CN117306600A - Inspection well periphery reinforcing and protecting device and mounting method thereof - Google Patents

Inspection well periphery reinforcing and protecting device and mounting method thereof Download PDF

Info

Publication number
CN117306600A
CN117306600A CN202311380406.2A CN202311380406A CN117306600A CN 117306600 A CN117306600 A CN 117306600A CN 202311380406 A CN202311380406 A CN 202311380406A CN 117306600 A CN117306600 A CN 117306600A
Authority
CN
China
Prior art keywords
shaft
protection device
well
layer
surface layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311380406.2A
Other languages
Chinese (zh)
Inventor
袁星
张洪军
林艳兵
张宏权
张允涛
李�灿
李广
杨振宁
徐鹏
徐国宝
姚来鹏
金权威
申洪雨
胡展博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongqing Construction Co Ltd
Original Assignee
Zhongqing Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongqing Construction Co Ltd filed Critical Zhongqing Construction Co Ltd
Priority to CN202311380406.2A priority Critical patent/CN117306600A/en
Publication of CN117306600A publication Critical patent/CN117306600A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/121Manhole shafts; Other inspection or access chambers; Accessories therefor characterised by the connection between shaft elements, e.g. of rings forming said shaft
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C21/00Apparatus or processes for surface soil stabilisation for road building or like purposes, e.g. mixing local aggregate with binder
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/125Manhole shafts; Other inspection or access chambers; Accessories therefor characterised by the lining of the shaft
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers
    • E02D29/1427Locking devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers
    • E02D29/1481Security devices, e.g. indicating unauthorised opening
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Abstract

The invention provides a manhole periphery reinforcement protection device and an installation method thereof, and belongs to the technical field of manhole periphery reinforcement. The problems that the road surface around the existing inspection well is generally provided with annular cracks, pits or pits, the well cover is loose and shifts and the like are solved, and therefore the driving comfort and the driving safety are affected. The well cover support is arranged at the top of the well cover protection device, and the integral high-strength bolt is buried in the ring beam. It is mainly used for reinforcing and protecting the periphery of the inspection well.

Description

Inspection well periphery reinforcing and protecting device and mounting method thereof
Technical Field
The invention belongs to the technical field of manhole periphery reinforcement, and particularly relates to a manhole periphery reinforcement protection device and an installation method thereof.
Background
On a driving lane or a road on which a heavy vehicle runs, the road surface around the manhole well commonly has annular cracks, pits or pits, loose displacement of the manhole cover and other hazards, so that the driving comfort and the driving safety are affected, wherein the following two main reasons are:
1. the annular cracks appear around the inspection well and mainly reflect the severe asphalt pavement, and the main reasons are that the material around the inspection well has insufficient strength or the backfill material has a certain sedimentation and the like, and under the action of long-term running vehicles, asphalt is combined with the rigid material of the inspection well cover, so that the flexible material is finally damaged;
2. the manhole cover support is not connected with the shaft, the manhole cover has a certain displacement under the action of vehicle running, and long time, the materials around the manhole cover support produce fatigue damage, and the damage such as sinking or pit slot, loose displacement of the manhole cover and the like is produced.
Disclosure of Invention
In view of the above, the invention aims to provide a manhole periphery reinforcing and protecting device and an installation method thereof, so as to solve the problems that the road surface around the manhole commonly has annular cracks, pits or pits, loose displacement of a manhole cover and the like, thereby influencing the driving comfort and the driving safety.
In order to achieve the above purpose, the present invention adopts the following technical scheme: the utility model provides a protection device is consolidated around inspection shaft well, it includes ring beam, well lid support, pit shaft protection device, integral bolt and inspection shaft pit shaft that excels in, the inspection shaft pit shaft includes first bricklaying brick wall pit shaft and second bricklaying brick wall pit shaft, first bricklaying brick wall pit shaft sets up in the second bricklaying brick wall pit shaft top, the ring beam sets up between first bricklaying brick wall pit shaft and second bricklaying brick wall pit shaft, well lid protection device cover is established in the top of first bricklaying brick wall pit shaft and ring beam, the well lid support sets up at the top of well lid protection device, the integral bolt that excels in has been buried in the ring beam, integral bolt that excels in includes go-between and a plurality of bolts that excel in, the go-between buries in inside the ring beam, a plurality of high-strength bolts evenly set up at the top of go-between along circumference, high-between passes ring beam top, first bricklaying brick wall, pit shaft protection device and well lid support setting in proper order.
Furthermore, the inspection well periphery reinforcing and protecting device is arranged in the pavement structural layer, and the pavement structural layer comprises a fine-grain asphalt surface layer, a middle-grain asphalt surface layer, a coarse-grain asphalt surface layer, a cement stabilized macadam upper base layer, a cement stabilized macadam lower base layer and a roadbed which are arranged layer by layer from top to bottom.
Still further, the well lid support sets up in fine grain formula asphalt pavement and well granule formula asphalt pavement, first brickwork pit shaft sets up in coarse grain formula asphalt pavement, the ring beam sets up in cement stabilized macadam upper base layer, second brickwork pit shaft sets up in cement stabilized macadam lower base layer and road bed.
Furthermore, the top of the high-strength bolt is connected with a nut, and the bottom of the nut is propped against the upper surface of the well cover support.
Furthermore, the ring beam is made of C15-level cast-in-situ reinforced concrete, the C15-level cast-in-situ reinforced concrete comprises a reinforcement cage and concrete, and the reinforcement cage is buried in the concrete.
Still further, the top of well lid support is provided with the well lid.
Further, the number of the high-strength bolts is four.
Further, the thicknesses of the cement stabilized macadam upper base layer and the cement stabilized macadam lower base layer are 18cm.
Further, the thicknesses of the fine-grain asphalt pavement, the medium-grain asphalt pavement and the coarse-grain asphalt pavement are 4cm, 6cm and 8cm, respectively.
The invention also provides an installation method of the inspection well periphery reinforcing and protecting device, which comprises the following steps:
step 1: constructing an inspection well shaft, covering the well mouth of the inspection well by adopting a steel plate when the second masonry brick wall shaft is constructed to the top surface of the roadbed, and positioning the center of the inspection well by coordinates;
step 2: constructing a cement stabilized macadam lower base layer, positioning an inspection well through a total station coordinate after the construction of the cement stabilized macadam lower base layer is completed, finding the inspection well in a reverse excavation mode, breaking a pavement structure layer in the construction range of a shaft of the inspection well, lengthening a shaft of a second masonry brick wall to the top surface of the cement stabilized macadam lower base layer, covering the shaft of the inspection well by adopting a steel plate until maintenance and acceptance are qualified, and preparing for the construction of the cement stabilized macadam upper base layer;
step 3: constructing a basic layer on cement stabilized macadam, immediately reversely excavating an extension shaft to a position 1cm below the top surface of a coarse-grained asphalt surface layer after paving and rolling the basic layer on the cement stabilized macadam, placing a reinforcement cage at the top of a second masonry brick wall shaft, embedding integral high-strength bolts in the reinforcement cage, erecting a template, pouring concrete, curing and forming to complete the forming of a ring beam, completing the construction of a first masonry brick wall shaft at the top of the ring beam after the forming of the ring beam, installing a shaft protection device at the moment, paving and leveling the basic layer on the cement stabilized macadam in the construction range of the protection device outside the inspection shaft immediately after the installation, covering the wellhead of the inspection shaft, and completing static compaction and sprinkling curing around the shaft;
step 4: after the construction of the cement stabilized macadam upper base layer is completed, curing is finished, penetrating oil is sprayed, coarse-grain asphalt surface layer paving is started, when the temperature of the coarse-grain asphalt surface layer is reduced to below 50 ℃, adhesive oil is sprayed to perform middle-grain asphalt surface layer paving, after rolling is completed, the middle-grain asphalt surface layer in the range of the well cover support is broken and cleaned in a reverse excavation mode, a screw cap is screwed after the well cover support of the inspection well is installed, and finally paving of the middle-grain asphalt surface layer and the whole fine-grain asphalt surface layer in the range of the well cover support is completed.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the invention, the cast-in-situ reinforced concrete annular beam is arranged on the inspection well shaft to play a role in controlling the sedimentation uniformity of the inspection well structure, and the integral high-strength bolt is embedded in the annular beam to serve as a connecting member between the inspection well shaft and the well cover support, so that the engineering quality and the durability can be effectively improved, the probability of the inspection well cover and the well Zhou Sunhai is reduced, and a powerful guarantee is provided for the travelling comfort and the safety of travelling crane;
2. the invention is provided with the shaft protection device, plays a role in protecting the shaft and the well Zhou Jun, can effectively prevent rain and water seepage, reduces the structural strength, plays a role in reinforcing the structure of the well Zhou Fan excavation extension shaft part, improves the integral strength of a structural layer and effectively improves the durability of the structure, and provides a solid foundation for the comfort and safety of driving;
3. the manhole cover support is connected with the ring beam by the embedded high-strength bolts, and the traditional movable mounting mode is changed into fixed mounting, so that the integrity of the manhole cover and a shaft is better, the occurrence of damages such as looseness and abnormal sound of the manhole is avoided, and the driving safety is effectively ensured.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention. In the drawings:
FIG. 1 is a schematic view of the whole structure of a manhole periphery reinforcement protection device and a pavement structure layer according to the present invention;
FIG. 2 is a schematic top view of an integral high strength bolt assembly structure of an inspection well periphery reinforcement and protection device according to the present invention;
FIG. 3 is a schematic side view of the construction of an integral high strength bolt of an inspection well periphery reinforcement and protection device according to the present invention;
FIG. 4 is a schematic top view of the construction of a wellbore protection device of an inspection well periphery reinforcement protection device according to the present invention;
FIG. 5 is a schematic side view of the construction of a well bore protection device of an inspection well periphery reinforcement protection device in accordance with the present invention;
FIG. 6 is a schematic top view of the well lid support structure of an inspection well periphery reinforcement and protection device according to the present invention;
FIG. 7 is a schematic side view of the well lid support structure of an inspection well periphery reinforcement and protection device according to the present invention;
FIG. 8 is a schematic top view of a nut of a manhole periphery reinforcement and protection device according to the present invention;
FIG. 9 is an elevation view at A-A of FIG. 8;
fig. 10 is an elevation view at B-B in fig. 8.
1-well cover support, 2-well cover, 3-well shaft protection device, 4-ring beam, 5-integral high-strength bolt, 6-first masonry brick wall well, 7-second masonry brick wall well, 8-connecting ring, 9-high-strength bolt, 10-nut, 11-fine particle asphalt surface layer, 12-middle particle asphalt surface layer, 13-coarse particle asphalt surface layer, 14-cement stabilized macadam upper base layer, 15-cement stabilized macadam lower base layer and 16-roadbed.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. It should be noted that, in the case of no conflict, embodiments of the present invention and features of the embodiments may be combined with each other, and the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-10, this embodiment is described, a manhole well periphery reinforcing protection device, it includes ring beam 4, well lid support 1, pit shaft protection device 3, integral high strength bolt 5 and manhole pit shaft, the manhole pit shaft includes first bricklayed brick wall pit shaft 6 and second bricklayed brick wall pit shaft 7, first bricklayed brick wall pit shaft 6 sets up in second bricklayed brick wall pit shaft 7 top, ring beam 4 sets up between first bricklayed brick wall pit shaft 6 and second bricklayed brick wall pit shaft 7, well lid protection device 3 cover is established in the top of first bricklayed brick wall pit shaft 6 and ring beam 4, well lid support 1 sets up at the top of pit shaft protection device 3, the embedded integral high strength bolt 5 that has in the ring beam 4, integral high strength bolt 5 includes go-between 8 and a plurality of high strength bolts 9, go-between 8 buries inside ring beam 4, a plurality of high strength bolts 9 evenly set up at the top of go-between along the circumference, high strength bolt 9 passes ring beam 4, first well lid support 6, protection device 1 in proper order and well lid support 1.
In the embodiment, the cast-in-situ reinforced concrete ring beam 4 is arranged on the inspection well shaft to play a role in controlling the sedimentation uniformity of the inspection well structure, and the integral high-strength bolts 5 are embedded in the ring beam 4 to serve as connecting members of the inspection well shaft and the well cover support 1, so that the engineering quality and the durability can be effectively improved, the probability of the inspection well cover and the well Zhou Sunhai is reduced, and powerful guarantee is provided for the travelling comfort and the travelling safety.
The well bore protection device 3 is arranged in the embodiment, the well bore and the well Zhou Jun are protected, the well bore and the well Zhou Jun can be effectively pre-rain-proof and underwater seepage are caused, the structural strength is reduced, the reinforcement effect is achieved for the structure of the well Zhou Fan excavation extension well bore part, the integral strength of the structural layer is improved, the durability of the structure is effectively improved, and a solid foundation is provided for the comfort and the safety of driving.
The manhole cover support 1 in the embodiment is connected with the ring beam 4 through the embedded high-strength bolts 9, and the traditional movable installation mode is changed into fixed installation, so that the integrity of the manhole cover 2 and a shaft is better, the occurrence of damages such as looseness and abnormal sound of the manhole is avoided, and the driving safety is effectively ensured.
The well periphery reinforcing and protecting device of the inspection well is arranged in a pavement structural layer, and the pavement structural layer comprises a fine-grain asphalt surface layer 11, a middle-grain asphalt surface layer 12, a coarse-grain asphalt surface layer 13, a cement stabilized macadam upper base layer 14, a cement stabilized macadam lower base layer 15 and a roadbed 16 which are arranged layer by layer from top to bottom.
In this embodiment, the well cover support 1 is disposed in a fine-grain asphalt pavement 11 and a medium-grain asphalt pavement 12, the first masonry brick wall shaft 6 is disposed in a coarse-grain asphalt pavement 13, the ring beam 4 is disposed in a cement stabilized macadam upper base layer 14, and the second masonry brick wall shaft 7 is disposed in a cement stabilized macadam lower base layer 15 and a roadbed 16.
In this embodiment, the top of the high-strength bolt 9 is connected with a nut 10, the bottom of the nut 10 abuts against the upper surface of the manhole cover support 1, and the nut 10 is used for connecting and fixing the high-strength bolt 9.
In this embodiment, the ring beam 4 is made of C15-stage cast-in-situ reinforced concrete, the C15-stage cast-in-situ reinforced concrete includes a reinforcement cage and concrete, the reinforcement cage is embedded in the concrete, the ring beam 4 in this embodiment is made of C15-stage cast-in-situ reinforced concrete, the structural dimension is 18cm in height and 22cm in width, the reinforcement cage is composed of 4 HRB335 reinforcement bars with diameters of 12cm main reinforcement and stirrup, diameters of 8cm, and intervals of 20cm, the reinforcement protection layer is 3cm, and the ring beam is embedded with a ring-shaped high-strength bolt.
The top of the manhole cover support 1 in this embodiment is provided with a manhole cover 2.
The number of the high-strength bolts 9 in this embodiment is four.
The thicknesses of the cement stabilized macadam upper base 14 and the cement stabilized macadam lower base 15 in this embodiment are 18cm.
The thicknesses of the fine-grain asphalt pavement 11, the medium-grain asphalt pavement 12, and the coarse-grain asphalt pavement 13 in this example were 4cm, 6cm, and 8cm, respectively.
In this embodiment, the shaft protection device 3 is made of a 3mm steel plate, has a square shape, and is fixed on the shaft of the inspection well.
The embodiment also provides an installation method of the manhole periphery reinforcing and protecting device, which comprises the following steps:
step 1: constructing an inspection well shaft, covering the well mouth of the inspection well by adopting a steel plate when the second masonry brick wall shaft 7 is constructed to the top surface of the roadbed 16, and positioning the center of the inspection well by coordinates, wherein the steel plate in the embodiment adopts a steel plate with the thickness of 0.5cm and the diameter of 80 cm;
step 2: constructing a cement stabilized macadam lower base layer 15, positioning an inspection well through a total station coordinate after the construction of the cement stabilized macadam lower base layer 15 is completed, finding the inspection well in a reverse excavation mode, breaking a pavement structure layer in the construction range of an inspection well shaft, lengthening a second masonry brick wall shaft 7 to the top surface of the cement stabilized macadam lower base layer 15, covering an inspection well mouth by a steel plate until maintenance and acceptance are qualified, and preparing for the construction of a cement stabilized macadam upper base layer 14, wherein the steel plate is a steel plate with the thickness of 0.5cm and the diameter of 80 cm;
step 3: constructing a cement stabilized macadam upper base layer 14, immediately reversely excavating an extension shaft to a position 1cm below the top surface of a coarse-grained asphalt surface layer 13 after the cement stabilized macadam upper base layer 14 is paved and rolled, placing a reinforcement cage at the top of a second masonry brick wall shaft 7, embedding integral high-strength bolts 5 in the reinforcement cage, erecting a template and pouring concrete, curing and forming to complete the forming of a ring beam 4, completing the construction of a first masonry brick wall shaft 6 at the top of the ring beam 4 after the ring beam 4 is formed, installing a shaft protection device 3 at the moment, paving the cement stabilized macadam upper base layer 14 in the construction range of the shaft protection device 3 outside the inspection shaft well to be smooth immediately after the installation, covering the well mouth of the inspection shaft, and completing static compaction and water spraying maintenance of the periphery of the shaft;
step 4: after the construction of the cement stabilized macadam upper base layer 14 is finished, curing is finished, penetrating oil is sprayed, coarse-grain asphalt surface layer 13 paving is started, when the temperature of the coarse-grain asphalt surface layer 13 is reduced to below 50 ℃, the adhesive oil is sprayed to perform the paving of the medium-grain asphalt surface layer 12, after rolling is finished, the medium-grain asphalt surface layer 12 in the range of the well lid support 1 is broken and cleaned in a reverse excavation mode, the screw cap 10 is screwed after the well lid support 1 is installed, and finally the paving of the medium-grain asphalt surface layer 12 and the whole fine-grain asphalt surface layer 11 in the range of the well lid support 1 is finished.
The embodiments of the invention disclosed above are intended only to help illustrate the invention. The examples are not intended to be exhaustive or to limit the invention to the precise forms disclosed. Many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and the practical application, to thereby enable others skilled in the art to best understand and utilize the invention.

Claims (10)

1. The utility model provides a protection device is consolidated to inspection shaft well week which characterized in that: it includes ring beam (4), well lid support (1), pit shaft protection device (3), integral bolt (5) and inspection shaft pit shaft that excels in, the inspection shaft pit shaft includes first brick wall pit shaft (6) and second brick wall pit shaft (7) of building by laying bricks or stones, first brick wall pit shaft (6) setting up in second brick wall pit shaft (7) top of building by laying bricks or stones, ring beam (4) set up between first brick wall pit shaft (6) and second brick wall pit shaft (7) of building by laying bricks or stones, pit shaft protection device (3) cover is established in the top of first brick wall pit shaft (6) and ring beam (4) of building by laying bricks or stones, well lid support (1) set up the top at pit shaft protection device (3), the interior bolt (5) of having high strength of burying of ring beam (4), the bolt (5) that excels in integral bolt (8) include go-between ring (8) and a plurality of bolts (9) of excelling in, a plurality of bolts (9) of excel in evenly set up evenly along circumference in ring beam (6), well lid protection device (4) top (4) of building bricks or stones, well lid protection device (4) are set up in proper order.
2. The manhole perimeter reinforcement and protection device of claim 1, wherein: the well periphery reinforcing and protecting device of the inspection well is arranged in a pavement structural layer, and the pavement structural layer comprises a fine-grain asphalt surface layer (11), a middle-grain asphalt surface layer (12), a coarse-grain asphalt surface layer (13), a cement stabilized macadam upper base layer (14), a cement stabilized macadam lower base layer (15) and a roadbed (16) which are arranged layer by layer from top to bottom.
3. The manhole perimeter reinforcement and protection device of claim 2, wherein: the well lid support (1) is arranged in a fine-grain asphalt surface layer (11) and a medium-grain asphalt surface layer (12), the first masonry brick wall shaft (6) is arranged in a coarse-grain asphalt surface layer (13), the ring beam (4) is arranged in a cement stabilized macadam upper base layer (14), and the second masonry brick wall shaft (7) is arranged in a cement stabilized macadam lower base layer (15) and a roadbed (16).
4. The manhole perimeter reinforcement and protection device of claim 1, wherein: the top of the high-strength bolt (9) is connected with a nut (10), and the bottom of the nut (10) is propped against the upper surface of the well cover support (1).
5. The manhole perimeter reinforcement and protection device of claim 1, wherein: the ring beam (4) is made of C15-level cast-in-situ reinforced concrete, the C15-level cast-in-situ reinforced concrete comprises a reinforcement cage and concrete, and the reinforcement cage is buried in the concrete.
6. The manhole perimeter reinforcement and protection device of claim 1, wherein: the top of well lid support (1) is provided with well lid (2).
7. The manhole perimeter reinforcement and protection device of claim 1, wherein: the number of the high-strength bolts (9) is four.
8. The manhole perimeter reinforcement and protection device of claim 2, wherein: the thicknesses of the cement stabilized macadam upper base layer (14) and the cement stabilized macadam lower base layer (15) are 18cm.
9. The manhole perimeter reinforcement and protection device of claim 2, wherein: the thicknesses of the fine-grain asphalt surface layer (11), the medium-grain asphalt surface layer (12) and the coarse-grain asphalt surface layer (13) are respectively 4cm, 6cm and 8cm.
10. A method of installing a manhole perimeter reinforcement and protection device using the manhole perimeter reinforcement and protection device of claim 1, wherein: it comprises the following steps:
step 1: constructing an inspection well shaft, covering the well mouth of the inspection well by adopting a steel plate when the second masonry brick wall shaft (7) is constructed to the top surface of the roadbed (16), and positioning the center of the inspection well by coordinates;
step 2: constructing a cement stabilized macadam lower base layer (15), locating an inspection well through a total station coordinate after the construction of the cement stabilized macadam lower base layer (15) is completed, finding the inspection well in a reverse excavation mode, breaking a pavement structure layer in the construction range of a shaft of the inspection well, lengthening the pavement structure layer to a second masonry brick wall shaft (7) until the top surface of the cement stabilized macadam lower base layer (15), covering a shaft mouth of the inspection well by adopting a steel plate until maintenance and acceptance are qualified, and starting to prepare for the construction of a cement stabilized macadam upper base layer (14);
step 3: constructing a cement stabilized macadam upper base layer (14), immediately reversely excavating an extension shaft to a position 1cm below the top surface of a coarse-grained asphalt surface layer (13) after the cement stabilized macadam upper base layer (14) is paved and rolled, placing a reinforcement cage at the top of a second masonry brick wall shaft (7), embedding integral high-strength bolts (5) in the reinforcement cage, erecting a template, pouring concrete, curing and forming to complete the forming of a ring beam (4), and after the ring beam (4) is formed, completing the construction of a first masonry brick wall shaft (6) at the top of the ring beam (4), installing a shaft protection device (3) at the moment, immediately paving and flattening the cement stabilized macadam upper base layer (14) in the construction range of the shaft protection device (3) outside the inspection shaft after the installation is completed, covering the well mouth of the inspection shaft, and completing the static pressure compaction and water spraying and curing of the periphery of the shaft;
step 4: after the construction of the cement stabilized macadam upper base layer (14) is completed, curing is finished, penetrating oil is sprayed, coarse-grain asphalt surface layer (13) paving is started, when the temperature of the coarse-grain asphalt surface layer (13) is reduced to below 50 ℃, the adhesive oil is sprayed to perform middle-grain asphalt surface layer (12) paving, after rolling is completed, the middle-grain asphalt surface layer (12) in the range of the well cover support (1) is broken and cleaned in a reverse excavation mode, a screw cap (10) is screwed after the manhole cover support (1) is installed, and finally the paving of the middle-grain asphalt surface layer (12) and the whole fine-grain asphalt surface layer (11) in the range of the well cover support (1) is completed.
CN202311380406.2A 2023-10-24 2023-10-24 Inspection well periphery reinforcing and protecting device and mounting method thereof Pending CN117306600A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311380406.2A CN117306600A (en) 2023-10-24 2023-10-24 Inspection well periphery reinforcing and protecting device and mounting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311380406.2A CN117306600A (en) 2023-10-24 2023-10-24 Inspection well periphery reinforcing and protecting device and mounting method thereof

Publications (1)

Publication Number Publication Date
CN117306600A true CN117306600A (en) 2023-12-29

Family

ID=89237262

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311380406.2A Pending CN117306600A (en) 2023-10-24 2023-10-24 Inspection well periphery reinforcing and protecting device and mounting method thereof

Country Status (1)

Country Link
CN (1) CN117306600A (en)

Similar Documents

Publication Publication Date Title
CN107059667B (en) Door shape assembled armored concrete box culvert and its construction method
CN109972659B (en) Novel municipal inspection well structure and construction method
CN102966114B (en) Tower crane foundation structure and construction method thereof
CN108560542B (en) Waste tire coated building slag bidirectional reinforcement and construction method thereof
CN108560684B (en) Heavy-load traffic road inspection well ring and construction method thereof
CN110295627B (en) Construction method of road inspection well
CN109610263B (en) Construction method of assembled construction access road
CN108035379B (en) Comprehensive pipe gallery and construction method thereof
CN103195060B (en) Soft soil foundation prestressing bolt anchorage structure and uses thereof
CN106884436B (en) A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab
CN104328790B (en) Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed
CN110700320A (en) Anti-sedimentation construction process for municipal road inspection well
CN108360570B (en) Lifting construction method for asphalt pavement inspection well
KR20030096697A (en) A tunnel lining structure system using curved corrugated steel plates and consrution method therof
CN204690528U (en) Urban road pavement around inspection well Defects Treatment structure
CN117306600A (en) Inspection well periphery reinforcing and protecting device and mounting method thereof
US10794034B2 (en) Adapter frame
CN114411761A (en) Advanced pre-support system for planned subway tunnel during construction of newly-built building and pre-support construction method
CN218933222U (en) Reinforced structure of well lid
CN110644593A (en) Embedded anti-settling prefabricated overhaul well and construction method thereof
KR20020005876A (en) A Construction Method for Foundation of the Bridge and A Structure thereof
CN113431077B (en) Tower crane foundation construction method
CN212358403U (en) A reinforced structure for bar brick base
CN111779502B (en) Tunnel shock insulation structure and construction process
CN107227753A (en) Municipal administration is mated formation bright dress inspection shaft and mat formation engineering attachment structure and method in engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination