CN116876288A - Curb slip form construction method - Google Patents

Curb slip form construction method Download PDF

Info

Publication number
CN116876288A
CN116876288A CN202310884184.1A CN202310884184A CN116876288A CN 116876288 A CN116876288 A CN 116876288A CN 202310884184 A CN202310884184 A CN 202310884184A CN 116876288 A CN116876288 A CN 116876288A
Authority
CN
China
Prior art keywords
curb
construction
concrete
machine
slip form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310884184.1A
Other languages
Chinese (zh)
Inventor
金德熙
施杰书
王利家
唐亮
杨冬
康松涛
华龙
杨光
李鑫
徐文龙
李龙飞
夏吾才让
伊伟大
袁德识
李艺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 3 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 3 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 3 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN202310884184.1A priority Critical patent/CN116876288A/en
Publication of CN116876288A publication Critical patent/CN116876288A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/0906Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for forming, opening-out, cleaning, drying or heating cuts, grooves, recesses or, excluding forming, cracks, e.g. cleaning by sand-blasting or air-jet ; for trimming paving edges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Road Repair (AREA)
  • Road Paving Structures (AREA)
  • Road Paving Machines (AREA)

Abstract

The invention relates to the technical field of highway pavement engineering curb construction, in particular to a construction method of a curb slip form. The method comprises the steps of measuring lofting, mixing and transporting the mixture, sliding-mode paving, manual trimming and preserving and the like. The method changes the construction process of the curb stone by the one-time discharging vibration molding of the slip-form machine into the one-time molding process of 1h internal cutting maintenance of the slip-form machine discharging molding. The change of the technological method can greatly improve the work efficiency, reduce the environmental pollution of the cutting seam after curing and forming, and effectively improve the on-site overall effect of the curb.

Description

Curb slip form construction method
Technical Field
The invention relates to the field of road surface curb construction, in particular to a curb installation construction method.
Background
The construction method of the road stone in highway engineering controls the vast majority of construction methods adopting a slip form machine, and the process can utilize mechanized construction to form site standardized construction. However, the existing curb slip form construction method has large joint-cutting pollution in the later period and poor control of the crack in the earlier period on site.
Disclosure of Invention
The invention aims to solve the problems that the traditional curb slip form construction method is large in later-stage joint cutting pollution and poor in control of on-site earlier-stage cracks, and provides an improved curb slip form construction method for improving the working efficiency.
The invention adopts the technical proposal for solving the problems that:
the curb slip form construction method comprises the following steps of;
s1, preparing materials and equipment; designing a concrete mix ratio and slump, preparing a measuring and lofting instrument tool, and carrying out joint measurement on a measuring plane control point and an elevation control point to meet the lofting requirement;
s2, base layer treatment; after the working surface is cleaned, the working surface is always ensured to be moist;
s3, measuring and lofting; measuring and lofting after the base layer reaches the curing period, discharging the plane position of the curb by a GPS, controlling the elevation by a sliding mode machine sensor through a steel wire hanging wire, wherein the hanging wire position is 25-30cm away from the inner side edge of the curb;
s4, mixing and transporting the mixture; transporting the concrete to a construction site through a concrete tank truck;
s5, sliding-mode paving; connecting the tank truck with a slip form machine, conveying concrete to a hopper through a conveyor belt of the slip form machine, and enabling the slip form machine to walk and simultaneously enabling the concrete to enter a die for forming;
when the concrete in the storage hopper of the slip form machine reaches more than 2/3, the slip form machine can start to spread, and the normal continuous construction speed of the slip form machine is controlled to be 2.5-3m/min; cleaning the base layer after finishing paving;
s6, manually trimming; manually trimming the appearance of the curb;
s7, slitting and preserving health; and cutting the curb after manual trimming, and covering a plastic curing film on the surface of the curb for curing.
Preferably, in the step S1, the mixing ratio can be C20 common concrete, and the slump is 40-50mm.
Preferably, in step S4, slump detection is performed before the concrete is discharged; after reaching the construction site, a second slump detection is performed.
Preferably, in the paving process of the step S5, the concrete consumption speed in the storage hopper is ensured to be consistent with the concrete conveying speed of the concrete tank truck through the slipform machine conveyor belt.
Preferably, in the step S5, water is sprayed in the storage hopper of the slipform machine in advance before paving, so that the slipform machine is ensured not to absorb the water consumption in the concrete, and the slump loss of the concrete is reduced. The vibration intensity and frequency of the vibrating rod of the slip-form machine must be determined according to the field test section, so that the compaction of the curb concrete after slip-form is ensured. The slowest speed of the slip-form machine is preferably controlled to be 0.5-1m/min when the slip-form machine is started.
Preferably, in the construction process of the step S5, when concrete supply is not timely and exceeds 1h, a construction joint is needed, the whole sliding die machine is opened out of a construction area to be not less than 5m, the top surface of the terminal curb stone of a construction operator is measured for flatness of two side surfaces, and vertical joints are cut at positions where the flatness of three surfaces is less than 1mm for terminal treatment.
Preferably, in step S6, the manual dressing includes dressing the curb surface pores.
Preferably, in step S6, the manual dressing further comprises adjusting the surface moistures by draining the curb with an intravenous line.
Preferably, in step S7, an expansion joint is provided every 5m during lancing.
Preferably, in step S7, a slitting cutter with a thickness mark is used for slitting, and the slitting time is controlled within 1h after the completion of the curb slip form, and the die is formed once. The curb collapse caused by early cutting and the curb fracture caused by late cutting are avoided.
The invention advances the slitting time in the construction process of the curb slip form, and the film is covered and maintained for one-step molding, so that the change of the technological method can greatly improve the work efficiency and the overall effect of the curb site.
The traditional mode is that a toothless saw is used for cutting an expansion joint about 24 hours after the initial setting and curing of the curb concrete; by adopting the construction method disclosed by the invention, the technical difficulty of cutting in advance is overcome. The collapse condition caused by the unshaped curb concrete due to the vibration of cutting needs to be mastered, the cutting time is controlled, and the cutting is controlled to be performed within 1 hour after the completion of the sliding film. (1) Controlling the slump of the concrete site to be 40-50mm; (2) when in cutting, a kerf cutter with a cutting thickness marking is adopted, and the cutting is carried out on site according to the marking, so that the consistency of the cutting thickness is ensured, and the influence caused by inconsistent cutting thickness due to inconsistent cutting thickness can be avoided; (3) and the plastic film is covered immediately after the slotting, so that the shrinkage crack caused by the loss of water on the surface of the curb is avoided.
Drawings
FIG. 1 is a flow chart of a curb slipform construction method of the present invention.
Description of the embodiments
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Examples
The highway is paved with the curb, and each block of the curb is 49cm in design length and about 49kg in weight according to the traditional prefabricated installation method. The precast block has large volume, difficult removal and low efficiency, meanwhile, the line type is not easy to control in installation, the construction efficiency is low, and the progress cannot meet the requirement of construction period.
The construction is carried out according to the curb slipform construction method disclosed by the invention, as shown in figure 1, compared with the traditional method, the construction quality of the curb is ensured, the construction cost is reduced, and the overall appearance after finishing is greatly improved. The method of the invention comprises the following steps.
S1, material and equipment preparation
The sliding mode machine arrives at the scene, the sliding mode template part is designed according to the size of the design drawing, and the equipment performance passes through the equipment part inspection; the concrete mix and corresponding slump, which in this example is C20 plain concrete, is determined by the laboratory from the field materials and is maintained at 50mm.
And preparing instruments and tools for measuring and lofting, and carrying out joint measurement on the control points of the measuring plane and the control points of the elevation to meet the lofting requirement.
S2, base layer treatment
The base layer treatment can be constructed after the construction of the water-stable upper base layer is completed and the maintenance is completed, so that the binding force between the curb and the top surface of the water-stable layer is improved, the working surface is cleaned before the curb construction, no soil sundries are generated, and water is sprayed and wetted, so that the water-stable upper base layer can be combined with the water-stable upper base layer. Cleaning a section, wetting a section and constructing a section in construction, and ensuring clean and wet working surfaces all the time;
s3, measuring and lofting
After the base layer reaches the curing period, the measuring and lofting work can be carried out. The straight line section adopts 10m one place, the curve section adopts 5m one place, the position of the curb plane is discharged through GPS, and the steel wire hanging wire is adopted to control the elevation through the sliding mode machine sensor. The position of the hanging wire is 30cm away from the inner edge of the curb. Because the elevation is finished by water stable construction and has errors, the elevation can not be measured upwards by using a tape measure, so that the phenomenon that the overall apparent effect of the curb is influenced due to abrupt points of the line type of the curb is avoided;
s4, mixing and transporting the mixture
Considering that the machine-made sand has unstable water content in different storage time and batches, the water content of the sand and stone materials is detected before daily construction, and the mixing proportion is adjusted in time. Before the concrete is discharged, slump detection is carried out, and after the concrete arrives at a construction site, slump detection is carried out. Aiming at a construction site with a long concrete conveying distance, the problem that the collapse degree of concrete is small is solved, a closed tank is easy to cause, and the collapse degree loss is fully utilized to improve the collapse degree of the concrete when the concrete is discharged. If the slump is problematic, the slump is timely communicated with the mixing station to be adjusted.
Because the construction of the curb slip form requires smaller concrete slump, in order to prevent the generation of a concrete closed tank, the discharge port blades of the concrete tank truck can be reduced to increase the caliber of the discharge port;
s5, slipform paving
Before sliding the mould, the hanging wire should be checked first, after the construction requirement is met, the positions of the sliding mould machine and the mould plate are adjusted, the mould is guaranteed to be clung to the surface of the base layer, and meanwhile the inner surface of the mould is guaranteed to be clean and free of sundries. The sensor is checked to ensure that the sensor is normal.
After the concrete tank truck arrives at the construction site, the tank truck is connected with the slip form machine, concrete is conveyed to the hopper through the self conveyor belt of the slip form machine, the concrete reaches a certain compactness through the action of the self vibrating rod of the slip form machine, and the machine walks and simultaneously makes the concrete enter the mould for forming.
When the paving is started, after the volume of the concrete in the storage hopper of the slipform machine reaches 2/3, the paving is started, the speed of the slipform machine is controlled to be 3m/min, and the slipform machine can be properly accelerated after no abnormal phenomenon exists. In order to prevent the concrete from being adhered in the template, a small amount of water is sprayed in the storage hopper of the slip-form machine in advance, so that the smoothness of starting paving is ensured.
In the paving process, the concrete consumption speed in the storage hopper is ensured to be consistent with the concrete conveying speed of the concrete tank truck through the sliding mode machine conveyor belt, and the situation of material breakage is avoided.
After the paving is finished, the base layer should be cleaned in time to ensure that the base layer is not polluted in the slipform process.
When the gap between the mould and the water stabilizing surface in the slip form process is insufficient, slurry leakage phenomenon exists at the root of the curb, and the repair is needed manually, so that the construction quality is ensured.
S6, manually trimming
After the slip form construction is finished, manually finishing the appearance of the curb, dipping the plastic film in water, and then lightly sliding the plastic film on the surface of the curb, wherein the plastic film can be removed after the curb reaches a maintenance period.
S7, slitting health preserving
When the seam is cut, a curb expansion joint is arranged every 5m, if a crack is found before the seam is cut, the seam can be directly cut at the crack, and the apparent quality of the curb is ensured.
When in lancing, a lancing cutter with a marking with a cutting thickness is adopted, and the marking is cut on site, so that the consistency of the cutting thickness is ensured, and the influence caused by inconsistent cutting thickness due to inconsistent cutting thickness can be avoided; and after the seam is cut, the plastic film is immediately covered, so that the shrinkage crack caused by water loss on the surface of the curb is avoided. And (5) curing the curb within 12 hours after molding. The newly paved kerbstone has faster water loss, so that plastic films are adopted for covering except water sprinkling and health maintenance, thereby reducing water evaporation and avoiding cracks.
The above description is only a preferred embodiment of the present invention, but the scope of the present invention is not limited thereto. Any person skilled in the art, within the scope of the present disclosure, may apply to the present invention, and equivalents and modifications may be substituted or altered by elements thereof.

Claims (10)

1. The curb slip form construction method is characterized by comprising the following steps of;
s1, preparing materials and equipment; designing a concrete mix ratio and slump, preparing a measuring and lofting instrument tool, and carrying out joint measurement on a measuring plane control point and an elevation control point to meet the lofting requirement;
s2, base layer treatment; after the working surface is cleaned, the working surface is always ensured to be moist;
s3, measuring and lofting; measuring and lofting after the base layer reaches the curing period, discharging the plane position of the curb by a GPS, controlling the elevation by a sliding mode machine sensor through a steel wire hanging wire, wherein the hanging wire position is 25-30cm away from the inner side edge of the curb;
s4, mixing and transporting the mixture; transporting the concrete to a construction site through a concrete tank truck;
s5, sliding-mode paving; connecting the tank truck with a slip form machine, conveying concrete to a hopper through a conveyor belt of the slip form machine, and enabling the slip form machine to walk and simultaneously enabling the concrete to enter a die for forming;
when the concrete in the storage hopper of the slip form machine reaches more than 2/3, the slip form machine can start to spread, and the normal continuous construction speed of the slip form machine is controlled to be 2.5-3m/min; cleaning the base layer after finishing paving;
s6, manually trimming; manually trimming the appearance of the curb;
s7, slitting and preserving health; and cutting the curb after manual trimming, and covering a plastic curing film on the surface of the curb for curing.
2. The method for constructing a sliding kerb formwork according to claim 1, wherein in the step S1, the mixing ratio is C20 plain concrete, and the slump is 40-50mm.
3. The method for constructing a curb slipform according to claim 1, wherein in step S4, slump detection is performed before the concrete is discharged; after reaching the construction site, a second slump detection is performed.
4. The method for constructing the sliding form of the curb according to claim 1, wherein the concrete consumption speed in the storage hopper is ensured to be consistent with the concrete conveying speed of the concrete tank truck through the conveyor belt of the sliding form machine in the paving process of the step S5.
5. The method for slipform construction of kerb according to claim 1, wherein in step S5, water is sprayed in advance in the storage hopper of the slipform machine before paving, and the slowest speed of the slipform machine is preferably controlled to be 0.5-1m/min when the slipform machine is started.
6. The construction method of the curb slipform according to any one of claims 1-5, wherein the construction joint is to be made when the concrete is not supplied timely and exceeds 1h in the construction process of step S5, the slipform machine is integrally opened out of the construction area by not less than 5m, the flatness of the top surface and two side surfaces of the curb at the end of the construction operator is measured, and the vertical joint is cut at the position where the flatness of the three surfaces is less than 1mm for the end treatment.
7. The curb slipform construction method as claimed in claim 1, wherein the manual finishing comprises finishing the curb surface pores in step S6.
8. The method of construction of a curb slip form according to claim 1 or 7, wherein in step S6, the manual finishing further comprises adjusting surface moistures by draining water on the curb with an intravenous line.
9. The method for constructing a sliding kerb form according to claim 1, wherein in the step S7, an expansion joint is provided every 5m during the slitting.
10. The construction method of the curb slip form according to claim 1 or 9, wherein in the step S7, a slitting cutter with a thickness mark is used for slitting, and the slitting time is controlled within 1h after the completion of the curb slip form.
CN202310884184.1A 2023-07-19 2023-07-19 Curb slip form construction method Pending CN116876288A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310884184.1A CN116876288A (en) 2023-07-19 2023-07-19 Curb slip form construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310884184.1A CN116876288A (en) 2023-07-19 2023-07-19 Curb slip form construction method

Publications (1)

Publication Number Publication Date
CN116876288A true CN116876288A (en) 2023-10-13

Family

ID=88267630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310884184.1A Pending CN116876288A (en) 2023-07-19 2023-07-19 Curb slip form construction method

Country Status (1)

Country Link
CN (1) CN116876288A (en)

Similar Documents

Publication Publication Date Title
CN104480802A (en) Construction method of CRTS III plate type ballastless track
CN106381980B (en) A kind of ground tile paving technique
CN106592368A (en) Asphalt pavement paving no-cutting construction method
CN104234413B (en) A kind of production method of Ascast finish concrete template with wood grain
CN110644318A (en) Concrete construction method for field road pavement
CN111535322B (en) Distorted concrete construction method with bottom grouting
CN108059476A (en) A kind of permeable concrete and preparation method thereof
CN110607894A (en) Construction method for floor of constructional engineering
CN116876288A (en) Curb slip form construction method
CN112412008A (en) Seamless construction method for accurate slope finding of super-large concrete flat roof structure
CN111996869A (en) Construction process of artificial grass court structure of ecological water-permeable concrete foundation structure
US3866384A (en) Method of forming crack control slots
CN110453555B (en) Cement stabilized base layer expansion joint construction method and cement stabilized base layer
CN115749193A (en) Flatness and anti-cracking control construction method for super-large-area terrace
CN111851196B (en) Integrated pavement construction method for elastic silica sand road surface layer
CN107327117A (en) The preparation method on flat-die color concrete ground
CN118029235A (en) Construction method of concave water blocking belt
CN108532985A (en) Foundation beam board construction method
CN116590993A (en) Manufacturing method and process of stone-like artistic cement floor
CN115126242A (en) Construction method of anti-hollowing and anti-cracking concrete leveling layer of industrial building ground
CN113638281A (en) Construction method for maintaining and transforming airport cement concrete pavement
CN109184093B (en) Roof flashing construction method and concrete stirring device
CN116084229A (en) Construction method of city square color pervious concrete
CN206376484U (en) A kind of floor system for industrial premises
CN112431085A (en) Sesame-imitated white stone construction method of polymer concrete easy to maintain

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination