CN116180864A - Pre-buried type sewage discharging device for traffic road engineering construction - Google Patents

Pre-buried type sewage discharging device for traffic road engineering construction Download PDF

Info

Publication number
CN116180864A
CN116180864A CN202310451242.1A CN202310451242A CN116180864A CN 116180864 A CN116180864 A CN 116180864A CN 202310451242 A CN202310451242 A CN 202310451242A CN 116180864 A CN116180864 A CN 116180864A
Authority
CN
China
Prior art keywords
buried
mounting
frame
clamping
adsorption
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310451242.1A
Other languages
Chinese (zh)
Other versions
CN116180864B (en
Inventor
郭志泽
朱永晖
时志超
朱妍
窦伍军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Hesheng Construction Co ltd
Original Assignee
Cangzhou Transportation Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cangzhou Transportation Bureau filed Critical Cangzhou Transportation Bureau
Priority to CN202310451242.1A priority Critical patent/CN116180864B/en
Publication of CN116180864A publication Critical patent/CN116180864A/en
Application granted granted Critical
Publication of CN116180864B publication Critical patent/CN116180864B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/0401Gullies for use in roads or pavements
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/0401Gullies for use in roads or pavements
    • E03F5/0404Gullies for use in roads or pavements with a permanent or temporary filtering device; Filtering devices specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/041Accessories therefor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to the technical field of road sewage disposal engineering, in particular to a pre-buried sewage disposal device for traffic road engineering construction, which comprises a pre-buried drainage mechanism arranged on a traffic road sewer, wherein the pre-buried drainage mechanism comprises a pre-buried adsorption mounting frame arranged on the ground, the pre-buried adsorption mounting frame is communicated with the sewer, a floating clamping frame is arranged in the pre-buried adsorption mounting frame, a filtering water inlet mechanism for filtering and draining water is arranged on the floating clamping frame, a prompting well cover is arranged at the axis position of the pre-buried adsorption mounting frame, and the pre-buried drainage mechanism further comprises a maintenance and dismounting device for quickly dismounting the filtering water inlet mechanism.

Description

Pre-buried type sewage discharging device for traffic road engineering construction
Technical Field
The invention relates to the technical field of road pollution discharge engineering, in particular to a pre-buried pollution discharge device for traffic road engineering construction.
Background
When the existing municipal engineering sewer well meets urban waterlogging condition, in order to timely discharge floods and drain waterlogging, the well lid of the sewer well is generally required to be lifted for draining, but the sewer well cannot filter water, so that the condition of plugging a sewer well pipeline is easy to occur, when the water level is higher, the concrete position of the sewer well lid cannot be clearly known after the sewer well lid is lifted, and potential safety hazards are easy to cause.
Chinese patent CN114277912a discloses a municipal road drainage well and construction flow thereof, including road surface body and drainage well body, the drainage well body is seted up inside the road surface body, just the mounting groove has been seted up on the surface of road surface body, and the mounting groove is located the drainage well body directly over, and communicates each other, the inner wall rotation of mounting groove installs the well lid, just the back-mounted of well lid has flexible pilot lever, the filter vat is installed to the upper end of drainage well body, and the top of filter vat is the opening form setting. The drainage device is novel in structure, and the device can be used for filtering water flow during drainage of municipal roads, so that the possibility of blockage of a drainage well pipeline is reduced, road surface personnel can obtain the position of the drainage well accurately, and potential safety hazards during drainage are avoided.
Above-mentioned technical scheme can make pavement personnel acquire the drainage well position and can filter the waterlogging accurately, but this technical scheme is nevertheless had certain potential safety hazard, and although can be through flexible pilot rod suggestion well site when the direct opening of well is discharged, night cyclist or walking personnel can cause the potential safety hazard at any time under the condition of carelessness at any time to the device is discharged at every turn and is all need the manual work to open the well lid, leads to extravagant manpower.
Disclosure of Invention
Aiming at the problems existing in the prior art, the pre-buried sewage draining device for traffic road engineering construction is provided, and the pre-buried draining mechanism can effectively and automatically start draining to save labor, and meanwhile, safety accidents are avoided.
In order to solve the problems in the prior art, the invention adopts the following technical scheme:
the utility model provides a pre-buried drain of traffic road engineering construction, including installing the pre-buried drainage mechanism on the traffic road sewer, pre-buried drainage mechanism is including installing at subaerial pre-buried adsorption mounting bracket, pre-buried adsorption mounting bracket and sewer intercommunication, and the internally mounted of pre-buried adsorption mounting bracket has the joint frame that floats, and the filtration mechanism that intakes of filtering the drainage is installed on the joint frame that floats, and the suggestion well lid is installed to the axle center position of pre-buried adsorption mounting bracket, and pre-buried drainage mechanism is still including the maintenance dismounting device that is used for dismantling the filtration mechanism that intakes fast.
Preferably, the axle center position of pre-buried adsorption mounting bracket is equipped with the mounting hole, and the inner wall of mounting hole is equipped with spacing joint groove, and the wall thickness department of pre-buried adsorption mounting bracket is equipped with spacing mounting groove, and the inside of pre-buried adsorption mounting bracket still is equipped with the siphon guide track of several, siphon guide track and spacing mounting groove intercommunication, and the bottom of pre-buried adsorption mounting bracket is equipped with the several apopore, and the top of pre-buried adsorption mounting bracket is equipped with spacing chimb.
Preferably, the floating clamping frame comprises a sliding mounting frame arranged in the limiting mounting groove, a plurality of clamping edges are arranged on the sliding mounting frame, and a plurality of floating blocks are arranged at the bottom of the sliding mounting frame.
Preferably, the filtering water inlet mechanism comprises a butt joint installation frame which is installed on the joint edge in a clamping way, a guiding self-rotating frame is rotatably installed on the butt joint installation frame, and an annular filtering screen plate is installed on the guiding self-rotating frame.
Preferably, the top of butt joint mounting bracket is equipped with the several and dismantles draw-in groove and evenly distributed, still is equipped with the installation slide rail on the butt joint mounting bracket, and the one end that the installation slide rail was kept away from to the butt joint mounting bracket is equipped with annular joint strip, still is equipped with the several on the butt joint mounting bracket and scrapes the material strip.
Preferably, the guiding self-rotating frame comprises a rotating mounting plate arranged on the mounting sliding rail, a first clamping groove is formed in the rotating mounting plate, a plurality of limiting guide posts are further arranged on the rotating mounting plate and are uniformly distributed at equal intervals, a plurality of pressing mounting plates are slidably arranged on the limiting guide posts, a second clamping groove is formed in the pressing mounting plate, the pressing mounting plate is fixedly locked with the butt-joint mounting frame through bolts, and a plurality of drainage blades are distributed on the pressing mounting plate.
Preferably, the prompting well lid is clamped and installed in a limiting clamping groove of the pre-buried adsorption installation frame, a prompting lamp is installed on the prompting well lid, a solar panel is further installed on the prompting well lid, a light controller is arranged in the prompting well lid, and an energy storage battery is further installed in the prompting well lid.
Preferably, the maintenance dismounting device comprises a movable adjusting mechanism arranged at the top of the pre-buried adsorption mounting frame, and a clamping mechanism for clamping the butt-joint mounting frame is arranged at the movable end of the movable adjusting mechanism.
Preferably, the movable adjusting mechanism comprises a docking base, a limiting placing groove is formed in the bottom of the docking base, a limiting sliding groove is formed in the docking base, a rotating frame is installed in the limiting sliding groove, a lifting screw rod sliding table and a guiding sliding table are vertically and symmetrically installed on the rotating frame, and a hanging plate is arranged between the lifting screw rod sliding table and the guiding sliding table.
Preferably, the fixture includes the two-way ball screw slip table of horizontal installation, and the removal end of two-way ball screw slip table all is equipped with the centre gripping buckle of several, and the centre gripping buckle is including installing the fixed mounting cover on two-way ball screw slip table, installs the centre gripping joint on the fixed mounting cover, is equipped with the spring between centre gripping joint and the fixed mounting cover, and spring one end is contradicted with the fixed mounting cover, and the one end that the fixed cover was kept away from to the spring is contradicted with the centre gripping joint.
Compared with the prior art, the beneficial effect that this application had is:
1. when the rainfall is too big, the outlet on the traffic road is blocked, can lead to the rainwater to produce the waterlogging on the traffic road, a large amount of rainwater can get into the inside of pre-buried adsorption mounting bracket when the contact of pre-buried adsorption mounting bracket, the inside water of entering pre-buried adsorption mounting bracket can promote the joint frame that floats and rise, can drive the filtration mechanism of intaking and rise in step when the joint frame that floats, the filtration mechanism of intaking rises and can open, make the inside circulation of water on the traffic road to pre-buried adsorption mounting bracket fast, filtration mechanism of intaking can filter ponding simultaneously and avoid causing the circulation to block up, pre-buried adsorption mounting bracket can produce siphon effect and adsorb ponding fast, guide the ponding and carry in the sewer, filtration mechanism of intaking is when the guide drainage, the suggestion well lid can go out suggestion light, be convenient for pedestrian's discernment observe, can effectually automatic start drainage uses manpower sparingly.
2. Meanwhile, if a rider or a pedestrian steps on the filter water inlet mechanism during drainage guiding, the filter water inlet mechanism can automatically contract downwards to avoid personnel safety, and the filter water inlet mechanism can be lifted again to continue drainage after the rider or the pedestrian walks, so that safety accidents are effectively avoided.
Drawings
FIG. 1 is a schematic view of an installation state of a pre-buried sewage disposal device for traffic road engineering construction;
FIG. 2 is a schematic perspective view of an embedded adsorption mounting frame in an embedded sewage disposal device for traffic road engineering construction;
FIG. 3 is a schematic perspective view of a pre-buried adsorption mounting frame in a pre-buried sewage disposal device for traffic road engineering construction;
FIG. 4 is a schematic perspective view of a floating clip frame in a pre-buried sewage disposal device for traffic road engineering construction;
FIG. 5 is a front view of a filter water intake mechanism in a pre-buried sewage disposal device for traffic road engineering construction;
FIG. 6 is a schematic perspective view of a docking mount in a pre-buried sewage disposal device for traffic road engineering construction;
FIG. 7 is a second perspective view of a docking mount in a pre-buried sewage disposal device for traffic road engineering construction;
FIG. 8 is a perspective view of a guide self-rotating frame and an annular filter screen plate in a pre-buried sewage disposal device for traffic road engineering construction;
FIG. 9 is a schematic perspective view of a cue well cover in a pre-buried sewage disposal device for traffic road engineering construction;
FIG. 10 is a schematic perspective view of a repair and disassembly device in a pre-buried sewage disposal device for traffic road engineering construction;
FIG. 11 is a schematic diagram II of a maintenance and disassembly device in a pre-buried sewage disposal device for traffic road engineering construction;
FIG. 12 is a front view of a clip buckle in a pre-buried drain for traffic engineering construction;
fig. 13 is a cross-sectional view taken at section A-A of fig. 12.
The reference numerals in the figures are:
1-a sewer;
2-embedding an adsorption mounting frame;
21-mounting holes; 211-a limiting clamping groove;
22-limit mounting grooves;
23-siphon guide track;
24-water outlet holes;
25-limiting convex edges;
3-a floating clamping frame;
31-a sliding mounting frame;
32-clamping edges;
33-floating blocks;
4-filtering a water inlet mechanism;
41-docking a mounting rack; 411-remove card slot; 412-mounting a slide rail; 413-annular snap bars; 414-scraping strips;
42-guiding the self-rotating stand; 421-rotating the mounting plate; 422-limit guide posts; 423-pressing the mounting plate; 424-fixing bolts; 425-drainage leaves;
43-annular filter screen plate;
5-prompting the well lid;
51-a warning light;
52-solar panel;
6-maintaining and disassembling the device;
61-movement adjustment mechanism; 611-docking station; 6111-a limiting placing groove; 612-rotating a rack; 613-lifting a screw rod sliding table; 614-hanging plate;
62-clamping mechanism; 621-a bidirectional ball screw slipway; 622-clip catch; 6221-a fixed mounting sleeve; 6222-clamping clip; 6223-spring.
Detailed Description
The invention will be further described in detail with reference to the drawings and the detailed description below, in order to further understand the features and technical means of the invention and the specific objects and functions achieved.
As shown in fig. 1 to 12:
the utility model provides a pre-buried drain of traffic road engineering construction, including installing the pre-buried drainage mechanism on traffic road sewer 1, pre-buried drainage mechanism is including installing at subaerial pre-buried adsorption mounting bracket 2, pre-buried adsorption mounting bracket 2 and sewer 1 intercommunication, and the internally mounted of pre-buried adsorption mounting bracket 2 has the floating joint frame 3, installs the filtration water inlet mechanism 4 of filtering the drainage on the floating joint frame 3, and the suggestion well lid 5 is installed to the axle center position of pre-buried adsorption mounting bracket 2, and pre-buried drainage mechanism is still including the maintenance dismounting device 6 that is used for dismantling filtration water inlet mechanism 4 fast.
When the traffic road is constructed, constructors pre-embed the pre-buried adsorption mounting frame 2 on the traffic road sewer 1, the pre-buried adsorption mounting frame 2 installs the prompting well lid 5 on the pre-buried adsorption mounting frame 2, construction maintainers can open the prompting well lid 5 to enter the sewer 1 when the sewer 1 is required to be overhauled, rain water can flow into the sewer 1 from a water outlet on the traffic road directly under the normal condition of rain, when the rain water is too large, the water outlet on the traffic road is blocked, the rain water can cause waterlogging on the traffic road, a large amount of rain water can enter the pre-buried adsorption mounting frame 2 when contacting with the pre-buried adsorption mounting frame 2, water entering the pre-buried adsorption mounting frame 2 can push the floating clamping frame 3 to rise, the floating clamping frame 3 can drive the filtering water inlet mechanism 4 to synchronously rise when rising, the filtering water inlet mechanism 4 can be opened, the water on the traffic road flows into the embedded adsorption mounting frame 2 rapidly, the filtering water inlet mechanism 4 filters accumulated water to avoid flow blockage, the embedded adsorption mounting frame 2 can produce siphon effect to absorb accumulated water rapidly, the accumulated water is guided and conveyed into the sewer 1, the filtering water inlet mechanism 4 prompts the manhole cover 5 to give out prompt light when guiding and draining, so that pedestrians can be identified and observed, meanwhile, the filtering water inlet mechanism 4 can automatically contract downwards to avoid personnel safety if pedestrians or pedestrians step on when guiding and draining, the filtering water inlet mechanism 4 can lift again to continue draining after the pedestrians or pedestrians walk, the effective automatic starting drainage is realized, safety accidents are avoided, the filtering water inlet mechanism 4 needs road maintenance personnel to maintain and overhaul regularly when in use, constructor need dismantle filtering mechanism 4 when the maintenance, constructor can pass through lifting device and place the pre-buried adsorption mounting bracket 2 with maintenance dismounting device 6 on, maintenance dismounting device 6 cooperation pre-buried adsorption mounting bracket 2 is fixed a position and is placed, maintenance dismounting device 6 is placed and is finished, maintenance dismounting device 6 adjusts according to the position of filtering mechanism 4 again, maintenance dismounting device 6 adjustment is finished after, maintenance dismounting device 6 will filter mechanism 4 centre gripping and upwards pull, make filtering mechanism 4 break away from floating joint frame 3 and pre-buried adsorption mounting bracket 2, constructor is maintaining the maintenance to filtering mechanism 4, the maintenance is finished on the rethread maintenance dismounting device 6 will filter mechanism 4 joint floating joint frame 3. The smoothness of road drainage can be effectively guaranteed through regular maintenance, and meanwhile, maintenance and overhaul can be effectively improved through the maintenance and disassembly device 6.
As shown in fig. 1 to 3:
the axle center position of pre-buried adsorption mounting bracket 2 is equipped with mounting hole 21, and the inner wall of mounting hole 21 is equipped with spacing joint groove 211, and the wall thickness department of pre-buried adsorption mounting bracket 2 is equipped with spacing mounting groove 22, and the inside of pre-buried adsorption mounting bracket 2 still is equipped with several siphon guide rail 23, siphon guide rail 23 and spacing mounting groove 22 intercommunication, and the bottom of pre-buried adsorption mounting bracket 2 is equipped with several apopore 24, and the top of pre-buried adsorption mounting bracket 2 is equipped with spacing chimb 25.
The mounting hole 21 of pre-buried absorption mounting bracket 2 axle center position is convenient for constructor enter into sewer 1 maintenance, spacing joint groove 211 of mounting hole 21 is used for spacing joint installation suggestion well lid 5, avoid the suggestion to receive the waterlogging to influence and cause well lid displacement, spacing mounting groove 22 of pre-buried absorption mounting bracket 2 wall thickness department is used for installing floating joint frame 3 and filters water inlet mechanism 4 and can guide the rivers to flow, normal rainwater enters into, during spacing mounting groove 22 of pre-buried absorption mounting bracket 2 wall thickness department, the apopore 24 of spacing mounting groove 22 can directly discharge to sewer 1, enter into the inside rainwater of spacing mounting groove 22 and can not discharge fast when the phenomenon waterlogging, the rainwater can promote to install floating joint frame 3 and filter water inlet mechanism 4 and rise, make the rainwater gush into in the spacing mounting groove 22 fast when filtering water inlet mechanism 4 opens, guide track 23 can produce the siphon suction when the rivers of spacing mounting groove 22 inside reach a certain amount, the flow of effectual improvement drainage.
As shown in fig. 1 and 4:
the floating clamping frame 3 comprises a sliding mounting frame 31 arranged in the limiting mounting groove 22, a plurality of clamping edges 32 are arranged on the sliding mounting frame 31, and a plurality of floating blocks 33 are arranged at the bottom of the sliding mounting frame 31.
The sliding mounting frame 31 is used for sliding mounting in the spacing mounting groove 22 of pre-buried absorption mounting frame 2, and entering into the inside rainwater of spacing mounting groove 22 can not be unable to discharge fast and can cause ponding when phenomenon waterlogging, receives buoyancy to influence and makes the floating block 33 rise along with the water level, drives the sliding mounting frame 31 when the floating block 33 rises and remove, and the sliding mounting frame 31 drives the joint and installs the filtration water inlet mechanism 4 on joint limit 32 and carry out automatic lifting adjustment and remove, effectual automatic adjustment filtration water inlet mechanism 4 operating condition. Meanwhile, the filtering water inlet mechanism 4 is installed through the clamping connection in a clamping manner, so that the disassembly and the maintenance are effectively facilitated.
As shown in fig. 1 and 5:
the filtering water inlet mechanism 4 comprises a butt joint installation frame 41 which is installed on the clamping edge 32 in a clamping way, a guiding self-rotating frame 42 is rotatably installed on the butt joint installation frame 41, and an annular filtering screen plate 43 is installed on the guiding self-rotating frame 42.
When phenomenon waterlogging enters into the inside rainwater of spacing mounting groove 22 and can not cause ponding in the unable quick drainage rainwater of phenomenon, buoyancy influences makes floating block 33 rise along with the water level, drive the ascending removal of sliding mounting frame 31 when floating block 33 rises, sliding mounting frame 31 drives butt joint mounting frame 41 that the joint was installed on joint limit 32 and rises, drive when butt joint mounting frame 41 rises and guide from revolving rack 42 and annular filtration sieve 43 synchronous rising, can directly open the spacing mounting groove 22 of pre-buried adsorption mounting frame 2 when butt joint mounting frame 41 rises, make interior rainwater pass quick annular filtration sieve 43 and guide from revolving rack 42 enter into spacing mounting groove 22, a large amount of rainwater are gushed into and can cause the siphon guide track 23 in the pre-buried adsorption mounting frame 2 can effectually increase drainage velocity, annular filtration sieve 43 can effectually filter water, simultaneously when rivers pass and guide from revolving rack 42, guide from revolving rack 42 can drive annular filtration 43 and carry out, rotation can rub with butt joint filtration sieve 43, the rotation can be with the rotation 41 when annular filtration sieve 43, the effectual rotation that clear up shows that the annular filtration sieve 43, the flow through the screen is guaranteed.
As shown in fig. 5 to 7:
the top of butt joint mounting bracket 41 is equipped with several dismantlement draw-in groove 411 and evenly distributed, still is equipped with installation slide rail 412 on the butt joint mounting bracket 41, and the one end that butt joint mounting bracket 41 kept away from installation slide rail 412 is equipped with annular joint strip 413, still is equipped with several on the butt joint mounting bracket 41 and scrapes material strip 414.
Can effectually avoid the dust directly to get into in the spacing mounting groove 22 of pre-buried absorption mounting bracket 2 when the floating joint frame 3 of butt joint mounting bracket 41 cooperation goes up and down to remove, cause the jam condition, the installation slide rail 412 of butt joint mounting bracket 41 is used for rotating installation guide from revolving rack 42, annular joint strip 413 on the butt joint mounting bracket 41 is used for cooperation floating joint frame 3's joint limit 32 joint fixedly, can effectually be convenient for pull dismantlement maintenance through the cooperation of annular joint strip 413 on the butt joint mounting bracket 41 and floating joint frame 3's joint limit 32, but when needing periodic maintenance filtration water inlet mechanism 4, constructor can fix the dismantlement draw-in groove 411 and upwards can directly separate butt joint mounting bracket 41 and floating joint frame 3, the maintenance of convenient to detach, when rivers pass guide from revolving rack 42, guide from revolving rack 42 can drive annular filter screen 43 and rotate, annular filter screen 43 can with the scraping strip 414 friction of butt joint mounting bracket 41 can effectually clear up annular filter screen 43 surface's dirt and avoid blocking.
As shown in fig. 5 and 8:
the guiding self-rotating frame 42 comprises a rotating mounting plate 421 mounted on a mounting sliding rail 412, a first clamping groove is formed in the rotating mounting plate 421, a plurality of limiting guide posts 422 are further arranged on the rotating mounting plate 421 and are uniformly distributed at equal intervals, a plurality of pressing mounting plates 423 are slidably mounted on the limiting guide posts 422, a second clamping groove is formed in the pressing mounting plates 423, the pressing mounting plates 423 are fixedly locked with the butt-joint mounting frame 41 through bolts, and a plurality of drainage blades 425 are distributed on the pressing mounting plates 423.
The rotating mounting board 421 is used for rotating the installation slide rail 412 of connecting the butt joint mounting frame 41, when needing fixed annular filtration sieve 43, constructor places annular filtration sieve 43 in the second joint groove of supporting the pressure mounting board 423, after finishing placing, constructor again cooperates spacing guide post 422 on the rotating mounting board 421 and will support the butt joint of pressure mounting board 423, make the annular filtration sieve 43 card on the pressure mounting board 423 to the first joint groove of rotating mounting board 421, constructor rethread bolt will support the pressure mounting board 423 and dock mounting frame 41 locking fixedly, enter into the rainwater in spacing mounting groove 22 can not discharge unable exhaust rainwater can cause ponding fast when phenomenon waterlogging, receive buoyancy influence make the kicking 33 rise along with the water level, drive the slider mounting frame 31 and rise and remove when rising, slider mounting frame 31 drives the butt joint mounting frame 41 of joint installation on joint limit 32, drive the rotating mounting board 421 and support the synchronous rising of pressure mounting board 423 when rising, drive annular filtration 43 and support the synchronous rising of pressure mounting board 423 when rising, it can not be influenced by rotation of the annular filtration sieve 43 to pass through annular filtration impeller 423 and produce rotation and stop the rotation and filter the impeller and move 425 when the annular filtration sieve 43 is pressed to the blade and lead to the rotation and move 425.
As shown in fig. 1 and 9:
prompt well lid 5 joint is installed in the spacing joint groove 211 of pre-buried absorption mounting bracket 2, installs prompt lamp 51 on the prompt well lid 5, still installs solar panel 52 on the prompt well lid 5, and the inside of prompt well lid 5 has light controller, and the inside of prompt well lid 5 still installs energy storage battery.
The prompt well lid 5 is used for shielding the mounting hole 21 of the embedded adsorption mounting frame 2, the solar panel 52 on the prompt well lid 5 is used for charging the energy storage battery, and when waterlogging occurs on a traffic road, the constructor can open the prompt lamp 51 of the prompt well lid 5 through the light controller, and the prompt well lid 5 emits prompt light to facilitate the observation of the position of the sewer mouth of a pedestrian.
As shown in fig. 10:
the maintenance dismounting device 6 comprises a movable adjusting mechanism 61 arranged at the top of the pre-buried adsorption mounting frame 2, and a clamping mechanism 62 for clamping the butt-joint mounting frame 41 is arranged at the movable end of the movable adjusting mechanism 61.
The annular filtering sieve plate 43 of the filtering water inlet mechanism 4 can cause loss when being used for a long time, constructors need to overhaul the annular filtering sieve plate 43 regularly, the filtering water inlet mechanism 4 needs to be detached from the floating clamping frame 3 during overhaul, constructors butt-joint and place the movable adjusting mechanism 61 on the limit convex edge 25 of the embedded adsorption mounting frame 2 through hoisting equipment, the movable adjusting mechanism 61 and the embedded adsorption mounting frame 2 are kept coaxially, constructors rethread the movable adjusting mechanism 61 to adjust the clamping mechanism 62, the clamping mechanism 62 clamps and clamps the dismounting clamping groove 411 of the filtering water inlet mechanism 4, the movable adjusting mechanism 61 drives the clamping mechanism 62 to ascend, the clamping mechanism 62 drives the clamping fixed filtering water inlet mechanism 4 to ascend vertically synchronously when ascending, the filtering water inlet mechanism 4 breaks away from the floating clamping frame 3 and the embedded adsorption mounting frame 2, the constructors maintain and overhaul the filtering water inlet mechanism 4 after overhaul, the movable adjusting mechanism 61 presses the filtering water inlet mechanism 4 downwards, the filtering water inlet mechanism 4 is inserted into the limit mounting groove 22 of the embedded adsorption mounting frame 2 and clamped with the floating clamping frame 3, and the overhaul efficiency is effectively improved.
As shown in fig. 10 and 11:
the movable adjusting mechanism 61 comprises a docking base 611, a limiting placing groove 6111 is formed in the bottom of the docking base 611, a limiting sliding groove is formed in the docking base 611, a rotating frame 612 is installed in the limiting sliding groove, a lifting screw sliding table 613 and a guiding sliding table are vertically and symmetrically installed on the rotating frame 612, and a hanging plate 614 is arranged between the lifting screw sliding table 613 and the guiding sliding table.
When the constructor needs to overhaul the filtering water inlet mechanism 4, constructor places the docking base 611 on the pre-buried adsorption mounting frame 2 through the lifting device matched with the lifting plate 614, the limiting placing groove 6111 of the docking base 611 is in butt joint with the limiting convex edge 25 of the pre-buried adsorption mounting frame 2, the docking base 611 is placed on the pre-buried adsorption mounting frame 2 in the middle, when the constructor needs to adjust the position of the clamping mechanism 62, the position of the clamping mechanism 62 can be effectively adjusted through the coordination of the rotation adjustment of the rotating frame 612 and the lifting adjustment of the lifting screw sliding table 613, the position of the adjusting clamping mechanism 62 is moved to the dismounting clamping groove 411 of the filtering water inlet mechanism 4, the clamping mechanism 62 drives the clamping mechanism 62 to ascend through the lifting sliding table 613, the clamping mechanism 4 which is clamped and fixed is driven to synchronously and vertically ascend when the clamping mechanism 62 ascends, the filtering water inlet mechanism 4 is separated from the floating clamping frame 3 and the pre-buried adsorption mounting frame 2, and the constructor maintains and overhauls the filtering water inlet mechanism 4. And the labor is effectively saved.
As shown in fig. 10 to 13:
the fixture 62 includes the two-way ball screw slip table 621 of horizontal installation, and the removal end of two-way ball screw slip table 621 all is equipped with several centre gripping buckle 622, and centre gripping buckle 622 is including installing the fixed mounting cover 6221 on two-way ball screw slip table 621, installs centre gripping joint 6222 on the fixed mounting cover 6221, is equipped with spring 6223 between centre gripping joint 6222 and the fixed mounting cover 6221, and spring 6223 one end is contradicted with fixed mounting cover 6221, and the one end that fixed cover was kept away from to spring 6223 is contradicted with centre gripping joint 6222.
When the dismounting clamping groove 411 of the filtering water inlet mechanism 4 is required to be clamped, the position of the bidirectional ball screw sliding table 621 can be effectively adjusted through the cooperation of the rotation adjustment of the rotating frame 612 and the lifting adjustment of the lifting screw sliding table 613, the bidirectional ball screw sliding table 621 is adjusted downwards, the clamping head 6222 of the clamping buckle 622 is enabled to be in contact with the top of the filtering water inlet mechanism 4, the clamping head 6222 can shrink towards the inside of the fixed mounting sleeve 6221, constructors rotate and adjust the clamping head 6222, the clamping head 6222 moves to the dismounting clamping groove 411 of the filtering water inlet mechanism 4, the spring 6223 can push the clamping head 6222 to be clamped into the dismounting clamping groove 411 of the filtering water inlet mechanism 4, constructors drive the clamping buckle 622 to shrink and clamp synchronously through the bidirectional ball screw sliding table 621, the clamping buckle 622 clamps and fixes the filtering water inlet mechanism 4, and the bidirectional ball screw sliding table 621 rises to drive the filtering water inlet mechanism 4 to rise synchronously, so that the effective clamping and fixing of the filtering water inlet mechanism 4 is convenient to dismount and maintain.
The specific working principle is as follows:
during construction of traffic roads, constructors pre-buried install pre-buried adsorption mounting frame 2 on traffic road sewer 1, pre-buried adsorption mounting frame 2 is again with suggestion well lid 5 install on pre-buried adsorption mounting frame 2, construction maintainer can open suggestion well lid 5 and get into sewer 1 and get into when needing to overhaul sewer 1, rain volume normal condition down, the rainwater can directly flow into sewer 1 from the outlet on the traffic roads, the outlet on the traffic roads appears blocking when the rain volume is too big, can lead to the rainwater to produce the waterlogging on the traffic roads, rainwater can get into the inside of pre-buried adsorption mounting frame 2 when a large amount of rainwater and pre-buried adsorption mounting frame 2 contact, the inside water of entering pre-buried adsorption mounting frame 2 can promote floating joint frame 3 and rise, can drive filtration water inlet mechanism 4 and rise in step on when rising of floating joint frame 3, filtration water inlet mechanism 4 rises, make the water of traffic roads fast to pre-buried adsorption mounting frame 2 inside circulation, filtration water inlet mechanism 4 can filter and avoid leading up the water blocking effect to be produced by the sewer 1, lead to the drainage mechanism to be carried out to the water blocking in the water inlet mechanism and lead to the water inlet mechanism to be carried out by water inlet mechanism 4, the filtration mechanism is filtered and the water inlet mechanism is not led to lead to the water inlet mechanism to be polluted water leading up when the water inlet mechanism is filtered, and the water inlet mechanism is not leading up to be out, and the water leading up to the water leading up in time to the water to take off mechanism to be out to be filtered water leading to the water to be out to leading up through 4 to leading to down traffic safety traffic road to time to pass through time when water leading to leading up traffic road.
The foregoing examples merely illustrate one or more embodiments of the invention, which are described in greater detail and are not to be construed as limiting the scope of the invention. It should be noted that it will be apparent to those skilled in the art that several variations and modifications can be made without departing from the spirit of the invention, which are all within the scope of the invention. Accordingly, the scope of protection of the present invention is to be determined by the appended claims.

Claims (10)

1. The utility model provides a pre-buried drain of traffic road engineering construction, including installing pre-buried drainage mechanism on traffic road sewer (1), a serial communication port, pre-buried drainage mechanism is including installing at subaerial pre-buried adsorption mounting bracket (2), pre-buried adsorption mounting bracket (2) and sewer (1) intercommunication, the internally mounted of pre-buried adsorption mounting bracket (2) has floating joint frame (3), install filtration water inlet mechanism (4) of filtering the drainage on floating joint frame (3), suggestion well lid (5) are installed in the axle center position of pre-buried adsorption mounting bracket (2), pre-buried drainage mechanism is still including being used for dismantling maintenance dismounting device (6) of filtration water inlet mechanism (4) fast.
2. The traffic road engineering construction pre-buried drain according to claim 1, wherein the axle center position of pre-buried adsorption mounting bracket (2) is equipped with mounting hole (21), the inner wall of mounting hole (21) is equipped with spacing joint groove (211), the wall thickness department of pre-buried adsorption mounting bracket (2) is equipped with spacing mounting groove (22), the inside of pre-buried adsorption mounting bracket (2) still is equipped with several siphon guide rail (23), siphon guide rail (23) and spacing mounting groove (22) intercommunication, the bottom of pre-buried adsorption mounting bracket (2) is equipped with several apopore (24), the top of pre-buried adsorption mounting bracket (2) is equipped with spacing chimb (25).
3. The pre-buried drain of traffic engineering construction according to claim 2, wherein, floating joint frame (3) is including installing sliding mounting frame (31) in spacing mounting groove (22), is equipped with several joint limit (32) on sliding mounting frame (31), and the bottom of sliding mounting frame (31) is equipped with several kicker (33).
4. A pre-buried drain for traffic engineering construction according to claim 3, wherein the filtering water inlet mechanism (4) comprises a butt joint mounting frame (41) which is mounted on the joint side (32) in a clamping way, a guiding self-rotating frame (42) is rotatably mounted on the butt joint mounting frame (41), and an annular filtering screen plate (43) is mounted on the guiding self-rotating frame (42).
5. The traffic road engineering construction pre-buried drain according to claim 4, wherein the top of the butt joint mounting frame (41) is provided with a plurality of dismounting clamping grooves (411) and is uniformly distributed, the butt joint mounting frame (41) is further provided with an installation sliding rail (412), one end of the butt joint mounting frame (41) far away from the installation sliding rail (412) is provided with an annular clamping strip (413), and the butt joint mounting frame (41) is further provided with a plurality of scraping strips (414).
6. The pre-buried drain of traffic engineering construction according to claim 5, wherein the guiding self-rotating frame (42) comprises a rotating mounting plate (421) mounted on a mounting sliding rail (412), a first clamping groove is formed in the rotating mounting plate (421), a plurality of limiting guide posts (422) are further arranged on the rotating mounting plate (421) and uniformly distributed at equal intervals, a plurality of pressing mounting plates (423) are slidably mounted on the limiting guide posts (422), a second clamping groove is formed in the pressing mounting plates (423), the pressing mounting plates (423) are fixedly locked with the butt joint mounting frame (41) through bolts, and a plurality of drainage blades (425) are distributed on the pressing mounting plates (423).
7. The traffic road engineering construction embedded type sewage draining device according to claim 6, wherein the prompting well lid (5) is installed in a limiting clamping groove (211) of the embedded adsorption installation frame (2) in a clamping mode, the prompting well lid (5) is provided with a prompting lamp (51), the prompting well lid (5) is further provided with a solar panel (52), the inside of the prompting well lid (5) is provided with a light controller, and the inside of the prompting well lid (5) is further provided with an energy storage battery.
8. The pre-buried drain device for traffic road engineering construction according to claim 7, wherein the maintenance dismounting device (6) comprises a movable adjusting mechanism (61) arranged at the top of the pre-buried adsorption mounting frame (2), and a clamping mechanism (62) for clamping the butt joint mounting frame (41) is arranged at the movable end of the movable adjusting mechanism (61).
9. The traffic road engineering construction pre-buried sewage disposal device according to claim 8, wherein the movable adjusting mechanism (61) comprises a butt joint base (611), a limit placing groove (6111) is formed in the bottom of the butt joint base (611), a limit sliding groove is formed in the butt joint base (611), a rotating frame (612) is installed in the limit sliding groove, a lifting screw sliding table (613) and a guiding sliding table are vertically and symmetrically installed on the rotating frame (612), and a hanging plate (614) is arranged between the lifting screw sliding table (613) and the guiding sliding table.
10. The pre-buried drain of traffic engineering construction according to claim 9, wherein the clamping mechanism (62) comprises a transverse installed bidirectional ball screw sliding table (621), the moving ends of the bidirectional ball screw sliding table (621) are provided with a plurality of clamping buckles (622), the clamping buckles (622) comprise fixed mounting sleeves (6221) arranged on the bidirectional ball screw sliding table (621), clamping connectors (6222) are arranged on the fixed mounting sleeves (6221), springs (6223) are arranged between the clamping connectors (6222) and the fixed mounting sleeves (6221), one ends of the springs (6223) are in interference with the fixed mounting sleeves (6221), and one ends of the springs (6223) away from the fixed sleeves are in interference with the clamping connectors (6222).
CN202310451242.1A 2023-04-25 2023-04-25 Pre-buried type sewage discharging device for traffic road engineering construction Active CN116180864B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310451242.1A CN116180864B (en) 2023-04-25 2023-04-25 Pre-buried type sewage discharging device for traffic road engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310451242.1A CN116180864B (en) 2023-04-25 2023-04-25 Pre-buried type sewage discharging device for traffic road engineering construction

Publications (2)

Publication Number Publication Date
CN116180864A true CN116180864A (en) 2023-05-30
CN116180864B CN116180864B (en) 2023-09-22

Family

ID=86442696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310451242.1A Active CN116180864B (en) 2023-04-25 2023-04-25 Pre-buried type sewage discharging device for traffic road engineering construction

Country Status (1)

Country Link
CN (1) CN116180864B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3046184A1 (en) * 2015-12-29 2017-06-30 A P E I WATER COLLECTION AND EVACUATION WATER WITH SOLIDARITY PLATE OF A FLOAT
CN212475980U (en) * 2020-04-17 2021-02-05 任正林 Device is mentioned to well lid for town road
KR102220030B1 (en) * 2020-06-03 2021-02-25 이재형 Draining trap
CN214884272U (en) * 2021-07-16 2021-11-26 湖北同锦鑫工程有限公司 Municipal works drainage device prevent stifled device
CN215563200U (en) * 2021-07-27 2022-01-18 广东隆建工程有限公司 Municipal administration road drainage structures that impounds
CN216405670U (en) * 2021-12-21 2022-04-29 刘晖 Drainage device for municipal works
CN114809249A (en) * 2022-05-05 2022-07-29 杨春生 Municipal water conservancy project safety drainage lid with warning function

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3046184A1 (en) * 2015-12-29 2017-06-30 A P E I WATER COLLECTION AND EVACUATION WATER WITH SOLIDARITY PLATE OF A FLOAT
CN212475980U (en) * 2020-04-17 2021-02-05 任正林 Device is mentioned to well lid for town road
KR102220030B1 (en) * 2020-06-03 2021-02-25 이재형 Draining trap
CN214884272U (en) * 2021-07-16 2021-11-26 湖北同锦鑫工程有限公司 Municipal works drainage device prevent stifled device
CN215563200U (en) * 2021-07-27 2022-01-18 广东隆建工程有限公司 Municipal administration road drainage structures that impounds
CN216405670U (en) * 2021-12-21 2022-04-29 刘晖 Drainage device for municipal works
CN114809249A (en) * 2022-05-05 2022-07-29 杨春生 Municipal water conservancy project safety drainage lid with warning function

Also Published As

Publication number Publication date
CN116180864B (en) 2023-09-22

Similar Documents

Publication Publication Date Title
CN110206118B (en) Be favorable to rainy day municipal rainwater diverging device
CN212865862U (en) Urban river is with blocking dirty cleaning device
CN111270706A (en) Sewer well cover capable of being automatically opened or closed
CN215858110U (en) Rain and sewage flow dividing device for building engineering
CN116180864B (en) Pre-buried type sewage discharging device for traffic road engineering construction
WO2015026024A1 (en) Rotary refuse-removing apparatus
CN112323719A (en) Drainage device for subway entrance
CN218933377U (en) Sponge city cuts dirty anti-reflux overflow well
CN115404738B (en) Municipal road drainage structure and construction process
CN112681479A (en) Sponge city rainwater processing system
CN211523806U (en) Steel construction building roof drainage structures
KR100899774B1 (en) Waste removing equipment for waterway
CN112252443A (en) High stability municipal works road well head mechanism
CN211853847U (en) Municipal administration is with dustproof type solar street lamp
CN210238702U (en) Drainage seat for municipal road
CN110344344B (en) Intelligent road safety light-emitting induction system
CN111350264B (en) Multifunctional well lid assembly
CN218758350U (en) Drainage device for housing construction
CN214332535U (en) Intelligent power-saving type solar municipal night lamp
CN220952766U (en) Drainage asphalt pavement structure
CN214457305U (en) Rainwater infiltration purification regulation and storage tank
CN220704643U (en) Rainwater collecting and recycling device
CN220433865U (en) Municipal road drainage structures
CN221589846U (en) Drainage device for rural highway construction maintenance
CN217079009U (en) A automatic drainage equipment of municipal works for having handrail underpass step

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240905

Address after: 102300 YC-0294, No.1 Courtyard, Gaoqin Road, Yanyi Town, Mentougou District, Beijing

Patentee after: Beijing Hesheng Construction Co.,Ltd.

Country or region after: China

Address before: 061000 No. 77, Jiefang West Road, Yunhe District, Cangzhou City, Hebei Province

Patentee before: Cangzhou Transportation Bureau

Country or region before: China