CN1166449A - Method for assembling canopy in oil station - Google Patents

Method for assembling canopy in oil station Download PDF

Info

Publication number
CN1166449A
CN1166449A CN 97110322 CN97110322A CN1166449A CN 1166449 A CN1166449 A CN 1166449A CN 97110322 CN97110322 CN 97110322 CN 97110322 A CN97110322 A CN 97110322A CN 1166449 A CN1166449 A CN 1166449A
Authority
CN
China
Prior art keywords
ceiling portion
ceiling
pillar
temporarily
main truss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 97110322
Other languages
Chinese (zh)
Other versions
CN1081999C (en
Inventor
本泽茂人
冈本恒生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TATSUNO MECHATRONICS CORP
Original Assignee
TATSUNO MECHATRONICS CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TATSUNO MECHATRONICS CORP filed Critical TATSUNO MECHATRONICS CORP
Publication of CN1166449A publication Critical patent/CN1166449A/en
Application granted granted Critical
Publication of CN1081999C publication Critical patent/CN1081999C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)

Abstract

Disclosed is a manufacturing method of the roof of a gas station. The manufacturing method, which is safe and highly efficient, can avoid the falsework and the high-rise operation. in order to achieve the purpose, firstly, a main frame (1) which is composed of support pillars (1a) is vertically arranged on a base (G) and then the top part of a roof is assembled around the main frame (1) at the regulated height. The assembled top part of the roof is hoisted and fastened on the upper part of the main frame (1).

Description

The manufacture method of petrol service station ceiling
The present invention relates to be arranged on the manufacture method of the ceiling of petrol service station.
As everyone knows, the ceiling of petrol service station is with the state that overhangs, and is located on the main truss, and this main truss is upright to be located in the place of petrol service station.Therefore, when making ceiling, must need to set up scaffold, need carry out assembling operation aloft, exist low, the uneasy congruent problem of operating efficiency.
In addition, on the ground the ceiling portion of ceiling is assembled in advance, then, it is sling again be combined as a whole with main truss.This operation scheme also once considered, but on the level land during assembling ceiling portion, because of ceiling portion ground proximity makes some operation as carrying out as the tabular body of ceiling and the light equipment installation in the ceiling etc.
In addition, if in advance ceiling portion is turned over construction, after construction and installation finish, more in the past its upset.But constructing with this operational method, to make large-scale ceiling portion be very difficult.
Therefore, the purpose of this invention is to provide a kind of manufacture method of petrol service station ceiling, use this operational method, on the level land, just can easily assemble ceiling portion.
Adopt ceiling manufacture method of the present invention, at first the upright main truss of forming by pillar of establishing on the basis; And on the specified altitude and the girder of the adjacent ceiling portion of main truss temporarily be fixed in the ceiling portion, at this moment, described girder has carriage, described carriage is installed in screw and establishes temporarily on the pillar, the described pillar of establishing temporarily releasably temporarily is fixed on the main truss; And begin sequentially to assemble ceiling portion from this temporarily fixing girder; And then the ceiling portion that this assembling finishes hung main truss top, and fix.
In this case, if do not have smooth place, be difficult to constitute skeleton in the main truss turnover.
In addition, adopt ceiling manufacture method of the present invention, on the basis, stand earlier and establish the main truss that constitutes by pillar, on the regulation high altitude again temporarily being fixed on the ceiling with the mutually adjoining ceiling portion girder of main truss, girder fixing during from this begins to assemble successively ceiling portion, then, the top that main truss is hung in the ceiling portion that has assembled again, it is fixed.
Like this, installation exercise just is not subjected to the main truss influence in uneven place on every side.
Adopt the inventive method, the ceiling portion girder that is temporarily fixed on the main structure is installed on the pillar of interim setting, and this pillar has carriage, and this carriage can load and unload by bolt and temporarily be fixed on the main truss, owing to use bolt, so loading and unloading easily.
Adopt the inventive method, when slinging ceiling, on pillar, lead with orienting roll.
Therefore, when slinging operation, can prevent teeter, can successfully move.Like this, adopt the inventive method, the assembling operation of ceiling portion just can carry out on the position of damage easily, has improved operating efficiency, and working out reduces aloft, and therefore, safety has also improved.
Brief description of drawings:
Fig. 1 is the axonometric drawing that expression main truss of the present invention is provided with engineering;
Fig. 2 is the axonometric drawing of expression ceiling of the present invention portion packing engineering;
Fig. 3 is that the schematic partial sectional view of establishing leg portion temporarily of the present invention is implemented in expression;
Fig. 4 is the expression ceiling of the present invention portion axonometric drawing of engineering of slinging;
Fig. 5 is the birds-eye view that orienting roll of the present invention is implemented in expression;
Fig. 6 is the fixedly axonometric drawing of engineering of expression ceiling of the present invention portion;
Fig. 7 is the figure of expression employing ceiling of the present invention portion fixed part.
Closely execute example below in conjunction with description of drawings the present invention.
Fig. 1 represents the engineering that is provided with of main truss.At first, upright establishing with symbol 1 represented all main trusss on concrete foundation G, and this main truss is to constitute by pillar 1a (example shown in Fig. 1 is four) and with the beam 1b that its top couples together.The bottom of this pillar 1a is embedded in the concrete foundation G, shown in dotted line.
On the lateral surface of each pillar 1a, be equipped with and establish pillar 4 temporarily, this pillar can load and unload.Its installing condition is for example shown in Figure 3, its underpart can be installed on the carriage 10 (this carriage is contained on the pillar 1a) with bolt B with loading and unloading, its top releasably is installed in buttress shaft B and establishes pillar temporarily and bear on the member b, and this member also is (for example) angle steel that is contained on the pillar 1a.
On above-mentioned top of establishing pillar 4 temporarily, still the carriage 5 of supporting ceiling portion 2 usefulness is installed with bolt B, this carriage can load and unload.Carriage 5 is that steel 5a and reinforced rib 5b constitute.
Then, around main truss 1, assemble ceiling portion 2.In this case, also can install like this, promptly at first be that the skeleton that on the ground beam in length and breadth by ceiling portion 2 is constituted assembles, and then sling, and it is installed on the above-mentioned carriage 5 with bolt with state shown in Figure 4 (back will be introduced); Or with bolt B the girder 2a (with reference to Fig. 2) of ceiling portion 2 is installed on the carriage 5 earlier, then, begin to assemble successively the skeleton at top 2 again from girder 2a.
Figure 2 shows that the part that ceiling portion packing engineering has finished.This ceiling portion 2 height on the ground is about 1600mm, is the easiest height that carries out operation.If on the position that the skeleton of ceiling portion 2 like this temporarily fixes on the ground, then as shown in Figure 3, ceiling floor 2C is installed with bolt B, and with ornamental flap 2b be installed in ceiling utmost point 2C below.Then, again curtain plate 3 is contained on the circumference.Because these operations are to carry out on the suitable height in high ground, so carry out easily.
Like this, the top that main truss 1 is hung in the ceiling portion 2 of assembling, manufacturing finishes.Figure 4 shows that the hoisting engineering of this ceiling portion.When carrying out this operation, at first use steel rope W1 between four places (in the illustrated example for everywhere) is apparatus J and ceiling portion 2, to couple together, then, apparatus J is sling with hoisting crane of expressing among the figure and steel rope 2.Then, the bolt B that connects carriage 5 and establish pillar 4 is temporarily unloaded down, ceiling portion 2 is hung on hoisting crane.
For above-mentioned ceiling portion hoisting engineering can be carried out smoothly, as shown in Figure 5, the carriage 8 of L word shape is installed on the girder 2a with bolt B, the roller R1, the R2 that combine with two sides of pillar 1a are installed on this carriage 8, these two rollers can rotate freely.Because use the roller R1, the R2 that combine with two sides of each pillar 1a, therefore, pillar leads to ceiling portion 2, the operation of can successfully slinging.Then, will establish pillar 4 more temporarily removes.
As shown in Figure 6, after pillar 1a top is hung by ceiling portion 2, with bolt B it is installed on the beam 1b of pillar 1a more as shown in Figure 7.Then, between ceiling portion 2 and main truss 1, drip rail 9 is set again, so installation exercise finishes.
Adopt manufacture method of the present invention like this, can on the ground or assemble ceiling portion on the position in its vicinity, therefore, operation is carried out easily, and safety.
As mentioned above, adopt the inventive method, at first, assembling ceiling portion then, slings this ceiling portion again on the job position on the ground, and fixing.Therefore, do not need stance need can not make the ceiling of petrol service station safely, expeditiously at the high-rise working of danger yet.

Claims (1)

1. the manufacture method of a petrol service station ceiling may further comprise the steps: at first stand on the basis and establish the main truss of being made up of pillar; And on the specified altitude and the girder of the adjacent ceiling portion of main truss temporarily be fixed in the ceiling portion, at this moment, described girder has carriage, described carriage is installed in screw and establishes temporarily on the pillar, the described pillar of establishing temporarily releasably temporarily is fixed on the main truss; And begin sequentially to assemble ceiling portion from this temporarily fixing girder; And then the ceiling portion that this assembling finishes hung main truss top, and fix.
CN97110322A 1996-04-17 1997-04-04 Method for assembling canopy in oil station Expired - Fee Related CN1081999C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP95168/96 1996-04-17
JP08095168A JP3111446B2 (en) 1996-04-17 1996-04-17 Gas station canopy manufacturing method

Publications (2)

Publication Number Publication Date
CN1166449A true CN1166449A (en) 1997-12-03
CN1081999C CN1081999C (en) 2002-04-03

Family

ID=14130241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN97110322A Expired - Fee Related CN1081999C (en) 1996-04-17 1997-04-04 Method for assembling canopy in oil station

Country Status (3)

Country Link
JP (1) JP3111446B2 (en)
KR (1) KR100198702B1 (en)
CN (1) CN1081999C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19981597B4 (en) 1998-02-24 2011-04-14 Asahi Kasei Kabushiki Kaisha Polyoxymethylene resin composition, and molded articles thereof
EP1156160A1 (en) * 2000-05-18 2001-11-21 WCK Limited A canopy

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01254452A (en) * 1988-04-01 1989-10-11 Tokyo Tatsuno Co Ltd Service device for gas station
DE69300356T2 (en) * 1992-07-24 1996-03-21 Johannes Bastiaan Bol Liquid-tight floor for gas station.

Also Published As

Publication number Publication date
KR970070702A (en) 1997-11-07
CN1081999C (en) 2002-04-03
KR100198702B1 (en) 1999-06-15
JPH09279871A (en) 1997-10-28
JP3111446B2 (en) 2000-11-20

Similar Documents

Publication Publication Date Title
US5417018A (en) Construction apparatus for building and constructing method therewith
US5881504A (en) Temporary frame system for construction
US7000733B2 (en) Work platform
JP2000282691A (en) Construction method for mounting member on inner wall of high-rise, tower structure, and scaffold device
CN113428811A (en) Corridor ceiling mounting plate hoisting structure and construction method thereof
CN1081999C (en) Method for assembling canopy in oil station
JPH0754491A (en) Erecting device for exterior curtain wall of building
JPH08311818A (en) Climbing type lift-up construction method of building and device thereof
CA2482342A1 (en) Work platform
JP3822084B2 (en) Construction lifting system for high-rise buildings
JP2579715B2 (en) External tower crane
CN113175222A (en) Installation method of embedded prefabricated external wall panel component
JP2010150039A (en) Crane girder replacing method and crane girder replacing device
JPH0782897A (en) All weather type building method of building
JP3532161B2 (en) Tower construction machine and tower construction method
JPH08120936A (en) Method and device for constructing multistoried building
CN117513764B (en) Sliding method with installation position lower than sliding rail
CN214194169U (en) Large-span steel truss bridge high bolt construction sliding platform
JPH1077745A (en) Dismantling method for waterless gas holder and its device
RU2231602C2 (en) Device for assembling oversized structure elements, lifting loads and preforming work in difficult-to-access areas of high structures
CN2170291Y (en) Automatic gantry lifting type crane
CN211597666U (en) Steel construction laced beam installation appurtenance
CN116181041B (en) Building machine of multilayer quick construction
JP3002054U (en) Tower crane with multiple main columns as tower mast
JP2843042B2 (en) Steel framing unit scaffolding method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee