CN117168965A CN202311114929.2A CN202311114929A CN117168965A CN 117168965 A CN117168965 A CN 117168965A CN 202311114929 A CN202311114929 A CN 202311114929A CN 117168965 A CN117168965 A CN 117168965A
Authority
CN
China
Prior art keywords
connector
steel wire
fatigue test
hole
clamping piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311114929.2A
Other languages
Chinese (zh)
Inventor
段兰
王春生
李熙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN202311114929.2A priority Critical patent/CN117168965A/en
Publication of CN117168965A publication Critical patent/CN117168965A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The clamp comprises two clamp bodies which are opposite to each other, wherein the clamp bodies comprise connecting bodies, disassembly bolts are arranged at the central positions of opposite sides of the two clamp bodies on the connecting bodies, connecting rods are arranged at the central positions of the other sides of the connecting bodies, pre-pressing jacks are arranged on the inner walls of one sides of the connecting bodies, which correspond to the disassembly bolts, anchor cups are arranged on the inner walls of one sides, which correspond to the disassembly bolts, of the connecting bodies, clamping pieces are arranged in the anchor cups, pier head force transmission assemblies are arranged on the upper parts of the clamping pieces, the telescopic ends of the pre-pressing jacks are contacted with the upper parts of the pier head force transmission assemblies, and steel wires sequentially penetrate through the pier head force transmission assemblies, the clamping pieces and the disassembly bolts; the invention is matched with a fatigue testing machine for use, and can effectively reduce the influence of the clamp on the steel wire and avoid the problem of broken wire at the clamping position, thereby ensuring the smooth performance of the fatigue test of the cable steel wire.

Description

Bridge cable wire fatigue test fixture
Technical Field
The invention belongs to the technical field of bridge engineering, in particular to the technical field of bridge engineering tests, and particularly relates to a clamp for a bridge cable steel wire fatigue test.
Background
In the design of large span bridges, cable load-bearing bridges are widely adopted with their great crossing capacity, good technical and economic indicators and aesthetic value. The core stress member of the large span cable load-bearing bridge is a cable, and part of the cable is composed of galvanized steel wires. Because the bridge bears the dynamic load such as running vehicles and wind load, the cable is under the action of the dynamic load with high and low tensile stress alternation. It is necessary to conduct a cable fatigue test study by means of a cause analysis of an actual cable breakage accident. To study the fatigue properties of the cables, it is necessary to study the fatigue properties of the steel wires in the cables. Therefore, it is important to develop the basic test research of the fatigue of the bridge cable steel wire.
The primary problem of developing a bridge cable wire fatigue test is how to effectively clamp the cable wire reasonably and scientifically, and ensuring that the wire cannot be broken at the clamping jaw and the area nearby in the fatigue test. However, when the existing steel wire fatigue test clamp clamps steel wires, the steel wires can generate uneven stress, clamping damage, stress concentration, slipping and other phenomena, and the clamping effect of the clamp is affected. Therefore, it is necessary to provide a novel wire fatigue test jig to reduce the influence of the jig on the wire, thereby avoiding breakage of the wire at the clamping end and the vicinity thereof, and further improving the effectiveness of the test.
Disclosure of Invention
The technical problem to be solved by the invention is to overcome the defects in the prior art, and provide the bridge cable steel wire fatigue test clamp which is matched with the fatigue testing machine, can realize effective clamping of the steel wire, reduce the influence of the clamp on the steel wire, and prevent the steel wire from breaking at the clamping end and the area nearby, thereby ensuring smooth running of the steel wire fatigue test, and is convenient to detach and capable of observing the clamping condition of the steel wire.
The technical scheme adopted for solving the technical problems is as follows: the utility model provides a bridge cable wire fatigue test anchor clamps, includes two relative anchor clamps bodies, the anchor clamps body include the connector, two anchor clamps opposite side central point put on the connector and be provided with the dismantlement bolt, another side central point put of connector is provided with the connective bar, be provided with the pre-compaction jack on the inner wall of one side that the connector corresponds with the connective bar, be provided with the anchor cup on the inner wall of one side that corresponds with the dismantlement bolt, the clamping piece sets up in the anchor cup inside, clamping piece upper portion is provided with pier nose power subassembly, the flexible end of pre-compaction jack contacts with pier nose power subassembly upper portion, the steel wire passes pier nose power subassembly, the clamping piece in proper order, dismantle the bolt.
The cross section of the connector is of a rectangular structure, a connecting hole is formed in the center of the upper surface of the connector, first threaded holes are formed in the two sides of the connecting hole in the upper surface of the connector, a third threaded hole is formed in the center of the lower surface of the connector, and second threaded holes are formed in the two sides of the third threaded hole in the lower surface of the connector.
Rectangular through holes are formed in the width direction of the connector.
The clamping piece is of an inverted circular truncated cone shape, a circular threading hole is formed in the center of the clamping piece, a 2mm deep circular groove is formed in the top of the clamping piece, the diameter of the circular groove is matched with the diameter of a pier head force transmission assembly, the cone angle is 8.5 degrees+/-1 degrees, three fan-shaped structures are formed by trisecting the clamping piece in 360 degrees, and the gap between the adjacent fan-shaped structures is 1mm.
The inner surface of the clamping piece is toothless, the roughness of the clamping piece is the same as that of the steel wire, and copper plating treatment is carried out within the range of 20mm upwards at the bottom of the clamping piece.
The pier head force transmission assembly of the invention is as follows: the gasket is arranged in the gasket sleeve ring, the gasket sleeve ring and the gasket are radially and correspondingly provided with unthreaded holes, and the clamping pins are arranged in the unthreaded holes.
The gasket disclosed by the invention consists of two symmetrical semicircular structures, a wire through hole is processed in the center of the gasket, and the contact part of the wire through hole and the steel wire pier head is processed into a sphere.
The anchor cup is of a cylindrical structure with a conical hole machined in the center, the taper of the bottom end of the conical hole is 8 degrees in the range of 15mm, the taper of the rest part is 8.5 degrees plus or minus 1 degrees, the taper is consistent with the taper angle of the clamping piece, and a fifth threaded hole is machined in the bottom of the anchor cup.
The base of the pre-pressing jack is provided with a sixth threaded hole, the telescopic end of the base is provided with a pre-pressing rod, and the lower part of the pre-pressing rod is provided with a rectangular groove.
The steel wire is a hot dip galvanized steel wire for bridge cables, and pier heads are processed at two ends of the steel wire.
Compared with the prior device, the invention has the following advantages:
1. the pre-pressing device applies pre-pressing force to the clamping piece before the steel wire is stretched, so that the sliding of the steel wire in the clamp is effectively prevented.
2. The clamping pieces are in a tooth-free form, the surface roughness of the clamping pieces is consistent with that of the steel wires, when the steel wires are stretched, the steel wires and the clamping pieces have a relative movement trend, but the static friction force between the steel wires and the clamping pieces can prevent the steel wires and the clamping pieces from generating relative movement, the movement trend can increase the relative positive pressure between the clamping pieces and the contact surface of the anchor cup, so that the relative positive pressure between the clamping pieces and the steel wires is increased along with the increase, and finally the static friction force born by the steel wires is increased, and the effect is called the cone angle effect of the clamping pieces and the anchor cup. The cone angle effect can lead the static friction force born by the steel wire to be increased along with the increase of the tensile force, thereby ensuring that the steel wire is clamped firmly and the sliding wire can not occur. Besides, the inner surface of the clamping piece adopts a toothless structure, so that the surface damage of the clamping piece to the steel wire can be reduced. Therefore, the steel wire clamping device can not only realize effective clamping of the steel wire, but also reduce clamping damage, and can also avoid the occurrence of the condition of sliding the steel wire.
3. The taper of the clamping piece and the anchor cup is calculated by finite element analysis and calculation, and is reduced by 0.5 DEG within the range of 15mm at the lowest end, so that the clamping pressure is properly transited by the change of the taper, and the stress concentration phenomenon is reduced.
4. The invention can make the steel wire easy to disassemble, can conveniently and economically test a large number of parameters, and has wide application prospect.
5. The pier head measure for clamping the steel wire can be used as a safety reserve for sliding the steel wire, and the pier head force transmission assembly not only enables the pier head to bear part of the tensile force of the steel wire, but also facilitates the precompaction jack to transmit precompaction force to the clamping piece.
6. The hollowed-out part of the pre-pressing rod can not only ensure that the pre-pressing rod does not conflict with the space occupied by the pier head steel wire when in force transmission, but also can observe the condition of the pier head part in the test process.
Drawings
Fig. 1 is a schematic structural view of the present invention.
Fig. 2 is a cross-sectional view of the clamp body of fig. 1.
Fig. 3 is a schematic three-dimensional structure and a sectional view of the connector 1 of fig. 1.
Fig. 4 is a schematic and sectional view of the three-dimensional structure of the clip 2 of fig. 1.
Fig. 5 is a schematic and sectional view of the three-dimensional structure of the anchor cup 9 of fig. 1.
Figure 6 is a schematic and cross-sectional view of the three-dimensional structure of the pier head force transfer assembly of figure 1.
Fig. 7 is a schematic view of the three-dimensional structure of the pre-compression jack 10 and the pre-compression rod 8 in fig. 1.
In the figure: 1. a connecting body; 2. a clamping piece; 3. a clamping needle; 4. a gasket collar; 5. a gasket; 6. a steel wire; 7. disassembling the bolts; 8. pre-pressing a rod; 9. an anchor cup; 10. prepressing the jack; 11. a connecting rod; 12. prepressing jack fixing bolts; 13. an anchor cup fixing bolt; 1-1, connecting holes; 1-2, a second threaded hole; 1-3, a first threaded hole; 1-4, a third threaded hole; 2-1, a fan-shaped structure; 9-1, a fifth threaded hole; sixth threaded bore 10-1.
Detailed Description
The present invention will be described in further detail with reference to the drawings and examples, but the present invention is not limited to these examples.
Example 1
In fig. 1, 2 and 3, the clamp for testing the fatigue of the bridge cable steel wire comprises two clamp bodies which are opposite up and down, wherein the clamp bodies comprise a connecting body 1, a dismounting bolt 7 is arranged at the center of the opposite sides of the two clamp bodies on the connecting body 1, and a connecting rod 11 is arranged at the center of the other side of the connecting body 1. Specifically, the cross-section shape of the connector 1 of this embodiment is rectangular structure, the center position of the upper surface of the connector 1 is processed with a connecting hole 1-1, a connecting rod 11 is arranged in the connecting hole 1-1, the free end of the connecting rod 11 is connected with a fatigue testing machine, the two sides of the connecting hole 1-1 on the upper surface of the connector 1 are processed with first threaded holes 1-3, the center position of the lower surface of the connector 1 is processed with third threaded holes 1-4, a disassembling bolt 7 is installed in the third threaded holes 1-4 and used for ejecting a clamping piece 2, and the two sides of the third threaded holes 1-4 on the lower surface of the connector 1 are processed with second threaded holes 1-2. For the convenience of observation, the connecting body 1 is provided with a rectangular through hole in the width direction, so that the whole device is visual and visible during installation, disassembly and operation. Further, the connector 1 is manufactured by machining 45 # steel (about 45 required by Rockwell hardness), the external outline dimension of the connector is 190mm long, 130mm wide and 300mm high, and the internal hollowed-out dimension is 130mm long, 130mm wide and 220mm high.
The pre-pressing jack 10 is installed on the inner wall of one side of the connecting body 1 corresponding to the connecting rod 11 through the pre-pressing jack fixing bolt 12 installed in the first threaded hole 1-3 and the sixth threaded hole 10-1, the anchor cup 9 is fixedly connected on the inner wall of one side of the connecting body 1 corresponding to the dismounting bolt 7 through the anchor cup fixing bolt 13 arranged in the second threaded hole 1-2 and the fifth threaded hole 9-1, and the clamping piece 2 is arranged in the middle of the anchor cup 9. The upper part of the clamping piece 2 is provided with a pier head force transmission assembly, the telescopic end of the pre-pressing jack 10 is contacted with the upper part of the pier head force transmission assembly, and the steel wire 6 sequentially penetrates through the pier head force transmission assembly, the clamping piece 2 and the dismounting bolt 7. The steel wire 6 is a hot dip galvanized steel wire for bridge cables, the diameter is 7mm, the strength is 1670MPa, 1770MPa, 1860MPa, 1960MPa, 2060MPa or 2160MPa, and pier heads are processed at the two ends.
In fig. 4, the clamping piece 2 of this embodiment is inverted round platform shape, and central point puts the processing and has circular wire hole, and circular wire hole diameter is 7mm, and the processing of top has 2mm dark circular slot, and circular slot diameter suits with pier nose power transmission subassembly diameter, and 2mm chamfer is opened to clamping piece 2 bottom, and the diameter is 47mm in this embodiment. Three fan-shaped structures 2-1 are trisected in 360 DEG phase, the gap between the adjacent fan-shaped structures 2-1 is 1mm, and the device is suitable for clamping the diameterSteel wires in the range. The clamping piece 2 is manufactured by machining 40 mm (about 45 required by Rockwell hardness), the height of the clamping piece 2 is 80mm, the cone angle is 8.5 degrees+/-1 degrees, the diameter of the bottom surface circle is 32mm, the diameter of the top surface circle can be calculated according to the cone angle and the height, the inner surface of the clamping piece 2 is tooth-free, and the roughness is the same as the surface roughness of the steel wire 6. And copper plating is performed at a height of 20mm above the bottom of the steel wire to reduce friction between the steel wire and the contact surface. The clamping piece 2 is positioned in the hollowed-out part of the anchor cup 9, and the outer side surface of the clamping piece is required to be smooth.
In fig. 5, the anchor cup 9 of the present embodiment is a cylindrical structure with a tapered hole formed in the center, and 2 fifth threaded holes 9-1 with a diameter of 10mm are formed in the bottom of the anchor cup 9 and correspond to two second threaded holes 1-2 with a diameter of 10mm formed in the lower portion of the connector 1, and anchor cup fixing bolts 13 are screwed into the threaded holes of the anchor cup 9 and the connector 1, so that the anchor cup 9 can be mounted on the connector 1 in a centered manner. The anchor cup 9 is manufactured by processing No. 45 steel (about 45 is required by Rockwell hardness), and has the height of 75mm and the diameter of 110mm; the taper angle of the inner hollowed-out part is 8 degrees within 15mm from the bottom, the taper angle of the rest part is 8.5 degrees plus or minus 1 degrees, the taper angle is consistent with the taper angle of the clamping piece 2, the diameter of the bottom of the hollowed-out part is 32mm, and the diameter of the top end is calculated according to the taper angle and the height.
In fig. 6, the pier head force transmission assembly of the embodiment is formed by connecting a clamping pin 3, a gasket collar 4 and a gasket 5, and is made of 45-gauge steel. The gasket 5 is installed in the gasket lantern ring 4, and gasket lantern ring 4 and gasket 5 radial corresponding processing have the unthreaded hole, and card needle 3 is installed in the unthreaded hole, and gasket 5 height 12mm, diameter 27mm, middle part processing have the diameter to be 7 mm's wire hole, wire hole top 2mm within range with 6 pier heads direct contact of steel wire and handle into the sphere that is close with the pier head appearance. The gasket 5 is composed of two symmetrical semicircular structures, and two round holes with the diameter of 2mm and the depth of 3mm are symmetrically dug in the middle of the side face along the direction perpendicular to the central axis. The gasket lantern ring 4 is cylindrical in appearance, 12mm in height and 47mm in diameter, a round hole with the diameter of 27mm is machined in the middle, and two round holes with the diameter of 2mm penetrating through the gasket lantern ring 4 are symmetrically dug in the middle of the side face, so that the clamp needle 3 can conveniently penetrate through. The clip 3 is of a cylindrical structure, the diameter is 2mm, and the length is 16mm. The gasket 5 is tightly sleeved by the gasket sleeve ring 4, and the gasket 5 and the gasket sleeve ring 4 are integrally connected by the clamping needle 3. The spacer 5 and spacer collar 4 in the pier head force transfer assembly are located in the hollowed out portion of the top of the clip 2.
In fig. 7, a sixth threaded hole 10-1 is machined in the base of the pre-pressing jack 10 of the embodiment, a pre-pressing rod 8 is mounted at the telescopic end, the pre-pressing jack 10 is a 10-ton small manual hydraulic jack, the pre-pressing rod 8 is of a cylindrical structure, a rectangular groove is machined in the lower portion of the pre-pressing rod 8, and the steel wire 6 pier head is located in the rectangular groove. The lowest end of the pre-pressing rod 8 is contacted with the pier head force transmission component.
The bridge cable steel wire fatigue test fixture has the following installation process:
firstly, the connecting rod 11 and the dismounting bolt 7 are arranged on the connecting body 1, and the connecting rod 11 is clamped by the clamping head of the fatigue testing machine, so that the connection with the fatigue testing machine is completed. Secondly, the anchor cup 9 is fixed at the lowest part inside the connector 1 in a centering way through the anchor cup fixing bolts 13, the steel wire 6 penetrates through the anchor cup 9 from the lower through hole of the connector 1, then the clamping piece 2 is placed into the anchor cup 9, and the inner side surface of the clamping piece 2 clamps the steel wire 6, and the outer side surface is contacted with the anchor cup 9. Then the gasket 5 is placed at the lower part of the head end of the steel wire pier, the gasket collar 4 is sleeved outside, and the gasket 5 and the gasket collar 4 are connected together by the clamp needle 3. And then, fixing the pre-pressing jack 10 at the uppermost part inside the connecting body 1 through a pre-pressing jack fixing device 12, installing the pre-pressing rod 8 below the pre-pressing jack 10, applying pre-pressing force to the clamping piece 2 before the steel wire 6 is not stretched through the pre-pressing rod 8, so that the device clamps the steel wire 6, slippage at the clamp position during the stretching of the steel wire 6 is prevented, and 2 clamp bodies are oppositely arranged at two ends of the steel wire 6, so that a fatigue test can be performed.
The dismounting process of the bridge cable steel wire fatigue test clamp is as follows:
the hydraulic device of the prepressing jack 10 is adjusted to withdraw the prepressing force, and the prepressing rod 8 is removed. The disassembly bolt 7 is screwed upwards to eject the clamping piece 2, the clamping piece 2 is taken out of the connector 1, and the disassembly bolt 7 is screwed back to the original position. Firstly, the clamping needle 3 on the gasket sleeve ring 4 is taken out, then the gasket 5 and the gasket sleeve ring 4 are taken out, and finally, the steel wire 6 is taken out and put. The anchor cup 9 is removed after the anchor cup fixing bolts 13 are removed. The fatigue machine chuck is loosened, the connecting body 1 is firstly taken down, and then the connecting rod 11 is taken down. And (5) finishing the disassembly.

Claims (10)

1. The utility model provides a bridge cable wire fatigue test anchor clamps which characterized in that: including two relative anchor clamps bodies, the anchor clamps body include connector (1), two anchor clamps opposite sides central point put on connector (1) and be provided with dismantlement bolt (7), connector (1) another side central point put and be provided with connecting rod (11), be provided with pre-compaction jack (10) on the inner wall of one side that connector (1) corresponds with connecting rod (11), be provided with anchor cup (9) on the inner wall of one side that corresponds with dismantlement bolt (7), clamping piece (2) set up in anchor cup (9) inside, clamping piece (2) upper portion is provided with pier nose and passes power subassembly, the flexible end of pre-compaction jack (10) contacts with pier nose power subassembly upper portion, steel wire (6) pass pier nose power subassembly, clamping piece (2), dismantlement bolt (7) in proper order.
2. The bridge cable wire fatigue test fixture according to claim 1, wherein: the cross-section shape of connector (1) be rectangular structure, connector (1) upper surface central point puts and processes there is connecting hole (1-1), and connector (1) upper surface connecting hole (1-1) both sides processing have first screw hole (1-3), connector (1) lower surface central point put and process there is third screw hole (1-4), connector (1) lower surface third screw hole (1-4) both sides processing have second screw hole (1-2).
3. The bridge cable wire fatigue test fixture according to claim 2, wherein: rectangular through holes are formed in the width direction of the connector (1).
4. The bridge cable wire fatigue test fixture according to claim 1, wherein: the clamping piece (2) is of an inverted truncated cone shape, a round threading hole is machined in the center, a round groove with the depth of 2mm is machined in the top, the diameter of the round groove is matched with the diameter of the pier head force transmission assembly, the cone angle is 8.5 degrees+/-1 degrees, three fan-shaped structures (2-1) are trisected in 360 degrees of phase, and the gap between every two adjacent fan-shaped structures (2-1) is 1mm.
5. The bridge cable wire fatigue test fixture according to claim 4, wherein: the inner surface of the clamping piece (2) is toothless, the roughness is the same as that of the steel wire (6), and copper plating treatment is carried out within the range of 20mm upwards at the bottom of the clamping piece (2).
6. The bridge cable steel wire fatigue test fixture according to claim 1, wherein the pier head force transmission assembly is: the gasket (5) is arranged in the gasket lantern ring (4), the gasket lantern ring (4) and the gasket (5) are radially and correspondingly provided with unthreaded holes, and the clamping needle (3) is arranged in the unthreaded holes.
7. The bridge cable wire fatigue test fixture according to claim 6, wherein: the gasket (5) is composed of two symmetrical semicircular structures, a wire penetrating hole is formed in the center of the gasket (5), and the contact part of the wire penetrating hole and the pier head of the steel wire (6) is processed into a sphere.
8. The bridge cable wire fatigue test fixture according to claim 1, wherein: the anchor cup (9) is of a cylindrical structure with a conical hole machined in the center, the taper of the bottom end of the conical hole is 8 degrees within 15mm, the taper of the rest part of the conical hole is 8.5 degrees+/-1 degrees, the conical angle of the anchor cup is consistent with that of the clamping piece (2), and a fifth threaded hole (9-1) is machined in the bottom of the anchor cup (9).
9. The bridge cable wire fatigue test fixture according to claim 1, wherein: the base of the pre-pressing jack (10) is provided with a sixth threaded hole (10-1), the telescopic end of the base is provided with a pre-pressing rod (8), and the lower part of the pre-pressing rod (8) is provided with a rectangular groove.
10. The bridge cable wire fatigue test fixture according to claim 1, wherein: the steel wire (6) is a hot dip galvanized steel wire for bridge cables, and pier heads are processed at two ends of the steel wire (6).
CN202311114929.2A 2023-08-31 2023-08-31 Bridge cable wire fatigue test fixture Pending CN117168965A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311114929.2A CN117168965A (en) 2023-08-31 2023-08-31 Bridge cable wire fatigue test fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311114929.2A CN117168965A (en) 2023-08-31 2023-08-31 Bridge cable wire fatigue test fixture

Publications (1)

Publication Number Publication Date
CN117168965A true CN117168965A (en) 2023-12-05

Family

ID=88938871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311114929.2A Pending CN117168965A (en) 2023-08-31 2023-08-31 Bridge cable wire fatigue test fixture

Country Status (1)

Country Link
CN (1) CN117168965A (en)

Similar Documents

Publication Publication Date Title
CN209784052U (en) Anti-bending fatigue test fixture
CN106483025A (en) The slow tensile test fixture of light-wall pipe arc sample high-temperature high pressure water and using method
CN110186756B (en) Device and method for testing stress corrosion of ultrahigh-strength steel wire
CN105527155B (en) A kind of high/low temperature fatigue test clamper suitable for pole fatigue testing specimen
CN106289977B (en) Bolt concrete tensile test device and test method
CN117168965A (en) Bridge cable wire fatigue test fixture
CN107271261A (en) A kind of servicing unit of fastener tension test in kind and the method tested with it
CN105806702B (en) For the fixture on horizontal the steel strand relaxation test machine
CN104655486B (en) Tubular test sample constant-deformation stress corrosion testing clamp
CN205506555U (en) A anchor clamps for on horizontal steel strand wires relaxation testing machine
CN117147305A (en) Bridge cable steel wire corrosion fatigue test device
CN209656437U (en) A kind of test fixture
CN111238969A (en) A fatigue test fixing device for combined material pipe
CN204882223U (en) But loosening wedge load test anchor clamps
CN111442974A (en) Clamping device for thin-wall steel pipe tensile test
CN210690224U (en) Lower clamp for bolt tensile test and clamp combination
CN103115815A (en) Jig for testing notch sensitivity of bolt
CN113514330A (en) Tensile test device and method
CN205719769U (en) A kind of repeatedly used tensile test fixture device
CN204461894U (en) Ribbed Bar anti-fatigue test fixture
CN113091978A (en) Device and method for detecting prestress of parallel steel strand type stay cable
CN206070527U (en) A kind of easy-to-dismount intermediate plate anchorage
CN211740593U (en) Clamping device for tension test of initiating explosive device electrode plug
CN211825397U (en) Clamping device for sucker rod fatigue test
CN218668200U (en) Special anchorage device for extracting stress corrosion acoustic emission signals at end of steel cable

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination