CN117196321A - Nuclear power plant planning task probability risk calculation method and calculation device thereof - Google Patents

Nuclear power plant planning task probability risk calculation method and calculation device thereof Download PDF

Info

Publication number
CN117196321A
CN117196321A CN202311450666.2A CN202311450666A CN117196321A CN 117196321 A CN117196321 A CN 117196321A CN 202311450666 A CN202311450666 A CN 202311450666A CN 117196321 A CN117196321 A CN 117196321A
Authority
CN
China
Prior art keywords
risk
probability
model
probability risk
minimum cut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202311450666.2A
Other languages
Chinese (zh)
Other versions
CN117196321B (en
Inventor
陈国才
况慧文
杨赟
沙平川
李华
潘延卿
彭涣淋
张华志
魏兴
孔凡鹏
张佶翱
肖冰山
耿飞
宋林
杨汝贞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNNC Fujian Nuclear Power Co Ltd
Original Assignee
CNNC Fujian Nuclear Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNNC Fujian Nuclear Power Co Ltd filed Critical CNNC Fujian Nuclear Power Co Ltd
Priority to CN202311450666.2A priority Critical patent/CN117196321B/en
Publication of CN117196321A publication Critical patent/CN117196321A/en
Application granted granted Critical
Publication of CN117196321B publication Critical patent/CN117196321B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The application provides a method and a device for calculating probability risk of a planned task of a nuclear power plant, wherein the method comprises the following steps: acquiring a plurality of groups of minimum cut set equivalent models corresponding to the probability risk models under different working conditions, wherein the probability risk models under the same working condition correspond to a group of minimum cut set equivalent models; splitting the planning task according to logic of the planning task to obtain a plurality of configuration change points; determining a system operation standby list condition of a plurality of configuration change points; if a plurality of unavailable equipment combinations which do not meet the rule exist in the system, calculating a risk value of the probability risk model in a reconstruction model solving mode; if a single device is unavailable or an unavailable device combination meeting the rule exists in the system, calculating a risk value according to a plurality of groups of minimum cut set equivalence models. The method and the device improve the accuracy and the efficiency of probability risk calculation by comprehensively using the re-solving method and the minimum cut-set method.

Description

Nuclear power plant planning task probability risk calculation method and calculation device thereof
Technical Field
The application belongs to the technical field of probability safety analysis of nuclear power plants, and particularly relates to a method and a device for calculating probability risk of a planned task of a nuclear power plant.
Background
And the scientificity and the effectiveness of the nuclear safety management can be improved by carrying out configuration risk management on the nuclear power plant. In the risk monitoring management tool, the rapid analysis calculation of the probability risk is the core.
However, the probabilistic risk models used in the engineering of existing nuclear power plants are large-scale and highly complex. In a planning task scene, risk information of a plurality of different configuration change points needs to be calculated at one time, the calculated amount is very large, and the calculation time is long.
Disclosure of Invention
In view of the above, the embodiments of the present application are directed to providing a method and an apparatus for calculating probability risk of a planned task in a nuclear power plant, which implement balance of accuracy and speed in calculation of risk analysis of the planned task by comprehensively using a re-solving method and a minimum cut-set method, so as to improve accuracy and efficiency of calculation of probability risk.
The first aspect of the application provides a method for calculating probability risk of a planned mission of a nuclear power plant, which comprises the following steps: acquiring a plurality of groups of minimum cut set equivalent models corresponding to the probability risk models under different working conditions, wherein the probability risk models under the same working condition correspond to a group of minimum cut set equivalent models; splitting the planning task according to logic of the planning task to obtain a plurality of configuration change points; determining a system operation standby list condition of a plurality of configuration change points; judging whether a plurality of unavailable devices exist in the system and whether the unavailable device combination meets the rule is judged according to the system operation standby column conditions of a plurality of configuration change points; if a plurality of unavailable equipment combinations which do not meet the rule exist in the system, calculating a risk value of the probability risk model in a reconstruction model solving mode; if single equipment is unavailable or unavailable equipment combination meeting rules exists in the system, calculating the risk value of the probability risk model according to a plurality of groups of minimum cut set equivalent models corresponding to the probability risk model under different working conditions.
In the scheme, the risk value is calculated by adopting a reconstruction model solving mode or a minimum cut set equivalent model solving mode according to rule judgment, the re-solving method and the minimum cut set method are comprehensively used, the balance of precision and speed in the calculation of the planned task risk analysis is realized, the calculation tasks of different configuration points (namely, the condition that different equipment is not available in different time periods) are uniformly distributed on multiple threads, the analysis calculation of the multiple configuration points is completed in a parallel mode, and therefore, the risk value of the probability risk model can be obtained by quickly solving under enough calculation precision, and the calculation precision and the calculation efficiency in the configuration risk management process of daily operation and maintenance planning activities are ensured.
In a specific embodiment of the present application, the obtaining multiple sets of minimum cut set equivalent models corresponding to probability risk models under different working conditions includes: determining a system operation standby list situation affecting probability risk model logic according to a probability risk model under each working condition of the nuclear power unit, wherein each system operation standby list situation comprises a plurality of system operation standby list combinations; determining boundary conditions corresponding to a plurality of system operation standby column combinations; calculating to obtain a minimum cut set under a plurality of operation standby column combinations of each working condition according to boundary conditions corresponding to the plurality of system operation standby column combinations; and determining the minimum cut sets under the combination of a plurality of system operation standby columns of each working condition as a group of minimum cut set equivalent models so as to obtain a plurality of groups of minimum cut set equivalent models under different working conditions.
In one embodiment of the present application, the determining the system operation standby list condition affecting the probabilistic risk model logic includes: if the probability risk model has the house-shaped event in the fault tree logic structure, determining a system operation standby column condition affecting the probability risk model logic according to the house-shaped event in the fault tree logic structure; and if the probability risk model does not have the house-shaped event in the fault tree logic structure, determining that the equipment is in an operation state.
In one embodiment of the present application, the calculating the risk value of the probabilistic risk model by using the reconstruction model solving method includes: determining boundary conditions of a probability risk model of the current working condition of the nuclear power unit; generating a first calculation task for solving the probability risk model according to the boundary condition of the probability risk model; and calculating a risk value according to the first calculation task.
In one embodiment of the present application, after the above-mentioned system operation standby column situation of determining a plurality of configuration change points, the calculation method further includes: determining the operation, stop or fault state of equipment in the system according to the system operation standby list conditions of a plurality of configuration change points; and updating the state and probability value of the basic event related to the equipment in the system in the probability risk model according to the operation, stop or fault state of the equipment. According to the multiple groups of minimum cut set equivalent models corresponding to the probability risk models under different working conditions, calculating the risk value of the probability risk model comprises the following steps: determining the standby state of the system operation under the current working condition of the nuclear power unit; screening a minimum cut set equivalent model corresponding to the system operation standby list condition under the current working condition; generating a second calculation task for solving the probability risk sharing model by using the minimum cut set equivalence model according to the state and probability value of the basic event related to the equipment in the system; and calculating a risk value according to the second calculation task.
In an embodiment of the present application, the calculating the risk value according to the second calculation task includes: if the target thread has no executing computing task, a second computing task is dispatched to the target thread.
In one embodiment of the present application, the calculation method further includes: and storing the risk value of the probability risk model into a risk monitoring case database.
The application provides a computing device for probability risk of a nuclear power plant, which comprises an acquisition module, a splitting module, a determining module, a judging module and a computing module. The acquisition module is used for acquiring a plurality of groups of minimum cut set equivalent models corresponding to the probability risk models under different working conditions, and the probability risk models under the same working condition correspond to a group of minimum cut set equivalent models. The splitting module is used for splitting the planning task according to logic of the planning task so as to obtain a plurality of configuration change points. The determining module is used for determining a system operation standby list condition of a plurality of configuration change points. The judging module is used for judging whether a plurality of unavailable devices exist in the system and whether the unavailable device combination meets the rule or not according to the system operation standby column conditions of a plurality of configuration change points. The calculation module is used for calculating a risk value of the probability risk model in a reconstruction model solving mode if a plurality of unavailable equipment combinations which do not meet the rules exist in the system; if single equipment is unavailable or unavailable equipment combination meeting rules exists in the system, calculating the risk value of the probability risk model according to a plurality of groups of minimum cut set equivalent models corresponding to the probability risk model under different working conditions.
A third aspect of the present application provides a computer-readable storage medium having stored thereon computer-executable instructions. The executable instructions, when executed by the processor, implement a method for calculating a probability risk of a planned mission of a nuclear power plant according to the first aspect of the present application.
A fourth aspect of the application provides an electronic device comprising a processor and a memory. The processor is configured to perform the method for calculating a probability risk of a planned mission of a nuclear power plant according to the first aspect of the present application. The memory is used to store executable instructions of the processor.
Drawings
Fig. 1 is a flowchart illustrating a method for calculating probability risk of a planned mission of a nuclear power plant according to an embodiment of the present application.
Fig. 2 is a flowchart illustrating a method for calculating probability risk of a planned mission of a nuclear power plant according to another embodiment of the present application.
Fig. 3 is a schematic structural diagram of a probability risk calculating device for a nuclear power plant according to an embodiment of the application.
Fig. 4 is a block diagram of an electronic device according to an embodiment of the present application.
Detailed Description
The following description of the embodiments of the present application will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present application, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the application without making any inventive effort, are intended to be within the scope of the application.
Fig. 1 is a flowchart illustrating a method for calculating probability risk of a planned mission of a nuclear power plant according to an embodiment of the present application. The execution subject of the method may be a processor or a server or the like. As shown in fig. 1, the method includes the following steps.
S100: and obtaining a plurality of groups of minimum cut set equivalent models corresponding to the probability risk models under different working conditions. The probability risk model corresponds to a group of least cut set equivalent models under the same working condition.
The probability risk model can reflect the configuration change condition of the nuclear power unit under a certain working condition. The subject of the probabilistic risk model can be an event tree and a fault tree model.
The different working conditions comprise a power operation working condition, a low-power and hot shutdown working condition, a bidirectional middle shutdown working condition, a normal shutdown working condition, a maintenance cold shutdown working condition with a small opening of a loop, a maintenance cold shutdown working condition with a large opening of the loop and the like. The probability risk model corresponds to a group of least cut set equivalent models under the same working condition. A set of minimal cut set equivalence models includes a plurality of minimal cut sets corresponding to a plurality of system run standby column combinations.
S200: the planning task is split according to logic of the planning task to obtain a plurality of configuration change points.
Specifically, when the risk evaluation of the planning task is performed in the risk monitoring system, the planning task can be split according to logic of the planning task, so that a plurality of different configuration change points are obtained.
In a planning task, there may be a plurality of device states that change, and the time points at which the states change may also differ. For example, assume that, in a planning task, three devices C1, C2, C3 in standby state sequentially enter a maintenance unavailable state, and the time points are T1, T2, T3 respectively; c3 is expected to resume standby at time T4, and C1, C2 resume standby at time T5. Then, according to the configuration conditions of the units at different moments, the following configuration change points can be determined: configuration change point 1: at the time T1, the equipment C1 is not available for maintenance, and the equipment C2 and C3 are in a standby state; configuration change point 2: at the time T2, the equipment C1 and C2 are not available for maintenance, and the equipment C3 is in a standby state; configuration change point 3: at time T3, equipment C1, C2, C3 is not available for maintenance; configuration change point 4: at the time T4, the equipment C1 and C2 are not available for maintenance, and the equipment C3 is in a standby state; configuration change point 5: at time T5, devices C1, C2, C3 are all in standby.
S300: a system operation standby column condition of a plurality of configuration change points is determined.
S400: judging whether a plurality of unavailable devices exist in the system and whether the unavailable device combination meets the rule or not according to the system operation standby column conditions of a plurality of configuration change points.
Specifically, the operation, stop or fault state of the equipment in the system can be determined according to the system operation standby column conditions of a plurality of configuration change points, and whether a plurality of unavailable equipment exist in the system is judged according to the operation, stop or fault state of the equipment.
S500: if a plurality of unavailable equipment combinations which do not meet the rule exist in the system, calculating a risk value of the probability risk model in a reconstruction model solving mode.
The method of solving by using the reconstruction model may be simply referred to as a reconstruction method. In some embodiments, the recalculation may be performed for configuration points that need to be recalculated using a reconstruction model approach.
S600: if single equipment is unavailable or unavailable equipment combination meeting rules exists in the system, calculating the risk value of the probability risk model according to a plurality of groups of minimum cut set equivalent models corresponding to the probability risk model under different working conditions.
It should be noted that, the manner of calculating the risk value of the probability risk model based on the multiple sets of minimum cut set equivalent models corresponding to the probability risk model under different working conditions is simply referred to as a cut set method or a minimum cut set method.
For example, when the number of unavailable devices exceeds 1 (. Gtoreq.2), in general, calculation is performed using a pyrolysis method. And calculating the unavailable combination situation of the equipment in batches in advance, and determining some unavailable equipment combination scenes, wherein the minimum cut set result obtained by using a cut set method and a reconstruction method under the scenes is the same. These combinations are recorded as "rules" for discrimination. The equipment can not be combined in the range, and a cut-and-gather method is adopted; the unavailable quantity of the equipment is more than or equal to 2, and is not in the range, then adopting a pyrolysis method.
According to the technical scheme provided by the embodiment of the application, the risk value is calculated by judging a reconstruction model solving mode or a minimum cut set equivalent model solving mode according to rules, the re-solving method and the minimum cut set method are comprehensively used, the balance of precision and speed in the calculation of the plan task risk analysis is realized, the calculation tasks of different configuration points (namely, the condition that different equipment is unavailable in different time periods) are uniformly distributed on multiple threads, and the analysis calculation of the multiple configuration points is finished in a parallel mode, so that the risk value of the probability risk model can be quickly solved under enough calculation precision, and the calculation precision and the calculation efficiency in the configuration risk management process of daily operation and maintenance plan activities are ensured.
Fig. 2 is a flowchart illustrating a method for calculating probability risk of a planned mission of a nuclear power plant according to another embodiment of the present application. The embodiment shown in fig. 2 is a modification of the embodiment shown in fig. 1. As shown in fig. 2, steps S110 to S140 are different from the embodiment shown in fig. 1 in that they are a specific implementation of S100 in the embodiment shown in fig. 1.
S110: and determining the system operation standby list situation affecting the logic of the probability risk model according to the probability risk model under each working condition of the nuclear power unit, wherein each system operation standby list situation comprises a plurality of system operation standby list combinations.
It should be noted that, the operation standby state of these system devices is controlled by the atrial event in the fault tree logic structure, and the minimum cut-set result cannot embody the influence of the atrial event on the fault tree logic structure. For example, in some embodiments, if there is a room-shaped event in the fault tree logic structure in the probabilistic risk model, a system operation standby list condition affecting the probabilistic risk model logic is determined according to the room-shaped event in the fault tree logic structure, for example, if the room-shaped event is false, the device is in an operation state, and if the room-shaped event is true, the device is in a standby state. For another example, in other embodiments, if the probabilistic risk model does not have a atrial event in the fault tree logic structure, then the probabilistic risk model may default to processing in a "false" (i.e., event not occurring) state, i.e., the device defaults to being in an operational state.
And forming a group of minimum cut set equivalent models corresponding to different combinations according to the combination situation of the standby columns of different operation of the system equipment. For both systems S1 and S2, there are a total of 6 combinations as follows. Combination 1: column A in the system S1 operates, and column B stands by; column a in system S2 is running and the other columns are ready for use. Combination 2: column A in the system S1 operates, and column B stands by; column B in system S2 is running and the other columns are ready for use. Combination 3: column A in the system S1 operates, and column B stands by; column C in system S2 is running and the other columns are ready for use. Combination 4: b column in the system S1 operates, and A column is reserved; column a in system S2 is running and the other columns are ready for use. Combination 5: b column in the system S1 operates, and A column is reserved; column B in system S2 is running and the other columns are ready for use. Combination 6: b column in the system S1 operates, and A column is reserved; column C in system S2 is running and the other columns are ready for use.
S120: boundary conditions corresponding to a plurality of system operation standby column combinations are determined. Boundary conditions refer to a set of atrial events and states of atrial events in a probabilistic risk model that employs a fault tree model.
The probability risk model mainly uses event tree and fault tree models. In the fault tree model, house-shaped events/switch events are included in addition to elements such as top events, middle events, bottom events, logic gates, etc. The house-shaped event has only 'true and false' state values, and the control of fault tree logic is realized by setting corresponding state values so as to reflect the current running configuration of the nuclear power unit. Boundary conditions are a set of atrial events and their states. These atrial events indicate that the system column or device is in an operational or standby state. Assuming a system with A, B columns, the atrial events HS1, HS2 represent A, B columns of spares, respectively. If the system A runs the B column for standby, the corresponding boundary conditions are: { HS1, false; HS2, true }.
S130: and calculating to obtain the minimum cut set under the multiple operation standby column combinations of each working condition according to boundary conditions corresponding to the multiple system operation standby column combinations.
S140: and determining the minimum cut sets under the combination of a plurality of system operation standby columns of each working condition as a group of minimum cut set equivalent models so as to obtain a plurality of groups of minimum cut set equivalent models under different working conditions.
Specifically, for different working conditions, the probability risk model logic is different, the operations from S110 to S130 are repeated, and the minimum cut set under the combination of a plurality of system operation standby columns of the same working condition is determined as a group of minimum cut set equivalent models, so that a plurality of groups of minimum cut set equivalent models under different working conditions can be obtained.
According to the technical scheme provided by the embodiment of the application, the minimum cut set with enough precision is calculated under the boundary condition corresponding to the system operation standby column combination by determining the system operation standby column condition affecting the probability risk model logic, so that a group of minimum cut set equivalent models corresponding to different system equipment operation standby column combinations are formed, and a plurality of groups of minimum cut set equivalent models under different working conditions are obtained.
In at least one embodiment of the present application, S510 to S530 are a specific implementation of S500 in the embodiment shown in fig. 1.
S510: and determining the boundary condition of a probability risk model of the current working condition of the nuclear power unit. Boundary conditions refer to a set of atrial events and states of atrial events in a probabilistic risk model that employs a fault tree model.
Note that the meaning of the boundary condition in step S510 refers to the description in step S120.
S520: and generating a first calculation task for solving the probability risk model according to the boundary condition of the probability risk model.
S530: and calculating a risk value according to the first calculation task.
It should be noted that, before S530, if there is no executing computing task on the target thread, the first computing task may be dispatched to the target thread.
In the embodiment of the application, the first calculation task for solving the probability risk model is generated by utilizing the boundary condition of the probability risk model of the current working condition of the nuclear power unit, so that the risk value of the probability risk model can be obtained by calculation according to the first calculation task, and a mode for solving the risk value of the probability risk model by adopting the reconstruction model is provided.
In at least one embodiment of the present application, after S300, the calculation method further includes S304 and S308. S610 to S640 are a specific implementation of S600 in the embodiment shown in fig. 1.
S304: and determining the operation, stop or fault state of the equipment in the system according to the system operation standby list conditions of a plurality of configuration change points.
S308: and updating the state and probability value of the basic event related to the equipment in the system in the probability risk model according to the operation, stop or fault state of the equipment.
S610: and determining the standby state of the system operation under the current working condition of the nuclear power unit.
S620: and screening a minimum cut set equivalent model corresponding to the system operation standby list condition under the current working condition.
S630: and generating a second calculation task for solving the probability risk sharing model by using the minimum cut set equivalence model according to the state and the probability value of the basic event related to the equipment in the system.
S640: if the target thread has no executing computing task, a second computing task is dispatched to the target thread.
S650: and calculating a risk value according to the second calculation task.
In the embodiment of the application, the basic event state and the probability value related to the equipment in the system in the probability risk model are updated according to the equipment operation, stop or fault condition, and the influence on the related basic event is introduced when the risk value is calculated by adopting the method of the minimum cut set, so that the accuracy of the calculated risk value is higher. In addition, if the target thread has no executing computing task, a second computing task is distributed to the target thread, so that the computing task is distributed according to the load condition, and the risk value calculation of all the computing tasks is achieved by utilizing the multi-thread parallel computing technology.
In at least one embodiment of the present application, after S500 and S600, the calculation method further includes S700.
S700: and storing the risk value of the probability risk model into a risk monitoring case database.
In the embodiment of the application, the risk value of the probability risk model is stored in the risk monitoring case database, so that a user can call the risk value of the probability risk model at any time, and the monitoring of the change process of the risk value is facilitated.
Fig. 3 is a schematic structural diagram of a probability risk calculating device for a nuclear power plant according to an embodiment of the application. As shown in fig. 3, the computing device 100 includes an acquisition module 110, a splitting module 120, a determination module 130, a discrimination module 140, and a computing module 150. The obtaining module 110 is configured to obtain multiple sets of minimum cut set equivalent models corresponding to probability risk models under different working conditions, where the probability risk models under the same working condition correspond to one set of minimum cut set equivalent models. The splitting module 120 is configured to split the planning task according to logic of the planning task to obtain a plurality of configuration change points. The determining module 130 is configured to determine a system operation standby column status of the plurality of configuration change points. The judging module 140 is configured to judge whether a plurality of unavailable devices exist in the system and whether the unavailable device combination satisfies the rule according to the system operation standby column conditions of the plurality of configuration change points. The calculating module 150 is configured to calculate a risk value of the probabilistic risk model by adopting a reconstruction model solving manner if there are a plurality of unavailable devices in the system and the unavailable device combination does not satisfy the rule; if single equipment is unavailable or unavailable equipment combination meeting rules exists in the system, calculating the risk value of the probability risk model according to a plurality of groups of minimum cut set equivalent models corresponding to the probability risk model under different working conditions.
It should be noted that, the computing device 100 is a computing device corresponding to the computing method for probability risk of a planned task of a nuclear power plant provided in the foregoing embodiment of the present application, so each module in the computing device 100 may implement a corresponding method, and the computing device may at least implement the foregoing corresponding technical effects, which is not described herein again.
Fig. 4 is a block diagram of an electronic device according to an embodiment of the present application.
Referring to fig. 4, the electronic device 10 includes a processor 11 and a memory 12. The memory 12 is used to store instructions, such as application programs, that are executable by the processor 11. The number of processors 11 may be one or more. The application program stored in the memory 12 may include one or more modules each corresponding to a set of instructions. Further, the processor 11 is configured to execute instructions to perform the above-described method of calculating a probability risk of a planned mission of a nuclear power plant.
The electronic device 10 may also include a power component configured for power management of the electronic device 10, a wired or wireless network interface configured to connect the electronic device 10 to a network, and an input output (I/O) interface. The electronic device 10 may operate an operating system, such as Windows Server, based on storage in the memory 12 TM ,Mac OSX TM ,Unix TM ,Linux TM ,FreeBSD TM Or the like.
A non-transitory computer readable storage medium, which when executed by a processor of the electronic device 10, enables the electronic device 10 to perform a method of computing a probability risk of a planned mission of a nuclear power plant. The calculation method is performed by the agent program. The method for calculating the probability risk of the planned task of the nuclear power plant comprises the following steps: acquiring a plurality of groups of minimum cut set equivalent models corresponding to the probability risk models under different working conditions, wherein the probability risk models under the same working condition correspond to a group of minimum cut set equivalent models; splitting the planning task according to logic of the planning task to obtain a plurality of configuration change points; determining a system operation standby list condition of a plurality of configuration change points; judging whether a plurality of unavailable devices exist in the system according to the system operation standby column conditions of a plurality of configuration change points; if a plurality of unavailable equipment combinations which do not meet the rule exist in the system, calculating a risk value of the probability risk model in a reconstruction model solving mode; if single equipment is unavailable or unavailable equipment combination meeting rules exists in the system, calculating the risk value of the probability risk model according to a plurality of groups of minimum cut set equivalent models corresponding to the probability risk model under different working conditions.
Those of ordinary skill in the art will appreciate that the algorithm steps described in connection with the embodiments disclosed herein may be implemented as electronic hardware, or combinations of computer software and electronic hardware. Whether such functionality is implemented as hardware or software depends upon the particular application and design constraints imposed on the solution. Skilled artisans may implement the described functionality in varying ways for each particular application, but such implementation decisions should not be interpreted as causing a departure from the scope of the present application.
In the several embodiments provided in the present application, it should be understood that the disclosed computing method and computing device may be implemented in other manners. For example, the above-described embodiments of the computing device are merely illustrative, e.g., the division of the modules is merely a logical functional division, and there may be additional divisions of actual implementation, e.g., multiple modules may be combined or integrated into another system, or some features may be omitted, or not performed.
The functions, if implemented in the form of software functional units and sold or used as a stand-alone product, may be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application may be embodied essentially or in a part contributing to the prior art or in a part of the technical solution in the form of a software product stored in a storage medium, comprising several instructions for causing a computer device (which may be a personal computer, a server, a network device, or the like) to perform all or part of the steps of the method according to the embodiments of the present application. And the aforementioned storage medium includes: a usb disk, a removable hard disk, a Read-Only Memory (ROM), a random access Memory (Random Access Memory, RAM), a magnetic disk, or an optical disk, or other various media capable of storing program verification codes.
It will be clear to those skilled in the art that, for convenience and brevity of description, the specific working processes of the computing device and the electronic apparatus described above may refer to the corresponding processes in the foregoing computing method embodiments, which are not described herein again.
It should be noted that, the combination of the technical features in the embodiment of the present application is not limited to the combination described in the embodiment of the present application or the combination described in the specific embodiment, and all the technical features described in the present application may be freely combined or combined in any manner unless contradiction occurs between them.
The foregoing description of the preferred embodiments of the application is not intended to be limiting, but rather is to be construed as including any modifications, equivalents, and alternatives falling within the spirit and principles of the application.

Claims (10)

1. The method for calculating the probability risk of the planned mission of the nuclear power plant is characterized by comprising the following steps of:
acquiring a plurality of groups of minimum cut set equivalent models corresponding to probability risk models under different working conditions, wherein the probability risk models under the same working condition correspond to one group of minimum cut set equivalent models;
splitting the planning task according to logic of the planning task to obtain a plurality of configuration change points;
determining a system operation standby list condition of a plurality of configuration change points;
judging whether a plurality of unavailable devices exist in the system and whether the unavailable device combination meets the rule is judged according to the system operation standby column conditions of a plurality of configuration change points;
if a plurality of unavailable equipment combinations which do not meet the rule exist in the system, calculating a risk value of a probability risk model in a reconstruction model solving mode;
if single equipment is unavailable or unavailable equipment combination meeting rules exists in the system, calculating the risk value of the probability risk model according to a plurality of groups of minimum cut set equivalent models corresponding to the probability risk model under different working conditions.
2. The computing method of claim 1, wherein the obtaining a plurality of sets of minimum cut set equivalence models corresponding to probabilistic risk models under different conditions comprises:
determining a system operation standby list situation affecting probability risk model logic according to a probability risk model under each working condition of the nuclear power unit, wherein each system operation standby list situation comprises a plurality of system operation standby list combinations;
determining boundary conditions corresponding to a plurality of system operation standby column combinations, wherein the boundary conditions refer to a group of house-shaped events and states of the house-shaped events in a probability risk model adopting a fault tree model;
calculating to obtain a minimum cut set under a plurality of operation standby column combinations of each working condition according to boundary conditions corresponding to the plurality of system operation standby column combinations;
and determining the minimum cut sets under the plurality of system operation standby series combinations of each working condition as a group of minimum cut set equivalent models so as to obtain a plurality of groups of minimum cut set equivalent models under different working conditions.
3. The computing method of claim 2, wherein determining a system run reserve column instance that affects probabilistic risk model logic comprises:
if the probability risk model has the house-shaped event in the fault tree logic structure, determining a system operation standby column condition affecting the probability risk model logic according to the house-shaped event in the fault tree logic structure;
and if the probability risk model does not have the house-shaped event in the fault tree logic structure, determining that the equipment is in an operating state.
4. The method according to claim 1, wherein calculating the risk value of the probabilistic risk model by means of reconstruction model solution comprises:
determining boundary conditions of a probability risk model of the current working condition of the nuclear power unit, wherein the boundary conditions refer to a group of house-shaped events and states of the house-shaped events in the probability risk model adopting a fault tree model;
generating a first calculation task for solving the probability risk model according to the boundary condition of the probability risk model;
and calculating a risk value according to the first calculation task.
5. The computing method of claim 1, further comprising, after the determining the system operation standby column instance for the plurality of configuration change points:
determining the operation, stop or fault state of equipment in the system according to the system operation standby column conditions of a plurality of configuration change points;
updating the state and probability value of the basic event related to the equipment in the system in the probability risk model according to the operation, stop or fault state of the equipment;
wherein, according to the corresponding multiple groups of least cut set equivalent models of probability risk models under different working conditions, calculating the risk value of the probability risk model comprises:
determining a standby system operation list condition of the nuclear power unit under the current working condition;
screening a minimum cut set equivalent model corresponding to the system operation standby list condition under the current working condition;
generating a second calculation task for solving a probability risk sharing model by utilizing the minimum cut set equivalent model according to the state and probability value of the basic event related to the equipment in the system;
and calculating a risk value according to the second calculation task.
6. The computing method of claim 5, wherein the computing a risk value from the second computing task comprises:
and if the target thread has no executing computing task, dispatching the second computing task to the target thread.
7. The calculation method according to any one of claims 1 to 6, characterized by further comprising:
and storing the risk value of the probability risk model into a risk monitoring case database.
8. A computing device for probability risk of a nuclear power plant, comprising:
the acquisition module is used for acquiring a plurality of groups of minimum cut set equivalent models corresponding to the probability risk models under different working conditions, wherein the probability risk models under the same working condition correspond to one group of minimum cut set equivalent models;
the splitting module is used for splitting the planning task according to logic of the planning task so as to obtain a plurality of configuration change points;
the determining module is used for determining the system operation standby column conditions of a plurality of configuration change points;
the judging module is used for judging whether a plurality of unavailable devices exist in the system and whether the unavailable device combination meets the rule or not according to the system operation standby column conditions of a plurality of configuration change points; and
the calculation module is used for calculating a risk value of the probability risk model in a reconstruction model solving mode if a plurality of unavailable equipment combinations which do not meet the rules exist in the system; if single equipment is unavailable or unavailable equipment combination meeting rules exists in the system, calculating the risk value of the probability risk model according to a plurality of groups of minimum cut set equivalent models corresponding to the probability risk model under different working conditions.
9. An electronic device, comprising:
a processor for performing the method of computing a probability risk for a planned mission of a nuclear power plant as claimed in any one of claims 1 to 7; and
and the memory is used for storing executable instructions of the processor.
10. A computer readable storage medium having stored thereon executable instructions of a computer, which when executed by a processor, implements the method of calculating a probability risk of a planned mission of a nuclear power plant according to any one of claims 1 to 7.
CN202311450666.2A 2023-11-03 2023-11-03 Nuclear power plant planning task probability risk calculation method and calculation device thereof Active CN117196321B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311450666.2A CN117196321B (en) 2023-11-03 2023-11-03 Nuclear power plant planning task probability risk calculation method and calculation device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311450666.2A CN117196321B (en) 2023-11-03 2023-11-03 Nuclear power plant planning task probability risk calculation method and calculation device thereof

Publications (2)

Publication Number Publication Date
CN117196321A true CN117196321A (en) 2023-12-08
CN117196321B CN117196321B (en) 2024-03-01

Family

ID=88987243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311450666.2A Active CN117196321B (en) 2023-11-03 2023-11-03 Nuclear power plant planning task probability risk calculation method and calculation device thereof

Country Status (1)

Country Link
CN (1) CN117196321B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4632802A (en) * 1982-09-16 1986-12-30 Combustion Engineering, Inc. Nuclear plant safety evaluation system
KR20090089631A (en) * 2008-02-19 2009-08-24 한양대학교 산학협력단 Failure mode, effect and criticality analyzing apparatus and method for a certain system using minimum cut set and fuzzy expert system
CN101710400A (en) * 2009-12-15 2010-05-19 中科华核电技术研究院有限公司 Method and device for evaluating risk of nuclear power station
CN103095730A (en) * 2013-02-21 2013-05-08 健雄职业技术学院 Information security risk assessment method based on fault tree and system thereof
CN111091292A (en) * 2019-12-18 2020-05-01 中国科学院合肥物质科学研究院 Real-time risk dynamic modeling analysis system for nuclear power station
CN112926865A (en) * 2021-03-10 2021-06-08 苏州热工研究院有限公司 Nuclear power plant fault level calculation method based on probability safety analysis and computer
JP2021117092A (en) * 2020-01-24 2021-08-10 三菱重工業株式会社 Risk evaluation system, risk evaluation method and risk evaluation program for nuclear power plant
US20220066853A1 (en) * 2020-08-28 2022-03-03 Sap Se Systems and methods for failure diagnosis using fault tree
CN115130284A (en) * 2022-06-13 2022-09-30 中国核电工程有限公司 Nuclear power unit risk prediction method, prediction system and evaluation system
CN115330229A (en) * 2022-08-22 2022-11-11 同济大学 Transformer substation earthquake risk rapid assessment method based on minimum cut set

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4632802A (en) * 1982-09-16 1986-12-30 Combustion Engineering, Inc. Nuclear plant safety evaluation system
KR20090089631A (en) * 2008-02-19 2009-08-24 한양대학교 산학협력단 Failure mode, effect and criticality analyzing apparatus and method for a certain system using minimum cut set and fuzzy expert system
CN101710400A (en) * 2009-12-15 2010-05-19 中科华核电技术研究院有限公司 Method and device for evaluating risk of nuclear power station
CN103095730A (en) * 2013-02-21 2013-05-08 健雄职业技术学院 Information security risk assessment method based on fault tree and system thereof
CN111091292A (en) * 2019-12-18 2020-05-01 中国科学院合肥物质科学研究院 Real-time risk dynamic modeling analysis system for nuclear power station
JP2021117092A (en) * 2020-01-24 2021-08-10 三菱重工業株式会社 Risk evaluation system, risk evaluation method and risk evaluation program for nuclear power plant
US20220066853A1 (en) * 2020-08-28 2022-03-03 Sap Se Systems and methods for failure diagnosis using fault tree
CN112926865A (en) * 2021-03-10 2021-06-08 苏州热工研究院有限公司 Nuclear power plant fault level calculation method based on probability safety analysis and computer
CN115130284A (en) * 2022-06-13 2022-09-30 中国核电工程有限公司 Nuclear power unit risk prediction method, prediction system and evaluation system
CN115330229A (en) * 2022-08-22 2022-11-11 同济大学 Transformer substation earthquake risk rapid assessment method based on minimum cut set

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王家群;袁润;王芳;汪进;李亚洲;胡丽琴;汪建业;顾晓慧;吴宜灿;FDS团队;曾春;宋明海;彭晓春;张刚平;苏长松;: "核电站风险监测系统恢复分析方法及其应用", 核科学与工程, no. 03, 15 September 2011 (2011-09-15) *
王玉成,薛大知: "核电站风险管理系统及其构模方法", 核动力工程, no. 06, 28 December 1994 (1994-12-28) *

Also Published As

Publication number Publication date
CN117196321B (en) 2024-03-01

Similar Documents

Publication Publication Date Title
Zhai et al. Fast identification of inactive security constraints in SCUC problems
KR20180108446A (en) System and method for management of ict infra
JP4881402B2 (en) Method for operating a process management system having a risk display function
CN103154904B (en) Operational administrative equipment, operation management method and program
CN113221362B (en) Satellite launching field performance test subject purpose selection method and device and electronic equipment
JP4326731B2 (en) Process management system having risk monitor and process management method having risk display function
CN111624986A (en) Case base-based fault diagnosis method and system
Mandelli et al. Dynamic PRA: an overview of new algorithms to generate, analyze and visualize data
CN111581191B (en) Nuclear safety data verification method, device, computer equipment and storage medium
CN115062534A (en) Method and device for calculating gas supply reliability of natural gas pipeline system
Gao A fuzzy-ANP approach to project management performance evaluation indices system
JP3054039B2 (en) Plant maintenance support equipment
CN115130284A (en) Nuclear power unit risk prediction method, prediction system and evaluation system
CN117196321B (en) Nuclear power plant planning task probability risk calculation method and calculation device thereof
CN109961160B (en) Power grid future operation trend estimation method and system based on tide parameters
CN112965990A (en) Low-voltage contact cabinet fault solution generation method and device
CN110415136B (en) Service capability evaluation system and method for power dispatching automation system
CN116151433A (en) Intelligent operation risk management and control method and device based on key process model
Pelikán et al. Detection of resource overload in conditions of project ambiguity
CN112467806B (en) Method and system for determining power grid operation state based on DMN power grid regulation and control rule
CN115441456A (en) Fault diagnosis method and device for power grid dispatching support system
CN114154962A (en) Batch processing monitoring method, device and equipment
JP2005071136A (en) Delivery time management support system, its program, recording medium recording its program and delivery time management method for product
Taylor et al. Trust and adaptation failure: An experimental study of unco-operation awareness
CN109492951A (en) Creation method, device and the computer equipment of robot maturity assessment model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant