CN114298685A - Engineering consultation supervision test operation and maintenance overall process management system - Google Patents

Engineering consultation supervision test operation and maintenance overall process management system Download PDF

Info

Publication number
CN114298685A
CN114298685A CN202111635322.XA CN202111635322A CN114298685A CN 114298685 A CN114298685 A CN 114298685A CN 202111635322 A CN202111635322 A CN 202111635322A CN 114298685 A CN114298685 A CN 114298685A
Authority
CN
China
Prior art keywords
module
supervision
project
electrically connected
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111635322.XA
Other languages
Chinese (zh)
Inventor
付东生
郭燕菊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Ruiguan Information Technology Co ltd
Original Assignee
Guangzhou Ruiguan Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Ruiguan Information Technology Co ltd filed Critical Guangzhou Ruiguan Information Technology Co ltd
Priority to CN202111635322.XA priority Critical patent/CN114298685A/en
Publication of CN114298685A publication Critical patent/CN114298685A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an engineering consultation supervision test operation and maintenance overall process management system, which relates to the field of engineering supervision, and aims at solving the problems that the existing partial engineering supervision work process records depend on manual compiling of work logs, data is difficult to search, and the work logs are easy to lose, and the partial engineering supervision overall process management system cannot carry out self-checking, has poor work stability and is inconvenient to use, the following scheme is proposed, and comprises the following steps: the login module is electrically connected with the function classification module and is used for logging in the system; and the function classification module is electrically connected with the log recording module and is used for classified display of new system functions. The invention has novel structure, can make the compiling of the supervision log more data, avoids the loss of paper files, and can also test, operate and maintain the system, make the system simulate and run, avoid the system from being out of order and improve the stability of the system.

Description

Engineering consultation supervision test operation and maintenance overall process management system
Technical Field
The invention relates to the field of engineering supervision, in particular to an engineering consultation supervision test operation and maintenance overall process management system.
Background
Project supervision is a commission of a party A, a professional service activity representing the implementation and monitoring of project construction of a party B is a paid project consultation service according to project construction files approved by the state, laws and regulations related to the project construction, project construction supervision contracts and other project construction contracts, the supervision is mainly based on laws, regulations, technical standards, related contracts and files, the supervision criterion is law, integrity, justice and science, the supervision aims to ensure the quality and safety of the project construction, improve the project construction level, fully exert investment benefits, and needs to be recorded when supervision is carried out, so that the party A can conveniently look up, but the existing partial project supervision working process records depend on manual compiling of working logs, data is difficult to find, and data is easy to lose, and partial project supervision cannot carry out self-inspection by using a whole process management system, the work stability is poor, and the problem of inconvenient use exists, therefore, in order to solve this kind of problem, we have proposed engineering consultation supervision test operation and maintenance overall process management system.
Disclosure of Invention
The engineering consultation supervision test operation and maintenance overall process management system provided by the invention solves the problems that the existing partial engineering supervision work process records depend on manual work log compiling, data searching is difficult, data are easy to lose, the partial engineering supervision overall process management system cannot perform self-checking, the work stability is poor, and the use is inconvenient.
In order to achieve the purpose, the invention adopts the following technical scheme:
the engineering consultation supervision test operation and maintenance overall process management system comprises the following steps:
the login module is electrically connected with the function classification module and is used for logging in the system;
the function classification module is electrically connected with the log recording module and is used for classified display of new system functions;
the log recording module is electrically connected with the content editing module and is used for compiling a working log in the project supervision process;
the content editing module is electrically connected with the data storage module and is used for character editing of all contents in the system and character input and character modification of a working log;
the data storage module is electrically connected with the file uploading module and is used for storing files recorded in the project supervision process;
the file uploading module is electrically connected with the analysis module and is used for uploading attachments in a working log and performing cloud transmission work;
the analysis module is electrically connected with the file export module and is used for the accuracy analysis of the file;
and the file export module is used for exporting the files generated in the project supervision process.
Preferably, the engineering consultation, supervision, test, operation and maintenance overall process management system further comprises:
the system operation and maintenance module is electrically connected with the system self-checking module and is used for simulating the operation of the system;
the system self-checking module is electrically connected with the virus killing module and is used for carrying out system self-checking work;
and the virus searching and killing module is used for searching and killing viruses in the system, so that system loopholes are reduced.
Preferably, the system operation and maintenance module is electrically connected with the system self-checking module and the login module respectively, the login module is electrically connected with the consultation module, and the consultation module is used for consultation of the engineering supervision process.
Preferably, the function classification module is electrically connected with the data import module, the data import module is used for importing data into the system from the database, so that the system data is more complete, and the function classification module is respectively electrically connected with the login module and the data import module.
The engineering consultation supervision test operation and maintenance overall process management method comprises the following steps:
s1, logging in a main page, and then selecting functions;
s2, selecting a system to test operation and maintenance service, new project supervision personnel allocation, past supervision project check, new supervision project addition, existing supervision project selection, project supervision consultation and other functions according to requirements;
s3, feeding back proctoring problems encountered in each proctoring work;
s4, exporting the proctoring content list and signing by a related responsible person;
and S5, submitting the signed file to a project chief manager for acceptance and signature, and completing the supervision work.
Preferably, the adding of the new proctoring project in S2 specifically includes the following steps:
s201, creating a new proctoring project, and selecting a project template;
s202, performing writing on the project content while manipulating the journal according to the project content;
s203, adding time and date to the written project log and project content, uploading the document attachment according to specific conditions, and if the document attachment is uploaded, turning to S204, and if the document attachment is not uploaded, turning to S205;
s204, uploading the managed document attachment, detecting whether the uploaded document attachment meets the requirement, reserving the document attachment meeting the requirement, and uploading the document attachment which does not meet the requirement again after being modified;
s205, exporting and printing the prepared supervision work log list, and then signing by a project principal;
and S206, delivering the work log list signed by the project principal to a project chief manager for checking, accepting and signing, and finishing the supervision work.
Preferably, the specific step of selecting the existing item in S2 refers to the step of adding a new proctoring item, and skips S201.
Preferably, the new project supervisor distribution process is as follows:
s211, appointing a proctoring person without work content;
s212, the project chief manager takes effect after signing.
Preferably, the system testing operation and maintenance service in S2 specifically includes the following steps:
s221, performing simulation operation on the system, checking whether the simulation operation of the system is successful, and switching to S223 if the simulation operation is not successful, or switching to S222 if the simulation operation is not successful;
s222, detecting the reason of the system simulation operation failure, and returning to S221 after the problem is solved;
s223, after the simulation operation of the system is successful, self-checking the system, and checking and killing viruses in the system;
and S224, finishing the self-checking of the system and closing the system.
Preferably, the system test operation and maintenance service, the allocation of new project supervision personnel, the checking of past supervision projects, the addition of new supervision projects, the selection of existing supervision projects and the supervision consultation of projects in the step S2 are independent functions and cannot be performed simultaneously.
The invention has the beneficial effects that:
the distribution of project supervision personnel, the check of past supervision projects, the addition of new supervision projects and the editing of existing supervision projects can be realized through the plurality of functional modules, the check of the past supervision projects is more convenient, meanwhile, the compiling of supervision logs is more digitalized, the loss of paper files is avoided, meanwhile, the operation and maintenance of the system can be tested, the system is simulated, the system is prevented from being broken down, the stability of the system is improved, the efficiency of supervision work is improved, and the practicability of the system is improved.
In conclusion, the system is convenient to use, compiling of the supervision logs can be more digitalized, loss of paper files is avoided, meanwhile, the system can be tested, operated and maintained, the system can be simulated, system faults are avoided, stability of the system is improved, and the problems that existing working process records of partial project supervision depend on manual compiling of the working logs, data searching is difficult, data are easy to lose, self checking cannot be carried out on partial project supervision by using a whole process management system, working stability is poor, and use is inconvenient are solved.
Drawings
FIG. 1 is a schematic structural diagram of an overall process management system for engineering consultation supervision test operation and maintenance according to the present invention.
FIG. 2 is a flowchart of the management method of the whole operation and maintenance process of the engineering consultation supervision test according to the present invention.
FIG. 3 is a flowchart of the proctoring project record of FIG. 2 according to the present invention.
FIG. 4 is a flowchart illustrating the system testing operation and maintenance service of FIG. 2 according to the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Example 1
Referring to fig. 1, the engineering consultation, supervision, test, operation and maintenance overall process management system comprises the following components:
the login module is electrically connected with the function classification module and is used for logging in the system;
the function classification module is electrically connected with the log recording module and is used for classified display of new system functions;
the log recording module is electrically connected with the content editing module and is used for compiling a working log in the project supervision process;
the content editing module is electrically connected with the data storage module and is used for character editing of all contents in the system and character input and character modification of a working log;
the data storage module is electrically connected with the file uploading module and is used for storing files recorded in the project supervision process;
the file uploading module is electrically connected with the analysis module and is used for uploading attachments in a working log and performing cloud transmission work;
the analysis module is electrically connected with the file export module and is used for the accuracy analysis of the file;
and the file export module is used for exporting the files generated in the project supervision process.
The system operation and maintenance module is electrically connected with the system self-checking module and is used for simulating the operation of the system;
the system self-checking module is electrically connected with the virus killing module and is used for carrying out system self-checking work;
and the virus searching and killing module is used for searching and killing viruses in the system, so that system loopholes are reduced.
The system operation and maintenance module is respectively electrically connected with the system self-checking module and the login module, the login module is electrically connected with the consultation module, and the consultation module is used for consultation of the engineering supervision process.
The function classification module is electrically connected with the data import module, the data import module is used for importing data into the system from the database, so that the system data are more complete, and the function classification module is electrically connected with the login module and the data import module respectively.
Example 2
Referring to fig. 2-4, the engineering consultation supervision test operation and maintenance overall process management method comprises the following steps:
s1, logging in a main page, and then selecting functions;
s2, selecting a system to test operation and maintenance service, new project supervision personnel allocation, past supervision project viewing, new supervision project addition, existing supervision project selection, project supervision consultation and other functions according to requirements, wherein the new supervision project addition in S2 specifically comprises the following steps:
s201, creating a new proctoring project, and selecting a project template;
s202, performing writing on the project content while manipulating the journal according to the project content;
s203, adding time and date to the written project log and project content, uploading the document attachment according to specific conditions, and if the document attachment is uploaded, turning to S204, and if the document attachment is not uploaded, turning to S205;
s204, uploading the managed document attachment, detecting whether the uploaded document attachment meets the requirement, reserving the document attachment meeting the requirement, and uploading the document attachment which does not meet the requirement again after being modified;
s205, exporting and printing the prepared supervision work log list, and then signing by a project principal;
s206, submitting the work log list signed by the project principal to a project chief manager for checking and accepting to complete the supervision work, wherein the specific step of selecting the existing project in the S2 refers to the step of adding a new supervision project and skips the step S201; the new project supervisor distribution process comprises the following steps:
s211, appointing a proctoring person without work content;
s212, the project chief manager takes effect after signing;
the system testing operation and maintenance service in the S2 specifically includes the following steps:
s221, performing simulation operation on the system, checking whether the simulation operation of the system is successful, and switching to S223 if the simulation operation is not successful, or switching to S222 if the simulation operation is not successful;
s222, detecting the reason of the system simulation operation failure, and returning to S221 after the problem is solved;
s223, after the simulation operation of the system is successful, self-checking the system, and checking and killing viruses in the system;
s224, the system self-check is finished, and the system is closed;
the system test operation and maintenance service, the allocation of new project supervision personnel, the checking of past supervision projects, the addition of new supervision projects, the selection of existing supervision projects and the supervision consultation of the project in the S2 are independent functions and cannot be carried out simultaneously;
s3, feeding back proctoring problems encountered in each proctoring work;
s4, exporting the proctoring content list and signing by a related responsible person;
and S5, submitting the signed file to a project chief manager for acceptance and signature, and completing the supervision work.
In summary, the invention can realize the distribution of project supervision personnel, the check of past supervision projects, the addition of new supervision projects and the editing of the existing supervision projects through the arranged functional modules, so that the check of the past supervision projects is more convenient, the compiling of supervision logs is more data, the loss of paper files is avoided, the system can be tested, operated and maintained, the system is simulated, the system is prevented from being out of order, the stability of the system is improved, the efficiency of supervision work is improved, and the practicability of the invention is improved.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (10)

1. The engineering consultation supervision test operation and maintenance overall process management system is characterized by comprising the following steps:
the login module is electrically connected with the function classification module and is used for logging in the system;
the function classification module is electrically connected with the log recording module and is used for classified display of new system functions;
the log recording module is electrically connected with the content editing module and is used for compiling a working log in the project supervision process;
the content editing module is electrically connected with the data storage module and is used for character editing of all contents in the system and character input and character modification of a working log;
the data storage module is electrically connected with the file uploading module and is used for storing files recorded in the project supervision process;
the file uploading module is electrically connected with the analysis module and is used for uploading attachments in a working log and performing cloud transmission work;
the analysis module is electrically connected with the file export module and is used for the accuracy analysis of the file;
and the file export module is used for exporting the files generated in the project supervision process.
2. The system as claimed in claim 1, further comprising:
the system operation and maintenance module is electrically connected with the system self-checking module and is used for simulating the operation of the system;
the system self-checking module is electrically connected with the virus killing module and is used for carrying out system self-checking work;
and the virus searching and killing module is used for searching and killing viruses in the system, so that system loopholes are reduced.
3. The system of claim 2, wherein the system operation and maintenance module is electrically connected to the system self-check module and the log-in module, the log-in module is electrically connected to the advisory module, and the advisory module is used for engineering supervision process advisory.
4. The system as claimed in claim 1, wherein the function classification module is electrically connected to the data import module, the data import module is used to import data from the database into the system to make the system data more complete, and the function classification module is electrically connected to the login module and the data import module, respectively.
5. An engineering consultation supervision test operation and maintenance overall process management method, which is applied to the engineering consultation supervision test operation and maintenance overall process management system of any one of claims 1 to 4, and comprises the following steps:
s1, logging in a main page, and then selecting functions;
s2, selecting a system to test operation and maintenance service, new project supervision personnel allocation, past supervision project check, new supervision project addition, existing supervision project selection, project supervision consultation selection and the like according to requirements;
s3, feeding back proctoring problems encountered in each proctoring work;
s4, exporting the proctoring content list and signing by a related responsible person;
and S5, submitting the signed file to a project chief manager for acceptance and signature, and completing the supervision work.
6. The engineering consultation supervision test operation and maintenance overall process management method according to claim 5, wherein the addition of the new supervision item in the S2 specifically comprises the following steps:
s201, creating a new proctoring project, and selecting a project template;
s202, performing writing on the project content while manipulating the journal according to the project content;
s203, adding time and date to the written project log and project content, uploading the document attachment according to specific conditions, and if the document attachment is uploaded, turning to S204, and if the document attachment is not uploaded, turning to S205;
s204, uploading the managed document attachment, detecting whether the uploaded document attachment meets the requirement, reserving the document attachment meeting the requirement, and uploading the document attachment which does not meet the requirement again after being modified;
s205, exporting and printing the prepared supervision work log list, and then signing by a project principal;
and S206, delivering the work log list signed by the project principal to a project chief manager for checking, accepting and signing, and finishing the supervision work.
7. The method as claimed in claim 5, wherein the step of selecting the project in S2 refers to the step of adding new project, and skips S201.
8. The engineering consultation supervision test operation and maintenance overall process management method according to claim 5, wherein the new project supervision personnel allocation process is as follows:
s211, appointing a proctoring person without work content;
s212, the project chief manager takes effect after signing.
9. The method as claimed in claim 5, wherein the system test operation and maintenance service in the step S2 includes the following steps:
s221, performing simulation operation on the system, checking whether the simulation operation of the system is successful, and switching to S223 if the simulation operation is not successful, or switching to S222 if the simulation operation is not successful;
s222, detecting the reason of the system simulation operation failure, and returning to S221 after the problem is solved;
s223, after the simulation operation of the system is successful, self-checking the system, and checking and killing viruses in the system;
and S224, finishing the self-checking of the system and closing the system.
10. The method as claimed in claim 5, wherein the system test operation and maintenance service, the allocation of new project supervisors, the inspection of past supervisors, the addition of new supervisors, the selection of existing supervisors, and the project supervision consultation in S2 are independent functions and cannot be performed simultaneously.
CN202111635322.XA 2021-12-29 2021-12-29 Engineering consultation supervision test operation and maintenance overall process management system Pending CN114298685A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111635322.XA CN114298685A (en) 2021-12-29 2021-12-29 Engineering consultation supervision test operation and maintenance overall process management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111635322.XA CN114298685A (en) 2021-12-29 2021-12-29 Engineering consultation supervision test operation and maintenance overall process management system

Publications (1)

Publication Number Publication Date
CN114298685A true CN114298685A (en) 2022-04-08

Family

ID=80972379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111635322.XA Pending CN114298685A (en) 2021-12-29 2021-12-29 Engineering consultation supervision test operation and maintenance overall process management system

Country Status (1)

Country Link
CN (1) CN114298685A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116738080A (en) * 2023-06-30 2023-09-12 公诚管理咨询有限公司 Automatic generation method and system for engineering supervision log

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111191965A (en) * 2020-02-10 2020-05-22 重庆图强工程技术咨询有限公司 Overall process engineering consultation service evaluation system
CN112396407A (en) * 2020-12-25 2021-02-23 张瑞青 Engineering supervision cost consultation comprehensive management system
CN112766645A (en) * 2020-12-30 2021-05-07 苏州深鉴信息科技有限公司 Supervision and management platform for whole process of information project
CN113806170A (en) * 2021-09-07 2021-12-17 广东世纪信通网络科技有限公司 Method, system, medium and terminal for automatically generating engineering industry supervision log

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111191965A (en) * 2020-02-10 2020-05-22 重庆图强工程技术咨询有限公司 Overall process engineering consultation service evaluation system
CN112396407A (en) * 2020-12-25 2021-02-23 张瑞青 Engineering supervision cost consultation comprehensive management system
CN112766645A (en) * 2020-12-30 2021-05-07 苏州深鉴信息科技有限公司 Supervision and management platform for whole process of information project
CN113806170A (en) * 2021-09-07 2021-12-17 广东世纪信通网络科技有限公司 Method, system, medium and terminal for automatically generating engineering industry supervision log

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄聪普等: "《建设工程招投标与合同管理》", 重庆大学出版社, pages: 349 - 358 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116738080A (en) * 2023-06-30 2023-09-12 公诚管理咨询有限公司 Automatic generation method and system for engineering supervision log

Similar Documents

Publication Publication Date Title
Host et al. Checklists for software engineering case study research
CN109271368B (en) Database system and maintenance method of fire safety assessment system
US20110129806A1 (en) System for training
CN108805407B (en) Power grid engineering safety assessment system based on big data
CN103971023B (en) R&D process quality automatic evaluation system and method
CN113807747A (en) Enterprise budget management maturity evaluation system
CN109947833A (en) A kind of data quality management method based on B/S framework
CN114298685A (en) Engineering consultation supervision test operation and maintenance overall process management system
Botez Recent challenge for auditors: using data analytics in the audit of the financial statements
CN111652513A (en) Enterprise performance assessment system and method based on cloud platform
CN108710978A (en) Enterprise management method and system and computer readable storage medium
Luo et al. Research on CPA auditing reform Strategy under the background of artificial intelligence
CN113159528A (en) Post matching evaluation method and device
Ali et al. The Effect of Activating Artificial Intelligence techniques on Enhancing Internal Auditing Activities" Field Study"
Kudrenko et al. Information systems and technologies in the audit
Cai et al. Design of examination management system for engineering management
Hoodlebrink et al. Big data applications in accounting: Insights for higher education curriculum planning
Xie et al. Solution Ideas and Practices for Data Governance Engineering in Colleges and universities
Yan Construction of Smart Audit System Based on Big Data Analysis
Luo et al. Asset Management System of University Laboratory Equipment Based on Data Mining and Analysis
Huang Design of Evaluation and Apply System for International Catering Personnel Training
Stevan et al. Computer-based android application for vessel’s condition survey by owner surveyor
CN116306555A (en) Self-help pre-evaluation system for high enterprise declaration
Cai Study on Data Security of Computerization under Centralized Accounting Mode
Topchiy et al. System-technical fundamentals of the structure of state construction supervision in the re-profiling of big urban area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Room 504, 203 Kezhu Road, Huangpu District, Guangzhou City, Guangdong Province, 510000

Applicant after: Ruiguan (Guangdong) Information Technology Co.,Ltd.

Address before: 510670 401d, No. 9, caipin Road, high tech Industrial Development Zone, Guangzhou, Guangdong

Applicant before: GUANGZHOU RUIGUAN INFORMATION TECHNOLOGY Co.,Ltd.

RJ01 Rejection of invention patent application after publication

Application publication date: 20220408