the connecting rod, a bottom plate is arranged below the supporting rod, a protection frame is fixedly connected to the top of the bottom plate, and a limiting hole is formed in the top of the bottom plate. According to the invention, the leveling instrument is arranged at the top of the positioning disk, settlement monitoring is carried out on a building engineering through the leveling instrument, the surface of the positioning disk is provided with the supporting rods, the number of the supporting rods is three, the three supporting rods are triangular to support and fix the positioning disk, the stability of the positioning disk for supporting the leveling instrument is improved, the adjusting part is arranged in the protective frame, and the opening and closing degree of the three supporting rods can be monitored through the adjusting part.

Description

On-site supervision and settlement monitoring integrated device for building engineering and monitoring method thereof
Technical Field
The invention relates to the technical field of settlement monitoring, in particular to an on-site supervision settlement monitoring integrated device for construction engineering and a monitoring method thereof.
Background
The settlement observation is carried out according to the observation points arranged on the building and the measurement points of the fixed permanent level points, the settlement degree is expressed by data, and the settlement observation should be arranged on the artificial foundation, the soil foundation (sand foundation) and the like when more than one layer of building and structure design requirements are set, and the observation and recording should be carried out on schedule or according to the layer progress in the construction until completion;
subside the monitoring and need monitor the building through the spirit level, the spirit level needs to be fixed through the support when the building site is used, the geology in the building site is generally the weak soil, the surface of soil is uneven, lead to the support to need flatten the soil when fixing the spirit level, with the stability that improves the support to the spirit level is fixed, when need adjusting the angle of spirit level, just need to twist the spirit level at the top of support through the manual work and adjust, the soil is comparatively soft, lead to the support to appear not hard up easily when adjusting the spirit level, thereby lead to the support to empty.
Disclosure of Invention
The invention aims to provide an on-site supervision and settlement monitoring integrated device for a building engineering and a monitoring method thereof, so as to solve the problems in the background technology.
In order to solve the technical problems, the invention is realized by the following technical scheme:
the invention relates to an on-site supervision and settlement monitoring integrated device for a building engineering and a monitoring method thereof, and the on-site supervision and settlement monitoring integrated device comprises a level, wherein a hanging rod is hinged to the bottom of the level, a positioning disc is inserted on the surface of the hanging rod, a connecting rod is fixedly connected to the inner wall of the positioning disc, a supporting rod is sleeved on the surface of the connecting rod, a bottom plate is arranged below the supporting rod, a protection frame is fixedly connected to the top of the bottom plate, a limit hole is formed in the top of the bottom plate, a trampling frame is fixedly connected to the surface of the protection frame, a rubber pad is fixedly connected to the bottom of the bottom plate, and a round hole is formed in the surface of the bottom plate, and the on-site supervision and settlement monitoring integrated device further comprises:
the adjusting component comprises a slide hole frame, the bottom of the slide hole frame is fixedly connected with the top of the bottom plate, the inner wall of the slide hole frame is connected with a sliding block in a sliding manner, and the end part of the sliding block is fixedly connected with a positioning frame;
the fixing component comprises a round hole rod, the round hole rod is fixedly connected with the inner wall of the round hole, the inner wall of the round hole rod is rotationally connected with a threaded cylinder, the inner wall of the threaded cylinder is in threaded connection with a sliding hole threaded rod, and the bottom of the sliding hole threaded rod is fixedly connected with a fixed sharp block;
the stabilizing component comprises a stabilizing cylinder, the stabilizing cylinder is fixedly connected with the surface of the supporting rod, the surface of the stabilizing cylinder is hinged with a telescopic rod, and one end, far away from the stabilizing cylinder, of the telescopic rod is hinged with a round club.
Further, the bottom of bracing piece passes through spacing hole and extends to the inside of protection frame, the bottom of bracing piece is connected with the surface rotation of locating rack, the quantity of slide hole frame is provided with three, three the slide hole frame uses the bottom plate as central circumference setting.
Further, the adjusting component comprises a center frame, the center frame is fixedly connected with the top of the bottom plate, the surface of the center frame is fixedly connected with a limiting cylinder, the inner wall of the limiting cylinder is slidably connected with a sliding rod, the top of the sliding rod is fixedly connected with a threaded plate, the top of the bottom plate is fixedly connected with a motor, the output end of the motor is fixedly connected with a rotating rod, the surface of the rotating rod is fixedly connected with a gear, and the surface of the gear is meshed with a driving ring;
the driving ring is arranged in the sliding hole frames, and the center frame is positioned at one end of the three sliding hole frames, which are close to each other.
Further, the bottom of drive ring and screw thread board's top threaded connection, the one end that the center frame was kept away from to the slide bar runs through smooth Kong Jia and extends to the inside of slide hole frame, the one end that the center frame was kept away from to the slide bar and the fixed surface of slider are connected, the top of locating rack sets up in the top of slide hole frame, the top of drive ring rotates with the inner wall top of slide hole frame and is connected.
Further, the fixed part comprises a vertical rod, the bottom of the vertical rod is fixedly connected with the top of the bottom plate, the upper surface of the vertical rod is rotationally connected with a transmission gear, the surface of the vertical rod is fixedly connected with a bent plate, one end of the bent plate, which is far away from the vertical rod, is rotationally connected with a double-sided tooth ring, the top of the bottom plate is fixedly connected with a chute frame, the surface of the chute frame is slidingly connected with an elastic sliding frame, the top of the elastic sliding frame is hinged with a sloping plate, the surface of the sloping plate is fixedly connected with a pedal, the top of the sloping plate is hinged with a movable ring, the top of the bottom plate is fixedly connected with a round rod, the top of the bottom plate is fixedly connected with a spring, the top of the spring is fixedly connected with a connecting plate, one end of the connecting plate, which is far away from the movable ring, is rotationally connected with a cross rod, and the surface of the cross rod is fixedly connected with a gear frame;
the cross rod is arranged above the rotating rod, a semicircular groove and a cross hole are formed in the lower portion of the cross rod, the semicircular groove is formed in the top of the rotating rod, and the cross hole is formed in the rotating rod.
Further, the tip of cross pole runs through the gear frame and extends to the outer end of gear frame, the inner wall looks adaptation of cross pole and cross hole, the inner wall meshing of gear frame and two-sided tooth ring, the tip of screw thread section of thick bamboo runs through round hole pole and extends to the outer end of round hole pole, the top fixedly connected with meshing board of screw thread section of thick bamboo, the fixed surface of round hole pole is connected with the curved frame, the one end that the round hole pole was kept away from to the curved frame and the inner wall sliding connection of smooth hole threaded rod.
Further, the inner wall of the movable ring is slidably connected with the surface of the round rod, the round rod is arranged in the spring, the end part of the elastic sliding frame is fixedly connected with the inner wall of the sliding groove frame, the pedal is arranged in the pedal frame, the transmission gear is meshed with the outer surface of the double-sided tooth ring, and one end of the transmission gear, far away from the double-sided tooth ring, is meshed with the meshing plate.
Further, the stabilizing component comprises a lifting rod, the top of the lifting rod is fixedly connected with the bottom of the round ball rod, the surface of the lifting rod is fixedly connected with an elastic spring, the top of the elastic spring is fixedly connected with the bottom of the center frame, the surface of the telescopic rod is fixedly connected with an elastic sheet, the center of the elastic sheet is fixedly connected with a positioning bracket, and the surface of the positioning bracket is fixedly connected with a cylindrical telescopic rod;
the number of the telescopic rods is three, and the three telescopic rods are symmetrically arranged by taking the round club as a center.
Further, the surface of lifter and the inner wall sliding connection of center frame, the bottom of lifter runs through center frame and extends to the bottom outer end of bottom plate.
The on-site supervision and settlement monitoring integrated device for the constructional engineering comprises the following steps:
s1: the sliding rod pushes the positioning frame to move through the sliding block when sliding, and the supporting rod can adjust the opening and closing angle through the movement of the sliding block;
s2: the transmission gear pushes the threaded cylinder to rotate in the round hole rod through the meshing plate, and the sliding hole threaded rod is positioned through the bent frame;
s3: when the telescopic rod extends, the elastic piece and the cylindrical telescopic rod are pulled to deform, so that the supporting rod is pulled and extruded by the pulling of the telescopic rod;
s4: the ball pole utilizes the elasticity of elasticity spring to extrude the telescopic link, further improves the stability of bracing piece when opening and shutting.
The invention has the following beneficial effects:
according to the invention, the leveling instrument is arranged at the top of the positioning disk, settlement monitoring is carried out on a building engineering through the leveling instrument, the supporting rods are arranged on the surface of the positioning disk, the number of the supporting rods is three, the three supporting rods are triangular to support and fix the positioning disk, the stability of the positioning disk on the leveling instrument support is improved, the adjusting part is arranged in the protective frame, the opening and closing degree of the three supporting rods can be monitored through the adjusting part, the stability of the support is improved, the fixing part is arranged in the protective frame, the bottom plate is fixed on the surface of the land through the fixing part, the rubber pad is arranged at the bottom of the bottom plate, the contact tightness between the bottom plate and the ground is improved, the stabilizing part is arranged above the protective frame, and the three supporting rods are extruded and fixed through the stabilizing part, so that the stability of the supporting rods in working is further improved.
When the bottom plate is required to be fixed, after the motor is electrified, the motor drives the gear to rotate through the rotating rod, the driving ring rotates on the surface of the threaded plate through meshing with the gear, the threaded plate is in threaded connection with the driving ring, the sliding rod can be driven to slide on the sliding hole frame through rotation of the driving ring, the sliding rod can drive the positioning frame to move through the sliding block during sliding, the supporting rod can be used for adjusting the opening and closing angle through movement of the sliding block, the stability of the supporting rod on the positioning plate is improved through the opening and closing angle, and the height of the positioning plate is convenient to adjust through the opening and closing angle.
When the bottom plate is required to be fixed, the pedal is trampled to move downwards, the pedal pushes the movable ring to move downwards through the inclined plate, the movable ring slides on the surface of the round rod, so that the stability of the movable ring in moving is improved, the connecting plate pushes the cross rod to enter the cross hole to be meshed with the rotating rod along with the movement of the movable ring, the cross rod pushes the gear rack to rotate through the rotation of the rotating rod, the double-sided tooth ring pushes the transmission gear to rotate through the rotation of the gear rack, the transmission gear pushes the threaded cylinder to rotate in the round hole rod through the meshing plate, the sliding hole threaded rod is positioned through the bent frame, and the sliding hole threaded rod can push the fixed sharp block to move downwards through the rotation of the threaded cylinder and be pricked into the ground, so that the stability of the bottom plate to the support rod is improved.
According to the invention, when the support rod is expanded outwards, the telescopic rod is pulled to extend through the stabilizing cylinder, and the elastic piece and the cylindrical telescopic rod are pulled to deform when the telescopic rod is extended, so that the support rod is pulled and extruded by the pulling of the telescopic rod, the phenomenon that the support rod is shaking and dynamic is strong when moving is avoided, the telescopic rod is extruded by the spherical rod by the elasticity of the elastic spring, and the stability of the support rod when opening and closing is further improved.
Of course, it is not necessary for any one product to practice the invention to achieve all of the advantages set forth above at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are needed for the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure of the base plate of the present invention;
FIG. 3 is a schematic cross-sectional view of a protective frame according to the present invention;
FIG. 4 is a schematic diagram of the structure of the present invention;
FIG. 5 is a schematic view of the overall structure of the adjusting part of the present invention;
FIG. 6 is a schematic view of the overall structure of the fixing member of the present invention;
FIG. 7 is a schematic view of a fixed-tip block structure according to the present invention;
FIG. 8 is an enlarged schematic view of portion A of FIG. 6 in accordance with the present invention;
FIG. 9 is a schematic view of the structure of the stabilizing member of the present invention;
fig. 10 is a schematic diagram of the overall structure of the present invention.
In the drawings, the list of components represented by the various numbers is as follows:
in the figure: 1. a bottom plate; 2. a protective frame; 3. a limiting hole; 4. a pedal frame; 5. a support rod; 6. a positioning plate; 7. a level gauge; 8. a connecting rod; 9. a hanging rod; 10. a rubber pad; 11. a round hole; 12. an adjusting member; 13. a fixing member; 14. a stabilizing member; 20. a slide hole frame; 21. a gear; 22. a rotating rod; 23. a slide bar; 24. a motor; 25. a limiting cylinder; 26. a center frame; 27. a positioning frame; 28. a thread plate; 29. a drive ring; 30. a slide block; 31. a chute frame; 32. an elastic carriage; 33. a round bar; 34. a moving ring; 35. a spring; 36. a sloping plate; 37. stepping on the pedal; 38. a connecting plate; 39. double-sided tooth ring; 40. a transmission gear; 41. a vertical rod; 42. engaging the plate; 43. a round hole rod; 44. a thread cylinder; 45. bending the frame; 46. fixing the sharp block; 47. a sliding hole threaded rod; 48. a bending plate; 49. a cross bar; 50. a semicircular groove; 51. a cross hole; 52. a gear frame; 60. round ball rod; 61. an elastic spring; 62. a lifting rod; 63. a stabilizing cylinder; 64. a positioning bracket; 65. an elastic sheet; 66. a telescopic rod; 67. a cylindrical telescopic rod.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1-10, the invention discloses an on-site settlement monitoring integrated device for constructional engineering and a monitoring method thereof, the on-site settlement monitoring integrated device comprises a level gauge 7, a vertical rod 9 is hinged at the bottom of the level gauge 7, a positioning disc 6 is inserted on the surface of the vertical rod 9, a connecting rod 8 is fixedly connected to the inner wall of the positioning disc 6, a supporting rod 5 is sleeved on the surface of the connecting rod 8, a bottom plate 1 is arranged below the supporting rod 5, a protection frame 2 is fixedly connected to the top of the bottom plate 1, a limiting hole 3 is formed in the top of the bottom plate 1, the on-site settlement monitoring integrated device is provided with a level gauge 7 at the top of the positioning disc 6, settlement monitoring is carried out on constructional engineering through the level gauge 7, supporting rods 5 are arranged on the surface of the positioning disc 6, the number of the supporting rods 5 is three, three supporting rods 5 are fixedly supported on the positioning disc 6 in a triangular mode, the stability of the positioning disc 6 supported by the level gauge 7 is improved, an adjusting part 12 is arranged in the interior of the protection frame 2, the opening and closing angle of the supporting rod 5 can be monitored through the adjusting part 12, a protection frame 2 is fixedly connected to the bottom plate 1, a rubber pad 14 is fixedly arranged on the bottom plate 1 is fixedly connected to the bottom plate 1 through the fixing part 13, and the bottom plate 1 is fixedly connected to the bottom plate 2 by the bottom plate 2, and the bottom plate 2 is fixedly connected to the bottom plate 10 by the bottom plate 1 through the fixing part 13, and the bottom plate 2 is fixedly arranged on the bottom plate 2, and the bottom plate 2 is fixedly connected to the bottom plate 2, and the bottom plate 2 is further fixedly connected to the bottom plate 2 by the bottom plate 2, and the bottom plate 2 is fixedly connected to the bottom plate 2 by the bottom plate 2.
The adjusting part 12 comprises a slide hole frame 20, the bottom of the slide hole frame 20 is fixedly connected with the top of the bottom plate 1, the inner wall of the slide hole frame 20 is slidably connected with a slide block 30, and the end part of the slide block 30 is fixedly connected with a positioning frame 27;
the fixing component 13, the fixing component 13 comprises a round hole rod 43, the round hole rod 43 is fixedly connected with the inner wall of the round hole 11, the inner wall of the round hole rod 43 is rotatably connected with a threaded cylinder 44, the inner wall of the threaded cylinder 44 is in threaded connection with a sliding hole threaded rod 47, and the bottom of the sliding hole threaded rod 47 is fixedly connected with a fixed sharp block 46;
the stabilizing component 14, the stabilizing component 14 includes a stabilizing cylinder 63, the stabilizing cylinder 63 is fixedly connected with the surface of the supporting rod 5, the surface of the stabilizing cylinder 63 is hinged with a telescopic rod 66, and one end of the telescopic rod 66 far away from the stabilizing cylinder 63 is hinged with a ball rod 60.
The bottom of bracing piece 5 extends to the inside of protection frame 2 through spacing hole 3, and the bottom of bracing piece 5 is connected with the surface rotation of locating rack 27, and the quantity of slide hole frame 20 is provided with three, and three slide hole frame 20 use bottom plate 1 as central circumference setting.
The adjusting part 12 comprises a center frame 26, the center frame 26 is fixedly connected with the top of the bottom plate 1, the surface of the center frame 26 is fixedly connected with a limit cylinder 25, the inner wall of the limit cylinder 25 is connected with a slide bar 23 in a sliding way, the top of the slide bar 23 is fixedly connected with a thread plate 28, the top of the bottom plate 1 is fixedly connected with a motor 24, the output end of the motor 24 is fixedly connected with a rotating rod 22, when the bottom plate 1 is required to be fixed, after the motor 24 is electrified, the motor 24 pushes a gear 21 to rotate through the rotating rod 22, a driving ring 29 rotates on the surface of the thread plate 28 through meshing with the gear 21, the thread plate 28 is in threaded connection with the driving ring 29 so as to push the slide bar 23 to slide on a slide hole frame 20 through the rotation of the driving ring 29, the slide bar 23 pushes a positioning frame 27 to move through a slide block 30 in the sliding way, the supporting bar 5 can adjust the opening and closing angle through the movement of the slide block 30, the stability of the supporting rod 5 on the positioning plate 6 is improved through the opening and closing angle, the height of the positioning plate 6 is also convenient to adjust the height of the positioning plate 6 through the opening and closing angle, the surface of the rotating rod 22 is fixedly connected with the gear 21, and the surface of the rotating rod 22 is meshed with the gear 29;
the drive ring 29 is provided inside the slide hole frames 20, and the center frame 26 is located at one end of the three slide hole frames 20 close to each other.
The bottom of drive ring 29 and screw thread connection at the top of screw thread board 28, the one end that slide bar 23 kept away from center frame 26 runs through slide hole frame 20 and extends to the inside of slide hole frame 20, and the one end that slide bar 23 kept away from center frame 26 is connected with the fixed surface of slider 30, and the top of locating rack 27 sets up in the top of slide hole frame 20, and the top of drive ring 29 rotates with the inner wall top of slide hole frame 20 to be connected.
The fixed part 13 comprises a vertical rod 41, the bottom of the vertical rod 41 is fixedly connected with the top of the bottom plate 1, the upper surface of the vertical rod 41 is rotationally connected with a transmission gear 40, the surface of the vertical rod 41 is fixedly connected with a bent plate 48, one end of the bent plate 48 away from the vertical rod 41 is rotationally connected with a double-sided tooth ring 39, the top of the bottom plate 1 is fixedly connected with a chute frame 31, the surface of the chute frame 31 is slidingly connected with an elastic sliding frame 32, the top of the elastic sliding frame 32 is hinged with a sloping plate 36, the surface of the sloping plate 36 is fixedly connected with a pedal 37, the top of the sloping plate 36 is hinged with a movable ring 34, when the bottom plate 1 is required to be fixed, the pedal 37 is stamped to move downwards, the pedal 37 pushes the movable ring 34 to move downwards through the sloping plate 36, the movable ring 34 slides on the surface of the round rod 33, so that the stability of the movable ring 34 is improved, the connecting plate 38 pushes a cross rod 49 to enter into the inside of the cross hole 51 to be meshed with the rotating rod 22 along with the movement of the movable ring 34, the cross rod 49 drives the gear frame 52 to rotate through the rotation of the rotating rod 22, the double-sided gear ring 39 drives the transmission gear 40 to rotate through the rotation of the gear frame 52, the transmission gear 40 drives the thread cylinder 44 to rotate in the round hole rod 43 through the engagement plate 42, the sliding hole threaded rod 47 is positioned through the bent frame 45, so that the sliding hole threaded rod 47 can push the fixed sharp block to move downwards through the rotation of the thread cylinder 44 and be pricked into the inside of the ground, the stability of the bottom plate 1 when the bottom plate 1 is fixed to the supporting rod 5 is improved, the top of the bottom plate 1 is fixedly connected with the round rod 33, the top of the bottom plate 1 is fixedly connected with the spring 35, the top of the spring 35 is fixedly connected with the bottom of the moving ring 34, the surface of the moving ring 34 is fixedly connected with the connecting plate 38, one end of the connecting plate 38 away from the moving ring 34 is rotationally connected with the cross rod 49, the surface of the cross rod 49 is fixedly connected with a gear rack 52;
the cross rod 49 is arranged above the rotating rod 22, a semicircular groove 50 and a cross hole 51 are arranged below the cross rod 49, the semicircular groove 50 is formed in the top of the rotating rod 22, and the cross hole 51 is formed in the rotating rod 22.
The end of the cross rod 49 penetrates through the gear frame 52 and extends to the outer end of the gear frame 52, the cross rod 49 is matched with the inner wall of the cross hole 51, the gear frame 52 is meshed with the inner wall of the double-sided tooth ring 39, the end of the threaded cylinder 44 penetrates through the round hole rod 43 and extends to the outer end of the round hole rod 43, the top of the threaded cylinder 44 is fixedly connected with the meshing plate 42, the surface of the round hole rod 43 is fixedly connected with the bent frame 45, and one end of the bent frame 45 away from the round hole rod 43 is in sliding connection with the inner wall of the sliding hole threaded rod 47.
The inner wall of the movable ring 34 is slidably connected with the surface of the round bar 33, the round bar 33 is arranged in the spring 35, the end of the elastic carriage 32 is fixedly connected with the inner wall of the chute frame 31, the pedal 37 is arranged in the pedal frame 4, the transmission gear 40 is meshed with the outer surface of the double-sided toothed ring 39, and one end of the transmission gear 40 away from the double-sided toothed ring 39 is meshed with the meshing plate 42.
The stabilizing component 14 comprises a lifting rod 62, the top of the lifting rod 62 is fixedly connected with the bottom of a round ball rod 60, the surface of the lifting rod 62 is fixedly connected with an elastic spring 61, the top of the elastic spring 61 is fixedly connected with the bottom of a center frame 26, when the supporting rod 5 is outwards expanded, a stabilizing cylinder 63 is used for pulling a telescopic rod 66 to extend, the telescopic rod 66 is used for pulling an elastic sheet 65 and a cylindrical telescopic rod 67 to deform, so that the supporting rod 5 is pulled and extruded by the pulling of the telescopic rod 66, the round ball rod 60 is prevented from having stronger shaking feeling when the supporting rod 5 moves, the elastic force of the elastic spring 61 is used for extruding the telescopic rod 66, the stability of the supporting rod 5 when the supporting rod 5 is opened and closed is further improved, the surface of the telescopic rod 66 is fixedly connected with the elastic sheet 65, the center of the elastic sheet 65 is fixedly connected with a positioning bracket 64, and the surface of the positioning bracket 64 is fixedly connected with the cylindrical telescopic rod 67;
the number of the telescopic rods 66 is three, and the three telescopic rods 66 are symmetrically arranged with the round ball rod 60 as a center.
The surface of the lifting rod 62 is slidably connected to the inner wall of the central frame 26, and the bottom of the lifting rod 62 penetrates through the central frame 26 and extends to the outer end of the bottom of the base plate 1.
The on-site supervision and settlement monitoring integrated device for the building engineering comprises the following steps:
s1: the slide bar 23 pushes the positioning frame 27 to move through the slide block 30 during sliding, and the support rod 5 can adjust the opening and closing angle through the movement of the slide block 30;
s2: the transmission gear 40 pushes the threaded cylinder 44 to rotate in the round hole rod 43 through the engagement plate 42, and the sliding hole threaded rod 47 is positioned through the bent frame 45;
s3: when the telescopic rod 66 is extended, the elastic piece 65 and the cylindrical telescopic rod 67 are pulled to deform, so that the supporting rod 5 is pulled and extruded by the pulling of the telescopic rod 66;
s4: the round club 60 presses the telescopic rod 66 by using the elasticity of the elastic spring 61, and further improves the stability of the support rod 5 when opening and closing.
When in use, the leveling instrument 7 is arranged at the top of the positioning disk 6, the settlement monitoring is carried out on the constructional engineering through the leveling instrument 7, the supporting rods 5 are arranged on the surface of the positioning disk 6, the number of the supporting rods 5 is three, the three supporting rods 5 are in triangular shape to support and fix the positioning disk 6, the stability of the positioning disk 6 for supporting the leveling instrument 7 is improved, the adjusting part 12 is arranged in the protecting frame 2, the opening and closing degree of the three supporting rods 5 can be monitored through the adjusting part 12, the opening and closing angle of the supporting rods 5 is improved, the supporting stability is improved, the fixing part 13 is arranged in the protecting frame 2, the bottom plate 1 is fixed on the surface of the land through the fixing part 13, the rubber pad 10 is arranged at the bottom of the bottom plate 1, the compactness of the bottom plate 1 and the ground is improved, the stabilizing part 14 is arranged above the protecting frame 2, the three support rods 5 are extruded and fixed by the stabilizing component 14, so that the stability of the support rods 5 during working is further improved, when the bottom plate 1 is required to be fixed, after the motor 24 is electrified, the motor 24 pushes the gear 21 to rotate through the rotating rod 22, the driving ring 29 rotates on the surface of the threaded plate 28 through the engagement with the gear 21, the threaded plate 28 is in threaded connection with the driving ring 29, the sliding rod 23 can be pushed to slide on the sliding hole frame 20 through the rotation of the driving ring 29, the sliding rod 23 pushes the positioning frame 27 to move through the sliding block 30 during sliding, the support rods 5 can adjust the opening and closing angle through the movement of the sliding block 30, the stability of the support rods 5 on the positioning plate 6 is improved through the opening and closing angle, the height of the positioning plate 6 is also convenient to adjust through the opening and closing angle, when the bottom plate 1 is required to be fixed, the pedal 37 is stepped down, pedal 37 promotes the shift collar 34 through swash plate 36 and moves downwards, shift collar 34 slides on the surface of round bar 33, thereby improve shift collar 34 stability when moving, link plate 38 promotes cross bar 49 to get into the inside of cross hole 51 and engage with bull stick 22 along with shift collar 34's removal, cross bar 49 promotes the gear carrier 52 rotation through the rotation of bull stick 22, double-sided gear ring 39 promotes drive gear 40 and rotates through the rotation of gear carrier 52, drive gear 40 promotes screw thread section of thick bamboo 44 and rotates in the inside of round hole pole 43 through engaging plate 42, slide hole 47 is fixed through curved frame 45, make slide hole 47 can promote fixed sharp piece downwardly moving and prick to the inside of soil through the rotation of screw thread section of thick bamboo 44, thereby improve the stability when bottom plate 1 is fixed to bracing piece 5, the bracing piece 5 outwards expands through stabilizing section of thick bamboo 63 pulling telescopic link 66 and extends, telescopic link 66 draws elastic piece 65 and cylinder telescopic link 67 to produce deformation when extending, thereby utilize the pulling of telescopic link 66 to extrude bracing piece 5, avoid bracing piece 5 to appear stronger dynamic movement when moving, the elastic rod 60 utilizes telescopic link 66 to extrude bracing piece 5, further stability when utilizing telescopic link 60 to extrude bracing piece 5.
The preferred embodiments of the invention disclosed above are intended only to assist in the explanation of the invention. The preferred embodiments are not exhaustive or to limit the invention to the precise form disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and the practical application, to thereby enable others skilled in the art to best understand and utilize the invention. The invention is limited only by the claims and the full scope and equivalents thereof.

Claims (10)

1. The utility model provides a building engineering scene is managed and is subsided monitoring integrated device, includes spirit level (7), the bottom of spirit level (7) articulates has perpendicular pole (9), peg graft on the surface of perpendicular pole (9) has positioning disk (6), inner wall fixedly connected with connecting rod (8) of positioning disk (6), bracing piece (5) have been cup jointed on the surface of connecting rod (8), the below of bracing piece (5) is provided with bottom plate (1), the top fixedly connected with protection frame (2) of bottom plate (1), spacing hole (3) have been seted up at the top of bottom plate (1), the fixed surface of protection frame (2) is connected with tramples frame (4), the bottom fixedly connected with rubber pad (10) of bottom plate (1), round hole (11) have been seted up on the surface of bottom plate (1), its characterized in that still includes:
the adjusting component (12), the adjusting component (12) comprises a slide hole frame (20), the bottom of the slide hole frame (20) is fixedly connected with the top of the bottom plate (1), the inner wall of the slide hole frame (20) is slidably connected with a sliding block (30), and the end part of the sliding block (30) is fixedly connected with a positioning frame (27);
the fixing component (13), the fixing component (13) comprises a round hole rod (43), the round hole rod (43) is fixedly connected with the inner wall of the round hole (11), a threaded cylinder (44) is rotatably connected with the inner wall of the round hole rod (43), a sliding hole threaded rod (47) is connected with the inner wall of the threaded cylinder (44) in a threaded manner, and a fixed sharp block (46) is fixedly connected with the bottom of the sliding hole threaded rod (47);
the stabilizing component (14), stabilizing component (14) include steady section of thick bamboo (63), the fixed surface of steady section of thick bamboo (63) and bracing piece (5) is connected, the surface of steady section of thick bamboo (63) articulates there is telescopic link (66), the one end that steady section of thick bamboo (63) was kept away from to telescopic link (66) articulates there is ball pole (60).
2. The on-site supervision and settlement monitoring integrated device for construction engineering according to claim 1, wherein: the bottom of bracing piece (5) extends to the inside of protection frame (2) through spacing hole (3), the bottom of bracing piece (5) is connected with the surface rotation of locating rack (27), the quantity of slide hole frame (20) is provided with three, three slide hole frame (20) use bottom plate (1) as central circumference setting.
3. The on-site supervision and settlement monitoring integrated device for construction engineering according to claim 1, wherein: the adjusting component (12) comprises a center frame (26), the center frame (26) is fixedly connected with the top of the bottom plate (1), a limiting cylinder (25) is fixedly connected to the surface of the center frame (26), a sliding rod (23) is slidably connected to the inner wall of the limiting cylinder (25), a threaded plate (28) is fixedly connected to the top of the sliding rod (23), a motor (24) is fixedly connected to the top of the bottom plate (1), a rotating rod (22) is fixedly connected to the output end of the motor (24), a gear (21) is fixedly connected to the surface of the rotating rod (22), and a driving ring (29) is meshed with the surface of the gear (21);
the driving ring (29) is arranged in the sliding hole frames (20), and the center frame (26) is positioned at one end of the three sliding hole frames (20) close to each other.
4. The integrated device for monitoring settlement in on-site supervision of construction engineering according to claim 4, wherein: the bottom of driving ring (29) and the top threaded connection of screw thread board (28), the one end that center frame (26) was kept away from to slide bar (23) runs through slide hole frame (20) and extends to the inside of slide hole frame (20), the one end that center frame (26) was kept away from to slide bar (23) and the fixed surface of slider (30) are connected, the top of locating rack (27) sets up the top in slide hole frame (20), the top of driving ring (29) rotates with the inner wall top of slide hole frame (20) and is connected.
5. The on-site supervision and settlement monitoring integrated device for construction engineering according to claim 1, wherein: the fixed part (13) comprises a vertical rod (41), the bottom of the vertical rod (41) is fixedly connected with the top of a bottom plate (1), the upper surface of the vertical rod (41) is rotationally connected with a transmission gear (40), the surface of the vertical rod (41) is fixedly connected with a bent plate (48), one end of the bent plate (48) far away from the vertical rod (41) is rotationally connected with a double-sided toothed ring (39), the top of the bottom plate (1) is fixedly connected with a chute frame (31), the surface of the chute frame (31) is slidingly connected with an elastic carriage (32), the top of the elastic carriage (32) is hinged with a sloping plate (36), the surface of the sloping plate (36) is fixedly connected with a pedal (37), the top of the sloping plate (36) is hinged with a movable ring (34), the top of the bottom plate (1) is fixedly connected with a round rod (33), the top of the spring (35) is fixedly connected with the bottom of the movable ring (34), the surface of the movable ring (34) is fixedly connected with a chute frame (31), and one end of the movable ring (38) is far away from the movable ring (49) and is fixedly connected with a cross gear (49).
The cross rod (49) is arranged above the rotating rod (22), a semicircular groove (50) and a cross hole (51) are formed in the lower portion of the cross rod (49), the semicircular groove (50) is formed in the top of the rotating rod (22), and the cross hole (51) is formed in the rotating rod (22).
6. The integrated device for monitoring settlement in a construction engineering site according to claim 5, wherein: the tip of cross pole (49) runs through carrier (52) and extends to the outer end of carrier (52), the inner wall looks adaptation of cross pole (49) and cross hole (51), carrier (52) and the inner wall meshing of two-sided tooth ring (39), the tip of screw thread section of thick bamboo (44) runs through round hole pole (43) and extends to the outer end of round hole pole (43), the top fixedly connected with meshing board (42) of screw thread section of thick bamboo (44), the fixed surface of round hole pole (43) is connected with curved frame (45), the one end and the inner wall sliding connection of sliding hole (47) of round hole pole (43) are kept away from to curved frame (45).
7. The integrated device for monitoring settlement in a construction engineering site according to claim 5, wherein: the inner wall of the movable ring (34) is in sliding connection with the surface of the round rod (33), the round rod (33) is arranged in the spring (35), the end part of the elastic sliding frame (32) is fixedly connected with the inner wall of the sliding groove frame (31), the pedal (37) is arranged in the pedal frame (4), the transmission gear (40) is meshed with the outer surface of the double-sided toothed ring (39), and one end, far away from the double-sided toothed ring (39), of the transmission gear (40) is meshed with the meshing plate (42) mutually.
8. The on-site supervision and settlement monitoring integrated device for construction engineering according to claim 1, wherein: the stabilizing component (14) comprises a lifting rod (62), the top of the lifting rod (62) is fixedly connected with the bottom of the round ball rod (60), the surface of the lifting rod (62) is fixedly connected with an elastic spring (61), the top of the elastic spring (61) is fixedly connected with the bottom of the center frame (26), the surface of the telescopic rod (66) is fixedly connected with an elastic sheet (65), the center of the elastic sheet (65) is fixedly connected with a positioning bracket (64), and the surface of the positioning bracket (64) is fixedly connected with a cylindrical telescopic rod (67);
the number of the telescopic rods (66) is three, and the three telescopic rods (66) are symmetrically arranged by taking the round ball rod (60) as a center.
9. The integrated device for monitoring settlement in on-site supervision of construction engineering according to claim 8, wherein: the surface of the lifting rod (62) is in sliding connection with the inner wall of the center frame (26), and the bottom of the lifting rod (62) penetrates through the center frame (26) and extends to the outer end of the bottom plate (1).
10. The integrated device for monitoring settlement on construction site according to any one of claims 1 to 9, wherein the monitoring method comprises the following steps:
s1: the sliding rod (23) pushes the positioning frame (27) to move through the sliding block (30) when sliding, and the supporting rod (5) can adjust the opening and closing angle through the movement of the sliding block (30);
s2: the transmission gear (40) pushes the threaded cylinder (44) to rotate in the round hole rod (43) through the engagement plate (42), and the sliding hole threaded rod (47) is positioned through the bent frame (45);
s3: the telescopic rod (66) pulls the elastic piece (65) and the cylindrical telescopic rod (67) to deform when being extended, so that the supporting rod (5) is pulled and extruded by pulling of the telescopic rod (66);
s4: the round ball rod (60) presses the telescopic rod (66) by utilizing the elasticity of the elastic spring (61), so that the stability of the supporting rod (5) during opening and closing is further improved.
CN202311521859.2A 2023-11-15 On-site supervision and settlement monitoring integrated device for building engineering and monitoring method thereof Active CN117419684B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311521859.2A CN117419684B (en) 2023-11-15 On-site supervision and settlement monitoring integrated device for building engineering and monitoring method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311521859.2A CN117419684B (en) 2023-11-15 On-site supervision and settlement monitoring integrated device for building engineering and monitoring method thereof

Publications (2)

Publication Number Publication Date
CN117419684A true CN117419684A (en) 2024-01-19
CN117419684B CN117419684B (en) 2024-05-28

Family

ID=

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014025212A (en) * 2012-07-24 2014-02-06 Spi Iguteibu Kk Jig for hydraulic jack used for repair construction of uneven settlement of building, and method for repairing unevenly settled building by using the same
CN108106609A (en) * 2018-02-08 2018-06-01 王玉振 One kind is convenient for stablizing fixed mapping measuring instrument
CN214793125U (en) * 2021-07-05 2021-11-19 凯里学院 Portable level for settlement observation of house building
CN214947832U (en) * 2020-10-09 2021-11-30 西安和光明宸科技有限公司 High-stability level gauge support for settlement observation
RU2764875C1 (en) * 2020-12-24 2022-01-21 Общество с ограниченной ответственностью "Стройтехинновации ТДСК" (ООО "СТИ ТДСК") Ground geodetic bench mark
CN216717359U (en) * 2022-01-11 2022-06-10 王灿 Foundation pit and settlement monitoring device of peripheral stratum thereof based on BIM
CN114811368A (en) * 2022-04-24 2022-07-29 祁晓荣 Building concrete member subsides check out test set
CN115539768A (en) * 2022-04-19 2022-12-30 朱国礼 Building settlement detection method
CN116066690A (en) * 2023-03-31 2023-05-05 河北工程大学 Level gauge for hydraulic engineering
CN116147575A (en) * 2023-01-07 2023-05-23 中铁二十四局集团有限公司 Pre-compression deformation measurement method and leveling instrument for pre-compression deformation measurement
CN219511523U (en) * 2023-03-16 2023-08-11 安徽鸿图地理信息科技有限公司 Automatic monitoring device for building settlement
CN219796778U (en) * 2023-05-11 2023-10-03 德润工程咨询有限公司 Level gauge for engineering settlement monitoring

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014025212A (en) * 2012-07-24 2014-02-06 Spi Iguteibu Kk Jig for hydraulic jack used for repair construction of uneven settlement of building, and method for repairing unevenly settled building by using the same
CN108106609A (en) * 2018-02-08 2018-06-01 王玉振 One kind is convenient for stablizing fixed mapping measuring instrument
CN214947832U (en) * 2020-10-09 2021-11-30 西安和光明宸科技有限公司 High-stability level gauge support for settlement observation
RU2764875C1 (en) * 2020-12-24 2022-01-21 Общество с ограниченной ответственностью "Стройтехинновации ТДСК" (ООО "СТИ ТДСК") Ground geodetic bench mark
CN214793125U (en) * 2021-07-05 2021-11-19 凯里学院 Portable level for settlement observation of house building
CN216717359U (en) * 2022-01-11 2022-06-10 王灿 Foundation pit and settlement monitoring device of peripheral stratum thereof based on BIM
CN115539768A (en) * 2022-04-19 2022-12-30 朱国礼 Building settlement detection method
CN114811368A (en) * 2022-04-24 2022-07-29 祁晓荣 Building concrete member subsides check out test set
CN116147575A (en) * 2023-01-07 2023-05-23 中铁二十四局集团有限公司 Pre-compression deformation measurement method and leveling instrument for pre-compression deformation measurement
CN219511523U (en) * 2023-03-16 2023-08-11 安徽鸿图地理信息科技有限公司 Automatic monitoring device for building settlement
CN116066690A (en) * 2023-03-31 2023-05-05 河北工程大学 Level gauge for hydraulic engineering
CN219796778U (en) * 2023-05-11 2023-10-03 德润工程咨询有限公司 Level gauge for engineering settlement monitoring

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
温贤培: "基于液压静力水准仪的综合管廊沉降监测方法研究", 自动化与仪器仪表, 30 April 2021 (2021-04-30), pages 182 - 185 *

Similar Documents

Publication Publication Date Title
CN110440117A (en) A kind of construction engineering cost field surveys device based on BIM technology
CN117419684B (en) On-site supervision and settlement monitoring integrated device for building engineering and monitoring method thereof
CN117419684A (en) On-site supervision and settlement monitoring integrated device for building engineering and monitoring method thereof
CN115751029A (en) Land survey and drawing frame with location structure
CN217276544U (en) Soil temperature monitoring device in region
CN215563851U (en) House building upright post structure
CN213579128U (en) Spiral bevel gear is by tooth outer loop levelling detection with location support
CN212631552U (en) High jump training frame with adjustable track and field teaching is used
CN113759094A (en) A remote sensing monitoring devices for producing construction project soil and water conservation
CN112964502A (en) Environment-friendly sampling device for geotechnical engineering investigation
CN220142308U (en) Adjustable infusion rod
CN220982928U (en) Fullness detection device of plush festival toy
CN215410881U (en) Die casting machine supporting footing with height adjusting mechanism
CN111982569A (en) Farmland environment information acquisition and monitoring devices
CN114190222B (en) Rattan curtain manufacturing method
CN219001900U (en) Multistage regulation automatic arm comprehensive training support
CN213813537U (en) Detection device for indoor environment improvement
CN214010331U (en) Equipment for surveying and mapping house property and cadastral
CN220953449U (en) Adjustable rectangular supporting device
CN219251536U (en) Temper horizontal bar convenient to adjust
CN217472667U (en) Dance rotary motion exercise auxiliary device
CN220848134U (en) Novel anti-seismic structure for constructional engineering
CN219167621U (en) A temper device for cardiovascular internal medicine is clinical
CN218349673U (en) Pressure gauge core convenient to adjust
CN214209270U (en) Jumping stand is used in sports training

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant