CN116307959A - A data processing method and device for material distribution - Google Patents

A data processing method and device for material distribution Download PDF

Info

Publication number
CN116307959A
CN116307959A CN202111470764.3A CN202111470764A CN116307959A CN 116307959 A CN116307959 A CN 116307959A CN 202111470764 A CN202111470764 A CN 202111470764A CN 116307959 A CN116307959 A CN 116307959A
Authority
CN
China
Prior art keywords
delivery
distribution
information
time
real
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111470764.3A
Other languages
Chinese (zh)
Inventor
李应新
刘赞
陈克剑
罗志辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuzhou Ruidel Intelligent Equipment Co ltd
Original Assignee
Zhuzhou Ruidel Intelligent Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuzhou Ruidel Intelligent Equipment Co ltd filed Critical Zhuzhou Ruidel Intelligent Equipment Co ltd
Priority to CN202111470764.3A priority Critical patent/CN116307959A/en
Priority to PCT/CN2021/139852 priority patent/WO2023097807A1/en
Priority to US18/716,062 priority patent/US20250037064A1/en
Priority to JP2024533248A priority patent/JP2024541685A/en
Publication of CN116307959A publication Critical patent/CN116307959A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了一种用于物料配送的数据处理方法及装置,该方法包括:获取物料实时线边信息;判断物料实时线边信息是否满足配送条件,得到第一判断结果;当第一判断结果为是时,利用预设的物料动态配送规则对物料实时线边信息进行处理,得到物料配送参数信息;利用预设的配送指令生成规则对物料配送参数信息进行处理,得到配送指令集合;配送指令集合用于指示物料配送。可见,本发明能够通过对物料实时线边信息与配送条件的判断以及利用物料动态配送规则对物料实时线边信息的综合处理来确定配送参数信息,并生成用于指示物料配送的配送指令,有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。

Figure 202111470764

The invention discloses a data processing method and device for material distribution. The method includes: obtaining real-time line edge information of materials; judging whether the real-time line edge information of materials satisfies the distribution conditions, and obtaining a first judgment result; when the first judgment result When it is true, use the preset material dynamic distribution rules to process the real-time line edge information of materials to obtain material distribution parameter information; use the preset distribution instruction generation rules to process material distribution parameter information to obtain a distribution instruction set; Collections are used to indicate material dispatch. It can be seen that the present invention can determine the delivery parameter information by judging the real-time line edge information and delivery conditions of materials and comprehensively processing the real-time line edge information of materials by using the dynamic material delivery rules, and generate delivery instructions for instructing material delivery. It is beneficial to realize the precise matching of material demand and distribution, thereby reducing the cost of material distribution and improving operation efficiency.

Figure 202111470764

Description

一种用于物料配送的数据处理方法及装置A data processing method and device for material distribution

技术领域technical field

本发明涉及数据处理技术领域,尤其涉及一种用于物料配送的数据处理方法及装置。The invention relates to the technical field of data processing, in particular to a data processing method and device for material distribution.

背景技术Background technique

当前对于物料配送通常是通过根据人工统计数据对物料需求和配送时间等信息处理得到的,仍难以实现物料需求和配送的精准匹配。因此,提供一种用于物料配送的数据处理方法及装置,以实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率显得尤为重要。At present, material distribution is usually obtained by processing information such as material demand and delivery time based on manual statistical data, and it is still difficult to achieve accurate matching of material demand and delivery. Therefore, it is particularly important to provide a data processing method and device for material distribution to achieve accurate matching of material demand and distribution, thereby reducing material distribution costs and improving operational efficiency.

发明内容Contents of the invention

本发明所要解决的技术问题在于,提供一种用于物料配送的数据处理方法及装置,能够通过对物料实时线边信息与配送条件的判断以及利用物料动态配送规则对物料实时线边信息的综合处理来确定配送参数信息,并生成用于指示物料配送的配送指令,有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。The technical problem to be solved by the present invention is to provide a data processing method and device for material distribution, which can synthesize the real-time line information of materials by judging the real-time line information of materials and delivery conditions and using the dynamic distribution rules of materials Processing to determine the distribution parameter information, and generate distribution instructions for instructing material distribution, which is conducive to the accurate matching of material demand and distribution, thereby reducing material distribution costs and improving operational efficiency.

为了解决上述技术问题,本发明实施例第一方面公开了一种用于物料配送的数据处理方法,所述方法包括:In order to solve the above technical problems, the first aspect of the embodiment of the present invention discloses a data processing method for material distribution, the method includes:

获取物料实时线边信息;Obtain real-time line edge information of materials;

判断所述物料实时线边信息是否满足配送条件,得到第一判断结果;Judging whether the real-time line edge information of the material satisfies the distribution condition, and obtains the first judgment result;

当所述第一判断结果为是时,利用预设的物料动态配送规则对所述物料实时线边信息进行处理,得到物料配送参数信息;When the first judgment result is yes, use the preset material dynamic distribution rule to process the real-time line edge information of the material to obtain material distribution parameter information;

利用预设的配送指令生成规则对所述物料配送参数信息进行处理,得到配送指令集合;所述配送指令集合用于指示物料配送。The material distribution parameter information is processed by using a preset distribution instruction generation rule to obtain a distribution instruction set; the distribution instruction set is used to indicate material distribution.

作为一种可选的实施方式,在本发明实施例第一方面中,所述利用预设的物料动态配送规则对所述物料实时线边信息进行处理,得到物料配送参数信息,包括:As an optional implementation, in the first aspect of the embodiments of the present invention, the process of using the preset dynamic material distribution rules to process the real-time line edge information of the materials to obtain material distribution parameter information includes:

利用预设的配送时间确定规则对所述物料实时线边信息进行处理,得到配送时间信息;Processing the real-time line edge information of the material by using the preset delivery time determination rule to obtain the delivery time information;

利用预设的配送数量确定规则对所述物料实时线边信息进行处理,得到配送数量信息。The real-time line edge information of the material is processed by using the preset delivery quantity determination rule to obtain the delivery quantity information.

作为一种可选的实施方式,在本发明实施例第一方面中,所述利用预设的配送时间确定规则对所述物料实时线边信息进行处理,得到配送时间信息,包括:As an optional implementation manner, in the first aspect of the embodiments of the present invention, the process of using the preset delivery time determination rule to process the real-time line edge information of the material to obtain the delivery time information includes:

获取线边安全库存值;Obtain the line edge safety stock value;

利用预设的第一配送时间模型对所述线边安全库存值和所述物料实时线边信息进行处理,得到第一配送时间;Using the preset first delivery time model to process the lineside safety stock value and the real-time lineside information of the material to obtain the first delivery time;

利用预设的第二配送时间模型对所述物料实时线边信息进行处理,得到第二配送时间;Using the preset second delivery time model to process the real-time line edge information of the material to obtain the second delivery time;

利用预设的第三配送时间模型对所述第一配送时间和所述第二配送时间进行处理,得到配送时间信息。The first delivery time and the second delivery time are processed by using a preset third delivery time model to obtain delivery time information.

作为一种可选的实施方式,在本发明实施例第一方面中,所述物料实时线边信息包括配送周期和消耗速度;As an optional implementation, in the first aspect of the embodiment of the present invention, the real-time line edge information of the material includes delivery cycle and consumption speed;

所述利用预设的配送数量确定规则对所述物料实时线边信息进行处理,得到配送数量信息,包括:The use of the preset delivery quantity determination rules to process the real-time line edge information of the material to obtain the delivery quantity information includes:

根据所述配送周期,确定出周期配送量;According to the distribution cycle, determine the periodic distribution amount;

利用预设的需求修正模型对所述周期配送量和所述消耗速度进行处理,得到配送数量信息。The period delivery quantity and the consumption rate are processed by using a preset demand correction model to obtain delivery quantity information.

作为一种可选的实施方式,在本发明实施例第一方面中,所述根据所述配送周期,确定出周期配送量,包括:As an optional implementation manner, in the first aspect of the embodiments of the present invention, the determination of the periodic delivery amount according to the delivery cycle includes:

根据所述配送周期,确定出当期需求总量;According to the delivery cycle, determine the total demand for the current period;

根据所述当期需求总量和预设的数量求解模型,确定出目标数量模型;Determine the target quantity model according to the total demand in the current period and the preset quantity solution model;

对所述目标数量模型进行解析,得到周期配送量。The target quantity model is analyzed to obtain the period delivery quantity.

作为一种可选的实施方式,在本发明实施例第一方面中,所述物料配送参数信息包括配送时间信息和配送数量信息;As an optional implementation manner, in the first aspect of the embodiments of the present invention, the material delivery parameter information includes delivery time information and delivery quantity information;

所述利用预设的配送指令生成规则对所述物料配送参数信息进行处理,得到配送指令集合,包括:The use of the preset delivery instruction generation rules to process the material delivery parameter information to obtain a delivery instruction set, including:

获取当前时间信息;Get current time information;

判断所述当前时间信息和所述配送时间信息是否满足时间条件,得到第二判断结果;judging whether the current time information and the delivery time information meet a time condition, and obtain a second judging result;

当所述第二判断结果为是,根据所述配送数量信息,确定出配送指令集合。When the second judgment result is yes, a delivery instruction set is determined according to the delivery quantity information.

作为一种可选的实施方式,在本发明实施例第一方面中,所述根据所述配送数量信息,确定出配送指令集合,包括:As an optional implementation manner, in the first aspect of the embodiments of the present invention, the determining the delivery instruction set according to the delivery quantity information includes:

对所述物料实时线边信息进行处理,得到配送路径信息;Process the real-time line edge information of the material to obtain the delivery route information;

获取配送车辆信息;Obtain delivery vehicle information;

根据所述配送车辆信息和所述配送数量信息,生成装载指令;所述装载指令用于指示配送车辆装载与所述配送车辆相匹配数量的物料;Generate a loading instruction according to the delivery vehicle information and the delivery quantity information; the loading instruction is used to instruct the delivery vehicle to load materials that match the quantity of the delivery vehicle;

根据所述配送路径信息和所述配送车辆信息,生成物料配送指令;所述物料配送指令用于指示所述配送车辆配送物料到线边。A material delivery instruction is generated according to the delivery route information and the delivery vehicle information; the material delivery instruction is used to instruct the delivery vehicle to deliver the material to a line edge.

本发明实施例第二方面公开了一种用于物料配送的数据处理装置,装置包括:The second aspect of the embodiment of the present invention discloses a data processing device for material distribution, the device includes:

获取模块,用于获取物料实时线边信息;The acquisition module is used to obtain real-time line edge information of materials;

判断模块,用于判断所述物料实时线边信息是否满足配送条件,得到第一判断结果;A judging module, configured to judge whether the real-time line edge information of the material satisfies the distribution condition, and obtain a first judgment result;

第一处理模块,用于当所述第一判断结果为是时,利用预设的物料动态配送规则对所述物料实时线边信息进行处理,得到物料配送参数信息;The first processing module is configured to process the real-time line edge information of the material by using the preset material dynamic distribution rule to obtain material distribution parameter information when the first judgment result is yes;

第二处理模块,用于利用预设的配送指令生成规则对所述物料配送参数信息进行处理,得到配送指令集合;所述配送指令集合用于指示物料配送。The second processing module is configured to process the material distribution parameter information using a preset distribution instruction generation rule to obtain a distribution instruction set; the distribution instruction set is used to indicate material distribution.

作为一种该可选的实施方式,在本发明实施例第二方面中,所述第一处理模块包括第一处理子模块和第二处理子模块,其中:As an optional implementation manner, in the second aspect of the embodiment of the present invention, the first processing module includes a first processing submodule and a second processing submodule, wherein:

所述第一处理子模块,用于利用预设的配送时间确定规则对所述物料实时线边信息进行处理,得到配送时间信息;The first processing sub-module is used to process the real-time line edge information of the material by using the preset delivery time determination rule to obtain delivery time information;

所述第二处理子模块,用于利用预设的配送数量确定规则对所述物料实时线边信息进行处理,得到配送数量信息。The second processing sub-module is configured to process the real-time line edge information of the material by using a preset delivery quantity determination rule to obtain delivery quantity information.

作为一种该可选的实施方式,在本发明实施例第二方面中,所述第一处理子模块利用预设的配送时间确定规则对所述物料实时线边信息进行处理,得到配送时间信息的具体方式为:As an optional implementation, in the second aspect of the embodiment of the present invention, the first processing submodule uses the preset delivery time determination rule to process the real-time line edge information of the material to obtain the delivery time information The specific way is:

获取线边安全库存值;Obtain the line edge safety stock value;

利用预设的第一配送时间模型对所述线边安全库存值和所述物料实时线边信息进行处理,得到第一配送时间;Using the preset first delivery time model to process the lineside safety stock value and the real-time lineside information of the material to obtain the first delivery time;

利用预设的第二配送时间模型对所述物料实时线边信息进行处理,得到第二配送时间;Using the preset second delivery time model to process the real-time line edge information of the material to obtain the second delivery time;

利用预设的第三配送时间模型对所述第一配送时间和所述第二配送时间进行处理,得到配送时间信息。The first delivery time and the second delivery time are processed by using a preset third delivery time model to obtain delivery time information.

作为一种该可选的实施方式,在本发明实施例第二方面中,所述物料实时线边信息包括配送周期和消耗速度;As an optional implementation manner, in the second aspect of the embodiment of the present invention, the real-time line edge information of the material includes delivery cycle and consumption speed;

所述第二处理子模块利用预设的配送数量确定规则对所述物料实时线边信息进行处理,得到配送数量信息的具体方式为:The second processing sub-module processes the real-time line edge information of the material by using the preset delivery quantity determination rule, and the specific way to obtain the delivery quantity information is as follows:

根据所述配送周期,确定出周期配送量;According to the distribution cycle, determine the periodic distribution amount;

利用预设的需求修正模型对所述周期配送量和所述消耗速度进行处理,得到配送数量信息。The period delivery quantity and the consumption rate are processed by using a preset demand correction model to obtain delivery quantity information.

作为一种该可选的实施方式,在本发明实施例第二方面中,所述第二处理子模块根据所述配送周期,确定出周期配送量,包括:As an optional implementation manner, in the second aspect of the embodiment of the present invention, the second processing submodule determines the periodic delivery amount according to the delivery cycle, including:

根据所述配送周期,确定出当期需求总量;According to the delivery cycle, determine the total demand for the current period;

根据所述当期需求总量和预设的数量求解模型,确定出目标数量模型;Determine the target quantity model according to the total demand in the current period and the preset quantity solution model;

对所述目标数量模型进行解析,得到周期配送量。The target quantity model is analyzed to obtain the period delivery quantity.

作为一种该可选的实施方式,在本发明实施例第二方面中,所述物料配送参数信息包括配送时间信息和配送数量信息;As an optional implementation manner, in the second aspect of the embodiment of the present invention, the material delivery parameter information includes delivery time information and delivery quantity information;

所述第二处理模块利用预设的配送指令生成规则对所述物料配送参数信息进行处理,得到配送指令集合的具体方式为:The second processing module processes the material distribution parameter information by using the preset distribution instruction generation rules, and the specific way to obtain the distribution instruction set is as follows:

获取当前时间信息;Get current time information;

判断所述当前时间信息和所述配送时间信息是否满足时间条件,得到第二判断结果;judging whether the current time information and the delivery time information meet a time condition, and obtain a second judging result;

当所述第二判断结果为是,根据所述配送数量信息,确定出配送指令集合。When the second judgment result is yes, a delivery instruction set is determined according to the delivery quantity information.

作为一种该可选的实施方式,在本发明实施例第二方面中,所述第二处理模块根据所述配送数量信息,确定出配送指令集合的具体方式为:As an optional implementation manner, in the second aspect of the embodiment of the present invention, the specific method for the second processing module to determine the delivery instruction set according to the delivery quantity information is as follows:

对所述物料实时线边信息进行处理,得到配送路径信息;Process the real-time line edge information of the material to obtain the delivery route information;

获取配送车辆信息;Obtain delivery vehicle information;

根据所述配送车辆信息和所述配送数量信息,生成装载指令;所述装载指令用于指示配送车辆装载与所述配送车辆相匹配数量的物料;Generate a loading instruction according to the delivery vehicle information and the delivery quantity information; the loading instruction is used to instruct the delivery vehicle to load materials that match the quantity of the delivery vehicle;

根据所述配送路径信息和所述配送车辆信息,生成物料配送指令;所述物料配送指令用于指示所述配送车辆配送物料到线边。A material delivery instruction is generated according to the delivery route information and the delivery vehicle information; the material delivery instruction is used to instruct the delivery vehicle to deliver the material to a line edge.

本发明第三方面公开了另一种用于物料配送的数据处理装置,所述装置包括:The third aspect of the present invention discloses another data processing device for material distribution, which includes:

存储有可执行程序代码的存储器;a memory storing executable program code;

与所述存储器耦合的处理器;a processor coupled to the memory;

所述处理器调用所述存储器中存储的所述可执行程序代码,执行本发明实施例第一方面公开的用于物料配送的数据处理方法中的部分或全部步骤。The processor invokes the executable program code stored in the memory to execute some or all of the steps in the data processing method for material distribution disclosed in the first aspect of the embodiments of the present invention.

本发明第四方面公开了一种计算机存储介质,所述计算机存储介质存储有计算机指令,所述计算机指令被调用时,用于执行本发明实施例第一方面公开的用于物料配送的数据处理方法中的部分或全部步骤。The fourth aspect of the present invention discloses a computer storage medium, the computer storage medium stores computer instructions, and when the computer instructions are called, it is used to execute the data processing for material distribution disclosed in the first aspect of the embodiments of the present invention Some or all of the steps in the method.

与现有技术相比,本发明实施例具有以下有益效果:Compared with the prior art, the embodiments of the present invention have the following beneficial effects:

本发明实施例中,获取物料实时线边信息;判断物料实时线边信息是否满足配送条件,得到第一判断结果;当第一判断结果为是时,利用预设的物料动态配送规则对物料实时线边信息进行处理,得到物料配送参数信息;利用预设的配送指令生成规则对物料配送参数信息进行处理,得到配送指令集合;配送指令集合用于指示物料配送。可见,本发明能够通过对物料实时线边信息与配送条件的判断以及利用物料动态配送规则对物料实时线边信息的综合处理来确定配送参数信息,并生成用于指示物料配送的配送指令,有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。In the embodiment of the present invention, the real-time line edge information of the material is obtained; it is judged whether the real-time line edge information of the material satisfies the distribution condition, and the first judgment result is obtained; when the first judgment result is yes, the real-time distribution rule of the material is used Process the line edge information to obtain material distribution parameter information; use the preset distribution instruction generation rules to process the material distribution parameter information to obtain a distribution instruction set; the distribution instruction set is used to indicate material distribution. It can be seen that the present invention can determine the delivery parameter information by judging the real-time line edge information and delivery conditions of materials and comprehensively processing the real-time line edge information of materials by using the dynamic material delivery rules, and generate delivery instructions for instructing material delivery. It is beneficial to realize the precise matching of material demand and distribution, thereby reducing the cost of material distribution and improving operation efficiency.

附图说明Description of drawings

为了更清楚地说明本发明实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings that need to be used in the description of the embodiments will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present invention. For those skilled in the art, other drawings can also be obtained based on these drawings without creative effort.

图1是本发明实施例公开的一种用于物料配送的数据处理方法的流程示意图;Fig. 1 is a schematic flow chart of a data processing method for material distribution disclosed in an embodiment of the present invention;

图2是本发明实施例公开的另一种用于物料配送的数据处理方法的流程示意图;Fig. 2 is a schematic flow chart of another data processing method for material distribution disclosed in an embodiment of the present invention;

图3是本发明实施例公开的一种用于物料配送的数据处理装置的结构示意图;Fig. 3 is a schematic structural diagram of a data processing device for material distribution disclosed in an embodiment of the present invention;

图4是本发明实施例公开的另一种用于物料配送的数据处理装置的结构示意图;Fig. 4 is a schematic structural diagram of another data processing device for material distribution disclosed in an embodiment of the present invention;

图5本发明实施例公开的又一种用于物料配送的数据处理装置的结构示意图。Fig. 5 is a schematic structural diagram of another data processing device for material distribution disclosed in the embodiment of the present invention.

具体实施方式Detailed ways

为了使本技术领域的人员更好地理解本发明方案,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to enable those skilled in the art to better understand the solutions of the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only It is a part of embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

本发明的说明书和权利要求书及上述附图中的术语“第一”、“第二”等是用于区别不同对象,而不是用于描述特定顺序。此外,术语“包括”和“具有”以及它们任何变形,意图在于覆盖不排他的包含。例如包含了一系列步骤或单元的过程、方法、装置、产品或设备没有限定于已列出的步骤或单元,而是可选地还包括没有列出的步骤或单元,或可选地还包括对于这些过程、方法、产品或设备固有的其他步骤或单元。The terms "first", "second" and the like in the description and claims of the present invention and the above drawings are used to distinguish different objects, rather than to describe a specific order. Furthermore, the terms "include" and "have", as well as any variations thereof, are intended to cover a non-exclusive inclusion. For example, a process, method, device, product or equipment comprising a series of steps or units is not limited to the listed steps or units, but optionally also includes steps or units not listed, or optionally further includes For other steps or units inherent in these processes, methods, products or devices.

在本文中提及“实施例”意味着,结合实施例描述的特定特征、结构或特性可以包含在本发明的至少一个实施例中。在说明书中的各个位置出现该短语并不一定均是指相同的实施例,也不是与其它实施例互斥的独立的或备选的实施例。本领域技术人员显式地和隐式地理解的是,本文所描述的实施例可以与其它实施例相结合。Reference herein to an "embodiment" means that a particular feature, structure, or characteristic described in connection with the embodiment can be included in at least one embodiment of the present invention. The occurrences of this phrase in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments. It is understood explicitly and implicitly by those skilled in the art that the embodiments described herein can be combined with other embodiments.

本发明公开了一种用于物料配送的数据处理方法及装置,能够通过对物料实时线边信息与配送条件的判断以及利用物料动态配送规则对物料实时线边信息的综合处理来确定配送参数信息,并生成用于指示物料配送的配送指令,有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。以下分别进行详细说明。The invention discloses a data processing method and device for material distribution, which can determine the distribution parameter information by judging the real-time line information of materials and distribution conditions and comprehensively processing the real-time line information of materials by using dynamic material distribution rules , and generate distribution instructions for instructing material distribution, which is conducive to the precise matching of material demand and distribution, thereby reducing material distribution costs and improving operational efficiency. Each will be described in detail below.

实施例一Embodiment one

请参阅图1,图1是本发明实施例公开的一种用于物料配送的数据处理方法的流程示意图。其中,图1所描述的用于物料配送的数据处理方法应用于数据处理系统中,如用于物料配送的数据处理管理的本地服务器或云端服务器等,本发明实施例不做限定。如图1所示,该用于物料配送的数据处理方法可以包括以下操作:Please refer to FIG. 1 . FIG. 1 is a schematic flowchart of a data processing method for material distribution disclosed in an embodiment of the present invention. Wherein, the data processing method for material distribution described in FIG. 1 is applied to a data processing system, such as a local server or a cloud server for data processing and management of material distribution, which is not limited in the embodiment of the present invention. As shown in Figure 1, the data processing method for material distribution may include the following operations:

101、获取物料实时线边信息。101. Obtain real-time line edge information of materials.

102、判断物料实时线边信息是否满足配送条件,得到第一判断结果。102. Judging whether the real-time line edge information of the material satisfies the delivery condition, and obtaining the first judgment result.

103、当第一判断结果为是时,利用预设的物料动态配送规则对物料实时线边信息进行处理,得到物料配送参数信息。103. When the first judgment result is yes, use the preset material dynamic distribution rule to process the real-time line edge information of the material to obtain the material distribution parameter information.

104、利用预设的配送指令生成规则对物料配送参数信息进行处理,得到配送指令集合。104. Use the preset distribution instruction generation rules to process the material distribution parameter information to obtain a distribution instruction set.

本发明实施例中,上述配送指令集合用于指示物料配送。In the embodiment of the present invention, the above distribution instruction set is used to instruct material distribution.

可选的,上述物料实时线边信息包括配送周期,和/或,消耗速度,和/或,实时线边数量,和/或,实时线边时间,本发明实施例不做限定。Optionally, the real-time line edge information of the above-mentioned materials includes delivery cycle, and/or, consumption speed, and/or, real-time line edge quantity, and/or, real-time line edge time, which is not limited in this embodiment of the present invention.

可选的,上述配送条件为实时线边数量小于或等于响应库存值。Optionally, the above distribution condition is that the real-time line edge quantity is less than or equal to the corresponding inventory value.

可见,实施本发明实施例所描述的用于物料配送的数据处理方法能够通过对物料实时线边信息与配送条件的判断以及利用物料动态配送规则对物料实时线边信息的综合处理来确定配送参数信息,并生成用于指示物料配送的配送指令,有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。It can be seen that the implementation of the data processing method for material distribution described in the embodiment of the present invention can determine the distribution parameters by judging the real-time line edge information and distribution conditions of the material and comprehensively processing the real-time line edge information of the material by using the dynamic material distribution rules information, and generate distribution instructions for instructing material distribution, which is conducive to the precise matching of material demand and distribution, thereby reducing material distribution costs and improving operational efficiency.

在一个可选的实施例中,上述步骤103中利用预设的物料动态配送规则对物料实时线边信息进行处理,得到物料配送参数信息,包括:In an optional embodiment, in the above step 103, the preset material dynamic distribution rule is used to process the real-time line edge information of the material to obtain the material distribution parameter information, including:

利用预设的配送时间确定规则对物料实时线边信息进行处理,得到配送时间信息;Use the preset delivery time determination rules to process the real-time line edge information of materials to obtain delivery time information;

利用预设的配送数量确定规则对物料实时线边信息进行处理,得到配送数量信息。Use the preset distribution quantity determination rules to process the real-time line edge information of materials to obtain the distribution quantity information.

可见,实施本发明实施例所描述的用于物料配送的数据处理方法能够通过配送时间确定规则和配送数量确定规则对物料实时线边信息进行处理,得到配送时间信息和配送数量信息,有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。It can be seen that the implementation of the data processing method for material distribution described in the embodiment of the present invention can process the real-time line edge information of materials through the delivery time determination rules and delivery quantity determination rules, and obtain delivery time information and delivery quantity information, which is conducive to realizing Accurate matching of material demand and distribution, thereby reducing material distribution costs and improving operational efficiency.

在另一个可选的实施例中,上述利用预设的配送时间确定规则对物料实时线边信息进行处理,得到配送时间信息,包括:In another optional embodiment, the above-mentioned real-time line edge information is processed by using the preset delivery time determination rules to obtain delivery time information, including:

获取线边安全库存值;Obtain the line edge safety stock value;

利用预设的第一配送时间模型对线边安全库存值和物料实时线边信息进行处理,得到第一配送时间;Use the preset first delivery time model to process the lineside safety stock value and real-time lineside information of materials to obtain the first delivery time;

利用预设的第二配送时间模型对物料实时线边信息进行处理,得到第二配送时间;Use the preset second delivery time model to process the real-time line edge information of the material to obtain the second delivery time;

利用预设的第三配送时间模型对第一配送时间和第二配送时间进行处理,得到配送时间信息。The first delivery time and the second delivery time are processed by using the preset third delivery time model to obtain delivery time information.

可选的,上述线边安全库存值大于等于响应库存值。Optionally, the above line edge safety stock value is greater than or equal to the response stock value.

可选的,上述第一配送时间模型为Optionally, the first delivery time model above is

Figure BDA0003392003630000081
Figure BDA0003392003630000081

其中:T1为第一配送时间,t为实时线边时间,Q为实时线边数量,S为线边安全库存值,v为消耗速度。Among them: T1 is the first delivery time, t is the real-time line time, Q is the real-time line quantity, S is the line safety stock value, and v is the consumption speed.

可选的,上述第二配送时间模型为Optionally, the above-mentioned second delivery time model is

Figure BDA0003392003630000082
Figure BDA0003392003630000082

其中:T2为第二配送时间。Where: T 2 is the second delivery time.

可选的,上述第三配送时间模型为Optionally, the third delivery time model above is

Figure BDA0003392003630000091
Figure BDA0003392003630000091

其中:T3为第三配送时间,vc为配送车辆速度,Tf为配送修正时间,λ为时间修正系数,L为配送距离。Where: T 3 is the third delivery time, v c is the delivery vehicle speed, T f is the delivery correction time, λ is the time correction coefficient, and L is the delivery distance.

可见,实施本发明实施例所描述的用于物料配送的数据处理方法能够利用第一配送时间模型、第二配送时间模型和第三配送时间模型对数据信息进行综合处理得到配送时间信息,有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。It can be seen that implementing the data processing method for material distribution described in the embodiment of the present invention can use the first delivery time model, the second delivery time model and the third delivery time model to comprehensively process the data information to obtain delivery time information, which is beneficial to Realize the precise matching of material demand and distribution, thereby reducing material distribution costs and improving operational efficiency.

在又一个可选的实施例中,上述物料实时线边信息包括配送周期和消耗速度;In yet another optional embodiment, the real-time line edge information of the above-mentioned materials includes distribution cycle and consumption speed;

上述利用预设的配送数量确定规则对物料实时线边信息进行处理,得到配送数量信息,包括:The above-mentioned use of the preset distribution quantity determination rules processes the real-time line edge information of materials to obtain the distribution quantity information, including:

根据配送周期,确定出周期配送量;According to the delivery cycle, determine the cycle delivery volume;

利用预设的需求修正模型对周期配送量和消耗速度进行处理,得到配送数量信息。Use the preset demand correction model to process the periodic distribution volume and consumption speed to obtain the distribution quantity information.

可选的,上述配送数量信息包括配送数量,和/或,配送周期,和/或,物料信息,本发明实施例不做限定。Optionally, the above delivery quantity information includes delivery quantity, and/or delivery period, and/or material information, which is not limited in this embodiment of the present invention.

可选的,上述需求修正模型为Optionally, the above demand correction model is

Qp=Qd·v。 Qp = Qd ·v.

其中:Qp为配送数量,Qd为周期配送量,v为消耗速度。Among them: Q p is the delivery quantity, Q d is the cycle delivery volume, and v is the consumption speed.

可见,实施本发明实施例所描述的用于物料配送的数据处理方法能够通过配送周期确定周期配送量,并通过需求修正模型的进一步处理得到配送数量信息,更有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。It can be seen that implementing the data processing method for material distribution described in the embodiment of the present invention can determine the periodic delivery volume through the delivery cycle, and obtain the delivery quantity information through further processing of the demand correction model, which is more conducive to realizing the accuracy of material demand and delivery Matching, thereby reducing material distribution costs and improving operational efficiency.

在又一个可选的实施例中,上述根据配送周期,确定出周期配送量,包括:In yet another optional embodiment, the periodic delivery amount is determined according to the delivery period, including:

根据配送周期,确定出当期需求总量;According to the delivery cycle, determine the total demand for the current period;

根据当期需求总量和预设的数量求解模型,确定出目标数量模型;Determine the target quantity model according to the current total demand and the preset quantity solution model;

对目标数量模型进行解析,得到周期配送量。Analyze the target quantity model to obtain the periodic distribution quantity.

在该可选的实施例中,作为一种可选的实施方式,上述根据配送周期,确定出当期需求总量的具体方式为:In this optional embodiment, as an optional implementation, the above-mentioned specific method of determining the total demand of the current period according to the delivery cycle is as follows:

从预设的待选需求总量集合中筛选出与配送周期相匹配的待选需求总量作为待用需求总量;Select the total amount of demand to be selected that matches the distribution cycle from the preset total amount of demand to be selected as the total amount of demand to be used;

对实时线边数量和响应库存值进行处理,得到需求修正系数;Process the real-time line quantity and response inventory value to obtain the demand correction coefficient;

对需求修正系数和待用需求总量进行处理,得到当期需求总量。The demand correction coefficient and the total demand for use are processed to obtain the total demand for the current period.

在该可选的实施例中,作为另一种可选的实施方式,上述根据当期需求总量和预设的数量求解模型,确定出目标数量模型的具体方式为:In this optional embodiment, as another optional implementation, the specific method for determining the target quantity model based on the current total demand and the preset quantity solution model is as follows:

将当期需求总量输入数量求解模型得到目标函数;Input the total demand of the current period into the quantity solution model to obtain the objective function;

将当期需求总量输入预设的待用约束模型,得到目标约束模型。Input the total demand of the current period into the preset constraint model to be used to obtain the target constraint model.

可选的,上述数量求解模型为Optionally, the above quantity solving model is

Figure BDA0003392003630000101
Figure BDA0003392003630000101

其中:min(f)为目标函数,Qt为当期需求总量,Cf为运输成本,Ce为燃料成本,q为单位物料消耗数量,Ss为线边安全库存值,tt为生产时间,Cp为单位体积库存成本,V为物料体积,Cr风险成本系数。Among them: min(f) is the objective function, Q t is the total demand in the current period, C f is the transportation cost, C e is the fuel cost, q is the unit material consumption, S s is the line safety stock value, t t is the production Time, C p is the inventory cost per unit volume, V is the material volume, and C r is the risk cost coefficient.

在该可选的实施例中,作为又一种可选的实施方式,上述对目标数量模型进行解析,得到周期配送量的具体方式为:In this optional embodiment, as yet another optional implementation manner, the above-mentioned target quantity model is analyzed to obtain the specific method of periodic delivery quantity as follows:

根据预设的宽裕度,对目标数量模型进行解析,得到配送数量区间;According to the preset margin, the target quantity model is analyzed to obtain the delivery quantity range;

根据实时线边数量和实时线边数量,确定出周期配送量。According to the real-time line edge quantity and the real-time line edge quantity, determine the cycle delivery volume.

可见,实施本发明实施例所描述的用于物料配送的数据处理方法能够通过对配送周期的综合处理得到目标数量模型,并对其进行解析得到周期配送量,更有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。It can be seen that implementing the data processing method for material distribution described in the embodiment of the present invention can obtain the target quantity model through the comprehensive processing of the distribution cycle, and analyze it to obtain the periodic distribution amount, which is more conducive to realizing the material demand and distribution. Accurate matching reduces material distribution costs and improves operational efficiency.

实施例二Embodiment two

请参阅图2,图2是本发明实施例公开的另一种用于物料配送的数据处理方法的流程示意图。其中,图2所描述的用于物料配送的数据处理方法应用于数据处理系统中,如用于物料配送的数据处理管理的本地服务器或云端服务器等,本发明实施例不做限定。如图2所示,该用于物料配送的数据处理方法可以包括以下操作:Please refer to FIG. 2 . FIG. 2 is a schematic flowchart of another data processing method for material distribution disclosed in an embodiment of the present invention. Wherein, the data processing method for material distribution described in FIG. 2 is applied to a data processing system, such as a local server or a cloud server for data processing and management of material distribution, which is not limited in this embodiment of the present invention. As shown in Figure 2, the data processing method for material distribution may include the following operations:

201、获取物料实时线边信息。201. Obtain real-time line edge information of materials.

202、判断物料实时线边信息是否满足配送条件,得到第一判断结果。202. Judging whether the real-time line edge information of the material satisfies the delivery condition, and obtaining a first judgment result.

203、当第一判断结果为是时,利用预设的物料动态配送规则对物料实时线边信息进行处理,得到物料配送参数信息。203. When the first judgment result is yes, use the preset material dynamic distribution rule to process the real-time line edge information of the material to obtain the material distribution parameter information.

本发明实施例中,上述物料配送参数信息包括配送时间信息和配送数量信息。In the embodiment of the present invention, the above-mentioned material delivery parameter information includes delivery time information and delivery quantity information.

204、获取当前时间信息。204. Obtain current time information.

本发明实施例中,上述当前时间信息包括当前时间。In the embodiment of the present invention, the above current time information includes the current time.

205、判断当前时间信息和配送时间信息是否满足时间条件,得到第二判断结果。205. Judging whether the current time information and the delivery time information satisfy the time condition, and obtaining a second judgment result.

206、当第二判断结果为是,根据配送数量信息,确定出配送指令集合。206. When the second judgment result is yes, determine a delivery instruction set according to the delivery quantity information.

本发明实施例中,针对步骤201-步骤203的具体技术细节和技术名词解释,可以参照实施例一中针对步骤101-步骤103的详细描述,本发明实施例不再赘述。In the embodiment of the present invention, for the specific technical details and explanations of technical terms of steps 201-203, refer to the detailed description of steps 101-103 in Embodiment 1, which will not be repeated in this embodiment of the present invention.

可选的,配送时间信息包括若干个配送时间。Optionally, the delivery time information includes several delivery times.

可选的,上述时间条件为当前时间等于配送时间。Optionally, the above time condition is that the current time is equal to the delivery time.

可见,实施本发明实施例所描述的用于物料配送的数据处理方法能够通过对物料实时线边信息与配送条件的判断以及利用物料动态配送规则对物料实时线边信息的综合处理来确定配送参数信息,再通过对当前时间信息和物料配送参数信息的综合处理以生成用于指示物料配送的配送指令,有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。It can be seen that implementing the data processing method for material distribution described in the embodiment of the present invention can determine the distribution parameters by judging the real-time line edge information and distribution conditions of the material and comprehensively processing the real-time line edge information of the material by using the dynamic material distribution rules Information, and then through the comprehensive processing of current time information and material delivery parameter information to generate delivery instructions for instructing material delivery, which is conducive to achieving accurate matching of material demand and delivery, thereby reducing material delivery costs and improving operational efficiency.

在一个可选的实施例中,上述步骤206中根据配送数量信息,确定出配送指令集合,包括:In an optional embodiment, in step 206 above, the delivery instruction set is determined according to the delivery quantity information, including:

对物料实时线边信息进行处理,得到配送路径信息;Process the real-time line edge information of materials to obtain distribution route information;

获取配送车辆信息;Obtain delivery vehicle information;

根据配送车辆信息和配送数量信息,生成装载指令;装载指令用于指示配送车辆装载与配送车辆相匹配数量的物料;According to the delivery vehicle information and the delivery quantity information, a loading instruction is generated; the loading instruction is used to instruct the delivery vehicle to load materials that match the quantity of the delivery vehicle;

根据配送路径信息和配送车辆信息,生成物料配送指令;物料配送指令用于指示配送车辆配送物料到线边。According to the delivery route information and delivery vehicle information, material delivery instructions are generated; the material delivery instructions are used to instruct delivery vehicles to deliver materials to the edge of the line.

在该可选的实施例中,上述对物料实时线边信息进行处理,得到配送路径信息的具体方式为:In this optional embodiment, the above-mentioned method of processing the real-time line edge information of the material to obtain the delivery route information is as follows:

根据物料实时线边信息,确定出路径目标函数和路径约束条件;Determine the path objective function and path constraints according to the real-time line edge information of materials;

获取解析参数;get parsing parameters;

利用预设的路径规划模型对解析参数、路径目标函数和路径约束条件进行处理,得到待用路径信息;Use the preset path planning model to process the analytical parameters, path objective function and path constraints to obtain the path information to be used;

判断上述待用路径信息是否满足终止条件,得到路径判断结果;Judging whether the above-mentioned to-be-used path information satisfies the termination condition, and obtaining a path judgment result;

当上述路径判断结果为是时,根据待用路径信息确定出配送路径信息。When the determination result of the route is yes, the delivery route information is determined according to the route information to be used.

可选的,上述路径规划模型为基于动态步长果蝇算法的人工智能模型。Optionally, the above path planning model is an artificial intelligence model based on the dynamic step size Drosophila algorithm.

可选的,上述待用路径信息包括当前最优路径信息,和/或,迭代次数,和/或,迭代误差,本发明实施例不做限定。Optionally, the information about the path to be used includes information about the current optimal path, and/or, the number of iterations, and/or, an iteration error, which is not limited in this embodiment of the present invention.

可选的,上述解析参数包括误差阈值,和/或,迭代阈值,和/或,种群大小,和/或,上惩罚系数,和/或,下惩罚系数,和/或,时间窗满足率,本发明实施例不做限定。Optionally, the above parsing parameters include error threshold, and/or, iteration threshold, and/or, population size, and/or, upper penalty coefficient, and/or, lower penalty coefficient, and/or, time window satisfaction rate, The embodiments of the present invention are not limited.

可选的,上述判断上述待用路径信息是否满足终止条件,得到路径判断结果的具体方式为:Optionally, the specific method for determining whether the above-mentioned to-be-used path information satisfies the termination condition and obtaining the path judgment result is as follows:

判断迭代误差是否小于或等于误差阈值,得到误差判断结果;Judging whether the iteration error is less than or equal to the error threshold, and obtaining the error judgment result;

当上述误差判断结果为是时,路径判断结果为是;When the above error judgment result is yes, the path judgment result is yes;

当上述误差判断结果为否时,判断迭代次数是否等于迭代阈值,得到迭代判断结果;When the above-mentioned error judgment result is negative, it is judged whether the number of iterations is equal to the iteration threshold, and an iteration judgment result is obtained;

当上述迭代判断结果为是时,路径判断结果为是。When the above iteration judgment result is yes, the path judgment result is yes.

可见,实施本发明实施例所描述的用于物料配送的数据处理方法能够通过对物料实时线边信息、配送车辆信息和配送数量信息的综合处理得到装载指令和物料配送指令,更有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。It can be seen that implementing the data processing method for material delivery described in the embodiment of the present invention can obtain loading instructions and material delivery instructions through comprehensive processing of real-time line edge information, delivery vehicle information, and delivery quantity information, which is more conducive to realizing material delivery. Accurate matching of demand and distribution, thereby reducing material distribution costs and improving operational efficiency.

实施例三Embodiment three

请参阅图3,图3是本发明实施例公开的一种用于物料配送的数据处理装置的结构示意图。其中,图3所描述的装置能够应用于数据处理系统中,如用于物料配送的数据处理管理的本地服务器或云端服务器等,本发明实施例不做限定。如图3所示,该装置可以包括:Please refer to FIG. 3 . FIG. 3 is a schematic structural diagram of a data processing device for material distribution disclosed in an embodiment of the present invention. Wherein, the device described in FIG. 3 can be applied to a data processing system, such as a local server or a cloud server used for data processing and management of material distribution, which is not limited in the embodiment of the present invention. As shown in Figure 3, the device may include:

获取模块301,用于获取物料实时线边信息;An acquisition module 301, configured to acquire real-time line edge information of materials;

判断模块302,用于判断物料实时线边信息是否满足配送条件,得到第一判断结果;A judging module 302, configured to judge whether the real-time line edge information of the material satisfies the delivery condition, and obtain a first judging result;

第一处理模块303,用于当第一判断结果为是时,利用预设的物料动态配送规则对物料实时线边信息进行处理,得到物料配送参数信息;The first processing module 303 is used to process the real-time line edge information of the material by using the preset material dynamic distribution rule to obtain the material distribution parameter information when the first judgment result is yes;

第二处理模块304,用于利用预设的配送指令生成规则对物料配送参数信息进行处理,得到配送指令集合;配送指令集合用于指示物料配送。The second processing module 304 is configured to process the material distribution parameter information by using a preset distribution instruction generation rule to obtain a distribution instruction set; the distribution instruction set is used to instruct material distribution.

可见,实施图3所描述的用于物料配送的数据处理装置,能够通过对物料实时线边信息与配送条件的判断以及利用物料动态配送规则对物料实时线边信息的综合处理来确定配送参数信息,并生成用于指示物料配送的配送指令,有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。It can be seen that the implementation of the data processing device for material distribution described in Figure 3 can determine the distribution parameter information by judging the real-time line edge information and distribution conditions of the material and comprehensively processing the real-time line edge information of the material by using the dynamic material distribution rules , and generate distribution instructions for instructing material distribution, which is conducive to the precise matching of material demand and distribution, thereby reducing material distribution costs and improving operational efficiency.

在另一个可选的实施例中,如图4所示,第一处理模块303包括第一处理子模块3031和第二处理子模块3032,其中:In another optional embodiment, as shown in FIG. 4 , the first processing module 303 includes a first processing submodule 3031 and a second processing submodule 3032, wherein:

第一处理子模块3031,用于利用预设的配送时间确定规则对物料实时线边信息进行处理,得到配送时间信息;The first processing sub-module 3031 is used to process the real-time line edge information of the material by using the preset delivery time determination rule to obtain the delivery time information;

第二处理子模块3032,用于利用预设的配送数量确定规则对物料实时线边信息进行处理,得到配送数量信息。The second processing sub-module 3032 is used to process the real-time line edge information of the material by using the preset delivery quantity determination rule to obtain the delivery quantity information.

可见,实施图4所描述的用于物料配送的数据处理装置,能够通过配送时间确定规则和配送数量确定规则对物料实时线边信息进行处理,得到配送时间信息和配送数量信息,有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。It can be seen that the implementation of the data processing device for material distribution described in Figure 4 can process the real-time line edge information of materials through the rules for determining the delivery time and the number of deliveries, and obtain the delivery time information and delivery quantity information, which is conducive to the realization of material distribution. Accurate matching of demand and distribution, thereby reducing material distribution costs and improving operational efficiency.

在又一个可选的实施例中,如图4所示,第一处理子模块3031利用预设的配送时间确定规则对物料实时线边信息进行处理,得到配送时间信息的具体方式为:In yet another optional embodiment, as shown in Figure 4, the first processing submodule 3031 uses the preset delivery time determination rules to process the real-time line edge information of the material, and the specific way to obtain the delivery time information is as follows:

获取线边安全库存值;Obtain the line edge safety stock value;

利用预设的第一配送时间模型对线边安全库存值和物料实时线边信息进行处理,得到第一配送时间;Use the preset first delivery time model to process the lineside safety stock value and real-time lineside information of materials to obtain the first delivery time;

利用预设的第二配送时间模型对物料实时线边信息进行处理,得到第二配送时间;Use the preset second delivery time model to process the real-time line edge information of the material to obtain the second delivery time;

利用预设的第三配送时间模型对第一配送时间和第二配送时间进行处理,得到配送时间信息。The first delivery time and the second delivery time are processed by using the preset third delivery time model to obtain delivery time information.

可见,实施图4所描述的用于物料配送的数据处理装置,能够利用第一配送时间模型、第二配送时间模型和第三配送时间模型对数据信息进行综合处理得到配送时间信息,有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。It can be seen that implementing the data processing device for material distribution described in Figure 4 can use the first delivery time model, the second delivery time model and the third delivery time model to comprehensively process data information to obtain delivery time information, which is conducive to realizing Accurate matching of material demand and distribution, thereby reducing material distribution costs and improving operational efficiency.

在又一个可选的实施例中,如图4所示,物料实时线边信息包括配送周期和消耗速度;In yet another optional embodiment, as shown in Figure 4, the real-time line side information of the material includes the delivery cycle and consumption speed;

第二处理子模块3032利用预设的配送数量确定规则对物料实时线边信息进行处理,得到配送数量信息的具体方式为:The second processing sub-module 3032 uses the preset distribution quantity determination rules to process the real-time line edge information of the material, and the specific way to obtain the distribution quantity information is as follows:

根据配送周期,确定出周期配送量;According to the delivery cycle, determine the cycle delivery volume;

利用预设的需求修正模型对周期配送量和消耗速度进行处理,得到配送数量信息。Use the preset demand correction model to process the periodic distribution volume and consumption speed to obtain the distribution quantity information.

可见,实施图4所描述的用于物料配送的数据处理装置,能够通过配送周期确定周期配送量,并通过需求修正模型的进一步处理得到配送数量信息,更有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。It can be seen that the implementation of the data processing device for material distribution described in Figure 4 can determine the periodic delivery volume through the delivery cycle, and obtain the delivery quantity information through further processing of the demand correction model, which is more conducive to the accurate matching of material demand and delivery , thereby reducing material distribution costs and improving operational efficiency.

在又一个可选的实施例中,如图4所示,第二处理子模块3032根据配送周期,确定出周期配送量,包括:In yet another optional embodiment, as shown in FIG. 4 , the second processing submodule 3032 determines the periodic delivery amount according to the delivery cycle, including:

根据配送周期,确定出当期需求总量;According to the delivery cycle, determine the total demand for the current period;

根据当期需求总量和预设的数量求解模型,确定出目标数量模型;Determine the target quantity model according to the current total demand and the preset quantity solution model;

对目标数量模型进行解析,得到周期配送量。Analyze the target quantity model to obtain the periodic distribution quantity.

可见,实施图4所描述的用于物料配送的数据处理装置,能够通过对配送周期的综合处理得到目标数量模型,并对其进行解析得到周期配送量,更有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。It can be seen that implementing the data processing device for material distribution described in Figure 4 can obtain the target quantity model through the comprehensive processing of the distribution cycle, and analyze it to obtain the periodic distribution volume, which is more conducive to realizing the accuracy of material demand and distribution. Matching, thereby reducing material distribution costs and improving operational efficiency.

在又一个可选的实施例中,如图4所示,物料配送参数信息包括配送时间信息和配送数量信息;In yet another optional embodiment, as shown in Figure 4, the material delivery parameter information includes delivery time information and delivery quantity information;

第二处理模块304利用预设的配送指令生成规则对物料配送参数信息进行处理,得到配送指令集合的具体方式为:The second processing module 304 uses the preset distribution instruction generation rules to process the material distribution parameter information, and the specific way to obtain the distribution instruction set is as follows:

获取当前时间信息;Get current time information;

判断当前时间信息和配送时间信息是否满足时间条件,得到第二判断结果;Judging whether the current time information and delivery time information meet the time condition, and obtaining a second judgment result;

当第二判断结果为是,根据配送数量信息,确定出配送指令集合。When the second judgment result is yes, a set of delivery instructions is determined according to the delivery quantity information.

可见,实施图4所描述的用于物料配送的数据处理装置,能够通过对物料实时线边信息与配送条件的判断以及利用物料动态配送规则对物料实时线边信息的综合处理来确定配送参数信息,再通过对当前时间信息和物料配送参数信息的综合处理以生成用于指示物料配送的配送指令,有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。It can be seen that the implementation of the data processing device for material distribution described in Figure 4 can determine the distribution parameter information by judging the real-time line edge information of the material and the distribution conditions and comprehensively processing the real-time line edge information of the material by using the dynamic material distribution rules , and then through the comprehensive processing of the current time information and material delivery parameter information to generate delivery instructions for instructing material delivery, which is conducive to the precise matching of material demand and delivery, thereby reducing material delivery costs and improving operational efficiency.

在又一个可选的实施例中,如图4所示,第二处理模块304根据配送数量信息,确定出配送指令集合的具体方式为:In yet another optional embodiment, as shown in FIG. 4 , the second processing module 304 determines the delivery instruction set according to the delivery quantity information in a specific manner as follows:

对物料实时线边信息进行处理,得到配送路径信息;Process the real-time line edge information of materials to obtain distribution route information;

获取配送车辆信息;Obtain delivery vehicle information;

根据配送车辆信息和配送数量信息,生成装载指令;装载指令用于指示配送车辆装载与配送车辆相匹配数量的物料;According to the delivery vehicle information and the delivery quantity information, a loading instruction is generated; the loading instruction is used to instruct the delivery vehicle to load materials that match the quantity of the delivery vehicle;

根据配送路径信息和配送车辆信息,生成物料配送指令;物料配送指令用于指示配送车辆配送物料到线边。According to the delivery route information and delivery vehicle information, material delivery instructions are generated; the material delivery instructions are used to instruct delivery vehicles to deliver materials to the edge of the line.

可见,实施图4所描述的用于物料配送的数据处理装置,能够通过对物料实时线边信息、配送车辆信息和配送数量信息的综合处理得到装载指令和物料配送指令,更有利于实现物料需求和配送的精准匹配,进而降低物料配送成本,提升作业效率。It can be seen that the implementation of the data processing device for material distribution described in Figure 4 can obtain loading instructions and material distribution instructions through comprehensive processing of real-time material information, distribution vehicle information, and delivery quantity information, which is more conducive to realizing material demand. Accurate matching with distribution, thereby reducing material distribution costs and improving operational efficiency.

实施例四Embodiment four

请参阅图5,图5是本发明实施例公开的又一种用于物料配送的数据处理装置的结构示意图。其中,图5所描述的装置能够应用于数据处理系统中,如用于物料配送的数据处理管理的本地服务器或云端服务器等,本发明实施例不做限定。如图5所示,该装置可以包括:Please refer to FIG. 5 . FIG. 5 is a schematic structural diagram of another data processing device for material distribution disclosed in an embodiment of the present invention. Wherein, the device described in FIG. 5 can be applied to a data processing system, such as a local server or a cloud server used for data processing and management of material distribution, which is not limited in the embodiment of the present invention. As shown in Figure 5, the device may include:

存储有可执行程序代码的存储器401;A memory 401 storing executable program codes;

与存储器401耦合的处理器402;a processor 402 coupled to the memory 401;

处理器402调用存储器401中存储的可执行程序代码,用于执行实施例一或实施例二所描述的用于物料配送的数据处理方法中的步骤。The processor 402 invokes the executable program code stored in the memory 401 to execute the steps in the data processing method for material distribution described in the first or second embodiment.

实施例五Embodiment five

本发明实施例公开了一种计算机读存储介质,其存储用于电子数据交换的计算机程序,其中,该计算机程序使得计算机执行实施例一或实施例二所描述的用于物料配送的数据处理方法中的步骤。The embodiment of the present invention discloses a computer-readable storage medium, which stores a computer program for electronic data exchange, wherein the computer program enables the computer to execute the data processing method for material distribution described in Embodiment 1 or Embodiment 2 in the steps.

实施例六Embodiment six

本发明实施例公开了一种计算机程序产品,该计算机程序产品包括存储了计算机程序的非瞬时性计算机可读存储介质,且该计算机程序可操作来使计算机执行实施例一或实施例二所描述的用于物料配送的数据处理方法中的步骤。The embodiment of the present invention discloses a computer program product, the computer program product includes a non-transitory computer-readable storage medium storing a computer program, and the computer program is operable to enable the computer to execute the description described in Embodiment 1 or Embodiment 2 Steps in the data processing method for material distribution.

以上所描述的装置实施例仅是示意性的,其中作为分离部件说明的模块可以是或者也可以不是物理上分开的,作为模块显示的部件可以是或者也可以不是物理模块,即可以位于一个地方,或者也可以分布到多个网络模块上。可以根据实际的需要选择其中的部分或者全部模块来实现本实施例方案的目的。本领域普通技术人员在不付出创造性的劳动的情况下,即可以理解并实施。The device embodiments described above are only illustrative, and the modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical modules, that is, they may be located in one place , or can also be distributed to multiple network modules. Part or all of the modules can be selected according to actual needs to achieve the purpose of the solution of this embodiment. It can be understood and implemented by those skilled in the art without any creative effort.

通过以上的实施例的具体描述,本领域的技术人员可以清楚地了解到各实施方式可借助软件加必需的通用硬件平台的方式来实现,当然也可以通过硬件。基于这样的理解,上述技术方案本质上或者说对现有技术做出贡献的部分可以以软件产品的形式体现出来,该计算机软件产品可以存储在计算机可读存储介质中,存储介质包括只读存储器(Read-Only Memory,ROM)、随机存储器(Random Access Memory,RAM)、可编程只读存储器(Programmable Read-only Memory,PROM)、可擦除可编程只读存储器(ErasableProgrammable Read Only Memory,EPROM)、一次可编程只读存储器(One-timeProgrammable Read-Only Memory,OTPROM)、电子抹除式可复写只读存储器(Electrically-Erasable Programmable Read-Only Memory,EEPROM)、只读光盘(CompactDisc Read-Only Memory,CD-ROM)或其他光盘存储器、磁盘存储器、磁带存储器、或者能够用于携带或存储数据的计算机可读的任何其他介质。Through the specific description of the above embodiments, those skilled in the art can clearly understand that each implementation manner can be implemented by means of software plus a necessary general-purpose hardware platform, and of course also by hardware. Based on this understanding, the above-mentioned technical solution essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, and the storage medium includes a read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), programmable read-only memory (Programmable Read-only Memory, PROM), erasable programmable read-only memory (Erasable Programmable Read Only Memory, EPROM) , One-time Programmable Read-Only Memory (OTPROM), Electronically Erasable Programmable Read-Only Memory (EEPROM), Compact Disc Read-Only Memory , CD-ROM) or other optical disk storage, magnetic disk storage, magnetic tape storage, or any other computer-readable medium that can be used to carry or store data.

最后应说明的是:本发明实施例公开的一种用于物料配送的数据处理方法及装置所揭露的仅为本发明较佳实施例而已,仅用于说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解;其依然可以对前述各项实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或替换,并不使相应的技术方案的本质脱离本发明各项实施例技术方案的精神和范围。Finally, it should be noted that a data processing method and device for material distribution disclosed in the embodiment of the present invention is only a preferred embodiment of the present invention, and is only used to illustrate the technical solution of the present invention, not to Its limitations; although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that it can still modify the technical solutions described in the aforementioned embodiments, or perform equivalents to some of the technical features Replacement; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the various embodiments of the present invention.

Claims (10)

1.一种用于物料配送的数据处理方法,其特征在于,所述方法包括:1. A data processing method for material distribution, characterized in that the method comprises: 获取物料实时线边信息;Obtain real-time line edge information of materials; 判断所述物料实时线边信息是否满足配送条件,得到第一判断结果;Judging whether the real-time line edge information of the material satisfies the distribution condition, and obtains the first judgment result; 当所述第一判断结果为是时,利用预设的物料动态配送规则对所述物料实时线边信息进行处理,得到物料配送参数信息;When the first judgment result is yes, use the preset material dynamic distribution rule to process the real-time line edge information of the material to obtain material distribution parameter information; 利用预设的配送指令生成规则对所述物料配送参数信息进行处理,得到配送指令集合;所述配送指令集合用于指示物料配送。The material distribution parameter information is processed by using a preset distribution instruction generation rule to obtain a distribution instruction set; the distribution instruction set is used to indicate material distribution. 2.根据权利要求1所述的用于物料配送的数据处理方法,其特征在于,所述利用预设的物料动态配送规则对所述物料实时线边信息进行处理,得到物料配送参数信息,包括:2. The data processing method for material distribution according to claim 1, characterized in that, the real-time line edge information of the material is processed by using the preset material dynamic distribution rules to obtain material distribution parameter information, including : 利用预设的配送时间确定规则对所述物料实时线边信息进行处理,得到配送时间信息;Processing the real-time line edge information of the material by using the preset delivery time determination rule to obtain the delivery time information; 利用预设的配送数量确定规则对所述物料实时线边信息进行处理,得到配送数量信息。The real-time line edge information of the material is processed by using the preset delivery quantity determination rule to obtain the delivery quantity information. 3.根据权利要求2所述的用于物料配送的数据处理方法,其特征在于,所述利用预设的配送时间确定规则对所述物料实时线边信息进行处理,得到配送时间信息,包括:3. The data processing method for material distribution according to claim 2, characterized in that, the use of preset delivery time determination rules to process the real-time line edge information of the material to obtain delivery time information includes: 获取线边安全库存值;Obtain the line edge safety stock value; 利用预设的第一配送时间模型对所述线边安全库存值和所述物料实时线边信息进行处理,得到第一配送时间;Using the preset first delivery time model to process the lineside safety stock value and the real-time lineside information of the material to obtain the first delivery time; 利用预设的第二配送时间模型对所述物料实时线边信息进行处理,得到第二配送时间;Using the preset second delivery time model to process the real-time line edge information of the material to obtain the second delivery time; 利用预设的第三配送时间模型对所述第一配送时间和所述第二配送时间进行处理,得到配送时间信息。The first delivery time and the second delivery time are processed by using a preset third delivery time model to obtain delivery time information. 4.根据权利要求2所述的用于物料配送的数据处理方法,其特征在于,所述物料实时线边信息包括配送周期和消耗速度;4. The data processing method for material distribution according to claim 2, wherein the real-time line edge information of the material includes a distribution cycle and a consumption rate; 所述利用预设的配送数量确定规则对所述物料实时线边信息进行处理,得到配送数量信息,包括:The use of the preset delivery quantity determination rules to process the real-time line edge information of the material to obtain the delivery quantity information includes: 根据所述配送周期,确定出周期配送量;According to the distribution cycle, determine the periodic distribution amount; 利用预设的需求修正模型对所述周期配送量和所述消耗速度进行处理,得到配送数量信息。The period delivery quantity and the consumption rate are processed by using a preset demand correction model to obtain delivery quantity information. 5.根据权利要求4所述的用于物料配送的数据处理方法,其特征在于,所述根据所述配送周期,确定出周期配送量,包括:5. The data processing method for material distribution according to claim 4, characterized in that, determining the periodic distribution amount according to the distribution cycle includes: 根据所述配送周期,确定出当期需求总量;According to the delivery cycle, determine the total demand for the current period; 根据所述当期需求总量和预设的数量求解模型,确定出目标数量模型;Determine the target quantity model according to the total demand in the current period and the preset quantity solution model; 对所述目标数量模型进行解析,得到周期配送量。The target quantity model is analyzed to obtain the period delivery quantity. 6.根据权利要求1所述的用于物料配送的数据处理方法,其特征在于,所述物料配送参数信息包括配送时间信息和配送数量信息;6. The data processing method for material distribution according to claim 1, wherein the material distribution parameter information includes delivery time information and delivery quantity information; 所述利用预设的配送指令生成规则对所述物料配送参数信息进行处理,得到配送指令集合,包括:The use of the preset delivery instruction generation rules to process the material delivery parameter information to obtain a delivery instruction set, including: 获取当前时间信息;Get current time information; 判断所述当前时间信息和所述配送时间信息是否满足时间条件,得到第二判断结果;judging whether the current time information and the delivery time information meet a time condition, and obtain a second judging result; 当所述第二判断结果为是,根据所述配送数量信息,确定出配送指令集合。When the second judgment result is yes, a delivery instruction set is determined according to the delivery quantity information. 7.根据权利要求6所述的用于物料配送的数据处理方法,其特征在于,所述根据所述配送数量信息,确定出配送指令集合,包括:7. The data processing method for material distribution according to claim 6, wherein said determining a distribution instruction set according to said distribution quantity information includes: 对所述物料实时线边信息进行处理,得到配送路径信息;Process the real-time line edge information of the material to obtain the delivery route information; 获取配送车辆信息;Obtain delivery vehicle information; 根据所述配送车辆信息和所述配送数量信息,生成装载指令;所述装载指令用于指示配送车辆装载与所述配送车辆相匹配数量的物料;Generate a loading instruction according to the delivery vehicle information and the delivery quantity information; the loading instruction is used to instruct the delivery vehicle to load materials that match the quantity of the delivery vehicle; 根据所述配送路径信息和所述配送车辆信息,生成物料配送指令;所述物料配送指令用于指示所述配送车辆配送物料到线边。A material delivery instruction is generated according to the delivery route information and the delivery vehicle information; the material delivery instruction is used to instruct the delivery vehicle to deliver the material to a line edge. 8.一种用于物料配送的数据处理装置,其特征在于,所述装置包括:8. A data processing device for material distribution, characterized in that the device comprises: 获取模块,用于获取物料实时线边信息;The acquisition module is used to obtain real-time line edge information of materials; 判断模块,用于判断所述物料实时线边信息是否满足配送条件,得到第一判断结果;A judging module, configured to judge whether the real-time line edge information of the material satisfies the distribution condition, and obtain a first judgment result; 第一处理模块,用于当所述第一判断结果为是时,利用预设的物料动态配送规则对所述物料实时线边信息进行处理,得到物料配送参数信息;The first processing module is configured to process the real-time line edge information of the material by using the preset material dynamic distribution rule to obtain material distribution parameter information when the first judgment result is yes; 第二处理模块,用于利用预设的配送指令生成规则对所述物料配送参数信息进行处理,得到配送指令集合;所述配送指令集合用于指示物料配送。The second processing module is configured to process the material distribution parameter information using a preset distribution instruction generation rule to obtain a distribution instruction set; the distribution instruction set is used to indicate material distribution. 9.一种用于物料配送的数据处理装置,其特征在于,所述装置包括:9. A data processing device for material distribution, characterized in that the device comprises: 存储有可执行程序代码的存储器;a memory storing executable program code; 与所述存储器耦合的处理器;a processor coupled to the memory; 所述处理器调用所述存储器中存储的所述可执行程序代码,执行如权利要求1-7任一项所述的用于物料配送的数据处理方法。The processor invokes the executable program code stored in the memory to execute the data processing method for material distribution according to any one of claims 1-7. 10.一种计算机可存储介质,其特征在于,所述计算机存储介质存储有计算机指令,所述计算机指令被调用时,用于执行如权利要求1-7任一项所述的用于物料配送的数据处理方法。10. A computer storage medium, characterized in that the computer storage medium stores computer instructions, and when the computer instructions are invoked, it is used to execute the method for material distribution as described in any one of claims 1-7. data processing method.
CN202111470764.3A 2021-12-03 2021-12-03 A data processing method and device for material distribution Pending CN116307959A (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN202111470764.3A CN116307959A (en) 2021-12-03 2021-12-03 A data processing method and device for material distribution
PCT/CN2021/139852 WO2023097807A1 (en) 2021-12-03 2021-12-21 Data processing method and apparatus for material delivery
US18/716,062 US20250037064A1 (en) 2021-12-03 2021-12-21 Data processing method and apparatus for material delivery
JP2024533248A JP2024541685A (en) 2021-12-03 2021-12-21 Data processing method and apparatus for material distribution

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111470764.3A CN116307959A (en) 2021-12-03 2021-12-03 A data processing method and device for material distribution

Publications (1)

Publication Number Publication Date
CN116307959A true CN116307959A (en) 2023-06-23

Family

ID=86611457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111470764.3A Pending CN116307959A (en) 2021-12-03 2021-12-03 A data processing method and device for material distribution

Country Status (4)

Country Link
US (1) US20250037064A1 (en)
JP (1) JP2024541685A (en)
CN (1) CN116307959A (en)
WO (1) WO2023097807A1 (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003048621A (en) * 2001-08-06 2003-02-21 Sony Corp Supply chain management system, distributor-side device, parts manufacturer-side device, supply chain management device and method, its program and program recording medium
US8311902B2 (en) * 2007-01-05 2012-11-13 Amazon Technologies, Inc. System and method for filling an order
US20170147929A1 (en) * 2014-05-27 2017-05-25 Sony Corporation Information processing apparatus, information presentation method, and program
CN108596431B (en) * 2018-03-21 2019-08-02 柳州钢铁股份有限公司 The configuration method and system of cold rolling production material
CN109359903B (en) * 2018-08-28 2022-06-07 广东申菱环境系统股份有限公司 Material distribution method and system of air-conditioning workshop based on MES system
CN112288347B (en) * 2020-02-21 2024-06-21 北京京东振世信息技术有限公司 Cold chain distribution route determining method, device, server and storage medium
CN112163739B (en) * 2020-09-11 2022-10-04 格力电器(武汉)有限公司 Material distribution method and system
US11841138B2 (en) * 2021-03-01 2023-12-12 Fivovos, LLC Fuel tank monitoring systems and methods

Also Published As

Publication number Publication date
WO2023097807A1 (en) 2023-06-08
JP2024541685A (en) 2024-11-08
US20250037064A1 (en) 2025-01-30

Similar Documents

Publication Publication Date Title
US9336493B2 (en) Systems and methods for clustering time series data based on forecast distributions
CN110347971A (en) Particle filter method, device and storage medium based on TSK fuzzy model
CN111368887B (en) Training method of thunderstorm weather prediction model and thunderstorm weather prediction method
US20220066742A1 (en) Automatic Derivation Of Software Engineering Artifact Attributes
CN108154232A (en) Pruning method, device, equipment and the readable storage medium storing program for executing of artificial neural network
CN111752903B (en) Prediction method for usable time of data storage space
CN112365070B (en) Power load prediction method, device, equipment and readable storage medium
CN117632905B (en) Database management method and system based on cloud use records
CN113780913B (en) Method and device for generating safety stock information
CN112784212B (en) Inventory optimization method and device
CN110633924B (en) Method and system for inter-warehouse storage of commodities
CN110275895B (en) A filling device, device and method for missing traffic data
CN108197825A (en) System scheduling method and device
CN116307959A (en) A data processing method and device for material distribution
CN117236824B (en) Logistics scheduling method for agricultural product online transaction platform
CN111428821A (en) An asset classification method based on decision tree
US20200356870A1 (en) Intelligent controls for end-user computing
CN117455267A (en) Method and device for determining service promotion policy, storage medium and electronic equipment
CN112949825A (en) Resource adjusting method, device and equipment
CN115587701A (en) Enterprise risk assessment processing method and device and electronic equipment
CN112218169A (en) Method and device for calculating browsing value attribute of video with goods to commodities
CN118093975B (en) Industrial data indexing method and system
CN115795335B (en) Logistics network point anomaly identification method and device and electronic equipment
Mileff et al. Applying Analytical Methods in Inventory Control Problems
Görtz et al. Solving models with jump discontinuities in policy functions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination