CN116002209A - Multi-nutrient resource management system - Google Patents

Multi-nutrient resource management system Download PDF

Info

Publication number
CN116002209A
CN116002209A CN202310024372.7A CN202310024372A CN116002209A CN 116002209 A CN116002209 A CN 116002209A CN 202310024372 A CN202310024372 A CN 202310024372A CN 116002209 A CN116002209 A CN 116002209A
Authority
CN
China
Prior art keywords
board
management system
materials
feeding
statistics board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202310024372.7A
Other languages
Chinese (zh)
Inventor
魏江华
蒋伟
李小彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Chaozhi Information Technology Co ltd
Original Assignee
Jiangsu Chaozhi Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Chaozhi Information Technology Co ltd filed Critical Jiangsu Chaozhi Information Technology Co ltd
Priority to CN202310024372.7A priority Critical patent/CN116002209A/en
Publication of CN116002209A publication Critical patent/CN116002209A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Time Recorders, Dirve Recorders, Access Control (AREA)

Abstract

The invention relates to a multi-nutrient resource management system which comprises a feeding statistical board and a discharging statistical board, wherein the feeding statistical board and the discharging statistical board are arranged in parallel. According to the invention, when the materials in the storage place need to be moved to the construction place, note statistics is carried out on the number and the types of the materials in the storage place, meanwhile, the discharge sticker at the usage display is marked, the data at the roller counter is adjusted in real time, after the discharge date, the types and the numbers are marked at the discharge sticker, the discharge sticker is fixed at the corresponding area position on the surface of the construction place drawing through the fixed magnetic ring, so that the input quantity of the materials in the area place can be intuitively counted, after one construction period is finished, the residual materials in the area place at the construction place drawing are counted and changed, the rate of the materials input in the later stage is counted according to the construction efficiency, the reference data is made for the entering date of the materials stored in the later stage, the service period of the construction place materials can be traced back in detail, and the management is convenient.

Description

Multi-nutrient resource management system
Technical Field
The invention relates to the technical field of resource management, in particular to a multi-nutrient resource management system.
Background
The engineering resource management comprises a plurality of aspects such as work site work access control management, construction site real-name system management, three-level safety education management of construction, site monitoring management, site material management, enterprise remote management, government management departments, networking real-name system management and the like.
The existing engineering resource management is more general in feeding and discharging statistics, can not carry out visual statistics on the entry and the expenditure of materials, can not carry out statistics on the use of materials in each area respectively, is inconvenient to calculate in the later period, can not concretely trace back the entry time and the expenditure time of engineering resources, and can not intuitively know the material consumption rate, so that the problems of inaccurate material quantity and insufficient material storage position can be easily caused only by arranging various engineering resource entry and use periods through experience.
Disclosure of Invention
The invention provides a multi-nutrient resource management system, which solves the problems that the existing engineering resources are easy to cause the unpaired material quantity and insufficient material storage position by virtue of experience management.
The scheme for solving the technical problems is as follows: the utility model provides a many camps resource management system, includes feeding statistics board and ejection of compact statistics board, feeding statistics board and ejection of compact statistics board set up side by side, the front surface bonding of feeding statistics board has the storage place drawing, the front surface bonding of ejection of compact statistics board has the construction place drawing, the top of feeding statistics board and ejection of compact statistics board is all fixed with fixed otic placode, the bottom fixedly connected with of feeding statistics board and ejection of compact statistics board settles the case, the top swivelling joint of settling the case has the shield, the front surface magnetism of feeding statistics board is connected with stock display, the top intermediate position of stock display has the connection magnetic path, the front surface of stock display is close to intermediate position fixed mounting and has the cylinder counter, the front surface of stock display is close to bottom edge and pastes there is the measurement unit sticker, the front surface of stock display is close to top edge and is pasted there is the material sticker, the front surface magnetism of ejection of compact statistics board is connected with the quantity display, the back surface fixed with the fixed magnetic ring of stock display.
On the basis of the technical scheme, the invention can be improved as follows.
Further, the front surfaces of the feeding statistical plate and the discharging statistical plate are provided with a magnetic blackboard which is magnetically connected with the connecting magnetic block and the fixed magnetic ring.
Further, the front surface of the fixed lug plate is provided with a pin hole near the top edge.
Further, a connecting groove matched with the fixed magnetic ring is formed in the front surface of the dosage display, and the inner wall of the connecting groove is provided with a magnetic plate which is magnetically connected with the fixed magnetic ring.
Further, a clamping block is fixedly arranged on the outer wall of the placement box close to the right side edge, and a clamping groove matched with the clamping block is formed in the left side of the stock display.
Further, the right side of the construction site drawing is provided with a period consumption total amount.
Further, the front surface of the discharging sticker is marked with discharging date and material type and quantity.
Further, a connecting groove matched with the roller counter is formed in the front surface of the stock display, and the inner wall of the connecting groove is rotationally connected with the roller counter.
The beneficial effects of the invention are as follows: the invention provides a multi-nutrient resource management system, which has the following advantages:
the method comprises the steps of counting the total quantity of notes when various engineering resources are admitted, marking the types of the materials at a material sticker on the front surface of a storage display, stirring the total quantity at a roller counter, marking the material units at the unit sticker, placing the storage display at the actual corresponding position of a storage site drawing through a connecting magnetic block, enabling the position of the materials at the storage site to be clearly marked, facilitating searching and calculating the remaining storage space, counting the quantity and the types of the materials at the storage site when the materials at the storage site need to be moved to the construction site, marking the quantity and the types of the materials at the discharge sticker at the consumption display, adjusting the data at the roller counter in real time, fixing the quantity and the types of the materials at the discharge sticker at the corresponding region position of the surface of the construction site drawing through a fixed magnetic ring, enabling the input quantity of the materials at the region site to be intuitively counted, counting the remaining materials at the region site drawing of the construction site after one construction cycle is finished, counting the rate of the input materials at the later stage, referencing the date of the storage materials at the later stage according to the construction efficiency, enabling the utilization cycle to be convenient to be traced and capable of managing the resources in detail.
The foregoing description is only an overview of the present invention, and is intended to provide a better understanding of the present invention, as it is embodied in the following description, with reference to the preferred embodiments of the present invention and the accompanying drawings. Specific embodiments of the present invention are given in detail by the following examples and the accompanying drawings.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiments of the invention and together with the description serve to explain the invention and do not constitute a limitation on the invention. In the drawings:
FIG. 1 is a schematic diagram of a construction site material usage period tracing management system according to an embodiment of the present invention;
FIG. 2 is a schematic diagram of a configuration of a stock display in a system for traceability management of a usage period of a site material according to an embodiment of the present invention;
FIG. 3 is a schematic diagram of a usage display in a system for traceability management of usage periods of a site material according to an embodiment of the present invention;
fig. 4 is a system flowchart of a system for traceability management of a service life of a construction site material according to an embodiment of the present invention.
In the drawings, the list of components represented by the various numbers is as follows:
1. a feeding statistical board; 2. a discharging statistical board; 3. storing a site drawing; 4. a construction site drawing; 5. fixing the ear plate; 6. a placement box; 7. a dust cover; 8. a stock display; 9. connecting the magnetic blocks; 10. a roller counter; 11. a unit of measurement sticker; 12. material paster; 13. a dose display; 14. fixing a magnetic ring; 15. and (5) discharging the sticker.
Detailed Description
The principles and features of the present invention are described below with reference to fig. 1-4, the examples being provided for illustration only and not for limitation of the scope of the invention. The invention is more particularly described by way of example in the following paragraphs with reference to the drawings. Advantages and features of the invention will become more apparent from the following description and from the claims. It should be noted that the drawings are in a very simplified form and are all to a non-precise scale, merely for convenience and clarity in aiding in the description of embodiments of the invention.
It will be understood that when an element is referred to as being "fixed to" another element, it can be directly on the other element or intervening elements may also be present. When a component is considered to be "connected" to another component, it can be directly connected to the other component or intervening components may also be present. When an element is referred to as being "disposed on" another element, it can be directly on the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like are used herein for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used herein in the description of the invention is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. The term "and/or" as used herein includes any and all combinations of one or more of the associated listed items.
As shown in fig. 1-4, the invention provides a multi-nutrient resource management system, which comprises a feeding statistical board 1 and a discharging statistical board 2, wherein the feeding statistical board 1 and the discharging statistical board 2 are arranged in parallel, a storage site drawing 3 is adhered to the front surface of the feeding statistical board 1, a construction site drawing 4 is adhered to the front surface of the discharging statistical board 2, a fixed ear board 5 is fixedly installed on the tops of the feeding statistical board 1 and the discharging statistical board 2, a placement box 6 is fixedly connected to the bottoms of the feeding statistical board 1 and the discharging statistical board 2, a dust cover 7 is rotatably connected to the top of the placement box 6, a stock indicator 8 is magnetically connected to the front surface of the feeding statistical board 1, a connecting magnetic block 9 is arranged in the middle of the top of the stock indicator 8, a roller counter 10 is fixedly installed near the middle of the front surface of the stock indicator 8, a metering unit sticker 11 is adhered to the front surface of the stock indicator 8 near the bottom edge, a material sticker 12 is adhered to the front surface of the stock indicator 8, a magnetic ring 13 is fixedly adhered to the front surface 13, and a magnetic ring 13 is fixedly adhered to the front surface 13.
Preferably, the front surfaces of the feeding counting plate 1 and the discharging counting plate 2 are provided with magnetic blackboard which is magnetically connected with the connecting magnetic block 9 and the fixed magnetic ring 14.
Preferably, the front surface of the fixed ear panel 5 is provided with pin holes near the top edge.
Preferably, a connecting groove matched with the fixed magnetic ring 14 is formed on the front surface of the dosage display 13, and the inner wall of the connecting groove is provided with a magnetic plate magnetically connected with the fixed magnetic ring 14.
Preferably, a clamping block is fixedly arranged on the outer wall of the placement box 6 close to the right side edge, and a clamping groove matched with the clamping block is formed in the left side of the stock display 8.
Preferably, the right side of the construction site drawing 4 is provided with a cycle consumption total.
Preferably, the front surface of the discharge decal 15 is marked with the discharge date and the type and amount of material.
Preferably, a connecting groove matched with the roller counter 10 is formed on the front surface of the stock display 8, and the inner wall of the connecting groove is rotationally connected with the roller counter 10.
The specific working principle and the using method of the invention are as follows: the method comprises the steps of counting the total amount of notes when various engineering resources are entered, marking the types of the materials at a material sticker 12 on the front surface of a storage display 8, stirring the total amount at a roller counter 10, marking the units of the materials at a measurement unit sticker 11, placing the storage display 8 at the actual corresponding position of a storage site drawing 3 through a connecting magnetic block 9, enabling the positions of the materials at the storage site to be clearly marked, facilitating finding and calculating the remaining storage space, counting the number and types of the materials at the storage site when the materials at the storage site need to be moved to a construction site, marking the number and types of the notes at a material discharge sticker 15 at a dosage display 13, adjusting the data at the roller counter 10 in real time, marking the number and the date of the materials at the discharge sticker 15, fixing the materials at the corresponding region position of the surface of the construction site drawing 4 through a fixing magnetic ring 14, enabling the input amount of the materials at the region site to be intuitively counted, counting the remaining materials at the region site drawing 4 after one construction cycle, and counting the rate of the materials input at the later stage according to the construction efficiency.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. What is not described in detail in this specification is prior art known to those skilled in the art.
The above description is only of the preferred embodiments of the present invention, and is not intended to limit the present invention in any way; those skilled in the art will readily appreciate that the present invention may be implemented as shown in the drawings and described above; however, those skilled in the art will appreciate that many modifications, adaptations, and variations of the present invention are possible in light of the above teachings without departing from the scope of the invention; meanwhile, any equivalent changes, modifications and evolution of the above embodiments according to the essential technology of the present invention still fall within the scope of the present invention.

Claims (8)

1. The utility model provides a many camps resource management system, includes feeding statistics board (1) and ejection of compact statistics board (2), its characterized in that: the utility model discloses a magnetic meter, including feeding statistics board (1) and ejection of compact statistics board (2), feeding statistics board (1) and ejection of compact statistics board (2) set up side by side, the positive surface bonding of feeding statistics board (1) has storage floor drawing (3), the positive surface bonding of ejection of compact statistics board (2) has construction floor drawing (4), the top of feeding statistics board (1) and ejection of compact statistics board (2) is all fixed with fixed otic placode (5), the bottom fixedly connected with of feeding statistics board (1) and ejection of compact statistics board (2) settle case (6), settle the top swivelling joint of case (6) has shield (7), the positive surface magnetism of feeding statistics board (1) is connected with stock display (8), the top intermediate position of stock display (8) has connection magnetic path (9), the positive surface of stock display (8) is close to intermediate position fixed mounting have counter (10), the positive surface of stock display (8) is close to bottom edge and is pasted and is had unit sticker (11), the top of stock display (13) is close to the fixed surface of the magnetic path of magnetic ring (13), the front surface of the used display (13) is stuck with a discharging sticker (15).
2. The construction site material use period traceability management system according to claim 1, wherein the front surfaces of the feeding statistical board (1) and the discharging statistical board (2) are provided with a magnetic blackboard which is magnetically connected with the connecting magnetic block (9) and the fixed magnetic ring (14).
3. A worksite material usage cycle tracing management system according to claim 1, wherein the front surface of said fixed ear plate (5) is provided with pin holes near the top edge.
4. The construction site material use period traceability management system according to claim 1, wherein a connecting groove matched with the fixed magnetic ring (14) is formed in the front surface of the usage display (13), and the inner wall of the connecting groove is provided with a magnetic plate magnetically connected with the fixed magnetic ring (14).
5. The construction site material use period traceability management system according to claim 1, wherein a clamping block is fixedly installed on the outer wall of the placement box (6) close to the right side edge, and a clamping groove matched with the clamping block is formed in the left side of the stock display (8).
6. The construction site material use period traceability management system according to claim 1, wherein the right side of the construction site drawing (4) is provided with a period consumption total.
7. A worksite material usage cycle retrospective management system according to claim 1, characterized in that the front surface of the outfeed sticker (15) is marked with outfeed date and material type and quantity.
8. The construction site material use period traceability management system according to claim 1, wherein a connecting groove matched with the roller counter (10) is formed in the front surface of the stock display (8), and the inner wall of the connecting groove is rotatably connected with the roller counter (10).
CN202310024372.7A 2023-01-07 2023-01-07 Multi-nutrient resource management system Withdrawn CN116002209A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310024372.7A CN116002209A (en) 2023-01-07 2023-01-07 Multi-nutrient resource management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310024372.7A CN116002209A (en) 2023-01-07 2023-01-07 Multi-nutrient resource management system

Publications (1)

Publication Number Publication Date
CN116002209A true CN116002209A (en) 2023-04-25

Family

ID=86033433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310024372.7A Withdrawn CN116002209A (en) 2023-01-07 2023-01-07 Multi-nutrient resource management system

Country Status (1)

Country Link
CN (1) CN116002209A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116805203A (en) * 2023-08-22 2023-09-26 北京华邑建设集团有限公司 Construction management method and system based on Internet of things

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116805203A (en) * 2023-08-22 2023-09-26 北京华邑建设集团有限公司 Construction management method and system based on Internet of things
CN116805203B (en) * 2023-08-22 2023-10-27 北京华邑建设集团有限公司 Construction management method and system based on Internet of things

Similar Documents

Publication Publication Date Title
CN103048967B (en) A kind of building resources consumes monitoring management system
Monroy et al. Activity based costing, time-driven activity based costing and lean accounting: Differences among three accounting systems’ approach to manufacturing
CN108764683B (en) Power grid operation data analysis evaluation and report system
CN116002209A (en) Multi-nutrient resource management system
CN109840737A (en) A kind of mine materials management system
CN101414369A (en) Management method and system for material encode
CN105446299A (en) Data monitoring and cost accounting system
CN111242543A (en) Concrete material management system and method
CN101458276B (en) Electric quantity computation method and apparatus and electric meter controlling equipment
CN103761604A (en) Method and device for conforming completion of report data compilation
CN108830515A (en) A kind of photovoltaic plant capital construction information management system
CN113706086A (en) Bridge construction quality measurement change progress plan management data structure design
CN117035532A (en) Electric power marketing management system and method based on marketing index multidimensional linkage analysis
CN106504150A (en) A kind of middle and primary schools' integrated management system of laboratory instruments
Zhang et al. The application of resources consumption accounting in an enterprise
CN116384883A (en) Production operation management system of electric energy metering equipment
CN115936720A (en) Military electronic product production and delivery quality evaluation method
CN110175196A (en) A kind of bill of materials problem statistical method and device
Rosenbluth Input-output analysis: A critique
CN110503386B (en) Data processing system for marketized project
CN110597899B (en) Project expense management method and system
CN111445051B (en) Express mail traffic prediction method, prediction system and express mail employee scheduling method
CN113076302A (en) Power grid data management method, device, equipment and medium
CN106651110A (en) Laboratory informatized management system for primary and secondary schools
CN201654833U (en) Counting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20230425

WW01 Invention patent application withdrawn after publication