CN116542464A - Engineering material receiving accounting management system used in first-class engineering mode - Google Patents

Engineering material receiving accounting management system used in first-class engineering mode Download PDF

Info

Publication number
CN116542464A
CN116542464A CN202310498731.2A CN202310498731A CN116542464A CN 116542464 A CN116542464 A CN 116542464A CN 202310498731 A CN202310498731 A CN 202310498731A CN 116542464 A CN116542464 A CN 116542464A
Authority
CN
China
Prior art keywords
engineering
data
accounting
subunit
determining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310498731.2A
Other languages
Chinese (zh)
Other versions
CN116542464B (en
Inventor
金和平
龚涛
许青
何奎
刘佳岐
张梦禾
郭辉
谭鑫
田园
张晓萌
罗惠恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Three Gorges High Technology Information Technology Co ltd
China Three Gorges Corp
Original Assignee
Three Gorges High Technology Information Technology Co ltd
China Three Gorges Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Three Gorges High Technology Information Technology Co ltd, China Three Gorges Corp filed Critical Three Gorges High Technology Information Technology Co ltd
Priority to CN202310498731.2A priority Critical patent/CN116542464B/en
Publication of CN116542464A publication Critical patent/CN116542464A/en
Application granted granted Critical
Publication of CN116542464B publication Critical patent/CN116542464B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

The invention discloses an engineering material receiving accounting management system used in a first-class engineering mode, which comprises: the device comprises a first acquisition unit, a first determination unit, a first calculation unit and a second determination unit. The system redesigns the accounting management flow for the engineering material reception, adapts to the marketing-changing mode, meets the engineering construction requirements, reduces the impact on engineering construction, optimizes the original management mode and improves the economic benefit. Therefore, by implementing the invention, the control and management of the accounting mode for the engineering material in the nutrient change mode are realized.

Description

Engineering material receiving accounting management system used in first-class engineering mode
Technical Field
The invention relates to the technical field of engineering settlement, in particular to an engineering material receiving accounting management system in an A-supply engineering mode.
Background
In the mode of changing business tax into value-added tax (hereinafter referred to as "change of business tax"), the original engineering price settlement mode is changed greatly, and the existing system cannot manage. Therefore, according to the characteristics of large-scale hydroelectric engineering construction, a novel engineering material receiving accounting management system in a first-class supply engineering mode is provided.
Disclosure of Invention
In view of the above, the embodiment of the invention provides an accounting management system for engineering material adoption in a first-class engineering mode, which is used for solving the technical problem that the existing system cannot manage due to the significant change of the original engineering price settlement mode in the prior art.
The technical scheme provided by the invention is as follows:
in a first aspect, an embodiment of the present invention provides an accounting management system for engineering material reception in a first supply engineering mode, including: the first acquisition unit is used for acquiring an engineering parameter set and a preset code, sending the engineering parameter set to the first determination unit and sending the preset code to the second determination unit; the first determining unit is used for determining material recruitment standard supply data and material approximate calculation data based on the engineering parameter set and sending the engineering parameter set, the material recruitment standard supply data and the material approximate calculation data to the first calculating unit; the first calculating unit is used for calculating material receiving accounting difference value data based on the engineering parameter set, the material bidding system supply data and the material general calculation data, and sending the material receiving accounting difference value data to the second determining unit; the second determining unit is used for determining first engineering material receiving accounting data based on the preset codes and the material receiving accounting difference data.
With reference to the first aspect, in one possible implementation manner of the first aspect, the engineering parameter set includes an engineering contract code, an engineering material sending time, a material shortcut code and a material sending quantity; the first determination unit includes: a first determining subunit configured to determine, based on the engineering contract code and the engineering material sending time, allocation data, and send the allocation data to a second determining subunit; a sending subunit, configured to send the asset shortcut code and the asset issue number to a third determining subunit; the second determining subunit is used for determining the material bidding system supply data based on the allocation data; the third determining subunit is configured to determine the material approximate data based on the material shortcut code and the material issue number.
With reference to the first aspect, in another possible implementation manner of the first aspect, the second determining subunit includes: a first querying subunit configured to query a dial contract based on the dial data, and send the dial contract to a second querying subunit; the second inquiring subunit is configured to acquire a material supply price agreement, inquire a material virtual contract based on the allocating and contracting contract, and determine the material bidding system supply data in the material supply price agreement based on the material virtual contract.
With reference to the first aspect, in a further possible implementation manner of the first aspect, the third determining subunit includes: a third query subunit, configured to query a material code based on the material shortcut code, and send the material code to a fourth query subunit; the fourth query subunit is configured to determine the material calculation data based on the material code and the material issue number.
With reference to the first aspect, in a further possible implementation manner of the first aspect, the first determining unit further includes: and the fourth determining subunit is used for receiving the material virtual contract sent by the second inquiring subunit and determining the preset code corresponding to each material in the material virtual contract based on the material virtual contract.
With reference to the first aspect, in a further possible implementation manner of the first aspect, the first computing unit includes: a first calculation subunit for calculating first lead accounting data of the material based on the material issue number and the material bid system supply data, and transmitting the first lead accounting data of the material to a third calculation subunit; a second calculation subunit configured to calculate, based on the material issue number and the material approximate calculation data, material second pilot accounting data, and send the material second pilot accounting data to the third calculation subunit; the third calculation subunit is configured to calculate, based on the first material receiving accounting data and the second material receiving accounting data, material receiving accounting difference data.
With reference to the first aspect, in a further possible implementation manner of the first aspect, the second determining unit includes: and the control subunit is used for automatically generating the first engineering material receiving accounting data based on the preset codes and the material receiving accounting difference value data in a preset first control state.
With reference to the first aspect, in a further possible implementation manner of the first aspect, the control subunit is further configured to obtain engineering material reception accounting management data in a preset second control state, and determine the first engineering material reception accounting data based on the engineering material reception accounting management data.
With reference to the first aspect, in a further possible implementation manner of the first aspect, the system further includes: the second acquisition unit is used for acquiring second engineering material reception accounting data and sending the second engineering material reception accounting data to the establishment unit; the establishing unit is used for receiving the first engineering material receiving accounting data sent by the second determining unit, establishing an association relation between the first engineering material receiving accounting data and the second engineering material receiving accounting data based on a preset algorithm, and sending the association relation to the second calculating unit; the second calculation unit is configured to receive the first engineering material reception accounting data sent by the second determination unit, and obtain target settlement data in the second engineering material reception accounting data through the preset algorithm processing based on the association relationship, the first engineering material reception accounting data and a preset coefficient value.
In a second aspect, an embodiment of the present invention provides an accounting management method for engineering material reception in a first-class engineering mode, which is used for the accounting management system for engineering material reception in a first-class engineering mode according to any one of the first aspect and the first aspect of the embodiments of the present invention; the project material receiving accounting management method for the first-class supply project mode comprises the following steps: acquiring an engineering parameter set, a preset code and second engineering material receiving accounting data, and determining material bid system supply data and material general calculation data based on the engineering parameter set; calculating material acceptance accounting difference data based on the engineering parameter set, the material bid system supply data and the material general calculation data; determining first engineering material reception accounting data based on the preset codes and the material reception accounting difference data; establishing an association relation between the first engineering material reception accounting data and the second engineering material reception accounting data based on a preset algorithm; and processing the first engineering material reception accounting data and the preset coefficient value through the preset algorithm based on the association relation to obtain target settlement data in the second engineering material reception accounting data.
In a third aspect, an embodiment of the present invention provides an accounting management device for engineering material reception in a first-class engineering mode, which is configured to implement the accounting management system for engineering material reception in a first-class engineering mode according to any one of the first aspect and the first aspect of the embodiments of the present invention; the project material receiving accounting management device for the first-class project mode comprises: the acquisition and determination module is used for acquiring an engineering parameter set, a preset code and second engineering material receiving accounting data, and determining material bidding system supply data and material general calculation data based on the engineering parameter set; the calculation module is used for calculating material receiving accounting difference data based on the engineering parameter set, the material recruitment standard supply data and the material general calculation data; the determining module is used for determining first engineering material receiving accounting data based on the preset codes and the material receiving accounting difference data; the establishing module is used for establishing an association relation between the first engineering material reception accounting data and the second engineering material reception accounting data based on a preset algorithm; and the processing module is used for obtaining target settlement data in the second engineering material receiving accounting data through the preset algorithm processing based on the association relation, the first engineering material receiving accounting data and the preset coefficient value.
In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium storing a computer program for causing the computer to execute the engineering material reception accounting management method for the first supply engineering mode according to the second aspect of the embodiment of the present invention.
In a fifth aspect, an embodiment of the present invention provides an electronic device, including: the system comprises a memory and a processor, wherein the memory and the processor are in communication connection, the memory stores a computer program, and the processor executes the computer program so as to execute the engineering material receiving accounting management method in the first supply engineering mode according to the second aspect of the embodiment of the invention.
The technical scheme provided by the invention has the following effects:
the project material receiving accounting management system for the first supply project mode provided by the embodiment of the invention redesigns the project material receiving accounting management flow, adapts to the project change mode, meets the project construction requirement, reduces the impact on the project construction, optimizes the original management mode and improves the economic benefit. Therefore, by implementing the invention, the control and management of the accounting mode for the engineering material in the nutrient change mode are realized.
The engineering material receiving accounting management method for the first-class engineering mode provided by the embodiment of the invention is utilized to control and manage the engineering material receiving accounting flow, so that the original management mode is optimized, and the economic benefit is improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings that are needed in the description of the embodiments or the prior art will be briefly described, and it is obvious that the drawings in the description below are some embodiments of the present invention, and other drawings can be obtained according to the drawings without inventive effort for a person skilled in the art.
FIG. 1 is a block diagram of a construction of an accounting management system for engineering material reception in a first supply engineering mode according to an embodiment of the present invention;
FIG. 2 is a flow chart of an accounting management method for engineering material adoption in a first supply engineering mode according to an embodiment of the invention;
FIG. 3 is a block diagram of a construction of an accounting management device for engineering material reception in a first supply engineering mode according to an embodiment of the present invention;
FIG. 4 is a schematic diagram of a computer-readable storage medium provided according to an embodiment of the present invention;
fig. 5 is a schematic structural diagram of an electronic device according to an embodiment of the present invention.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is apparent that the described embodiments are some embodiments of the present invention, but not all embodiments of the present invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
It should be noted that the terms "first," "second," and the like in the description and the claims of the present invention and the above figures are used for distinguishing between similar objects and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used may be interchanged where appropriate such that the embodiments of the invention described herein may be implemented in sequences other than those illustrated or otherwise described herein. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
The embodiment of the invention provides an engineering material receiving accounting management system for a first-class engineering mode, as shown in fig. 1, wherein the engineering material receiving accounting management system 1 for the first-class engineering mode comprises: a first acquisition unit 11, a first determination unit 12, a first calculation unit 13, a second determination unit 14, a second acquisition unit 15, a setup unit 16, and a second calculation unit 17.
Wherein the first acquisition unit 11 is connected to the first determination unit 12; the first determination unit 12 is connected to the first calculation unit 13 and the second determination unit 14, respectively; the first calculation unit 13 is connected to the second determination unit 14; the establishing unit 16 is connected to the second determining unit 14, the second acquiring unit 15 and the second calculating unit 17, respectively; the second calculation unit 17 is connected to the second determination unit 14.
It should be understood that the system may also include other apparatuses, devices.
Specifically, the first determination unit 12 includes a first determination subunit 121, a transmission subunit 122, a second determination subunit 123, a third determination subunit 124, and a fourth determination subunit 125;
the first calculation unit 13 includes a first calculation subunit 131, a second calculation subunit 132, and a third calculation subunit 133;
the second determination unit 14 includes a control subunit 141.
Wherein the second determining subunit 123 is connected to the first determining subunit 121, and the third determining subunit 124 is connected to the transmitting subunit 122;
further, the second determining subunit 123 includes a first querying subunit 1231, a second querying subunit 1232; the third determination subunit 124 includes a third query subunit 1241 and a fourth query subunit 1242.
Wherein the first query subunit 1231 is connected to the second query subunit 1232; the third query subunit 1241 is connected to the fourth query subunit 1242.
Further, the function of each device in the above system will be described.
The first acquisition unit 11 is configured to acquire an engineering parameter set and a preset code, and then send the engineering parameter set to the first determination unit 12 and the preset code to the second determination unit 14.
The engineering parameter set may include an engineering contract code, an engineering material issue time, a material shortcut code, and a material issue number.
After the first determining unit 12 receives the engineering parameter set, first, the first determining subunit 121 may determine the corresponding allocation data according to the engineering contract code and the engineering material sending time in the engineering parameter set, for example, according to the contract code (BP 1400000004) +the sending time (2021, 3 months, 25 days), an allocation order with the status of I mode being 1, that is, the allocation data may be obtained. At the same time, the dial data is sent to the second determination subunit 123.
Next, the transmitting subunit 122 transmits the asset shortcut code and the asset issue number in the engineering parameter set to the third determining subunit 124.
Then, the second determining subunit 123 may determine the corresponding material recruitment standard supply data according to the received allocation data.
Specifically, according to the deployment data, the first querying subunit 1231 in the second determining subunit 123 queries and obtains a deployment contract, and sends the deployment contract to the second querying subunit 1232;
the second querying subunit 1232 obtains the material supply price agreement after receiving the allocating and contracting contract, queries the material virtual contract based on the allocating and contracting contract, and obtains the corresponding material bidding system supply data through the material supply price agreement hooked with the material virtual contract.
Finally, the third determining subunit 124 may determine the corresponding material approximate data according to the received material shortcut code and the material issue number.
Specifically, according to the material shortcut code, the material code corresponding to the material shortcut code is queried and obtained in the third querying subunit 1241 in the third determining subunit 124, and the material code is sent to the fourth querying subunit 1242.
Further, in the fourth query subunit 1242, the material code and the material issue number may be used to match the material calculation data of the corresponding material.
Finally, the first determining unit 12 sends the obtained material recruitment system supply data, material approximation data, and engineering parameter set to the first calculating unit 13.
Further, the second querying subunit 1232 is further configured to send the queried material virtual contract to the fourth determining subunit 125, and determine, in the fourth determining subunit 125, a preset code corresponding to each material (BOQ) in the material virtual contract.
After the first calculating unit 13 receives the material bid amount supply data, the material approximate calculation data, and the engineering parameter set, first, in the first calculating subunit 131, according to the material bid amount supply data and the material emission amount in the engineering parameter set, first receiving accounting data of the material is calculated:
first lead accounting data of material = material issue quantity material bid system supply data
Meanwhile, the calculated first lead accounting data of the material materials is transmitted to the third calculation subunit 133.
Next, in the second calculating subunit 132, according to the material general calculation data and the number of material emissions in the engineering parameter set, second pilot accounting data of the material is calculated:
second accounting data of material = material issue quantity × material overview data
Meanwhile, the calculated material second reception accounting data is transmitted to the third calculation subunit 133.
Finally, in the third calculation subunit 133, the received first accounting data of the material and the received second accounting data of the material are used to calculate and obtain accounting difference data of the material:
accounting difference data for material reception=material material second first lead accounting data of material materials
Further, the first calculation unit 13 transmits the obtained material reception accounting difference data to the second determination unit 14.
After receiving the accounting difference data and the preset code, the second determining unit 14 may determine corresponding first engineering material receiving accounting data according to the accounting difference data and the preset code.
The first engineering material receiving accounting data is virtual settlement data corresponding to the engineering material.
Specifically, the control subunit 141 is a switch, and when the switch state is "T", that is, the first control state is preset, the first engineering material receiving accounting data can be automatically generated based on the obtained material receiving accounting difference data and the preset code.
When the switch state is 'W', namely the second control state is preset, the engineering material settlement data cannot be automatically generated, the acquired engineering material lead accounting management data is required to be manually input, and the first engineering material lead accounting data is generated.
Further, the second acquisition unit 15 acquires second engineering material reception accounting data, and transmits the second engineering material reception accounting data to the establishment unit 16. The second engineering material receiving accounting data is actual settlement data corresponding to the engineering material.
The establishing unit 16 receives the first engineering material reception accounting data sent from the second determining unit 14, processes the first engineering material reception accounting data by using a preset algorithm, establishes an association relationship between the first engineering material reception accounting data and the second engineering material reception accounting data, and sends the association relationship to the second calculating unit 17.
After receiving the first engineering material reception accounting data sent by the second determining unit 14, the second calculating unit 17 processes the first engineering material reception accounting data, the preset coefficient value and the association relation according to the first engineering material reception accounting data and the preset algorithm, so as to obtain target settlement data in the second engineering material reception accounting data:
target settlement data = first engineering material reception accounting data preset coefficient value
Further, when the parameter in the preset algorithm is Y, the corresponding engineering material settlement batch processing result display data can be generated and output through the processing of the preset algorithm; when the parameter in the preset algorithm is 'N', the first engineering material receiving accounting data and the target settlement data can be automatically written into the second engineering material receiving accounting data through the processing of the preset algorithm.
Through the processing of the preset algorithm, the first engineering material reception accounting data can be automatically written into a transfer contract corresponding to the transfer data in a negative value mode, and the target settlement data is automatically generated, so that the purpose of deducting the first engineering material reception accounting data from the second engineering material reception accounting data is achieved.
The project material receiving accounting management system for the first supply project mode provided by the embodiment of the invention redesigns the project material receiving accounting management flow, adapts to the project change mode, meets the project construction requirement, reduces the impact on the project construction, optimizes the original management mode and improves the economic benefit. Therefore, by implementing the invention, the control and management of the accounting mode for the engineering material in the nutrient change mode are realized.
The embodiment of the invention also provides an accounting management method for the engineering material reception in the first-class engineering mode, which is used for the accounting management system 1 for the engineering material reception in the first-class engineering mode according to the embodiment of the invention; as shown in fig. 2, the method comprises the steps of:
step 201: and acquiring an engineering parameter set, a preset code and second engineering material receiving accounting data, and determining material receiving standard supply data and material general calculation data based on the engineering parameter set.
Specifically, the first acquiring unit 11 in the engineering material receiving accounting management system 1 for the first supply engineering mode provided by the embodiment of the invention is used for acquiring an engineering parameter set and a preset code; the second engineering material reception accounting data is acquired by the second acquisition unit 15.
The specific acquiring process refers to the functional descriptions of the first acquiring unit 11 and the second acquiring unit 15 in the accounting management system 1 for engineering material receiving in the first supply engineering mode in the above embodiment of the present invention, and are not repeated here.
Further, the first determining unit 12 in the engineering material receiving accounting management system 1 for the first supply engineering mode provided by the embodiment of the present invention is utilized to determine the material recruitment standard supply data and the material approximate data.
The description of the functions and the interaction process of the first determining subunit 121 and the second determining subunit 123 in the first determining unit 12 and the functions and the interaction process of the first querying subunit 1231 and the second querying subunit 1232 in the second determining subunit 123 in the first determining unit 12 and the first supply engineering mode are referred to in the above embodiment of the present invention, and are not repeated herein.
Determination of material calculation data referring to the description of the functions and interaction procedures of the transmitting subunit 122 and the third determining subunit 124 in the first determining unit 12 and the functions and interaction procedures of the third querying subunit 1241 and the fourth querying subunit 1242 in the third determining subunit 124 in the first determining unit 12 of the engineering material receiving accounting management system 1 for use in the first supply engineering mode according to the above embodiment of the present invention, the description will not be repeated here.
Step 202: calculating material acceptance accounting difference data based on the engineering parameter set, the material bid system supply data and the material general calculation data.
Specifically, the first calculation unit 13 in the engineering material receiving accounting management system 1 for the first supply engineering mode provided by the embodiment of the invention is used for calculation.
For specific processes, reference is made to the description of the functions and interaction processes of the first computing subunit 131, the second computing subunit 132 and the third computing subunit 133 in the first computing unit 13 in the first computing system 1 for engineering material receiving accounting management in the first supply engineering mode in the above embodiment of the present invention, which are not repeated herein.
Step 203: and determining first engineering material reception accounting data based on the preset codes and the material reception accounting difference data.
Specifically, the first engineering material reception accounting data is determined by the second determining unit 14 in the engineering material reception accounting management system 1 for the first engineering material reception engineering mode provided by the embodiment of the present invention.
For a specific process, reference is made to the description of the function of the control subunit 141 in the second determining unit 14 in the first determining unit 1 of the engineering material receiving accounting management system 1 in the first supply engineering mode in the above embodiment of the present invention, and the description is omitted here.
Step 204: and establishing an association relation between the first engineering material reception accounting data and the second engineering material reception accounting data based on a preset algorithm.
Specifically, the association relationship is established by using the establishment unit 16 in the engineering material reception accounting management system 1 in the first-order engineering mode provided by the embodiment of the present invention.
For a specific construction process, reference is made to the functional description of the construction unit 16 in the construction material receiving accounting management system 1 for the first-aid construction mode in the above embodiment of the present invention, and the description is omitted here.
Step 205: and processing the first engineering material reception accounting data and the preset coefficient value through the preset algorithm based on the association relation to obtain target settlement data in the second engineering material reception accounting data.
Specifically, the second calculation unit 17 in the accounting management system 1 is used for the engineering material reception in the first supply engineering mode provided by the embodiment of the present invention to process, and obtain the target settlement data.
For specific processing procedures, reference is made to the description of the functions and interaction procedures of the second determining unit 14, the establishing unit 16 and the second calculating unit 17 in the engineering material receiving accounting management system 1 for the first supply engineering mode in the above embodiment of the present invention, and the description is omitted here.
The engineering material receiving accounting management method for the first-class engineering mode provided by the embodiment of the invention is utilized to control and manage the engineering material receiving accounting flow, so that the original management mode is optimized, and the economic benefit is improved.
The embodiment of the invention also provides an accounting management device for the engineering material in the first-class engineering mode, which is used for the accounting management system 1 for the engineering material in the first-class engineering mode; as shown in fig. 3, the apparatus includes:
the acquiring and determining module 301 is configured to acquire an engineering parameter set, a preset code, and second engineering material receiving accounting data, and determine material receiving standard supply data and material general calculation data based on the engineering parameter set; for details, see the description of step 201 in the method embodiment described above.
A calculation module 302, configured to calculate material reception accounting difference data based on the engineering parameter set, the material recruitment standard supply data, and the material general calculation data; for details, see the description of step 202 in the method embodiment above.
A determining module 303, configured to determine first engineering material reception accounting data based on the preset code and the material reception accounting difference data; for details, see the description of step 203 in the above method embodiment.
The establishing module 304 is configured to establish an association relationship between the first engineering material reception accounting data and the second engineering material reception accounting data based on a preset algorithm; for details, see the description of step 204 in the method embodiment above.
The processing module 305 is configured to obtain target settlement data in the second engineering material reception accounting data through the processing of the preset algorithm based on the association relationship, the first engineering material reception accounting data and the preset coefficient value; for details, see the description of step 205 in the method embodiment described above.
The engineering material receiving accounting management device for the first-class engineering mode provided by the embodiment of the invention is utilized to control and manage the engineering material receiving accounting flow, so that the original management mode is optimized, and the economic benefit is improved.
The functional description of the engineering material receiving accounting management device for the first-class engineering mode provided by the embodiment of the invention is detailed in the description of the engineering material receiving accounting management method for the first-class engineering mode in the embodiment.
The embodiment of the present invention further provides a storage medium, as shown in fig. 4, on which a computer program 401 is stored, which when executed by a processor, implements the steps of the engineering material reception accounting management method used in the first supply engineering mode in the above embodiment. The storage medium may be a magnetic Disk, an optical disc, a Read-Only Memory (ROM), a random access Memory (Random Access Memory, RAM), a Flash Memory (Flash Memory), a Hard Disk (HDD), a Solid State Drive (SSD), or the like; the storage medium may also comprise a combination of memories of the kind described above.
It will be appreciated by those skilled in the art that implementing all or part of the above-described embodiment method may be implemented by a computer program to instruct related hardware, where the program may be stored in a computer readable storage medium, and the program may include the above-described embodiment method when executed. The storage medium may be a magnetic Disk, an optical disc, a Read-Only Memory (ROM), a random access Memory (Random Access Memory, RAM), a Flash Memory (Flash Memory), a Hard Disk (HDD), a Solid State Drive (SSD), or the like; the storage medium may also comprise a combination of memories of the kind described above.
The embodiment of the present invention further provides an electronic device, as shown in fig. 5, where the electronic device may include a processor 51 and a memory 52, where the processor 51 and the memory 52 may be connected by a bus or other means, and in fig. 5, the connection is exemplified by a bus.
The processor 51 may be a central processing unit (Central Processing Unit, CPU). The processor 51 may also be other general purpose processors, digital signal processors (Digital Signal Processor, DSP), application specific integrated circuits (Application Specific Integrated Circuit, ASIC), field programmable gate arrays (Field-Programmable Gate Array, FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, or combinations thereof.
The memory 52 serves as a non-transitory computer readable storage medium that may be used to store non-transitory software programs, non-transitory computer-executable programs, and modules, such as corresponding program instructions/modules in embodiments of the present invention. The processor 51 executes various functional applications of the processor and data processing by running non-transitory software programs, instructions and modules stored in the memory 52, i.e., implements the engineering material adoption accounting management method for the first supply engineering mode in the above-described method embodiment.
The memory 52 may include a memory program area that may store an operating device, an application program required for at least one function, and a memory data area; the storage data area may store data created by the processor 51, etc. In addition, memory 52 may include high-speed random access memory, and may also include non-transitory memory, such as at least one magnetic disk storage device, flash memory device, or other non-transitory solid state storage device. In some embodiments, memory 52 may optionally include memory located remotely from processor 51, which may be connected to processor 51 via a network. Examples of such networks include, but are not limited to, the internet, intranets, local area networks, mobile communication networks, and combinations thereof.
The one or more modules are stored in the memory 52, which when executed by the processor 51, perform the engineering material adoption accounting management method for the first supply engineering mode in the embodiment shown in fig. 2.
The details of the electronic device may be understood correspondingly with respect to the corresponding relevant descriptions and effects in the embodiment shown in fig. 2, which are not repeated herein.
Although embodiments of the present invention have been described in connection with the accompanying drawings, various modifications and variations may be made by those skilled in the art without departing from the spirit and scope of the invention, and such modifications and variations fall within the scope of the invention as defined by the appended claims.

Claims (10)

1. An engineering material reception accounting management system for use in a first supply engineering mode, the system comprising:
the first acquisition unit is used for acquiring an engineering parameter set and a preset code, sending the engineering parameter set to the first determination unit and sending the preset code to the second determination unit;
the first determining unit is used for determining material recruitment standard supply data and material approximate calculation data based on the engineering parameter set and sending the engineering parameter set, the material recruitment standard supply data and the material approximate calculation data to the first calculating unit;
the first calculating unit is used for calculating material receiving accounting difference value data based on the engineering parameter set, the material bidding system supply data and the material general calculation data, and sending the material receiving accounting difference value data to the second determining unit;
the second determining unit is used for determining first engineering material receiving accounting data based on the preset codes and the material receiving accounting difference data.
2. The system of claim 1, wherein the engineering parameter set comprises an engineering contract code, an engineering material issue time, a material shortcut code, and a material issue number; the first determination unit includes:
a first determining subunit configured to determine, based on the engineering contract code and the engineering material sending time, allocation data, and send the allocation data to a second determining subunit;
a sending subunit, configured to send the asset shortcut code and the asset issue number to a third determining subunit;
the second determining subunit is used for determining the material bidding system supply data based on the allocation data;
the third determining subunit is configured to determine the material approximate data based on the material shortcut code and the material issue number.
3. The system of claim 2, wherein the second determination subunit comprises:
a first querying subunit configured to query a dial contract based on the dial data, and send the dial contract to a second querying subunit;
the second inquiring subunit is configured to acquire a material supply price agreement, inquire a material virtual contract based on the allocating and contracting contract, and determine the material bidding system supply data in the material supply price agreement based on the material virtual contract.
4. The system of claim 2, wherein the third determination subunit comprises:
a third query subunit, configured to query a material code based on the material shortcut code, and send the material code to a fourth query subunit;
the fourth query subunit is configured to determine the material calculation data based on the material code and the material issue number.
5. A system according to claim 3, wherein the first determining unit further comprises:
and the fourth determining subunit is used for receiving the material virtual contract sent by the second inquiring subunit and determining the preset code corresponding to each material in the material virtual contract based on the material virtual contract.
6. The system of claim 2, wherein the first computing unit comprises:
a first calculation subunit for calculating first lead accounting data of the material based on the material issue number and the material bid system supply data, and transmitting the first lead accounting data of the material to a third calculation subunit;
a second calculation subunit configured to calculate, based on the material issue number and the material approximate calculation data, material second pilot accounting data, and send the material second pilot accounting data to the third calculation subunit;
the third calculation subunit is configured to calculate, based on the first material receiving accounting data and the second material receiving accounting data, material receiving accounting difference data.
7. The system according to claim 5, wherein the second determining unit comprises:
and the control subunit is used for automatically generating the first engineering material receiving accounting data based on the preset codes and the material receiving accounting difference value data in a preset first control state.
8. The system of claim 7, wherein the system further comprises a controller configured to control the controller,
the control subunit is further configured to obtain engineering material reception accounting management data in a preset second control state, and determine the first engineering material reception accounting data based on the engineering material reception accounting management data.
9. The system of claim 1, wherein the system further comprises:
the second acquisition unit is used for acquiring second engineering material reception accounting data and sending the second engineering material reception accounting data to the establishment unit;
the establishing unit is used for receiving the first engineering material receiving accounting data sent by the second determining unit, establishing an association relation between the first engineering material receiving accounting data and the second engineering material receiving accounting data based on a preset algorithm, and sending the association relation to the second calculating unit;
the second calculation unit is configured to receive the first engineering material reception accounting data sent by the second determination unit, and obtain target settlement data in the second engineering material reception accounting data through the preset algorithm processing based on the association relationship, the first engineering material reception accounting data and a preset coefficient value.
10. An engineering material reception accounting management method for an a-supply engineering mode, for the engineering material reception accounting management system for an a-supply engineering mode according to any one of claims 1 to 9; characterized in that the method comprises:
acquiring an engineering parameter set, a preset code and second engineering material receiving accounting data, and determining material bid system supply data and material general calculation data based on the engineering parameter set;
calculating material acceptance accounting difference data based on the engineering parameter set, the material bid system supply data and the material general calculation data;
determining first engineering material reception accounting data based on the preset codes and the material reception accounting difference data;
establishing an association relation between the first engineering material reception accounting data and the second engineering material reception accounting data based on a preset algorithm;
and processing the first engineering material reception accounting data and the preset coefficient value through the preset algorithm based on the association relation to obtain target settlement data in the second engineering material reception accounting data.
CN202310498731.2A 2023-04-26 2023-04-26 Engineering material receiving accounting management system used in first-class engineering mode Active CN116542464B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310498731.2A CN116542464B (en) 2023-04-26 2023-04-26 Engineering material receiving accounting management system used in first-class engineering mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310498731.2A CN116542464B (en) 2023-04-26 2023-04-26 Engineering material receiving accounting management system used in first-class engineering mode

Publications (2)

Publication Number Publication Date
CN116542464A true CN116542464A (en) 2023-08-04
CN116542464B CN116542464B (en) 2024-04-12

Family

ID=87442954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310498731.2A Active CN116542464B (en) 2023-04-26 2023-04-26 Engineering material receiving accounting management system used in first-class engineering mode

Country Status (1)

Country Link
CN (1) CN116542464B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040095445A (en) * 2003-05-09 2004-11-15 주식회사 한진중공업 unification productive optimum system of the shipbuilding industry
CN101127104A (en) * 2007-09-19 2008-02-20 渤海船舶重工有限责任公司 Ship engineering material integrated handling computer management system
CN107292560A (en) * 2017-06-23 2017-10-24 国网山东省电力公司莱芜供电公司 Material storage management method and system
CN107392558A (en) * 2017-09-21 2017-11-24 东易日盛家居装饰集团股份有限公司 Enter, outbound management method and system
CN109345168A (en) * 2018-09-21 2019-02-15 中石化第十建设有限公司 A kind of petrochemical plant mounting material storage management method and system
CN113592611A (en) * 2021-06-28 2021-11-02 龙净能源发展有限公司 Integrated management system for centralized acquisition and supervision of garbage incineration enterprises
CN113627862A (en) * 2021-10-13 2021-11-09 广东卓维网络有限公司 First supply material overall process management method and device based on account book
CN115222336A (en) * 2022-08-02 2022-10-21 安徽云轨信息科技有限公司 Comprehensive management system of intelligent warehouse

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040095445A (en) * 2003-05-09 2004-11-15 주식회사 한진중공업 unification productive optimum system of the shipbuilding industry
CN101127104A (en) * 2007-09-19 2008-02-20 渤海船舶重工有限责任公司 Ship engineering material integrated handling computer management system
CN107292560A (en) * 2017-06-23 2017-10-24 国网山东省电力公司莱芜供电公司 Material storage management method and system
CN107392558A (en) * 2017-09-21 2017-11-24 东易日盛家居装饰集团股份有限公司 Enter, outbound management method and system
CN109345168A (en) * 2018-09-21 2019-02-15 中石化第十建设有限公司 A kind of petrochemical plant mounting material storage management method and system
CN113592611A (en) * 2021-06-28 2021-11-02 龙净能源发展有限公司 Integrated management system for centralized acquisition and supervision of garbage incineration enterprises
CN113627862A (en) * 2021-10-13 2021-11-09 广东卓维网络有限公司 First supply material overall process management method and device based on account book
CN115222336A (en) * 2022-08-02 2022-10-21 安徽云轨信息科技有限公司 Comprehensive management system of intelligent warehouse

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
丁向阳;李二曼;邢振方;: "医院实物资产账务处理和管理", 今日科苑, no. 14 *
傅漫琼;: "水电工程建设甲供物资管理工作解析", 四川水力发电, no. 04 *
冉光灿;: "糯扎渡项目基建物资核销系统的建设", 电力信息化, no. 10 *
张美华;: "浅谈建筑业营改增后"甲供材"相关问题的处理", 财经界(学术版), no. 17 *
梁海波;谢宇;: "甲供物资管理模式探索与思考", 中国高新科技, no. 18 *
陈广荣;D公司甲供物资库存管理研究, 中国优秀硕士学位论文全文数据库, pages 15 - 23 *

Also Published As

Publication number Publication date
CN116542464B (en) 2024-04-12

Similar Documents

Publication Publication Date Title
CN108924250B (en) Service request processing method and device based on block chain and computer equipment
CN108681963B (en) Multi-block chain integration control method, system, electronic device and storage medium
CN100365597C (en) Download system, communication terminal, server, and download method
CN104156843A (en) Logistics distribution management system and logistics distribution management method
CN110677462B (en) Access processing method, system, device and storage medium for multi-block chain network
CN110163739B (en) Payment complaint method, device, server and readable storage medium
US10963888B2 (en) Payment complaint method, device, server and readable storage medium
CN113141383A (en) Device information subscription method, client, server, system and storage medium
CN110955715A (en) ERP system, data conversion method and device of target platform and electronic equipment
CN116205684A (en) Intelligent advertisement management method, system, computer equipment and storage medium
CN111445340A (en) Method and device for estimating value of financial product, electronic equipment and readable storage medium
CN112422450A (en) Computer equipment, and flow control method and device for service request
CN116542464B (en) Engineering material receiving accounting management system used in first-class engineering mode
CN110659272A (en) Data cleaning method and system
CN115984022B (en) Unified account checking method and device for distributed payment system
CN105427149A (en) Cross-border e-commerce BPO service method and device based on SOA expansion framework
CN110837421B (en) Task allocation method and device
CN108038643A (en) Intelligent goods dispatch management method and system
CN111582407A (en) Task processing method and device, readable storage medium and electronic equipment
CN116737198A (en) Firmware pushing method, device, equipment and storage medium
CN110659076A (en) Installation deployment method and device of operating system
CN110473088B (en) Block chain-based band type data processing method and system
CN115936315A (en) Agricultural machinery scheduling method, device, system, electronic equipment and storage medium
CN117130761A (en) Resource management method and related device
CN110674214B (en) Big data synchronization method, device, computer equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant