CN116738080A - Automatic generation method and system for engineering supervision log - Google Patents
Automatic generation method and system for engineering supervision log Download PDFInfo
- Publication number
- CN116738080A CN116738080A CN202310786783.XA CN202310786783A CN116738080A CN 116738080 A CN116738080 A CN 116738080A CN 202310786783 A CN202310786783 A CN 202310786783A CN 116738080 A CN116738080 A CN 116738080A
- Authority
- CN
- China
- Prior art keywords
- supervision
- data
- log
- engineering
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 45
- 238000012545 processing Methods 0.000 claims abstract description 7
- 238000010276 construction Methods 0.000 claims description 16
- 238000012795 verification Methods 0.000 claims description 10
- 238000007689 inspection Methods 0.000 claims description 6
- 238000012550 audit Methods 0.000 claims description 4
- 238000012937 correction Methods 0.000 claims description 3
- 230000008569 process Effects 0.000 claims description 3
- 238000013508 migration Methods 0.000 description 12
- 230000005012 migration Effects 0.000 description 12
- 238000007726 management method Methods 0.000 description 4
- 230000003203 everyday effect Effects 0.000 description 3
- 230000006399 behavior Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 238000013500 data storage Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002354 daily effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Landscapes
- Debugging And Monitoring (AREA)
Abstract
The invention relates to the technical field of data processing, in particular to an automatic generation method and system of an engineering supervision log, comprising the following steps: acquiring positioning data and date data of the same day, and acquiring weather condition data according to the positioning data and the date data; acquiring to-be-edited supervision data based on a preset supervision log template; acquiring the signature information of the authenticated proctoring person; and generating an engineering supervision log of the current day in the current day according to the date data, the weather condition data, the supervision data to be edited and the supervision person signature information. According to the date data, the weather condition data, the to-be-edited supervision data and the supervision person signature information, the automatic engineering supervision log generation system generates an engineering supervision log of the current day in the current day; the log does not need to be manually edited, the efficiency is high, and errors are not easy to occur.
Description
Technical Field
The invention relates to the technical field of data processing, in particular to an automatic generation method and system for engineering supervision logs.
Background
At present, the supervision log is an original record of supervision activities implemented by supervision engineers, and is important data for executing supervision consignment contracts, compiling supervision completion files, processing claims, postponing and changing; is also important for analyzing engineering quality problems, and is the most original and reliable material; is also the most basic component of engineering supervision files.
In the traditional supervision log generation method, a recorder needs to inquire whether working contents needing to be included in the supervision log exist or not one by one to the project colleague, and the record contents of the log are lost and incomplete due to untimely communication often occurs.
Disclosure of Invention
In order to solve the problems, the invention provides an automatic generation method and system for an engineering supervision log, which can standardize the content of the supervision log and improve the efficiency of editing the supervision log.
In order to achieve the above purpose, the invention adopts the following technical scheme:
an automatic generation method of an engineering supervision log comprises the following steps:
acquiring positioning data and date data of the same day, and acquiring weather condition data according to the positioning data and the date data;
acquiring to-be-edited supervision data based on a preset supervision log template;
acquiring the signature information of the authenticated proctoring person;
and generating an engineering supervision log of the current day in the current day according to the date data, the weather condition data, the supervision data to be edited and the supervision person signature information.
Further, the automatic generation method of the engineering supervision log further comprises the following steps:
and printing the generated engineering supervision log according to a supervision standard or a local standard supervision log format.
Further, the to-be-edited proctoring data includes: construction site and condition data, constructor number data, machine use condition data, side station and inspection condition data, process acceptance condition data, field problem data, correction processing condition data and other condition data.
Further, the method for generating the to-be-edited proctoring data comprises the following steps:
collecting supervision information through a user side;
and auditing the collected supervision information, taking the supervision information conforming to the auditing rules as the supervision data to be edited, returning the supervision information not conforming to the auditing rules to the user side, and reminding the user side to modify according to the requirements.
Further, the client comprises an administrator client, and the administrator client is used for uploading, deleting and modifying the supervision log template and editing the auditing rules.
Further, the auditing of the collected supervision information includes:
if the supervision information contains image information, the image information is identified through an image identification algorithm, the identified image information is classified, and then the classified image information is checked.
Further, the verification method of the signing information of the proctoring person comprises the following steps:
matching the acquired signature information with a preset signature sample library,
if the matching is successful, the verification is passed.
An automatic generation system of engineering supervision logs, which performs the automatic generation method of engineering supervision logs as described above.
Further, the automatic generation system of the engineering supervision log comprises:
the user terminal is used for collecting supervision information submitted by a user;
and the automatic engineering supervision log generation platform is used for generating the engineering supervision log of the current day in the current day according to the date data, the weather condition data, the supervision data to be edited and the supervision person signature information.
Further, the automatic generation platform of the engineering supervision log comprises:
the data acquisition module is used for acquiring date data, weather condition data, to-be-edited supervision data and supervision person signature information;
and the log generation module is used for generating engineering supervision logs of the current day in the current day according to the date data, the weather condition data, the to-be-edited supervision data and the supervision person signature information.
The invention has the beneficial effects that:
the automatic generation method of the engineering supervision log comprises the following steps: acquiring positioning data and date data of the same day, and acquiring weather condition data according to the positioning data and the date data; acquiring to-be-edited supervision data based on a preset supervision log template; acquiring the signature information of the authenticated proctoring person; and generating an engineering supervision log of the current day in the current day according to the date data, the weather condition data, the supervision data to be edited and the supervision person signature information. According to the date data, the weather condition data, the to-be-edited supervision data and the supervision person signature information, the automatic engineering supervision log generation system generates an engineering supervision log of the current day in the current day; the log does not need to be manually edited, the efficiency is high, and errors are not easy to occur. The method comprises the following steps: the embodiment of the invention can automatically summarize the working behaviors and the dynamics of each person on site, and only needs to fill in according to the content of the supervision log template, wherein the supervision log template is required according to the national standard, so that the supervision is ensured to check without missing items and missing inspection when checking and accepting, and has standard support, the on-site supervision work can be guided in real time, the problem of nonstandard caused by insufficient knowledge surface during checking and accepting is solved, and the professional requirement on supervision personnel is reduced. Moreover, the embodiment of the invention can automatically generate the complete personal supervision log for all the works in the same day, and the situations of write omission and the like can not occur.
Drawings
FIG. 1 is a flow chart of an automatic generation method of an engineering supervision log.
Detailed Description
Referring to fig. 1, the present invention relates to an automatic generation method and system for an engineering supervision log. The engineering supervision log is an original record of supervision activities implemented by supervision engineers, and is important data for executing supervision consignment contracts, compiling supervision completion files and processing claims, postponing and changing; is an important, original and reliable material for analyzing engineering quality problems; is also the most basic component of engineering supervision files. The supervision log should truly, accurately and comprehensively record the problems related to engineering progress, quality and safety, and words are accurate, precise and standard. The problems, solving approaches and methods are recorded, so that the method is convenient to find, and owners and authorities can know the supervision work content and the supervision work performance more comprehensively.
Besides inspection, side station and acceptance work, the supervision personnel can collect, arrange or record supervision data every day and edit the supervision data into supervision logs, so that the labor capacity is very large and mistakes or missed writing are easy. In the prior art, in the method for generating the supervision log, a recorder needs to inquire whether working contents needing to be included in the supervision log are included one by one to the project colleague, and the record contents of the log are always lost and incomplete due to untimely communication.
In view of the above, an embodiment of the present invention provides an automatic generation method of an engineering supervision log, where the automatic generation method of an engineering supervision log is applied to an automatic generation system of an engineering supervision log, and the automatic generation system of an engineering supervision log includes:
the user terminal is used for collecting supervision information submitted by a user; the user side comprises a supervisor user side, an administrator user side and a general supervision user side, wherein the supervisor user side is used for a supervisor to submit and modify supervisor information; the administrator user side is used for uploading, deleting and modifying the supervision log template and editing the auditing rules; and the general supervision user side is used for receiving the engineering supervision log and carrying out approval on the received engineering supervision log.
And the automatic engineering supervision log generation platform is used for generating the engineering supervision log of the current day in the current day according to the date data, the weather condition data, the supervision data to be edited and the supervision person signature information. Further, the automatic generation platform of the engineering supervision log comprises:
the data acquisition module is used for acquiring date data, weather condition data, to-be-edited supervision data and supervision person signature information;
the log generation module is used for generating engineering supervision logs of the current day in the current day according to the date data, the weather condition data, the to-be-edited supervision data and the supervision person signature information;
the approval pushing module is used for pushing the generated engineering supervision log to a general supervision user side for approval;
the participating unit pushing module is used for pushing the generated engineering supervision log to each participating party; the aim of the method is that each participating entity can intuitively see the supervision work condition completed by the supervision personnel every day, and the mutual understanding of a construction party and a supervision party is improved;
the archiving module is used for transmitting the project supervision log passing the approval of the general supervision client to an archive database; the aim of the method is to automatically archive and store engineering supervision logs in time; thereby preventing file data from losing and reducing file management difficulty. The archive database includes:
the temporary storage database is used for storing the project supervision log before the construction project is finished;
the archiving database is used for storing the project supervision log after the construction project is finished;
because the temporary storage database runs faster, but the storage capacity is relatively smaller, and each construction project contains a large amount of data; in order to reduce the data storage burden of the temporary database. Therefore, after one construction project is finished, the project supervision log data in the temporary storage database is copied into the archiving database, and the corresponding project supervision log data in the temporary storage database is deleted. It should be noted that, all engineering supervision log data which has finished the engineering flow are put in the archive database, so that the engineering supervision log data can be stored for a long time, and centralized management and maintenance can be facilitated.
Further, after one construction project is finished, project supervision log data in the temporary storage database is migrated to the archiving database, and the method specifically comprises the following steps of:
acquiring to-be-migrated engineering supervision log data in a temporary storage database;
determining first migration data added in an archive database after the project supervision log data to be migrated is migrated to the archive database;
performing consistency check of data volume before and after migration according to the project supervision log data to be migrated and the first migration data;
and if the verification is passed, deleting the project supervision log data to be migrated in the temporary storage database.
In this embodiment, after the data in the source database is stored in a database and a table is stored in a table, the data is inconsistent before and after migration due to the number of databases, the number of tables and the change of the data amount in each table after migration; the embodiment can perform consistency verification on the migrated data, so that consistency of the data before and after migration is guaranteed.
The automatic generation method of the engineering supervision log comprises the following steps:
acquiring positioning data and date data of the same day, and acquiring weather condition data according to the positioning data and the date data;
acquiring to-be-edited supervision data based on a preset supervision log template;
acquiring the signature information of the authenticated proctoring person;
generating an engineering supervision log of the current day in the current day according to the date data, the weather condition data, the supervision data to be edited and the supervision person signature information;
in the above scheme, the automatic generation system of the engineering supervision log generates the engineering supervision log of the current day in the current day according to the date data, the weather condition data, the supervision data to be edited and the supervision person signature information; the log does not need to be manually edited, the efficiency is high, and errors are not easy to occur. The method comprises the following steps: the embodiment of the invention can automatically summarize the working behaviors and the dynamics of each person on site, and only needs to fill in according to the content of the supervision log template, wherein the supervision log template is required according to the national standard, so that the supervision is ensured to check without missing items and missing inspection when checking and accepting, and has standard support, the on-site supervision work can be guided in real time, the problem of nonstandard caused by insufficient knowledge surface during checking and accepting is solved, and the professional requirement on supervision personnel is reduced. In addition, the embodiment of the invention can automatically generate complete personal supervision logs for all work on the same day, the condition of write omission and the like can not occur, and after the engineering supervision logs on the same day are generated, the system can be automatically pushed to a general supervision user side for approval.
The embodiment of the invention has comprehensive supervision content and can meet the daily work requirements of supervision personnel in a construction site. Compared with the traditional mode, the embodiment of the invention can save a plurality of troubles for the supervision personnel, greatly reduce the path and the workload of reporting work and lead the work to be more convenient and specialized.
Further, the automatic generation method of the engineering supervision log further comprises the following steps:
printing the generated engineering supervision log according to supervision specifications or local standard supervision log formats; the purpose of this definition is to meet the various demands of users and to make paper version project supervision logs as required.
Further, the to-be-edited proctoring data includes: construction site and condition data, constructor number data, machine use condition data, side station and inspection condition data, process acceptance condition data, field problem data, correction processing condition data and other condition data.
Further, the method for generating the to-be-edited proctoring data comprises the following steps:
collecting supervision information through a user side;
and auditing the collected supervision information, taking the supervision information conforming to the auditing rules as the supervision data to be edited, returning the supervision information not conforming to the auditing rules to the user side, and reminding the user side to modify according to the requirements.
Further, the client comprises an administrator client, and the administrator client is used for uploading, deleting and modifying the supervision log template and editing the auditing rules.
Further, the auditing of the collected supervision information includes:
if the supervision information contains image information, the image information is identified through an image identification algorithm, the identified image information is classified, and then the classified image information is checked; the aim of the method is that the image is classified and then audited, so that the complexity of audit and the workload of audit can be reduced, and the audit efficiency is improved.
Further, the verification method of the signing information of the proctoring person comprises the following steps:
matching the acquired signature information with a preset signature sample library,
if the matching is successful, the verification is passed.
Another embodiment of the present invention provides an automatic engineering supervision log generating system that executes the automatic engineering supervision log generating method as described above.
Further, the automatic generation system of the engineering supervision log comprises:
the user terminal is used for collecting supervision information submitted by a user; the user side comprises a supervisor user side, an administrator user side and a general supervision user side, wherein the supervisor user side is used for a supervisor to submit and modify supervisor information; the administrator user side is used for uploading, deleting and modifying the supervision log template and editing the auditing rules; and the general supervision user side is used for receiving the engineering supervision log and carrying out approval on the received engineering supervision log.
And the automatic engineering supervision log generation platform is used for generating the engineering supervision log of the current day in the current day according to the date data, the weather condition data, the supervision data to be edited and the supervision person signature information. Further, the automatic generation platform of the engineering supervision log comprises:
the data acquisition module is used for acquiring date data, weather condition data, to-be-edited supervision data and supervision person signature information;
the log generation module is used for generating engineering supervision logs of the current day in the current day according to the date data, the weather condition data, the to-be-edited supervision data and the supervision person signature information;
the approval pushing module is used for pushing the generated engineering supervision log to a general supervision user side for approval;
the participating unit pushing module is used for pushing the generated engineering supervision log to each participating party; the aim of the method is that each participating entity can intuitively see the supervision work condition completed by the supervision personnel every day, and the mutual understanding of a construction party and a supervision party is improved;
the archiving module is used for transmitting the project supervision log passing the approval of the general supervision client to an archive database; the aim of the method is to automatically archive and store engineering supervision logs in time; thereby preventing file data from losing and reducing file management difficulty.
Further, the archive database includes:
the temporary storage database is used for storing the project supervision log before the construction project is finished;
the archiving database is used for storing the project supervision log after the construction project is finished;
because the temporary storage database runs faster, but the storage capacity is relatively smaller, and each construction project contains a large amount of data; in order to reduce the data storage burden of the temporary database. Therefore, after one construction project is finished, the project supervision log data in the temporary storage database is copied into the archiving database, and the corresponding project supervision log data in the temporary storage database is deleted. It should be noted that, all engineering supervision log data which has finished the engineering flow are put in the archive database, so that the engineering supervision log data can be stored for a long time, and centralized management and maintenance can be facilitated.
Further, after one construction project is finished, project supervision log data in the temporary storage database is migrated to the archiving database, and the method specifically comprises the following steps of:
acquiring to-be-migrated engineering supervision log data in a temporary storage database;
determining first migration data added in an archive database after the project supervision log data to be migrated is migrated to the archive database;
performing consistency check of data volume before and after migration according to the project supervision log data to be migrated and the first migration data;
and if the verification is passed, deleting the project supervision log data to be migrated in the temporary storage database.
In this embodiment, after the data in the source database is stored in a database and a table is stored in a table, the data is inconsistent before and after migration due to the number of databases, the number of tables and the change of the data amount in each table after migration; the embodiment can perform consistency verification on the migrated data, so that consistency of the data before and after migration is guaranteed.
The above embodiments are merely illustrative of the preferred embodiments of the present invention and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art to the technical solution of the present invention should fall within the scope of protection defined by the claims of the present invention without departing from the spirit of the design of the present invention.
Claims (9)
1. The automatic generation method of the engineering supervision log is characterized by comprising the following steps of:
acquiring positioning data and date data of the same day, and acquiring weather condition data according to the positioning data and the date data;
acquiring to-be-edited supervision data based on a preset supervision log template;
acquiring the signature information of the authenticated proctoring person;
generating an engineering supervision log of the current day in the current day according to the date data, the weather condition data, the supervision data to be edited and the supervision person signature information;
the method for generating the to-be-edited supervision data comprises the following steps:
collecting supervision information through a user side;
and auditing the collected supervision information, taking the supervision information conforming to the auditing rules as the supervision data to be edited, returning the supervision information not conforming to the auditing rules to the user side, and reminding the user side to modify according to the requirements.
2. The automatic generation method of an engineering supervision log according to claim 1, further comprising the steps of:
and printing the generated engineering supervision log according to a supervision standard or a local standard supervision log format.
3. The automatic generation method of an engineering supervision log according to claim 1, wherein the supervision data to be edited includes: construction site and condition data, constructor number data, machine use condition data, side station and inspection condition data, process acceptance condition data, field problem data, correction processing condition data and other condition data.
4. The method for automatically generating an engineering supervision log according to claim 1, wherein the client comprises an administrator client, and the administrator client is configured to upload, delete and modify supervision log templates, and edit the audit rule.
5. The automatic generation method of engineering supervision log according to claim 1, wherein the auditing of the collected supervision information includes:
if the supervision information contains image information, the image information is identified through an image identification algorithm, the identified image information is classified, and then the classified image information is checked.
6. The automatic generation method of engineering supervision log according to claim 1, wherein the verification method of the supervision person signature information comprises the following steps:
matching the acquired signature information with a preset signature sample library,
if the matching is successful, the verification is passed.
7. An automatic generation system of engineering supervision logs, characterized in that the automatic generation system of engineering supervision logs executes the automatic generation method of engineering supervision logs according to any one of claims 1 to 6.
8. The automatic engineering supervision log generation system according to claim 7, comprising:
the user terminal is used for collecting supervision information submitted by a user;
and the automatic engineering supervision log generation platform is used for generating the engineering supervision log of the current day in the current day according to the date data, the weather condition data, the supervision data to be edited and the supervision person signature information.
9. The automatic generation system of engineering supervision logs according to claim 8, wherein the automatic generation platform of engineering supervision logs comprises:
the data acquisition module is used for acquiring date data, weather condition data, to-be-edited supervision data and supervision person signature information;
and the log generation module is used for generating engineering supervision logs of the current day in the current day according to the date data, the weather condition data, the to-be-edited supervision data and the supervision person signature information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310786783.XA CN116738080A (en) | 2023-06-30 | 2023-06-30 | Automatic generation method and system for engineering supervision log |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310786783.XA CN116738080A (en) | 2023-06-30 | 2023-06-30 | Automatic generation method and system for engineering supervision log |
Publications (1)
Publication Number | Publication Date |
---|---|
CN116738080A true CN116738080A (en) | 2023-09-12 |
Family
ID=87915022
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310786783.XA Pending CN116738080A (en) | 2023-06-30 | 2023-06-30 | Automatic generation method and system for engineering supervision log |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116738080A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109344311A (en) * | 2018-12-04 | 2019-02-15 | 北京诺士诚国际工程项目管理有限公司 | A kind of generation method of work diary, the generation method of supervision diary and system |
CN113806170A (en) * | 2021-09-07 | 2021-12-17 | 广东世纪信通网络科技有限公司 | Method, system, medium and terminal for automatically generating engineering industry supervision log |
CN114298685A (en) * | 2021-12-29 | 2022-04-08 | 广州睿冠信息科技有限公司 | Engineering consultation supervision test operation and maintenance overall process management system |
-
2023
- 2023-06-30 CN CN202310786783.XA patent/CN116738080A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109344311A (en) * | 2018-12-04 | 2019-02-15 | 北京诺士诚国际工程项目管理有限公司 | A kind of generation method of work diary, the generation method of supervision diary and system |
CN113806170A (en) * | 2021-09-07 | 2021-12-17 | 广东世纪信通网络科技有限公司 | Method, system, medium and terminal for automatically generating engineering industry supervision log |
CN114298685A (en) * | 2021-12-29 | 2022-04-08 | 广州睿冠信息科技有限公司 | Engineering consultation supervision test operation and maintenance overall process management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111767247A (en) | File specification and synchronous forming control platform for real-time supervision of engineering data | |
CN110852699A (en) | Electronic intelligent management system and method for files | |
US9009175B2 (en) | System and method for database migration and validation | |
CN113806170B (en) | Method, system, medium and terminal for automatically generating supervision log of engineering industry | |
CN112732641A (en) | Electronic file filing method, device and medium | |
CN110211581B (en) | Laboratory automatic voice recognition recording identification system and method | |
CN113190501A (en) | Method for forming and filing electronic file for quality testing of water conservancy and hydropower engineering | |
CN110866024B (en) | Vector database increment updating method and system | |
CN112651218A (en) | Automatic generation method and management method of bidding document, medium and computer | |
CN111311190A (en) | Experimental data management method convenient for data collection | |
CN114416638A (en) | Automatic electronic file filing method and system | |
CN116738080A (en) | Automatic generation method and system for engineering supervision log | |
CN117273394A (en) | Intelligent equipment selection allocation analysis management method based on big data | |
CN112232760A (en) | Infrastructure management system and method | |
CN116126790A (en) | Railway engineering archive archiving method and device, electronic equipment and storage medium | |
CN114565220A (en) | Engineering project quality management cooperative system based on cloud platform | |
CN113269536A (en) | Construction log system based on two-dimensional code and use method | |
CN111241231B (en) | Railway construction project document bus system | |
Munawar | Extract Transform Loading (ETL) Based Data Quality for Data Warehouse Development | |
CN115907519A (en) | Information security compliance detection method and system | |
CN116991859A (en) | Engineering machinery test data processing method and system | |
CN114066170A (en) | Government data open sharing-oriented problem feedback processing system and method | |
CN118069667A (en) | Heterogeneous database synchronization method based on log | |
CN116934282A (en) | Self-linkage enterprise human resource data extraction synchronization method and system thereof | |
KR20240079900A (en) | Systemfor processing laboratory note |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |