CN116612612A - Centralized control center alarm method for river basin step power plant, computer equipment and storage medium - Google Patents
Centralized control center alarm method for river basin step power plant, computer equipment and storage medium Download PDFInfo
- Publication number
- CN116612612A CN116612612A CN202310583811.8A CN202310583811A CN116612612A CN 116612612 A CN116612612 A CN 116612612A CN 202310583811 A CN202310583811 A CN 202310583811A CN 116612612 A CN116612612 A CN 116612612A
- Authority
- CN
- China
- Prior art keywords
- alarm
- information
- alarm information
- page
- level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 40
- 238000012544 monitoring process Methods 0.000 claims abstract description 41
- 239000003086 colorant Substances 0.000 claims abstract description 8
- 238000010248 power generation Methods 0.000 claims description 28
- 238000004590 computer program Methods 0.000 claims description 9
- 230000002572 peristaltic effect Effects 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B21/00—Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
- G08B21/18—Status alarms
- G08B21/182—Level alarms, e.g. alarms responsive to variables exceeding a threshold
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/20—Natural language analysis
- G06F40/279—Recognition of textual entities
- G06F40/284—Lexical analysis, e.g. tokenisation or collocates
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/451—Execution arrangements for user interfaces
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B3/00—Audible signalling systems; Audible personal calling systems
- G08B3/10—Audible signalling systems; Audible personal calling systems using electric transmission; using electromagnetic transmission
- G08B3/1008—Personal calling arrangements or devices, i.e. paging systems
- G08B3/1016—Personal calling arrangements or devices, i.e. paging systems using wireless transmission
- G08B3/1025—Paging receivers with audible signalling details
- G08B3/1033—Paging receivers with audible signalling details with voice message alert
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Software Systems (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Artificial Intelligence (AREA)
- Public Health (AREA)
- Electromagnetism (AREA)
- Audiology, Speech & Language Pathology (AREA)
- Computational Linguistics (AREA)
- Computer Networks & Wireless Communication (AREA)
- Emergency Management (AREA)
- Human Computer Interaction (AREA)
- Water Supply & Treatment (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Alarm Systems (AREA)
Abstract
The application provides a method for alarming a centralized control center of a river basin step power plant, computer equipment and a storage medium. The method comprises the following steps: each time new alarm information is received, confirming the alarm level of the alarm information; judging whether the alarm level is higher than a first set level; if yes, broadcasting the alarm information by voice, and displaying the alarm information in a monitoring page by using font colors corresponding to alarm levels; if not, storing the alarm information into a corresponding information column in the comprehensive alarm page; judging whether each information column in the comprehensive alarm page accords with preset conditions or not every set period, and sending each information column meeting the preset conditions to the alarm display of the monitoring page. The application solves the technical problem that the equipment monitoring work of staff is inconvenient due to the large quantity of equipment alarm information in the prior art.
Description
Technical Field
The application relates to the field of step power plant monitoring system alarm, in particular to a basin step power plant centralized control center alarm method, computer equipment and storage media.
Background
The central control center of the river basin step power plant is responsible for the step power plant power generation operation management work, one important work is power generation equipment operation monitoring work, the central control center monitoring system receives all equipment operation information sent by the step power plant, the power generation equipment alarm condition needs to be monitored in a key mode, and step power plant staff is informed of checking and processing in time.
However, the step power plant has more power generation equipment, and the equipment alarm information is tens of thousands in the daily operation process, so that inconvenience is brought to the monitoring work of the step power plant power generation equipment by centralized control center staff.
Disclosure of Invention
Aiming at the defects existing in the prior art, the application provides a method for alarming a centralized control center of a river basin step power plant, computer equipment and a storage medium, which solve the technical problem that the equipment monitoring work of staff is inconvenient due to the fact that the number of equipment alarming information is large in the prior art.
The application provides a method for alarming a centralized control center of a river basin step power plant, which comprises the following steps:
each time new alarm information is received, confirming the alarm level of the alarm information;
judging whether the alarm level is higher than a first set level;
if yes, broadcasting the alarm information by voice, and displaying the alarm information in a monitoring page by using font colors corresponding to alarm levels;
if not, storing the alarm information into a corresponding information column in the comprehensive alarm page;
judging whether each information column in the comprehensive alarm page accords with preset conditions or not every set period, and sending each information column meeting the preset conditions to the alarm display of the monitoring page.
Further, a plurality of information fields are arranged in the comprehensive alarm page, and each information field is used for storing all alarm information which is lower than a first set level and is formed by at least one type of power generation equipment; storing the alarm information into a corresponding information field in the comprehensive alarm page, including:
acquiring the name of power generation equipment in the alarm information; confirming a plurality of information bars corresponding to all alarm points of the power generation equipment based on the power generation equipment name; and copying the alarm information and storing the alarm information into each information field.
Further, copying the alarm information and saving the alarm information in each information field, including:
based on all alarm information in the corresponding information column, confirming whether the current alarm information is repeated alarm information or not;
if yes, marking the current alarm time in a column corresponding to the repeated alarm information, and recording the alarm times.
Further, judging whether each information column in the comprehensive alarm page meets a preset condition every set period comprises the following steps:
based on all alarm information in the information bar, acquiring a plurality of alarm levels and the number of alarm information of each alarm level;
confirming an early warning value based on the alarm information of the alarm levels and the number of the alarm information of each alarm level;
when the early warning value is larger than the corresponding preset warning value, judging that the information bar accords with the preset condition.
Further, based on the alarm information of the plurality of alarm levels and the number of alarm information of each alarm level, confirming the early warning value includes:
wherein YJF is an early warning value; alpha n A fixed coefficient for the nth alarm level; BJ (BJ) n The number of alarm information for the nth alarm level.
Further, sending each information field meeting the preset conditions to the monitoring page alarm display, including:
confirming the urgency of the information bar based on the early warning value of the information bar, the corresponding preset warning value and the total amount of warning information;
and sequentially displaying the information fields according to the order from high to low of the urgency degree, and broadcasting alarm points corresponding to each information field in a voice mode.
Further, based on the early warning value of the information field, the corresponding preset warning value and the total warning information, confirming the urgency of the information field comprises:
wherein JJD is urgency; YJF is an early warning value; YBF is a preset alarm value; BJZL is the total amount of alarm information; BZZL is the standard total.
Further, confirming the alarm level of the alarm information includes:
acquiring a plurality of alarm keywords in the new alarm information, wherein the plurality of alarm keywords comprise a power plant name, a machine group name, a power generation equipment name, an action name and an action value;
based on the plurality of alarm keywords, an alarm level of the alarm information is confirmed.
In a second aspect, the present application provides a computer device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, the processor implementing the steps of: each time new alarm information is received, confirming the alarm level of the alarm information; judging whether the alarm level is higher than a first set level; if yes, broadcasting the alarm information by voice, and displaying the alarm information in a monitoring page by using font colors corresponding to alarm levels; if not, storing the alarm information into a corresponding information column in the comprehensive alarm page; judging whether each information column in the comprehensive alarm page accords with preset conditions or not every set period, and sending each information column meeting the preset conditions to the alarm display of the monitoring page.
In a third aspect, a readable storage medium having stored thereon a computer program which when executed by a processor performs the steps of: each time new alarm information is received, confirming the alarm level of the alarm information; judging whether the alarm level is higher than a first set level; if yes, broadcasting the alarm information by voice, and displaying the alarm information in a monitoring page by using font colors corresponding to alarm levels; if not, storing the alarm information into a corresponding information column in the comprehensive alarm page; judging whether each information column in the comprehensive alarm page accords with preset conditions or not every set period, and sending each information column meeting the preset conditions to the alarm display of the monitoring page.
Compared with the prior art, the application has the following beneficial effects:
according to the application, the alarm information with the alarm level higher than the first set level is directly displayed on the monitoring page, so that a manager can timely find out urgent and important alarm information; the alarm information with the alarm level not higher than the first set level is temporarily stored in the corresponding information fields of the comprehensive alarm page, and meanwhile, whether each information field meets the preset condition is judged every set period, so that the information fields meeting the preset condition are timely sent to the monitoring page for display, a manager centrally processes a plurality of alarm information in the information fields of the monitoring page, and the working efficiency of the manager is improved. The technical problem that the equipment monitoring work of staff is inconvenient due to the fact that the number of the equipment alarm information is large in the prior art is solved.
Drawings
Fig. 1 is a schematic flow chart of a method for alarming a centralized control center of a river basin step power plant according to an embodiment of the present application.
Fig. 2 is a flowchart illustrating a process of determining whether the heald information field meets a preset condition according to another embodiment of the present application.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present application more apparent, the technical solutions of the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present application, and it is apparent that the described embodiments are some embodiments of the present application, but not all embodiments of the present application. All other embodiments, which can be made by those skilled in the art based on the embodiments of the application without making any inventive effort, are intended to be within the scope of the application.
In a first aspect, as shown in fig. 1, the present application provides a method for alarming a centralized control center of a river basin step power plant, which specifically includes the following embodiments:
embodiment one:
fig. 1 is a schematic flow chart of a method for alarming a centralized control center of a river basin step power plant, which specifically includes the following steps:
step S101: each time new alarm information is received, confirming the alarm level of the alarm information;
in this embodiment, the obtaining the alarm level of the alarm information includes: acquiring a plurality of alarm keywords in the new alarm information, wherein the plurality of alarm keywords comprise a power plant name, a machine group name, a power generation equipment name, an action name and an action value; based on the plurality of alarm keywords, an alarm level of the alarm information is confirmed. And the manager sets an alarm level for the action name and the action value in the alarm information of the power generation equipment according to the operation working condition of the power generation equipment in advance.
Step S102: judging whether the alarm level is higher than a first set level;
if yes, broadcasting the alarm information by voice, and displaying the alarm information in a monitoring page by using font colors corresponding to alarm levels;
when the alarm level is higher than the first set level, the alarm information is important and urgent, the normal operation of the generator set can be influenced, and the generator set can be forced to stop when serious; for example, alarm information "XXX factory # 1 unit peristaltic alarm"; the influence on the operation of the generator set is large, and the situation of tile burning is caused when the influence is serious; therefore, the alarm level of the alarm information XXX factory No. 1 unit peristaltic alarm is higher than the first set level. And displaying the alarm information in the monitoring page directly, and displaying the alarm information in the corresponding font color according to the alarm level of the alarm information.
If not, storing the alarm information into a corresponding information column in the comprehensive alarm page;
step S103: judging whether each information column in the comprehensive alarm page accords with preset conditions or not every set period, and sending each information column meeting the preset conditions to the alarm display of the monitoring page.
It should be noted that, in this embodiment, the monitoring page is a main page, and the comprehensive alarm page is a sub page; the centralized control center is provided with a special electronic screen for displaying the monitoring page and the comprehensive alarm page, and in the embodiment, the comprehensive alarm page is hidden in a task bar of the monitoring page, and the comprehensive alarm page can be controlled to be displayed on the electronic screen in a mouse clicking mode.
In this embodiment, after the information fields meeting the preset conditions are sent to the monitoring page, a corresponding blank information field is newly built in the comprehensive alarm page.
The implementation process of the embodiment comprises the following steps:
according to the embodiment, the alarm information with the alarm level higher than the first set level is directly displayed on the monitoring page, so that a manager can timely find out urgent and important alarm information; the alarm information with the alarm level not higher than the first set level is temporarily stored in the corresponding information fields of the comprehensive alarm page, and meanwhile, whether each information field meets the preset condition is judged every set period, so that the information fields meeting the preset condition are timely sent to the monitoring page for display, a manager centrally processes a plurality of alarm information in the information fields of the monitoring page, and the working efficiency of the manager is improved. The technical problem that the equipment monitoring work of staff is inconvenient due to the fact that the number of the equipment alarm information is large in the prior art is solved.
Example 2:
in this embodiment, a plurality of information fields are provided in the comprehensive alarm page, where each information field is used to store all alarm information of alarm points formed by at least one power generation device, which is lower than a first set level; storing the alarm information into a corresponding information field in the comprehensive alarm page, including:
acquiring the name of power generation equipment in the alarm information; confirming a plurality of information bars corresponding to all alarm points of the power generation equipment based on the power generation equipment name; and copying the alarm information and storing the alarm information into each information field.
The operation and maintenance personnel set a plurality of alarm points according to the composition relation of the power generation equipment and past historical fault data, and the power generation equipment at the fault points comprises a plurality of equipment belonging to the same power generation unit; the same equipment of a plurality of units; all power generation equipment of the XX power plant # 1 unit forms an alarm point; or eight sets of technical water supply equipment of 4 generator sets of the XX power plant form an alarm point, so that one power generation equipment corresponds to at least one alarm point; when the power generation device generates alarm information, the alarm information is stored in all corresponding information fields.
The implementation process of the embodiment comprises the following steps:
based on all alarm information in the corresponding information column, confirming whether the current alarm information is repeated alarm information or not;
if yes, marking the current alarm time in a column corresponding to the repeated alarm information, and recording the alarm times.
Judging that the current alarm information is repeated alarm information if the content of the current alarm information exists in the information bar; therefore, the current alarm time is marked in a column of the corresponding reported alarm information, the alarm times are recorded, the space of the information column is saved, and the manager can conveniently inquire.
Example 3:
as shown in fig. 2, in this embodiment, determining whether each information field in the integrated alarm page meets a preset condition every set period includes:
step S1: based on all alarm information in the information bar, acquiring a plurality of alarm levels and the number of alarm information of each alarm level;
step S2: confirming an early warning value based on the alarm information of the alarm levels and the number of the alarm information of each alarm level;
the early warning value is obtained by the following companies:
wherein YJF is an early warning value; alpha n A fixed coefficient for the nth alarm level; BJ (BJ) n The number of alarm information for the nth alarm level.
Step S3: when the early warning value is larger than the corresponding preset warning value, judging that the information bar accords with the preset condition.
The implementation process of the embodiment comprises the following steps:
the preset period in this embodiment is 30min; acquiring an early warning value of each information column in the comprehensive warning page every 30min, and judging that the information column meets preset conditions when the early warning value is larger than a corresponding preset warning value; the preset alarm value corresponding to each information field, namely each alarm point, can be set automatically according to the actual running condition of the unit.
In this embodiment, sending each information field meeting the preset conditions to the monitoring page for alarm display includes:
confirming the urgency of the information bar based on the early warning value of the information bar, the corresponding preset warning value and the total amount of warning information;
and sequentially displaying the information fields according to the order from high to low of the urgency degree, and broadcasting alarm points corresponding to each information field in a voice mode.
In this embodiment, when a plurality of information fields meet a preset condition at the same time when the current setting period is finished, the urgency of each information field is obtained, and the information fields are ordered according to the urgency and displayed in a monitoring page in sequence; at the moment, no alarm information with the alarm level higher than the first set level exists in the monitoring page; when the current setting period is finished and no alarm information with the alarm level higher than the first setting level exists in the monitoring page, displaying the alarm information in sequence according to the emergency level; based on the early warning value of the information field, the corresponding preset alarm value and the total alarm information, confirming the urgency of the information field, comprising:
wherein JJD is urgency; YJF is an early warning value; YBF is a preset alarm value; BJZL is the total amount of alarm information; BZZL is the standard total.
In a second aspect, the present application provides a computer device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, the processor implementing the steps of: each time new alarm information is received, confirming the alarm level of the alarm information; judging whether the alarm level is higher than a first set level; if yes, broadcasting the alarm information by voice, and displaying the alarm information in a monitoring page by using font colors corresponding to alarm levels; if not, storing the alarm information into a corresponding information column in the comprehensive alarm page; judging whether each information column in the comprehensive alarm page accords with preset conditions or not every set period, and sending each information column meeting the preset conditions to the alarm display of the monitoring page.
In a third aspect, a readable storage medium having stored thereon a computer program which when executed by a processor performs the steps of: each time new alarm information is received, confirming the alarm level of the alarm information; judging whether the alarm level is higher than a first set level; if yes, broadcasting the alarm information by voice, and displaying the alarm information in a monitoring page by using font colors corresponding to alarm levels; if not, storing the alarm information into a corresponding information column in the comprehensive alarm page; judging whether each information column in the comprehensive alarm page accords with preset conditions or not every set period, and sending each information column meeting the preset conditions to the alarm display of the monitoring page.
Those skilled in the art will appreciate that all or part of the processes in the methods of the above embodiments may be implemented by a computer program for instructing relevant hardware, where the program may be stored in a non-volatile computer readable storage medium, and where the program, when executed, may include processes in the embodiments of the methods described above. Any reference to memory, storage, database, or other medium used in embodiments provided herein may include non-volatile and/or volatile memory. The nonvolatile memory can include Read Only Memory (ROM), programmable ROM (PROM), electrically Programmable ROM (EPROM), electrically Erasable Programmable ROM (EEPROM), or flash memory. Volatile memory can include Random Access Memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms such as Static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double Data Rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous Link DRAM (SLDRAM), memory bus direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), among others.
It should be noted that in this document, relational terms such as "first" and "second" and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises an element.
Claims (10)
1. The centralized control center alarm method for the river basin step power plant is characterized by comprising the following steps of: the method comprises the following steps:
each time new alarm information is received, confirming the alarm level of the alarm information;
judging whether the alarm level is higher than a first set level;
if yes, broadcasting the alarm information by voice, and displaying the alarm information in a monitoring page by using font colors corresponding to alarm levels;
if not, storing the alarm information into a corresponding information column in the comprehensive alarm page;
judging whether each information column in the comprehensive alarm page accords with preset conditions or not every set period, and sending each information column meeting the preset conditions to the alarm display of the monitoring page.
2. The method for alarming a centralized control center of a river basin step power plant according to claim 1, wherein: the comprehensive alarm page is provided with a plurality of information fields, and each information field is used for storing all alarm information lower than a first set level of alarm points formed by at least one power generation device; storing the alarm information into a corresponding information field in the comprehensive alarm page, including:
acquiring the name of power generation equipment in the alarm information; confirming a plurality of information bars corresponding to all alarm points of the power generation equipment based on the power generation equipment name; and copying the alarm information and storing the alarm information into each information field.
3. The watershed step power plant centralized control center alarm method of claim 2, wherein: copying the alarm information and storing the alarm information in each information field, wherein the method comprises the following steps:
based on all alarm information in the corresponding information column, confirming whether the current alarm information is repeated alarm information or not;
if yes, marking the current alarm time in a column corresponding to the repeated alarm information, and recording the alarm times.
4. The method for alarming a centralized control center of a river basin step power plant according to claim 1, wherein: judging whether each information column in the comprehensive alarm page meets preset conditions or not at intervals of a set period, wherein the method comprises the following steps:
based on all alarm information in the information bar, acquiring a plurality of alarm levels and the number of alarm information of each alarm level;
confirming an early warning value based on the alarm information of the alarm levels and the number of the alarm information of each alarm level;
when the early warning value is larger than the corresponding preset warning value, judging that the information bar accords with the preset condition.
5. The method for alarming a centralized control center of a river basin step power plant according to claim 4, wherein: confirming the early warning value based on the alarm information of the plurality of alarm levels and the number of the alarm information of each alarm level, comprising:
wherein YJF is an early warning value; alpha n For the nth alarm levelIs a fixed coefficient of (2); BJ (BJ) n The number of alarm information for the nth alarm level.
6. The watershed step power plant centralized control center alarm method of any one of claims 1-5, wherein: sending each information bar meeting the preset conditions to a monitoring page for alarm display, wherein the information bar comprises:
confirming the urgency of the information bar based on the early warning value of the information bar, the corresponding preset warning value and the total amount of warning information;
and sequentially displaying the information fields according to the order from high to low of the urgency degree, and broadcasting alarm points corresponding to each information field in a voice mode.
7. The method for alarming a centralized control center of a river basin step power plant as set forth in claim 6, wherein: based on the early warning value of the information field, the corresponding preset alarm value and the total alarm information, confirming the urgency of the information field, comprising:
wherein JJD is urgency; YJF is an early warning value; YBF is a preset alarm value; BJZL is the total amount of alarm information; BZZL is the standard total.
8. The watershed step power plant centralized control center alarm method of claim 2, wherein: confirming the alarm level of the alarm information comprises:
acquiring a plurality of alarm keywords in the new alarm information, wherein the plurality of alarm keywords comprise a power plant name, a machine group name, a power generation equipment name, an action name and an action value;
based on the plurality of alarm keywords, an alarm level of the alarm information is confirmed.
9. A computer device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, characterized in that the processor implements the steps of the method of any one of claims 1 to 8 when the computer program is executed.
10. A readable storage medium having stored thereon a computer program, characterized in that the computer program, when executed by a processor, realizes the steps of the method of any of claims 1 to 8.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310583811.8A CN116612612A (en) | 2023-05-19 | 2023-05-19 | Centralized control center alarm method for river basin step power plant, computer equipment and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310583811.8A CN116612612A (en) | 2023-05-19 | 2023-05-19 | Centralized control center alarm method for river basin step power plant, computer equipment and storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN116612612A true CN116612612A (en) | 2023-08-18 |
Family
ID=87681363
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310583811.8A Pending CN116612612A (en) | 2023-05-19 | 2023-05-19 | Centralized control center alarm method for river basin step power plant, computer equipment and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116612612A (en) |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08212176A (en) * | 1995-02-08 | 1996-08-20 | Fujitsu Ltd | Support system for decision of network trouble |
JPH10334370A (en) * | 1997-05-29 | 1998-12-18 | Hitachi Building Syst Co Ltd | Building remote monitoring device |
CN104020730A (en) * | 2014-04-11 | 2014-09-03 | 华电国际电力股份有限公司技术服务中心 | Environmental-protection monitoring platform |
US8890676B1 (en) * | 2011-07-20 | 2014-11-18 | Google Inc. | Alert management |
CN105786919A (en) * | 2014-12-26 | 2016-07-20 | 亿阳信通股份有限公司 | Alarm association rule mining method and device |
CN106992900A (en) * | 2016-01-20 | 2017-07-28 | 北京国双科技有限公司 | The method and intelligent early-warning notification platform of monitoring and early warning |
CN110807908A (en) * | 2019-11-05 | 2020-02-18 | 五凌电力有限公司 | Intelligent alarm method for hydropower station cluster monitoring system |
CN111656418A (en) * | 2017-11-27 | 2020-09-11 | Abb瑞士股份有限公司 | Industrial plant alarm management |
CN112596990A (en) * | 2020-12-24 | 2021-04-02 | 科华恒盛股份有限公司 | Alarm storm processing method and device and terminal equipment |
CN113470288A (en) * | 2021-06-29 | 2021-10-01 | 华能左权煤电有限责任公司 | Audible and visual alarm system for power plant |
CN113806173A (en) * | 2021-09-17 | 2021-12-17 | 中国工商银行股份有限公司 | Log alarm classification method and system and electronic equipment |
CN113849513A (en) * | 2021-09-26 | 2021-12-28 | 中国地质大学(武汉) | Data center operation and maintenance alarm information merging method and system |
CN114143054A (en) * | 2021-11-24 | 2022-03-04 | 杭州安恒信息安全技术有限公司 | Safety alarm display method, system, device and server |
CN114172785A (en) * | 2021-10-21 | 2022-03-11 | 广州市百果园信息技术有限公司 | Alarm information processing method, device, equipment and storage medium |
US20220153140A1 (en) * | 2020-11-13 | 2022-05-19 | Nio Technology (Anhui) Co., Ltd | Remote monitoring and alarm system and method of vehicle traction battery fault |
CN116112342A (en) * | 2023-01-06 | 2023-05-12 | 广州文远知行科技有限公司 | Alarm information processing method, device, electronic equipment and storage medium |
-
2023
- 2023-05-19 CN CN202310583811.8A patent/CN116612612A/en active Pending
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08212176A (en) * | 1995-02-08 | 1996-08-20 | Fujitsu Ltd | Support system for decision of network trouble |
JPH10334370A (en) * | 1997-05-29 | 1998-12-18 | Hitachi Building Syst Co Ltd | Building remote monitoring device |
US8890676B1 (en) * | 2011-07-20 | 2014-11-18 | Google Inc. | Alert management |
CN104020730A (en) * | 2014-04-11 | 2014-09-03 | 华电国际电力股份有限公司技术服务中心 | Environmental-protection monitoring platform |
CN105786919A (en) * | 2014-12-26 | 2016-07-20 | 亿阳信通股份有限公司 | Alarm association rule mining method and device |
CN106992900A (en) * | 2016-01-20 | 2017-07-28 | 北京国双科技有限公司 | The method and intelligent early-warning notification platform of monitoring and early warning |
CN111656418A (en) * | 2017-11-27 | 2020-09-11 | Abb瑞士股份有限公司 | Industrial plant alarm management |
CN110807908A (en) * | 2019-11-05 | 2020-02-18 | 五凌电力有限公司 | Intelligent alarm method for hydropower station cluster monitoring system |
US20220153140A1 (en) * | 2020-11-13 | 2022-05-19 | Nio Technology (Anhui) Co., Ltd | Remote monitoring and alarm system and method of vehicle traction battery fault |
CN112596990A (en) * | 2020-12-24 | 2021-04-02 | 科华恒盛股份有限公司 | Alarm storm processing method and device and terminal equipment |
CN113470288A (en) * | 2021-06-29 | 2021-10-01 | 华能左权煤电有限责任公司 | Audible and visual alarm system for power plant |
CN113806173A (en) * | 2021-09-17 | 2021-12-17 | 中国工商银行股份有限公司 | Log alarm classification method and system and electronic equipment |
CN113849513A (en) * | 2021-09-26 | 2021-12-28 | 中国地质大学(武汉) | Data center operation and maintenance alarm information merging method and system |
CN114172785A (en) * | 2021-10-21 | 2022-03-11 | 广州市百果园信息技术有限公司 | Alarm information processing method, device, equipment and storage medium |
CN114143054A (en) * | 2021-11-24 | 2022-03-04 | 杭州安恒信息安全技术有限公司 | Safety alarm display method, system, device and server |
CN116112342A (en) * | 2023-01-06 | 2023-05-12 | 广州文远知行科技有限公司 | Alarm information processing method, device, electronic equipment and storage medium |
Non-Patent Citations (1)
Title |
---|
许利文等: "梯级水电站集控中心智能报警系统设计与应用", 《水利水电快报》, 31 October 2022 (2022-10-31), pages 3 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2350757B1 (en) | System and method for taking optimized decisions for water supply networks and/or water utilities | |
CH697714A2 (en) | A method for detecting anomalies of operational metrics of machines. | |
CN113988565A (en) | Building construction quality safety online risk management method and system | |
CN110909006A (en) | Data synchronization method and device, computer equipment and storage medium | |
CN116612612A (en) | Centralized control center alarm method for river basin step power plant, computer equipment and storage medium | |
CN109840601B (en) | Operation management method combining wind power plant equipment monitoring and production management | |
CN105183627A (en) | Server performance prediction method and system | |
CN111614520B (en) | IDC flow data prediction method and device based on machine learning algorithm | |
CN115841173A (en) | Power consumption prediction and display method, device, equipment and storage medium | |
CN116663853A (en) | Task assigning method, device, computer equipment and storage medium | |
CN116228298A (en) | Big data analysis method and system based on NB-IOT water meter metering information | |
CN112463321B (en) | Process concurrency number prediction method and device and process concurrency number control method and device | |
CN114186855A (en) | Monitoring and early warning method, device, computer equipment, storage medium and program product | |
CN115130774A (en) | Maintenance method, device and equipment of photovoltaic system and storage medium | |
CN113361904B (en) | Monitoring and alarming method, device, equipment and readable storage medium | |
Sunday et al. | Modeling extreme rainfall in kaduna using the generalised extreme value distribution | |
CN112307081A (en) | Project budget cost management system, method, electronic device and readable storage medium | |
Verheugd et al. | Predicting Water Pipe Failures with a Recurrent Neural Hawkes Process Model | |
CN116781481B (en) | Auxiliary analysis method for alarm message of centralized control center monitoring system of river basin step power station | |
CN114124758B (en) | Flow monitoring method and device | |
CN117350546A (en) | Engineering measurement analysis management system and method based on big data | |
CN112633527B (en) | Enterprise maintenance network management method, system, computer equipment and storage medium | |
CN113240358B (en) | Automatic recording method for creep data of ultra-large span cable-stayed bridge construction | |
CA2357994C (en) | Automated system for rating pipe segments in a water distribution system | |
CN117893245A (en) | Sales prediction method and system based on cloud service platform big data mining |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |