CN117114225A - Intelligent building site management system - Google Patents
Intelligent building site management system Download PDFInfo
- Publication number
- CN117114225A CN117114225A CN202311108251.7A CN202311108251A CN117114225A CN 117114225 A CN117114225 A CN 117114225A CN 202311108251 A CN202311108251 A CN 202311108251A CN 117114225 A CN117114225 A CN 117114225A
- Authority
- CN
- China
- Prior art keywords
- intelligent
- information
- workers
- personnel
- management system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 claims abstract description 77
- 238000001514 detection method Methods 0.000 claims description 36
- 230000005540 biological transmission Effects 0.000 claims description 12
- 238000012216 screening Methods 0.000 claims description 12
- 238000005516 engineering process Methods 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000012544 monitoring process Methods 0.000 description 3
- 238000007781 pre-processing Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000012790 confirmation Methods 0.000 description 2
- 230000002354 daily effect Effects 0.000 description 2
- 230000002950 deficient Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000000605 extraction Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 230000003190 augmentative effect Effects 0.000 description 1
- 238000007418 data mining Methods 0.000 description 1
- 238000013135 deep learning Methods 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000009439 industrial construction Methods 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000012549 training Methods 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06V—IMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
- G06V10/00—Arrangements for image or video recognition or understanding
- G06V10/70—Arrangements for image or video recognition or understanding using pattern recognition or machine learning
- G06V10/74—Image or video pattern matching; Proximity measures in feature spaces
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06V—IMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
- G06V20/00—Scenes; Scene-specific elements
- G06V20/50—Context or environment of the image
- G06V20/52—Surveillance or monitoring of activities, e.g. for recognising suspicious objects
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06V—IMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
- G06V40/00—Recognition of biometric, human-related or animal-related patterns in image or video data
- G06V40/10—Human or animal bodies, e.g. vehicle occupants or pedestrians; Body parts, e.g. hands
- G06V40/16—Human faces, e.g. facial parts, sketches or expressions
- G06V40/172—Classification, e.g. identification
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Multimedia (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Oral & Maxillofacial Surgery (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Primary Health Care (AREA)
- Operations Research (AREA)
- Human Computer Interaction (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Artificial Intelligence (AREA)
- Computing Systems (AREA)
- Databases & Information Systems (AREA)
- Evolutionary Computation (AREA)
- Medical Informatics (AREA)
- Software Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides an intelligent building site management system, which comprises: an intelligent platform; the information input platform set up in one side of wisdom platform, wisdom platform includes identification cell, detecting element and task unit. The invention provides an intelligent construction site management system, wherein photos and skills of workers are recorded through an information recording platform, an identification unit shoots the workers to come and go, the shot photos are transmitted to a face recognition system for comparison, the recorded workers are released, the workers which are not recorded are intercepted to enable security personnel to inquire, and the recorded workers are identified again by a safety helmet identification system to check whether to wear safety helmets.
Description
Technical Field
The invention relates to the field of building site management, in particular to an intelligent building site management system.
Background
The construction site, the construction site for short, is a site range concept related to the construction process of the building engineering, is a temporary site for construction operation, has two forms of opening and closing, is generally closed for construction safety and scientific management, is surrounded by various fence walls and other forms, is inspected for material and personnel to come in and go out, has complete and strict safety construction operation specification, strict management and standard operation, is safe first, and is subjected to strict training by construction manager to be on duty.
The intelligent construction site plays roles of network organization such as the Internet, the Internet of things and a sensor network by means of technical means such as virtual reality, augmented reality, RFID, three-dimensional scanning and mobile communication, forms a construction site form and an intelligent environment based on multidimensional information, data mining and dynamic decision, and the intelligent construction site is used for integrating advanced information technology, is combined with an industrial construction mode and mechanical, automatic and intelligent equipment to become an effective carrier for deeply fusing informatization and industrialization of the construction industry, realizes digitization, refinement and intelligent production and management of the construction site, improves the technical and management level of engineering project construction, and has important significance for promoting and realizing modernization of the construction industry.
For some open-type worksites, more workers in the worksite are often transported, more people mean that management is difficult, and the worksite is defective in personnel management, such as that constructors do not wear safety helmets, extraneous personnel are not allowed to enter the worksite, and the like, so that worksite accidents and the like are easily caused.
Therefore, it is necessary to provide an intelligent worksite management system to solve the above-mentioned technical problems.
Disclosure of Invention
The invention provides an intelligent building site management system, which solves the problems that a plurality of open type building sites have more staff, transportation vehicles come from the beginning, more people mean that management is difficult, and the management is defective, such as that constructors do not wear safety helmets, extraneous personnel are not allowed to enter the building sites, and the like, and building site accidents are easy to cause.
In order to solve the above technical problems, the present invention provides an intelligent building site management system, comprising: an intelligent platform;
the intelligent platform comprises an identification unit, a detection unit and a task unit, wherein the identification unit shoots personnel entering a construction site and compares and identifies member information recorded in the intelligent platform with the member information recorded in the system, the detection unit screens whether workers enter the information recording platform or not through a screening device, the detection unit compares successfully screened worker information with photos, the photos of the workers are compared through a safety helmet identification system, the wearing condition of the workers is inquired, the photos of the workers wearing the safety helmet and the photos of the workers not wearing the safety helmet are sorted, and finally work is distributed to the involutory workers through the task unit.
Preferably, the recognition unit comprises a camera, a face recognition system, a screening device and an early warning device.
Preferably, the detection unit comprises a comparison system, a safety helmet recognition system and a screening device.
Preferably, the task unit includes an information matching and task display device.
Preferably, the information input platform stores the information and the photo input of the staff in the construction site in advance.
Preferably, the identification unit shoots personnel entering the construction site through the camera, the camera transmits the shot personnel photos to the face recognition system, the face recognition system compares the shot personnel photos with the recorded personnel photos, and when the shot personnel photos are consistent with the recorded personnel photos, the personnel photos are transmitted to the detection unit through the data transmission equipment.
Preferably, when the photographed photo identified by the face recognition system does not exist in the information input platform, a warning device sends out a beeping sound to warn, so that security personnel are prompted to know visiting personnel.
Preferably, the detection unit compares the recorded photo with the situation of staff taking the photo through the comparison system, and the safety helmet recognition system recognizes whether the staff taking the photo wears the safety helmet or not.
Preferably, the sorting device of the detection unit sorts out whether personnel wear safety helmets in the shot photos, personnel wearing the safety helmets can enter the construction site for construction, and the sorting device sorts out photos of personnel not wearing the safety helmets.
Preferably, the detection unit transmits the detected employee information wearing the safety helmet to the information matching system through the data transmission device, and the information matching system analyzes the construction capacity of workers and displays the construction work of the constructors through the task display system.
The intelligent platform is arranged at a gate of a construction site gate, people entering the construction site are photographed through a camera, the photos are photographed by the camera and uploaded to a face recognition system to recognize the information of the photos, and meanwhile, whether people on the photos are personnel on the construction site or not is screened through a screening device.
When the information is inquired out to be a constructor of the construction site, the information is transmitted to the detection unit through the data transmission equipment.
When the construction personnel who are not the building site are inquired, the early warning device is controlled to emit beeping sounds for early warning, and security personnel are prompted to inquire about the entrance of the building site.
Photo information of constructors is transmitted to the detection unit through the data transmission equipment, storage information in a comparison system of the detection unit is compared, the safety helmet recognition system recognizes, whether the constructors wear safety helmets or not is detected, the recognized information is sorted, the constructors wearing the safety helmets are separated from the constructors not wearing the safety helmets, the constructors not wearing the safety helmets are detected to transmit information to the early warning device, and the early warning device sounds to warn the staff to wear the safety helmets and enter a construction site.
The construction personnel on the construction site wear the safety helmet and enter the construction site after all inspection is finished, the information of the construction personnel entering the construction site is transmitted to the task unit through the data transmission device, the task unit is internally provided with the task inside the task library through the information matching system, the construction work of the proper construction personnel is matched, the construction work is displayed through the task display system, the construction task of the construction personnel is displayed on a large screen, the construction personnel can conveniently know the work task of the construction personnel, and the construction task is intelligently distributed.
Compared with the related art, the intelligent building site management system provided by the invention has the following beneficial effects:
the invention provides an intelligent construction site management system, wherein photos and skills of workers are recorded through an information recording platform, an identification unit shoots the workers to come and go, the shot photos are transmitted to a face recognition system for comparison, the recorded workers are released, the workers which are not recorded are intercepted to enable security personnel to inquire, and the recorded workers are identified again by a safety helmet identification system to check whether to wear safety helmets.
Drawings
FIG. 1 is a schematic diagram of an intelligent worksite management system according to the present invention.
Detailed Description
The invention will be further described with reference to the drawings and embodiments.
Referring to fig. 1 in combination, fig. 1 is a schematic structural diagram of an intelligent worksite management system according to the present invention. An intelligent worksite management system, comprising: an intelligent platform;
the intelligent platform comprises an identification unit, a detection unit and a task unit, wherein the identification unit shoots personnel entering a construction site and compares and identifies member information recorded in the intelligent platform with the member information recorded in the system, the detection unit screens whether workers enter the information recording platform or not through a screening device, the detection unit compares successfully screened worker information with photos, the photos of the workers are compared through a safety helmet identification system, the wearing condition of the workers is inquired, the photos of the workers wearing the safety helmet and the photos of the workers not wearing the safety helmet are sorted, and finally work is distributed to the involutory workers through the task unit.
The recognition unit comprises a camera, a face recognition system, a screening device and an early warning device.
The detection unit comprises a comparison system, a safety helmet recognition system and a screening device.
The task unit comprises an information matching and task display device.
The information input platform stores information and photos of the staff in the construction site in advance.
The recognition unit shoots personnel entering a construction site through the camera, the camera transmits the shot personnel photos to the face recognition system, the face recognition system compares the shot personnel photos with the recorded personnel photos, and when the shot personnel photos are consistent with the recorded personnel photos, the personnel photos are transmitted to the detection unit through the data transmission equipment.
When the shot photo identified by the face recognition system does not exist in the information input platform, a warning device sounds beeps to warn, and security personnel are prompted to know visiting personnel.
The detection unit compares the recorded photo with the situation of staff taking the photo through the comparison system, and the safety helmet recognition system recognizes whether the staff taking the photo wears the safety helmet or not.
The sorting device of the detection unit sorts out whether personnel wear safety helmets in the shot photos, the personnel wearing the safety helmets can enter a construction site for construction, and the sorting device sorts out the photos of the personnel not wearing the safety helmets.
The detection unit transmits the detected employee information wearing the safety helmet to the information matching system through the data transmission device, and the information matching system analyzes the construction capacity of workers and displays the construction work of the constructors through the task display system.
The information input platform can input constructor information in the construction site manually in advance, and the credentials of constructors and the construction capacity of the foundation are input into the information input platform.
The face recognition system is an existing device and mainly comprises face image acquisition and detection, face image preprocessing, face image feature extraction, matching and recognition.
The face recognition system mainly comprises 3 parts, namely face tracking, face comparison and face detection, the face recognition technology is widely applied to an access control management system, an attendance management system, a payment field and a security field at present, the cloud pulse face recognition system mainly comprises two large modules, namely a front end and a rear end, the front end has the functions of face detection, face tracking, key point detection, face alignment and the like, the rear end is mainly used for face comparison and face recognition, generally, the face recognition system comprises image pickup, face positioning, image preprocessing and face recognition (identity confirmation or identity search), the technology comprises image acquisition, feature positioning, identity confirmation and search and the like, and the face recognition system mainly comprises four parts, namely face image acquisition and detection, face image preprocessing, face image feature extraction and face image matching and recognition.
As soon as the production construction place of the safety helmet identification system is in a situation that the safety helmet is not worn according to the requirements of a company, the safety helmet identification system gives an alarm in time, thereby reminding relevant supervision personnel in the area to process, and guaranteeing the life safety of production operators like a firewall.
The safety helmet recognition system relies on an AI technology, gathers safety helmet wearing big data, trains a software model through deep learning, and finally develops a system capable of replacing human eyes. According to the system, the condition that a worker wears the safety helmet is monitored by analyzing the video picture of the on-site operation of a line worker in real time, and once the person who does not wear the safety helmet is found, the safety helmet recognition system can take a candid photograph and store the first time and give an alarm to remind the worker.
The intelligent safety helmet has the advantages that the intelligent safety helmet is provided with the card inserting device, personnel information IC cards can be effectively prevented from entering a construction site by the intelligent IC safety helmet, loss of articles is reduced, personnel information entering the construction site every day is adopted, and when personnel are in improper operation or in improper civilized operation, the personnel information is transferred to the display screen information throwing module, so that all operators can be warned, and the operators can be reminded of the improper operation.
The identification unit can also comprise an access control management unit, a physical characteristic information detection unit, a personnel real-time image recording unit, a personnel walking route recording unit and a wireless signal transmitter I, wherein the access control management unit, the physical characteristic information detection unit, the personnel real-time image recording unit and the personnel walking route recording unit are all connected with the wireless signal transmitter I through a wireless network;
the intelligent platform can also comprise an environment information monitoring module, wherein the environment information monitoring module comprises a temperature information acquisition unit, a humidity information acquisition unit, a wind speed information acquisition unit, a wind direction information acquisition unit, a PM information acquisition unit, a noise information acquisition unit and a wireless signal transmitter, and the temperature information acquisition unit, the humidity information acquisition unit, the wind speed information acquisition unit, the wind direction information acquisition unit, the PM information acquisition unit and the noise information acquisition unit are all connected with the wireless signal transmitter through wireless networks.
The process information supervision module is added to the identification unit, so that the business trip of the daily staff can be recorded.
The information input platform is used for real-name authentication, the on-site time of the labor staff is recorded through face recognition and other modes, the daily attendance conditions of groups and individuals are accurately counted by means of the on-site records, a monthly attendance report is formed at the end of a month to provide basis for payroll settlement and issuing, a Bluetooth positioning module for preloading personnel identity information can be additionally arranged in an operator safety helmet, the Bluetooth positioning module is uploaded to the Internet of things platform for RSSI positioning, the information is associated with a map model, visualization of personnel tracks is achieved, management is facilitated, an AI camera behavior intelligent recognition system is added with the latest artificial intelligent technology in video monitoring, potential safety hazards are detected, an alarm can be immediately given out after the potential safety hazards are found, and an alarm signal is synchronously pushed to a manager;
the wisdom building site management system that this embodiment provided through being equipped with information entry platform, identification element, detecting element, task unit can monitor the condition that the gate crowd was frequented comprehensively, monitors the condition that the gate crowd of building site passed in and out, can reduce the emergence of not civilized construction and operation violating regulations simultaneously, reduces the dangerous accident of building site's production simultaneously.
The working principle of the intelligent building site management system provided by the invention is as follows:
during operation, at first with staff's photo and personal information input platform's inside, save in the wisdom platform, install the gate at construction site gate with the wisdom platform, shoot the crowd that gets into the building site through the appearance of making a video recording, upload after the appearance is made a video recording and give face recognition system and carry out information identification to the photo, whether the staff of building site when screening device screening people on the photo simultaneously.
When the information is inquired out to be a constructor of the construction site, the information is transmitted to the detection unit through the data transmission equipment.
When the construction personnel who are not the building site are inquired, the early warning device is controlled to emit beeping sounds for early warning, and security personnel are prompted to inquire about the entrance of the building site.
Photo information of constructors is transmitted to the detection unit through the data transmission equipment, storage information in a comparison system of the detection unit is compared, the safety helmet recognition system recognizes, whether the constructors wear safety helmets or not is detected, the recognized information is sorted, the constructors wearing the safety helmets are separated from the constructors not wearing the safety helmets, the constructors not wearing the safety helmets are detected to transmit information to the early warning device, and the early warning device sounds to warn the staff to wear the safety helmets and enter a construction site.
The construction personnel on the construction site wear the safety helmet and enter the construction site after all inspection is finished, the information of the construction personnel entering the construction site is transmitted to the task unit through the data transmission device, the task unit is internally provided with the task inside the task library through the information matching system, the construction work of the proper construction personnel is matched, the construction work is displayed through the task display system, the construction task of the construction personnel is displayed on a large screen, the construction personnel can conveniently know the work task of the construction personnel, and the construction task is intelligently distributed.
Compared with the related art, the intelligent building site management system provided by the invention has the following beneficial effects:
the invention provides an intelligent construction site management system, wherein photos and skills of workers are recorded through an information recording platform, an identification unit shoots the workers to come and go, the shot photos are transmitted to a face recognition system for comparison, the recorded workers are released, the workers which are not recorded are intercepted to enable security personnel to inquire, and the recorded workers are identified again by a safety helmet identification system to check whether to wear safety helmets.
The foregoing description is only illustrative of the present invention and is not intended to limit the scope of the invention, and all equivalent structures or equivalent processes or direct or indirect application in other related technical fields are included in the scope of the present invention.
Claims (10)
1. An intelligent worksite management system, comprising: an intelligent platform;
the intelligent platform comprises an identification unit, a detection unit and a task unit, wherein the identification unit shoots personnel entering a construction site and compares and identifies member information recorded in the intelligent platform with the member information recorded in the system, the detection unit screens whether workers enter the information recording platform or not through a screening device, the detection unit compares successfully screened worker information with photos, the photos of the workers are compared through a safety helmet identification system, the wearing condition of the workers is inquired, the photos of the workers wearing the safety helmet and the photos of the workers not wearing the safety helmet are sorted, and finally work is distributed to the involutory workers through the task unit.
2. The intelligent worksite management system of claim 1, wherein the identification unit comprises a camera, a face recognition system, a screening device and an early warning device.
3. The intelligent worksite management system of claim 1, wherein the detection unit comprises a comparison system, a helmet recognition system, and a screening device.
4. The intelligent worksite management system of claim 1, wherein the task unit comprises an information matching and task display device.
5. The intelligent worksite management system of claim 1, wherein the information entry platform stores information and photo entries of worksite employees in advance.
6. The intelligent worksite management system according to claim 1, wherein the identification unit photographs persons entering the worksite through the camera, the camera transmits photographed person photographs to the face recognition system, the face recognition system compares photographed person photographs with recorded employee photographs, and the photographed person photographs and recorded employee photographs are transmitted to the detection unit through the data transmission device when the photographed person photographs and the recorded employee photographs are consistent.
7. The intelligent building site management system according to claim 2, wherein when the photographed photo identified by the face recognition system does not exist in the information input platform, a warning device sounds a beep to warn, and a security personnel is prompted to know visiting personnel.
8. The intelligent worksite management system according to claim 1, wherein the detection unit compares the situations of staff entering the photo and taking the photo through the comparison system, and the safety helmet recognition system recognizes whether the staff wearing the safety helmet on the taken photo.
9. The intelligent building site management system according to claim 1, wherein the sorting device of the detecting unit sorts out whether personnel wearing safety caps in the photographed pictures can enter the building site for construction, and the sorting device sorts out the pictures of personnel not wearing safety caps.
10. The intelligent worksite management system according to claim 1, wherein the detection unit transmits the detected information of the personnel wearing the safety helmet to the information matching system through the data transmission device, and the information matching system analyzes the construction ability of the worker and displays the construction work of the constructor through the task display system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311108251.7A CN117114225A (en) | 2023-08-31 | 2023-08-31 | Intelligent building site management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311108251.7A CN117114225A (en) | 2023-08-31 | 2023-08-31 | Intelligent building site management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN117114225A true CN117114225A (en) | 2023-11-24 |
Family
ID=88799828
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202311108251.7A Pending CN117114225A (en) | 2023-08-31 | 2023-08-31 | Intelligent building site management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN117114225A (en) |
-
2023
- 2023-08-31 CN CN202311108251.7A patent/CN117114225A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111552216A (en) | Construction site intelligent supervision system based on 5G | |
CN112785798B (en) | Behavior analysis method for constructors of power substation engineering construction project | |
CN110620906A (en) | Electric power construction safety management system based on thing networking | |
CN111935645A (en) | Personnel positioning system based on UWB technology | |
CN109151383A (en) | One kind being based on BIM tunnel safety monitoring information early warning system | |
CN111768123A (en) | Visual management system for power distribution network construction site | |
CN112489272A (en) | Intelligent security control system special for garden | |
CN113298444A (en) | Private cloud-based intelligent power safety control platform | |
CN112153345A (en) | On-site intelligent anti-violation management and control platform based on 5G application operation | |
CN211877114U (en) | Construction site supervisory system based on 5G | |
CN108583592A (en) | A kind of subway service on buses or trains job information acquisition intelligent detecting method | |
CN112216010A (en) | Campus security management method, system, equipment and storage medium | |
CN106302758A (en) | Supervision department's management informationalized to demolition site system and using method thereof | |
CN112866647A (en) | Intelligent property management system based on smart community | |
CN113949717A (en) | Intelligent analysis system for construction site | |
CN115640925A (en) | Wisdom building site management system | |
CN107767497A (en) | Construction personnel's Non-contact attendance method | |
CN113256269A (en) | Engineering management system based on BIM, cloud computing and big data technology | |
DE202020102795U1 (en) | For spatial distancing ("social distancing") suitable person registration and distance measurement | |
CN117114225A (en) | Intelligent building site management system | |
CN111914050A (en) | Visual 3D monitoring platform based on specific places | |
CN115146906A (en) | Tunnel construction safety integrated management system | |
CN111754665A (en) | Open security system based on cloud computing architecture | |
CN214896722U (en) | Millimeter wave radar fuses transformer substation's operation orbit management and control device of video analysis | |
CN211877111U (en) | Construction site management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |