CN116818497A - Test loading device for tunnel load - Google Patents

Test loading device for tunnel load Download PDF

Info

Publication number
CN116818497A
CN116818497A CN202310762224.5A CN202310762224A CN116818497A CN 116818497 A CN116818497 A CN 116818497A CN 202310762224 A CN202310762224 A CN 202310762224A CN 116818497 A CN116818497 A CN 116818497A
Authority
CN
China
Prior art keywords
air bag
air
tunnel
loading device
supply system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310762224.5A
Other languages
Chinese (zh)
Inventor
陈立平
赵勇博
马永政
王睢
宋春霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo University of Technology
Original Assignee
Ningbo University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo University of Technology filed Critical Ningbo University of Technology
Priority to CN202310762224.5A priority Critical patent/CN116818497A/en
Publication of CN116818497A publication Critical patent/CN116818497A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/02Details
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • G01N3/10Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces generated by pneumatic or hydraulic pressure
    • G01N3/12Pressure testing

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)

Abstract

The invention discloses a test loading device for tunnel load, which relates to the technical field of tunnel load tests and comprises an outer frame, an outer air bag, a test piece, an inner air bag, an air supply system and a controller, wherein the outer frame is provided with a plurality of air inlets; the inner wall of the outer frame is annular, the outer air bag is arranged on the inner side of the outer frame, the outer air bag is annular, the test piece is arranged on the inner side of the outer air bag, and the inner air bag is arranged on the inner side of the test piece; the air supply system is communicated with the outer air bag and the inner air bag and is used for supplying air to the outer air bag and the inner air bag; the air supply system is electrically connected with the controller. According to the test loading device for tunnel load, the air bag is used for applying pressure to the test piece, and the air supply system is used for adjusting the pressure of the air bag to change the pressure to the test piece, so that various load conditions can be rapidly and accurately simulated.

Description

Test loading device for tunnel load
Technical Field
The invention relates to the technical field of tunnel load tests, in particular to a test loading device for tunnel load.
Background
Tunnel lining refers to a permanent structure that supports and maintains long-term stability and durability of a tunnel. The function is as follows: support and maintain stability of tunnels; keeping the space required by the running of the train; preventing the weathering of surrounding rock; and the influence of groundwater is relieved. Thus, tunnel liners must have sufficient strength, durability, and some resistance to freezing, penetration, and erosion. The tunnel lining mainly comprises arch rings, side walls, inverted arches and a bottom plate.
The tunnel lining mainly comprises an integral lining, a composite lining, a spray anchor lining, an assembled lining and a multi-arch lining. With the development of high-speed railways in China, the total extension of the high-speed railway tunnels is further increased. In China, a composite lining structure is adopted for high-speed railway tunnels, and the type of tunnels are affected by factors such as bad geological conditions, construction process, tooling equipment and the like in the construction process, so that lining cracking, blocking, water leakage and other disease forms are unavoidable.
The whole ring experiment of the ring tunnel lining is an important method for the stress performance of the tunnel structure.
The patent with publication number CN108801577A discloses a model test device for operating the evolution law of the tunnel lining disease of a highway, which comprises: the tunnel lining model pouring system is used for pouring a formed lining and forming cavities and cracks on the lining; the tunnel surrounding rock pouring system is used for pouring formed surrounding rocks, and lining placing spaces are reserved in the surrounding rocks; the tunnel burial loading system is used for pressurizing the top of the surrounding rock; a tunnel surrounding pressure loading system for pressurizing the surrounding rock periphery; the automobile load simulation system is used for impacting the bottom of the lining; a monitoring system comprising strain gages, soil pressure sensors, monitors and crack observers. The invention also discloses a model test method for operating the evolution law of the tunnel lining damage of the highway. The invention has simple structure and convenient operation, can perform defect prefabrication of the defect tunnel lining, ground stress of the highway tunnel and load simulation of the operation highway tunnel automobile, can be applied to various working conditions of the highway tunnel, and has high accuracy and wide application range.
In the above patent, the surrounding rock is pressurized by the elastic water bag to simulate the ground stress environment of the actual highway tunnel. Although the elastic water bag can provide relatively uniform pressure, the pressure is difficult to adjust, and the elastic water bag is difficult to be suitable for tunnel lining tests of different dimensions and different service environments.
Disclosure of Invention
In order to solve the technical problems, the invention provides the test loading device for the tunnel load, which is simpler in pressure adjustment and suitable for the tests of tunnel linings with different dimensions and different use environments.
In order to achieve the above object, the present invention provides the following solutions:
the invention provides a test loading device for tunnel load, which comprises an outer frame, an outer air bag, a test piece, an inner air bag, an air supply system and a controller, wherein the outer frame is provided with a plurality of air inlets; the inner wall of the outer frame is annular, the outer air bag is arranged on the inner side of the outer frame, the outer air bag is an annular air bag, the test piece is arranged on the inner side of the outer air bag, and the inner air bag is arranged on the inner side of the test piece; the air supply system is communicated with the outer air bag and the inner air bag and is used for supplying air to the outer air bag and the inner air bag; the air supply system is electrically connected with the controller.
Optionally, the inner air bag is an annular air bag, and a center support is arranged on the inner side of the inner air bag.
Optionally, the center support is a solid steel column or a cement column or a thick-wall steel tube.
Optionally, the outer air bag and the inner air bag comprise a plurality of sub-air bags, and each sub-air bag is provided with an air outlet, an air inlet, a pressure relief opening and a pressure sensor; the air inlet is connected with the air supply system, and the pressure sensor is electrically connected with the controller.
Optionally, the exhaust port is provided with an electric control exhaust valve, and the electric control exhaust valve is electrically connected with the controller.
Optionally, the pressure relief opening is provided with a safety valve.
Optionally, the air supply system comprises an air compressor and a pressure regulating valve, an air outlet of the air compressor is communicated with an air inlet end of the pressure regulating valve, and an air outlet end of the pressure regulating valve is communicated with the outer air bag and the inner air bag.
Optionally, the air supply system includes a plurality of air-regulating valves, the outer air bag and the inner air bag each include a plurality of sub-air bags, and an air outlet end of each air-regulating valve is respectively communicated with one sub-air bag.
Optionally, the outer frame includes a plurality of arc, connects through fastening bolt between the adjacent arc.
Compared with the prior art, the invention has the following technical effects:
the invention relates to a test loading device for tunnel load, which mainly comprises an outer frame, an outer air bag, a test piece, an inner air bag, an air supply system and a controller, wherein the outer frame is arranged on the outer air bag; the pressure is applied to the test piece through the air bag, and the pressure of the air bag is adjusted through the air supply system so as to change the pressure to the test piece, so that various load conditions can be simulated rapidly and accurately.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings that are needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic structural view of a test loading device for tunnel load according to the present invention.
Reference numerals illustrate: 1. an outer frame; 2. an outer balloon; 3. a test piece; 4. a fastening bolt; 5. an inner balloon; 6. a center support; 7. a pressure sensor; 8. an exhaust port; 9. an air inlet; 10. a pressure relief port; 11. a controller; 12. an air compressor; 13. and a pressure regulating valve.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
As shown in fig. 1, the present embodiment provides a test loading device for tunnel load, comprising an outer frame 1, an outer air bag 2, a test piece 3, an inner air bag 5, an air supply system and a controller 11; the inner wall of the outer frame 1 is annular, the outer air bag 2 is arranged on the inner side of the outer frame 1, the outer air bag 2 is annular, the test piece 3 is arranged on the inner side of the outer air bag 2, and the inner air bag 5 is arranged on the inner side of the test piece 3; the air supply system is communicated with the outer air bag 2 and the inner air bag 5 and is used for supplying air to the outer air bag 2 and the inner air bag 5; the air supply system is electrically connected with the controller 11.
The air supply system is controlled by the controller 11 to realize the pressure control of the outer air bag 2 and the inner air bag 5, achieve the technical effect of controlling the simulated load, and realize the comprehensive simulation of different loads on the inner side and the outer side of the tunnel by changing the pressures of the outer air bag 2 and the inner air bag 5, so that the simulation test is more fit with the actual condition.
In this embodiment, the inner balloon 5 is an annular balloon, and a center support 6 is provided inside the inner balloon 5. The center support 6 is used for supporting the inner side of the inner air bag 5, preventing friction and extrusion between the inner air bag walls of the inner air bag 5, effectively protecting the inner air bag 5, and enabling the inner air bag 5 to provide more accurate load for the test piece 3.
The center support 6 may be a solid steel column or a cement column or a thick-walled steel tube. The outer diameter of the center support 6 is such that the inner bag 5 can be completely deployed, and the inner side of the inner bag 5 is prevented from being squeezed and wrinkled.
The outer air bag 2 and the inner air bag 5 comprise a plurality of sub-air bags, and each sub-air bag is provided with an air outlet 8, an air inlet 9, a pressure relief opening 10 and a pressure sensor 7; the air inlet 9 is connected with an air supply system, and the pressure sensor 7 is electrically connected with the controller 11. The number of the sub-airbags may be even or odd, so that the situation that the periphery of the test piece 3 is uniformly loaded can be simulated, and the method can be used for simulating the situation that only one side of the test piece 3 is loaded. If one side of the tunnel is provided with a higher mountain, and the other side is shorter or is close to a valley, an odd number of sub-air bags are adopted, so that one side of the test piece 3 has higher load in a certain direction, and the load of the rest parts is lower.
The exhaust port 8 is provided with an electric control exhaust valve which is electrically connected with the controller 11. The pressure relief port 10 is provided with a relief valve. The air supply system comprises an air compressor 12 and a pressure regulating valve 13, an air outlet of the air compressor is communicated with an air inlet end of the pressure regulating valve 13, and an air outlet end of the pressure regulating valve 13 is communicated with the outer air bag 2 and the inner air bag 5. The air supply system comprises a plurality of pressure regulating valves 13, the outer air bag 2 and the inner air bag 5 comprise a plurality of sub-air bags, and the air outlet end of each pressure regulating valve 13 is respectively communicated with one sub-air bag.
The pressure sensor 7 is used for collecting the pressure of each sub-air bag, the controller 11 is used for setting and monitoring the pressure of each sub-air bag, the safety valve can limit the highest pressure of the sub-air bag, damage of the sub-air bag caused by overhigh pressure is avoided, and the controller 11 is used for controlling the electric control exhaust valve to exhaust each sub-air bag, so that the load change control is realized.
The outer frame 1 comprises a plurality of arc plates, and adjacent arc plates are connected through fastening bolts 4.
It should be noted that it will be apparent to those skilled in the art that the present invention is not limited to the details of the above-described exemplary embodiments, but may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
The above description of the embodiments is only for aiding in the understanding of the method of the present invention and its core ideas; also, it is within the scope of the present invention to be modified by those of ordinary skill in the art in light of the present teachings. In view of the foregoing, this description should not be construed as limiting the invention.

Claims (9)

1. The test loading device for tunnel load is characterized by comprising an outer frame, an outer air bag, a test piece, an inner air bag, an air supply system and a controller; the inner wall of the outer frame is annular, the outer air bag is arranged on the inner side of the outer frame, the outer air bag is an annular air bag, the test piece is arranged on the inner side of the outer air bag, and the inner air bag is arranged on the inner side of the test piece; the air supply system is communicated with the outer air bag and the inner air bag and is used for supplying air to the outer air bag and the inner air bag; the air supply system is electrically connected with the controller.
2. The test loading device for tunnel load according to claim 1, wherein the inner balloon is an annular balloon, and a center support is provided inside the inner balloon.
3. The test loading device for tunnel loading according to claim 2, wherein the center support is a solid steel column or a cement column or a thick-walled steel tube.
4. The test loading device for tunnel loading according to claim 1, wherein the outer airbag and the inner airbag each comprise a plurality of sub-airbags, each of which is provided with an exhaust port, an air inlet port, a pressure relief port and a pressure sensor; the air inlet is connected with the air supply system, and the pressure sensor is electrically connected with the controller.
5. The test loading device for tunnel load according to claim 4, wherein the exhaust port is provided with an electrically controlled exhaust valve, and the electrically controlled exhaust valve is electrically connected with the controller.
6. The test loading device for tunnel loading according to claim 4, wherein the pressure relief port is provided with a relief valve.
7. The test loading device for tunnel load according to claim 1, wherein the air supply system comprises an air compressor and a pressure regulating valve, an air outlet of the air compressor is communicated with an air inlet end of the pressure regulating valve, and an air outlet end of the pressure regulating valve is communicated with the outer air bag and the inner air bag.
8. The test loading device for tunnel load according to claim 7, wherein the air supply system comprises a plurality of pressure regulating valves, the outer air bag and the inner air bag each comprise a plurality of sub-air bags, and an air outlet end of each pressure regulating valve is respectively communicated with one sub-air bag.
9. The test loading device for tunnel loading according to claim 1, wherein the outer frame comprises a plurality of arc plates, and adjacent arc plates are connected through fastening bolts.
CN202310762224.5A 2023-06-27 2023-06-27 Test loading device for tunnel load Pending CN116818497A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310762224.5A CN116818497A (en) 2023-06-27 2023-06-27 Test loading device for tunnel load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310762224.5A CN116818497A (en) 2023-06-27 2023-06-27 Test loading device for tunnel load

Publications (1)

Publication Number Publication Date
CN116818497A true CN116818497A (en) 2023-09-29

Family

ID=88128741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310762224.5A Pending CN116818497A (en) 2023-06-27 2023-06-27 Test loading device for tunnel load

Country Status (1)

Country Link
CN (1) CN116818497A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114199686A (en) * 2021-11-05 2022-03-18 武汉二航路桥特种工程有限责任公司 Model test device and method for disease evolution law of tunnel lining of operation highway

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114199686A (en) * 2021-11-05 2022-03-18 武汉二航路桥特种工程有限责任公司 Model test device and method for disease evolution law of tunnel lining of operation highway
CN114199686B (en) * 2021-11-05 2024-05-14 中交特种工程有限公司 Model test device and method for operating highway tunnel lining disease evolution law

Similar Documents

Publication Publication Date Title
CN108872530B (en) Large-scale model test device for simulating asymmetric small-clear-distance tunnel excavation process
CN109556965B (en) Shield segment mechanical property simulation test device
CN110823612B (en) Tunnel surrounding rock lining composite structure stress waterproof test system and method
CN116818497A (en) Test loading device for tunnel load
CN106501014A (en) Vertical load testing machine for domain tunnel structure
CN108489748B (en) A kind of experimental rig and test method for continuous bridge long period Study of Cyclic Loading
CN102866070B (en) Loading method for bearing strength test for secondary lining concrete structure of tunnel
CN108414363A (en) A kind of experimental rig for simulating hydraulic pressure in water-conveyance tunnel height
CN112763581B (en) Multi-strain-rate disturbance outburst simulation test system and method in roadway pressure-maintaining excavation process
CN105588802A (en) Three-dimensional experimental system and experimental method for simulating plastic zone of surrounding rock of roadway
CN108678757A (en) Shield machine thread-changing method of reseptance based on steel bushing reception device
CN105092384A (en) System and method for flexibly loading controllable boundary based on true triaxial test
CN113588248A (en) Test device and method for simulating stress of shield segments with different turning radii
CN114198107A (en) Multifunctional reduced-scale shield model free of shield machine model and test method thereof
Wang et al. Newly developed pressure adaptable concrete lining for high pressure hydraulic tunnels
CN115163120A (en) Model test device and test method for shield tunnel lining
CN208297257U (en) A kind of water-conveyance tunnel experimental rig
CN111608709B (en) Yielding anchor rod suitable for soft rock large-deformation underground space and supporting method
CN109655346A (en) A kind of tunnel duct piece longitudinal force simulation bringing device and its method
CN109682624B (en) Deep tunnel whole ring test method
CN116312188B (en) Model device for simulating operation of abandoned mine compressed air energy storage system
Pi et al. Innovative loading system for applying internal pressure to a test model of pre-stressed concrete lining in pressure tunnels
CN116609509A (en) Novel compaction grouting test device and method for broken coal rock mass
CN110552729A (en) Surrounding rock supporting system and method
CN204855272U (en) Flexible loading system on controllable border based on real triaxial test

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination