CN115971320A - Forming process and device for valve body of Venturi valve - Google Patents

Forming process and device for valve body of Venturi valve Download PDF

Info

Publication number
CN115971320A
CN115971320A CN202211682872.1A CN202211682872A CN115971320A CN 115971320 A CN115971320 A CN 115971320A CN 202211682872 A CN202211682872 A CN 202211682872A CN 115971320 A CN115971320 A CN 115971320A
Authority
CN
China
Prior art keywords
valve body
wall
mold
electric telescopic
cylindrical tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211682872.1A
Other languages
Chinese (zh)
Other versions
CN115971320B (en
Inventor
李自强
田青华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Aidi Electromechanical Equipment Industry Co ltd
Original Assignee
Jiangsu Aidi Electromechanical Equipment Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Aidi Electromechanical Equipment Industry Co ltd filed Critical Jiangsu Aidi Electromechanical Equipment Industry Co ltd
Priority to CN202211682872.1A priority Critical patent/CN115971320B/en
Publication of CN115971320A publication Critical patent/CN115971320A/en
Application granted granted Critical
Publication of CN115971320B publication Critical patent/CN115971320B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Shaping Metal By Deep-Drawing, Or The Like (AREA)

Abstract

The invention relates to the technical field of manufacturing of Venturi valves, and particularly discloses a Venturi valve body forming process and a Venturi valve body forming device, wherein the process comprises the following steps: blanking according to the expansion length of the diameter of the minimum position of the caliber of the valve body and the expansion length of the axial direction of the valve body, and welding into a cylindrical pipe blank; placing the cylindrical pipe blank in a mold, and closing the mold; injecting hydraulic oil into the cylindrical pipe blank until the outer wall of the cylindrical pipe blank is tightly attached to the inner wall of the mold; and after the cylindrical pipe blank in the die is formed, controlling a hydraulic forming system to release pressure, opening the die after hydraulic oil is discharged, and taking out the formed valve body of the venturi valve. In the invention, the processing precision is comprehensively improved through a brand-new forming process, the product precision which can be realized by the traditional process is completely subverted, and the control precision of the valve body manufactured by adopting the novel process provided by the invention meets the requirement of a high-end product on the premise that other parts are completely the same, so that the valve body is in the world leading position.

Description

一种文丘里阀阀体成型工艺及成型装置A Venturi valve body forming process and forming device

技术领域technical field

本发明涉及一种阀体成型工艺,具体涉及一种文丘里阀阀体成型工艺及成型装置,属于文丘里阀制造技术领域。The invention relates to a valve body forming process, in particular to a Venturi valve body forming process and a forming device, belonging to the technical field of Venturi valve manufacturing.

背景技术Background technique

文丘里气流控制阀结合了机械的压力无关调节器与高速的气流控制器,将气流控制扩展至最高水平。通过空气动力学设计,阀门具有静音工作性能,快速反应的自动压力平衡装置,提供可靠的通风柜集尘与室内压力的控制。文丘里阀具有不受风管压力变化影响、反应迅速、调节精确等特点。但设备比较昂贵,适合应用在某些要求控制负压的生物制品生产厂房,有毒有害、化学实验室及生物安全实验室等场所。Venturi airflow control valves combine a mechanical pressure independent regulator with a high speed airflow controller to extend airflow control to the highest level. Through the aerodynamic design, the valve has quiet working performance, and the quick-response automatic pressure balance device provides reliable control of fume hood dust collection and indoor pressure. The Venturi valve has the characteristics of not being affected by changes in air duct pressure, quick response, and precise adjustment. However, the equipment is relatively expensive, and it is suitable for use in certain biological product production plants that require negative pressure control, toxic and harmful, chemical laboratories, and biosafety laboratories.

国际上对于该工件的传统成型方法有两种:分段拼接,曲线段采用旋压法成型。卷成筒后沿中心线剖开成两个,分别冲压成型后再焊接起来。这两种方法存在的缺点是:曲线段采用旋压成型后由于金属材料的回弹,尺寸精度就很低(直径公差≥0.3),各段拼焊后变形,圆度就不能保证(圆度≥0.2),而且左中右三段的同轴度也很低(两端同轴度≥0.5);中间剖开冲压成型法则由于纵向两条焊缝的焊接导致圆度和尺寸同样精度较低;两种成型方法变径处局部材料厚度减薄量很大(厚度减薄量≥0.3),降低了阀体的整体强度。Internationally, there are two traditional forming methods for this workpiece: segmented splicing, and curved segments formed by spinning. After being rolled into a tube, it is cut into two along the center line, stamped and formed separately, and then welded together. The disadvantages of these two methods are: after the curve section is formed by spinning, the dimensional accuracy is very low due to the rebound of the metal material (diameter tolerance ≥ 0.3), and the roundness of each section is deformed after tailor welding, and the roundness cannot be guaranteed (roundness ≥0.2), and the coaxiality of the left, middle and right three sections is also very low (coaxiality at both ends ≥0.5); the middle split stamping forming method has low roundness and dimension accuracy due to the welding of two longitudinal welds ; The local material thickness reduction at the variable diameter of the two molding methods is very large (thickness reduction ≥ 0.3), which reduces the overall strength of the valve body.

发明内容Contents of the invention

本发明的目的是为了解决现有技术中存在的缺点,而提出一种文丘里阀阀体成型工艺。The object of the present invention is to propose a venturi valve body molding process in order to solve the shortcomings in the prior art.

为了实现上述目的,本发明采用了如下技术方案:In order to achieve the above object, the present invention adopts the following technical solutions:

一种文丘里阀阀体成型工艺,该工艺包含以下步骤:A Venturi valve body molding process, the process includes the following steps:

步骤一:根据阀体口径最小处直径的展开长度和阀体轴线方向展开长度下料,并焊接成筒状管坯;Step 1: According to the developed length of the minimum diameter of the valve body and the developed length in the axial direction of the valve body, blanking is carried out and welded into a cylindrical tube blank;

步骤二:将筒状管坯放置在模具内,合上模具,使用封压堵头和可移动压力注油嘴对筒状管坯的两端进行封堵;Step 2: Place the cylindrical tube blank in the mold, close the mold, and use the sealing plug and the movable pressure oil nozzle to seal the two ends of the cylindrical tube blank;

步骤三:使用液压系统带动液压成型系统,将液压油注入筒状管坯内,直至筒状管坯的外壁与模具的内壁紧密贴合;Step 3: Use the hydraulic system to drive the hydraulic forming system, and inject hydraulic oil into the tubular tube blank until the outer wall of the tubular tube blank fits closely with the inner wall of the mold;

步骤四:在步骤三进行的同时,左侧的液压机自动推动系统带动推进机构在液压机导向套内向右移动,并同时推动可移动压力注油嘴、锁紧工艺环、筒状管坯向右侧移动,以减少筒状管坯成型过程中的壁厚减薄量;Step 4: While step 3 is being carried out, the automatic push system of the hydraulic press on the left drives the propulsion mechanism to move to the right in the guide sleeve of the hydraulic press, and at the same time pushes the movable pressure oil nozzle, locking process ring, and tubular tube to move to the right , to reduce the amount of wall thickness reduction during the forming process of the cylindrical tube blank;

步骤五:待模具内的筒状管坯成型后,控制液压成型系统泄压,使筒状管坯内的液压油排出后,打开模具,取出成型后的文丘里阀阀体,成型加工完成。Step 5: After the tubular tube blank in the mold is formed, control the hydraulic forming system to release the pressure to discharge the hydraulic oil in the tubular tube blank, open the mold, take out the formed Venturi valve body, and the forming process is completed.

可选的,所述模具的两端均安装有锁紧工艺环,两个锁紧工艺环可分别对封压堵头和可移动压力注油嘴进行锁紧。Optionally, both ends of the mold are equipped with locking process rings, and the two locking process rings can respectively lock the pressure sealing plug and the movable pressure oil injection nozzle.

可选的,所述可移动压力注油嘴的内部设有注油管路,液压油通过注油管路进入筒状管坯的内部。Optionally, an oil injection pipeline is provided inside the movable pressure oil injection nozzle, through which hydraulic oil enters the interior of the cylindrical tube blank.

一种文丘里阀阀体成型装置,该装置应用于上述中的成型工艺,且该装置包含有加工台,所述加工台的顶部通过多个支撑柱安装有箱体,且加工台的顶部还通过支撑柱与模具的底端相连接,箱体的内部设有用于对筒状管坯进行分拣的第一处理机构,加工台的顶部还设有用于对筒状管坯内部进行清理和检测的第二处理机构。A Venturi valve body molding device, which is applied to the above-mentioned molding process, and the device includes a processing table, the top of the processing table is equipped with a box through a plurality of support columns, and the top of the processing table is also The support column is connected with the bottom of the mold, the inside of the box is equipped with a first processing mechanism for sorting the tubular blanks, and the top of the processing table is also equipped with a cleaning and testing mechanism the second processing agency.

可选的,所述第一处理机构包括第一斜板,第一斜板安装在箱体的内部,且箱体内部位于第一斜板的下方还安装有第二斜板,第二斜板靠近高的一端和低的一端分别开设有第一下料口和第二下料口,箱体靠近第二斜板低的一端外壁开设有第三下料口。Optionally, the first processing mechanism includes a first swash plate, the first slant plate is installed inside the box body, and a second slant plate is also installed inside the box body below the first slant plate, and the second slant plate A first discharge port and a second discharge port are respectively opened near the high end and the low end, and a third discharge port is provided on the outer wall of the lower end of the box close to the second inclined plate.

可选的,所述箱体内部位于第二斜板的下方通过转轴呈倾斜状态转动安装有第一转动板,且第一转动板的底部等距开设有多个通槽,第一转动板的两个侧面均安装有竖板,且其中一个竖板内壁粘接有橡胶垫。Optionally, the inside of the box body is located below the second slanting plate, and the first rotating plate is installed in an inclined state through the rotating shaft, and the bottom of the first rotating plate is equidistantly provided with a plurality of through grooves. Risers are installed on both sides, and a rubber pad is bonded to the inner wall of one of the risers.

可选的,所述箱体与第三下料口相对立的一侧外壁开设有第四下料口,第四下料口内转动安装有第二转动板,且第二转动板靠近第一转动板的一侧安装有打磨带,第四下料口位于第二转动板下方还安装有密封门。Optionally, the outer wall of the box body opposite to the third discharge port is provided with a fourth discharge port, and a second rotating plate is installed in the fourth discharge port, and the second rotating plate is close to the first rotating plate. A grinding belt is installed on one side of the plate, and a sealing door is also installed on the fourth feeding port below the second rotating plate.

可选的,所述第二处理机构包括电动滑块,加工台的顶部开设有滑槽,电动滑块安装在滑槽的内部,电动滑块的顶部安装有固定板,且固定板顶部靠近箱体的一侧转动安装有转动块,转动块远离固定板的一侧外壁安装有第一电动伸缩杆,第一电动伸缩杆的伸出端安装有圆杆,且圆杆远离第一电动伸缩杆的一端安装有清洁块,箱体靠近固定板的一侧外壁开设有供第一电动伸缩杆带动清洁块移动至箱体内部的开口。Optionally, the second processing mechanism includes an electric slider, a chute is provided on the top of the processing table, the electric slider is installed inside the chute, a fixing plate is installed on the top of the electric slider, and the top of the fixing plate is close to the box A rotating block is installed on one side of the body, and a first electric telescopic rod is installed on the outer wall of the rotating block away from the fixed plate. A cleaning block is installed at one end of the box body, and the outer wall of the box close to the fixed plate is provided with an opening for the first electric telescopic rod to drive the cleaning block to move to the inside of the box body.

可选的,所述清洁块的外壁开设有凹槽,凹槽内安装有第二电动伸缩杆,第二电动伸缩杆的伸出端安装有弧形磁石块,清洁块的靠近圆杆的一侧外壁安装有两个第三电动伸缩杆,且两个第三电动伸缩杆的伸出端共同连接有移动块,移动块与圆杆的外壁滑动配合,移动块的外壁安装有用于与外部输气机构相连接的连接端,且移动块靠近清洁块的一侧外壁开设有多个出气口,清洁块靠近移动块的一侧外壁安装有气囊,气囊与移动块之间安装有连通管。Optionally, a groove is provided on the outer wall of the cleaning block, and a second electric telescopic rod is installed in the groove, and an arc-shaped magnet block is installed on the extending end of the second electric telescopic rod, and a part of the cleaning block close to the round rod Two third electric telescopic rods are installed on the side outer wall, and the protruding ends of the two third electric telescopic rods are jointly connected with a moving block. The connecting end of the gas mechanism, and the outer wall of the moving block near the cleaning block is provided with a plurality of air outlets, the outer wall of the cleaning block near the moving block is equipped with an air bag, and a connecting pipe is installed between the air bag and the moving block.

可选的,所述模具的内部安装有两个第四电动伸缩杆,且两个第四电动伸缩杆的伸出端均安装有弧形推板,加工台的顶部靠近箱体和模具一侧均开设有两个矩形槽,加工台的底部位于两个矩形槽正下方均滑动安装有收集箱。Optionally, two fourth electric telescopic rods are installed inside the mold, and arc-shaped push plates are installed on the protruding ends of the two fourth electric telescopic rods, and the top of the processing table is close to the box body and the mold side Both are provided with two rectangular slots, and the bottom of the processing table is located directly under the two rectangular slots, and a collection box is slidably installed.

本发明的有益效果是:The beneficial effects of the present invention are:

1、该发明中,通过全新的成型工艺实现加工精度的全面提高,完全颠覆了传统工艺所能实现的产品精度:各曲面直径公差≤0.05,各直径圆度≤0.05,两端口同轴度≤0.05,筒体壁厚减薄量≤0.1,可以在任意圆筒部位添加加强筋,有效提高阀体的抗压抗变形能力,采用本发明创造的新工艺制作的阀体,在其它零部件完全相同的前提下,其控制精度达到了高端产品的要求,处于世界领先地位。1. In this invention, the overall improvement of machining accuracy is achieved through a new molding process, which completely subverts the product accuracy that can be achieved by traditional processes: the diameter tolerance of each curved surface is ≤0.05, the roundness of each diameter is ≤0.05, and the coaxiality of the two ports is ≤ 0.05, cylinder wall thickness reduction ≤ 0.1, reinforcing ribs can be added to any cylinder part, effectively improving the pressure resistance and deformation resistance of the valve body. Under the same premise, its control accuracy has reached the requirements of high-end products and is in the leading position in the world.

2、该发明中,将焊接后的筒状管坯放置在模具之前,可先将其放置在箱体内,通过在第二斜板上设置的第一下料口和第二下料口,可对直径不合格的筒状管坯进行剔除,直径合格的筒状管坯会落在第一转动板顶部,经过第二转动板底部的打磨带对筒状管坯的外壁进行打磨清理,避免筒状管坯外壁的焊渣或其他杂质一同落在模具内,对文丘里阀阀体的成型带来影响。2. In this invention, before placing the welded tubular blank in the mold, it can be placed in the box first, and through the first and second discharge ports set on the second inclined plate, it can be The unqualified cylindrical tube blanks are removed, and the qualified cylindrical tube blanks will fall on the top of the first rotating plate, and the outer wall of the cylindrical tube blanks will be polished and cleaned by the grinding belt at the bottom of the second rotating plate to avoid The welding slag or other impurities on the outer wall of the tube blank fall into the mold together, which will affect the molding of the Venturi valve body.

3、该发明中,在直径合格的筒状管坯落在第一转动板顶部后,可通过第二转动板向下转动对落在第一转动板顶部的筒状管坯进行挤压,使得多个位于第一转动板顶部的筒状管坯能够整齐排列,方便外部驱动机构带动第一转动板转动呈倾斜状态后,多个筒状管坯的一端均与橡胶垫抵接,进而能够对长度不合格的筒状管坯进行剔除,实现对筒状管坯成型前的自动处理,进而提高文丘里阀阀体的合格率。3. In this invention, after the diameter-qualified cylindrical tube blank falls on the top of the first rotating plate, the second rotating plate can be rotated downward to squeeze the cylindrical tube blank falling on the top of the first rotating plate, so that A plurality of tubular blanks located on the top of the first rotating plate can be arranged neatly, so that after the external drive mechanism drives the first rotating plate to rotate in an inclined state, one end of the plurality of tubular blanks is all in contact with the rubber pad, thereby being able to The unqualified cylindrical tube blanks are rejected to realize the automatic processing of the cylindrical tube blanks before forming, thereby improving the qualified rate of the Venturi valve body.

4、该发明中,整齐排列在第一转动板顶部的多个筒状管坯,可通过第一电动伸缩杆带动清洁块伸入至筒状管坯的内部,对筒状管坯内壁的杂物进行清理;并且在清洁块进入筒状管坯内部后,两个第三电动伸缩杆能够带动移动块在圆杆外壁朝着靠近第一电动伸缩杆方向移动,使得移动块带有出气口的一侧外壁与筒状管坯相抵接,此时可借助外部的输气机构通过连接端对移动块进行输气,使出气口排气至筒状管坯的内部,对筒状管坯的密闭性进行检测,避免焊缝位置出现缺陷,导致后续成型过程中出现液压油泄漏或筒状管坯变形损坏的情况。4. In this invention, the plurality of tubular blanks neatly arranged on the top of the first rotating plate can drive the cleaning block into the interior of the tubular blank through the first electric telescopic rod, and clean the miscellaneous tube blanks on the inner wall of the tubular blank. and after the cleaning block enters the interior of the cylindrical tube blank, the two third electric telescopic rods can drive the moving block to move towards the direction close to the first electric telescopic rod on the outer wall of the round rod, so that the moving block has an air outlet One side of the outer wall is in contact with the tubular blank. At this time, the external gas transmission mechanism can be used to deliver gas to the moving block through the connecting end, so that the gas outlet can be exhausted to the inside of the cylindrical tube, and the airtightness of the cylindrical tube The accuracy of the inspection is carried out to avoid defects in the welding seam position, resulting in hydraulic oil leakage or deformation and damage of the tubular tube blank during the subsequent forming process.

附图说明Description of drawings

为了便于本领域技术人员理解,下面结合附图对本发明作进一步的说明。In order to facilitate the understanding of those skilled in the art, the present invention will be further described below in conjunction with the accompanying drawings.

图1为本发明提出的一种文丘里阀阀体成型工艺的示意图;Fig. 1 is the schematic diagram of a kind of Venturi valve body molding process that the present invention proposes;

图2为本发明提出的一种文丘里阀阀体成型装置的结构示意图;Fig. 2 is the structural representation of a kind of Venturi valve valve body molding device that the present invention proposes;

图3为图2另一角度的结构示意图;Fig. 3 is a structural schematic diagram of another angle of Fig. 2;

图4为本发明中箱体的结构剖视图;Fig. 4 is the structural sectional view of casing among the present invention;

图5为本发明中第一转动板的结构示意图;Fig. 5 is a structural schematic diagram of the first rotating plate in the present invention;

图6为本发明中模具的结构剖视图;Fig. 6 is the structural sectional view of mold among the present invention;

图7为本发明中第二处理机构的结构示意图;Fig. 7 is the structural representation of the second processing mechanism in the present invention;

图8为本发明中清洁块和弧形磁石块的结构示意图。Fig. 8 is a schematic structural view of the cleaning block and the arc-shaped magnet block in the present invention.

图中:1、加工台;2、箱体;3、模具;4、固定板;5、第四下料口;6、矩形槽;7、收集箱;8、滑槽;9、第三下料口;10、开口;11、第一转动板;12、第一斜板;13、第二斜板;14、第一下料口;15、第二下料口;16、第二转动板;17、打磨带;18、密封门;19、橡胶垫;20、通槽;21、弧形推板;22、第四电动伸缩杆;23、电动滑块;24、第一电动伸缩杆;25、清洁块;26、移动块;27、连接端;28、出气口;29、第三电动伸缩杆;30、气囊;31、连通管;32、弧形磁石块;33、第二电动伸缩杆;34、液压系统;35、液压机自动推动系统;36、液压成型系统;37、液压机导向套;38、推进机构;39、可移动压力注油嘴;40、锁紧工艺环;41、筒状管坯;42、封压堵头;43、圆杆。In the figure: 1. Processing table; 2. Box body; 3. Mold; 4. Fixed plate; 5. The fourth feeding port; 6. Rectangular slot; 7. Collection box; Material opening; 10, opening; 11, the first rotating plate; 12, the first inclined plate; 13, the second inclined plate; 14, the first feeding port; 15, the second feeding port; 16, the second rotating plate ;17, grinding belt; 18, sealed door; 19, rubber pad; 20, through groove; 21, arc push plate; 22, the fourth electric telescopic rod; 23, electric slider; 24, the first electric telescopic rod; 25. Cleaning block; 26. Moving block; 27. Connecting end; 28. Air outlet; 29. The third electric telescopic rod; 30. Air bag; 31. Connecting pipe; 32. Arc magnet block; 33. The second electric telescopic Rod; 34. Hydraulic system; 35. Automatic propulsion system of hydraulic press; 36. Hydraulic forming system; 37. Guide sleeve of hydraulic press; 38. Propelling mechanism; 39. Movable pressure nozzle; 40. Locking process ring; 41. Tube blank; 42, sealing plug; 43, round rod.

具体实施方式Detailed ways

下面将结合实施例对本发明的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。The technical solutions of the present invention will be clearly and completely described below in conjunction with the embodiments. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

参照图1-图8,一种文丘里阀阀体成型工艺,该工艺包含以下步骤:Referring to Figure 1-Figure 8, a Venturi valve body forming process, the process includes the following steps:

步骤一:根据阀体口径最小处直径的展开长度和阀体轴线方向展开长度下料,并焊接成筒状管坯41;Step 1: blanking according to the developed length of the smallest diameter of the valve body and the developed length in the axial direction of the valve body, and welding into a cylindrical tube blank 41;

步骤二:将筒状管坯41放置在模具3内,合上模具3,使用封压堵头42和可移动压力注油嘴39对筒状管坯41的两端进行封堵;Step 2: Place the cylindrical tube blank 41 in the mold 3, close the mold 3, and use the sealing plug 42 and the movable pressure oil nozzle 39 to seal the two ends of the cylindrical tube blank 41;

步骤三:使用液压系统34带动液压成型系统36,将液压油注入筒状管坯41内,直至筒状管坯41的外壁与模具3的内壁紧密贴合;Step 3: Use the hydraulic system 34 to drive the hydraulic forming system 36, and inject hydraulic oil into the cylindrical tube blank 41 until the outer wall of the cylindrical tube blank 41 is closely attached to the inner wall of the mold 3;

步骤四:在步骤三进行的同时,左侧的液压机自动推动系统35带动推进机构38在液压机导向套37内向右移动,并同时推动可移动压力注油嘴39、锁紧工艺环40、筒状管坯41向右侧移动,以减少筒状管坯41成型过程中的壁厚减薄量;Step 4: While step 3 is being carried out, the hydraulic press automatic push system 35 on the left drives the propulsion mechanism 38 to move to the right in the guide sleeve 37 of the hydraulic press, and at the same time pushes the movable pressure oil nozzle 39, the locking process ring 40, the tubular tube The blank 41 moves to the right to reduce the wall thickness reduction during the forming process of the cylindrical tube blank 41;

步骤五:待模具3内的筒状管坯41成型后,控制液压成型系统36泄压,使筒状管坯41内的液压油排出后,打开模具3,取出成型后的文丘里阀阀体,成型加工完成。Step 5: After the tubular tube blank 41 in the mold 3 is formed, control the hydraulic forming system 36 to release the pressure so that the hydraulic oil in the tubular tube blank 41 is discharged, open the mold 3, and take out the formed Venturi valve body , the forming process is completed.

作为本发明的一种技术优化方案,模具3的两端均安装有锁紧工艺环40,两个锁紧工艺环40可分别对封压堵头42和可移动压力注油嘴39进行锁紧。As a technical optimization solution of the present invention, both ends of the mold 3 are equipped with locking process rings 40, and the two locking process rings 40 can lock the sealing plug 42 and the movable pressure oil nozzle 39 respectively.

作为本发明的一种技术优化方案,可移动压力注油嘴39的内部设有注油管路,液压油通过注油管路进入筒状管坯41的内部。As a technical optimization solution of the present invention, an oil injection pipeline is provided inside the movable pressure oil injection nozzle 39 , and hydraulic oil enters the interior of the cylindrical tube blank 41 through the oil injection pipeline.

一种文丘里阀阀体成型装置,该装置应用于上述中的成型工艺,且该装置包含有加工台1,加工台1的顶部通过多个支撑柱安装有箱体2,且加工台1的顶部还通过支撑柱与模具3的底端相连接,箱体2的内部设有用于对筒状管坯41进行分拣的第一处理机构,加工台1的顶部还设有用于对筒状管坯41内部进行清理和检测的第二处理机构。A Venturi valve body forming device, which is applied to the above-mentioned forming process, and the device includes a processing table 1, the top of the processing table 1 is equipped with a box body 2 through a plurality of support columns, and the processing table 1 The top is also connected to the bottom end of the mold 3 through the support column, the inside of the box body 2 is provided with a first processing mechanism for sorting the cylindrical tube blanks 41, and the top of the processing table 1 is also provided with a processing mechanism for sorting the cylindrical tube blanks. The second processing mechanism for cleaning and testing the inside of the blank 41.

作为本发明的一种技术优化方案,第一处理机构包括第一斜板12,第一斜板12安装在箱体2的内部,且箱体2内部位于第一斜板12的下方还安装有第二斜板13,第二斜板13靠近高的一端和低的一端分别开设有第一下料口14和第二下料口15,箱体2靠近第二斜板13低的一端外壁开设有第三下料口9。焊接后的多个筒状管坯41可将其放置在箱体2内,使其在第一斜板12的顶部向下滑动至第二斜板13的顶部,多个筒状管坯41中直径较细的少量筒状管坯41会在经过第一下料口14时向下掉落,直径合格以及较粗的会经过第一下料口14,并且直径合格的筒状管坯41会在第二斜板13顶部继续移动至第二下料口15的位置后向下掉落。而较粗的仍会经过第二下料口15并从第三下料口9排出至箱体2的外部,实现对筒状管坯41的粗细进行分类。As a technical optimization solution of the present invention, the first processing mechanism includes a first slant plate 12, the first slant plate 12 is installed inside the box body 2, and the inside of the box body 2 is also installed below the first slant plate 12 The second slant plate 13, the second slant plate 13 is respectively provided with a first discharge port 14 and a second discharge port 15 near the high end and the low end, and the outer wall of the box body 2 is opened near the low end of the second slant plate 13. There is a third feeding port 9. A plurality of tubular blanks 41 after welding can be placed in the box body 2 so that it slides down from the top of the first inclined plate 12 to the top of the second inclined plate 13, and among the plurality of tubular blanks 41 A small amount of tubular blanks 41 with a thinner diameter will fall downward when passing through the first discharge opening 14, those with a qualified diameter and thicker will pass through the first discharge opening 14, and the cylindrical blanks 41 with a qualified diameter will pass through the first discharge opening 14. After the top of the second inclined plate 13 continues to move to the position of the second discharge opening 15, it falls downwards. The thicker ones will still pass through the second discharge port 15 and be discharged from the third discharge port 9 to the outside of the box body 2 , so as to classify the thickness of the tubular blank 41 .

作为本发明的一种技术优化方案,箱体2内部位于第二斜板13的下方通过转轴呈倾斜状态转动安装有第一转动板11,且第一转动板11的底部等距开设有多个通槽20,第一转动板11的两个侧面均安装有竖板,且其中一个长度较长的竖板内壁粘接有橡胶垫19。As a technical optimization solution of the present invention, the inside of the box body 2 is located below the second slant plate 13, and the first rotating plate 11 is installed in an inclined state through the rotating shaft, and the bottom of the first rotating plate 11 is equidistantly provided with a plurality of Both sides of the through slot 20 and the first rotating plate 11 are provided with risers, and a rubber pad 19 is bonded to the inner wall of one of the longer risers.

作为本发明的一种技术优化方案,箱体2与第三下料口9相对立的一侧外壁开设有第四下料口5,第四下料口5内转动安装有第二转动板16,且第二转动板16靠近第一转动板11的一侧安装有打磨带17,第四下料口5位于第二转动板16下方还安装有密封门18。多个筒状管坯41在第二斜板13的顶部移动时,此时的第二转动板16可通过外部的驱动机构带动其向上转动,使其远离转动部位的一端向上转动至与第二斜板13底部相抵接的位置后,此时的第二转动板16可作为引导板使用,方便从第一下料口14内向下掉落的直径较细的筒状管坯41落在第二转动板16的顶部,并顺势从箱体2内排出,而且也能够避免从第一下料口14内落下的直径不合格的筒状管坯41落在第一转动板11的顶部;由于第一转动板11呈倾斜设置,落在第一转动板11顶部的筒状管坯41会自动朝着低的一端移动,并且在第一转动板11顶部收集了足够多的直径合格的筒状管坯41后,这些筒状管坯41由于是自由向下掉落至第一转动板11的顶部,部分筒状管坯41会呈堆叠状态,此时可通过外部的驱动机构驱动第二转动板16向下转动至与第一转动板11相齐平的状态,使得第二转动板16在向下转动的过程中能够对第一转动板11顶部的多个筒状管坯41进行反复进行多次的挤压,通过第二转动板16的多次的挤压,促使多个筒状管坯41能够整齐排列在第一转动板11的顶部。As a technical optimization scheme of the present invention, the outer wall of the box body 2 opposite to the third discharge port 9 is provided with a fourth discharge port 5, and a second rotating plate 16 is rotatably installed in the fourth discharge port 5. , and the side of the second rotating plate 16 close to the first rotating plate 11 is equipped with a grinding belt 17 , and the fourth feeding port 5 is located below the second rotating plate 16 and is also equipped with a sealed door 18 . When a plurality of cylindrical tube blanks 41 are moving on the top of the second swash plate 13, the second rotating plate 16 at this time can be driven to rotate upwards by an external drive mechanism, so that the end away from the rotating part is rotated upwards until it is aligned with the second rotating plate. After the position where the bottom of the inclined plate 13 abuts, the second rotating plate 16 at this time can be used as a guide plate to facilitate the thinner diameter tubular tube blank 41 falling downward from the first feeding port 14 to fall on the second rotating plate 16. The top of the rotating plate 16 is discharged from the casing 2, and the unqualified cylindrical tube blank 41 falling from the first discharge port 14 can be prevented from falling on the top of the first rotating plate 11; A rotating plate 11 is arranged at an inclination, and the cylindrical tube blank 41 falling on the top of the first rotating plate 11 will automatically move towards the lower end, and enough cylindrical tubes with qualified diameters are collected on the top of the first rotating plate 11 After the blanks 41, these cylindrical tube blanks 41 freely fall down to the top of the first rotating plate 11, some of the cylindrical tube blanks 41 will be in a stacked state, at this time, the second rotating plate can be driven by an external driving mechanism 16 is rotated downwards to the state that is flush with the first rotating plate 11, so that the second rotating plate 16 can repeatedly carry out a plurality of cylindrical tube blanks 41 on the top of the first rotating plate 11 in the process of rotating downwards. Extrusion times, multiple times of extrusion by the second rotating plate 16, impels a plurality of tubular blanks 41 to be neatly arranged on the top of the first rotating plate 11.

作为本发明的一种技术优化方案,第二处理机构包括电动滑块23,加工台1的顶部开设有滑槽8,电动滑块23安装在滑槽8的内部,电动滑块23的顶部安装有固定板4,且固定板4顶部靠近箱体2的一侧转动安装有转动块,转动块远离固定板4的一侧外壁安装有第一电动伸缩杆24,第一电动伸缩杆24的伸出端安装有圆杆43,且圆杆43远离第一电动伸缩杆24的一端安装有清洁块25,箱体2靠近固定板4的一侧外壁开设有供第一电动伸缩杆24带动清洁块25移动至箱体2内部的开口10。As a technical optimization scheme of the present invention, the second processing mechanism includes an electric slider 23, the top of the processing table 1 is provided with a chute 8, the electric slider 23 is installed in the inside of the chute 8, and the top of the electric slider 23 is installed There is a fixed plate 4, and the side of the top of the fixed plate 4 close to the box body 2 is rotated with a rotating block, and the outer wall of the side of the rotating block away from the fixed plate 4 is equipped with a first electric telescopic rod 24, and the extension of the first electric telescopic rod 24 A round rod 43 is installed at the outlet, and a cleaning block 25 is installed on the end of the round rod 43 far away from the first electric telescopic rod 24, and a side outer wall of the casing 2 near the fixed plate 4 is provided with a cleaning block for the first electric telescopic rod 24 to drive. 25 moves to the opening 10 inside the box body 2 .

作为本发明的一种技术优化方案,清洁块25的外壁开设有凹槽,凹槽内安装有第二电动伸缩杆33,第二电动伸缩杆33的伸出端安装有弧形磁石块32,清洁块25的靠近圆杆43的一侧外壁安装有两个第三电动伸缩杆29,且两个第三电动伸缩杆29的伸出端共同连接有移动块26,移动块26与圆杆43的外壁滑动配合,移动块26的外壁安装有用于与外部输气机构相连接的连接端27,且移动块26靠近清洁块25的一侧外壁开设有多个出气口28,清洁块25靠近移动块26的一侧外壁安装有气囊30,气囊30与移动块26之间安装有连通管31。第一转动板11顶部的筒状管坯41排列整齐后,可通过外部的另一个驱动机构驱动转轴转动,能够带动第一转动板11外壁安装有竖板的一侧向下转动一定的角度后,使得位于第一转动板11顶部的多个筒状管坯41的一端均能够与竖板内壁的橡胶垫19相抵接,从而能够使得设置在箱体2内部的视觉识别设备对多个筒状管坯41的另一端进行自动识别,方便对第一转动板11顶部的多个筒状管坯41的长度进行检测,如识别出长度不合格的筒状管坯41,可将信号输送至装置内设置的控制器,由控制器控制电动滑块23在滑槽8内滑动至与不合格的筒状管坯41相同位置后,由第一电动伸缩杆24启动带动圆杆43以及圆杆43端部安装的清洁块25插装在不合格的筒状管坯41的内部,并启动第二电动伸缩杆33带动弧形磁石块32伸出,并与不合格筒状管坯41的内壁磁性吸附,再由第一电动伸缩杆24的伸出端复位带动清洁块25以及弧形磁石块32吸附的不合格筒状管坯41从开口10内移动至箱体2的外部,并使用外部的驱动机构带动转动块向下转动,进而能够带动清洁块25和不合格筒状管坯41向下同步转动,直至转动至矩形槽6的上方后,第二电动伸缩杆33带动弧形磁石块32复位,使得弧形磁石块32与不合格筒状管坯41之间相脱离,使得不合格筒状管坯41自动滑落至矩形槽6内,并落在收集箱7内进行收集即可,便于对长度不合格的筒状管坯41进行剔除。As a technical optimization scheme of the present invention, a groove is provided on the outer wall of the cleaning block 25, and a second electric telescopic rod 33 is installed in the groove, and an arc-shaped magnet block 32 is installed on the extended end of the second electric telescopic rod 33. Two third electric telescopic rods 29 are installed on the side outer wall near the round rod 43 of the cleaning block 25, and the extended ends of the two third electric telescopic rods 29 are jointly connected with a moving block 26, and the moving block 26 and the round rod 43 The outer wall of the moving block 26 is fitted with a connecting end 27 for connecting with an external air delivery mechanism, and the outer wall of the moving block 26 close to the cleaning block 25 is provided with a plurality of air outlets 28, and the cleaning block 25 moves close to An air bag 30 is installed on one side outer wall of the block 26 , and a communication pipe 31 is installed between the air bag 30 and the moving block 26 . After the cylindrical tube blanks 41 on the top of the first rotating plate 11 are arranged neatly, another external drive mechanism can be used to drive the rotating shaft to rotate, which can drive the side of the outer wall of the first rotating plate 11 where the vertical plate is installed to rotate downward for a certain angle. so that one end of a plurality of tubular blanks 41 located at the top of the first rotating plate 11 can all abut against the rubber pad 19 on the inner wall of the riser, so that the visual recognition equipment arranged inside the box body 2 can recognize a plurality of tubular blanks. The other end of the tube blank 41 is automatically identified to facilitate the detection of the lengths of multiple tubular tube blanks 41 on the top of the first rotating plate 11. If the cylindrical tube blank 41 with an unqualified length is identified, the signal can be sent to the device The controller installed inside controls the electric slider 23 to slide in the chute 8 to the same position as the unqualified tubular tube blank 41, and then the first electric telescopic rod 24 starts to drive the round rod 43 and the round rod 43. The cleaning block 25 installed at the end is inserted into the inside of the unqualified tubular blank 41, and the second electric telescopic rod 33 is activated to drive the arc-shaped magnet block 32 to protrude, and magnetically contact with the inner wall of the unqualified tubular blank 41. Adsorption, and then reset by the extended end of the first electric telescopic rod 24 to drive the cleaning block 25 and the unqualified cylindrical tube blank 41 adsorbed by the arc magnet block 32 to move from the opening 10 to the outside of the box body 2, and use the external The driving mechanism drives the rotating block to rotate downwards, and then can drive the cleaning block 25 and the unqualified cylindrical tube blank 41 to rotate downwards synchronously, until after rotating to the top of the rectangular groove 6, the second electric telescopic rod 33 drives the arc-shaped magnet block 32 Reset, so that the arc-shaped magnet block 32 is separated from the unqualified cylindrical tube blank 41, so that the unqualified cylindrical tube blank 41 automatically slides down into the rectangular groove 6, and falls in the collection box 7 for collection, which is convenient The cylindrical tube blank 41 whose length is unqualified is rejected.

并在第一转动板11顶部的长度不合格的筒状管坯41清理完成后,可通过第一电动伸缩杆24的伸出端带动清洁块25继续伸入至合格筒状管坯41的内部,对筒状管坯41内部的焊渣或其他杂物进行刮除清理,并在清洁块25伸入至筒状管坯41内后,由两个第三电动伸缩杆29的伸出端带动移动块26在圆杆43外壁滑动,方便第一电动伸缩杆24能够带动清洁块25移动至筒状管坯41的另一端,在清洁块25移动至筒状管坯41另一端后,第三电动伸缩杆29伸出端缩回一段距离,带动移动块26与筒状管坯41的一端相抵接,对筒状管坯41的一端进行封堵,而筒状管坯41的另一端会同样受到来自移动块26的推力与竖板内壁的橡胶垫19相抵接,进而完成对筒状管坯41两端的密封,然后可通过外部的输气机构与连接端27相连接,使得外部的输气机构可将气通过移动块26外壁的多个出气口28排出至筒状管坯41的内部,对筒状管坯41的气密性进行检测,避免焊接部位出现漏气,影响后续成型。而且在移动块26的多个出气口28排气的过程中,部分气体可通过连通管31排出至气囊30的内部,使得气囊30呈充气膨胀状态,连通管31为软管,且实际长度大于圆杆43的长度,在对筒状管坯41内部进行清理以及对其气密性进行检测后,呈充气膨胀状态的气囊30会与筒状管坯41的内壁相抵,第一电动伸缩杆24带动清洁块25从筒状管坯41内部移出的过程中,气囊30会与筒状管坯41的内壁产生摩擦,进而能够对筒状管坯41内部残留的灰尘进行清理;由于气囊30的外壁设置有耐磨层,在气囊30与筒状管坯41的内壁相摩擦时,能够避免气囊30长时间与筒状管坯41内壁摩擦导致损坏,延长气囊30的使用寿命,便于后续筒状管坯41内部液压油的注入以及液压油的重复使用。第一转动板11顶部的筒状管坯41经过多项检测后,留存下来的合格筒状管坯41可通过第二转动板16的向下转动,带动第二转动板16底部的打磨带17与筒状管坯41的外壁相抵接,通过转动中的打磨带17可对筒状管坯41外壁的焊渣以及其他杂物进行打磨清理,由于第一转动板11底部开设有多个通槽20,对筒状管坯41内外清理的杂物均能够通过通槽20向下掉落至箱体2的底部进行收集。And after the cleaning of the unqualified tubular blank 41 at the top of the first rotating plate 11 is completed, the protruding end of the first electric telescopic rod 24 can drive the cleaning block 25 to continue to extend into the inside of the qualified cylindrical blank 41 , scrape and clean the welding slag or other sundries inside the cylindrical tube blank 41, and after the cleaning block 25 extends into the cylindrical tube blank 41, it is driven by the extended ends of the two third electric telescopic rods 29 The moving block 26 slides on the outer wall of the round rod 43, so that the first electric telescopic rod 24 can drive the cleaning block 25 to move to the other end of the cylindrical tube blank 41. After the cleaning block 25 moves to the other end of the cylindrical tube blank 41, the third The extended end of the electric telescopic rod 29 is retracted for a certain distance, and the moving block 26 is driven to abut against one end of the tubular blank 41 to block one end of the tubular blank 41, while the other end of the tubular blank 41 will be the same. The thrust from the moving block 26 abuts against the rubber pad 19 on the inner wall of the riser, thereby completing the sealing of both ends of the cylindrical tube blank 41, and then it can be connected to the connecting end 27 through an external gas transmission mechanism, so that the external gas transmission The mechanism can discharge gas to the inside of the cylindrical tube blank 41 through the multiple air outlets 28 on the outer wall of the moving block 26, and test the air tightness of the cylindrical tube blank 41 to avoid air leakage at the welding part and affect subsequent molding. And in the process of exhausting air from multiple air outlets 28 of the moving block 26, part of the gas can be discharged to the inside of the airbag 30 through the connecting pipe 31, so that the airbag 30 is in an inflated state. The connecting pipe 31 is a flexible pipe, and the actual length is greater than The length of the round rod 43, after cleaning the inside of the cylindrical tube blank 41 and testing its airtightness, the air bag 30 in the inflated state will be against the inner wall of the cylindrical tube blank 41, and the first electric telescopic rod 24 In the process of driving the cleaning block 25 to move out from the inside of the tubular blank 41, the airbag 30 will rub against the inner wall of the tubular blank 41, and then the dust remaining inside the cylindrical blank 41 can be cleaned; because the outer wall of the airbag 30 A wear-resistant layer is provided, and when the airbag 30 rubs against the inner wall of the cylindrical tube blank 41, it can prevent the airbag 30 from being damaged by friction with the inner wall of the cylindrical tube blank 41 for a long time, prolong the service life of the airbag 30, and facilitate the subsequent cylindrical tube The injection of hydraulic oil inside the billet 41 and the repeated use of hydraulic oil. After the tubular blank 41 on the top of the first rotating plate 11 has passed multiple tests, the remaining qualified tubular blank 41 can be rotated downward by the second rotating plate 16 to drive the grinding belt 17 at the bottom of the second rotating plate 16 It abuts against the outer wall of the cylindrical tube blank 41, and the welding slag and other sundries on the outer wall of the cylindrical tube blank 41 can be polished and cleaned by the rotating grinding belt 17. Since the bottom of the first rotating plate 11 is provided with multiple through grooves 20. The sundries cleaned inside and outside of the cylindrical tube blank 41 can fall down to the bottom of the box body 2 through the through groove 20 for collection.

作为本发明的一种技术优化方案,模具3的内部安装有两个第四电动伸缩杆22,且两个第四电动伸缩杆22的伸出端均安装有弧形推板21,加工台1的顶部靠近箱体2和模具3一侧均开设有两个矩形槽6,加工台1的底部位于两个矩形槽6正下方均滑动安装有收集箱7。经过第一处理机构和第二处理机构处理后的筒状管坯41可通过打开第四下料口5内的密封门18,并继续借助转动中的打磨带17带动筒状管坯41移动至模具3的内部,经过上述中的成型工艺后,再打开模具3,并通过模具3内部设置的两个第四电动伸缩杆22带动弧形推板21将成型的文丘里阀阀体向上推出至模具3的顶部,此时可通过电动滑块23带动固定板4以及清洁块25等部件一同移动至与文丘里阀阀体同一直线位置后,通过第一电动伸缩杆24带动圆杆43及其外壁的移动块26移动至靠近文丘里阀阀体的位置后,通过出气口28朝着文丘里阀阀体内部进行吹气,可加快文丘里阀阀体内部粘附的液压油排出。如模具3内部的筒状管坯41成型失败,即可通过第一电动伸缩杆24带动清洁块25深入至筒状管坯41的内部后,由伸出状态的弧形磁石块32与其相磁吸后,再由外部的驱动机构带动转动块和第一电动伸缩杆24向下转动,带动磁吸的筒状管坯41转动至另一个矩形槽6的顶部后,使得弧形磁石块32与成型失败的筒状管坯41之间脱离,成型失败的筒状管坯41即可向下掉落至另一个收集箱7内进行收集;模具3内部的筒状管坯41成型成功后,清洁块25伸入至成型成功的文丘里阀阀体的内部,通过弧形磁石块32与其磁吸固定后,由转动块向上转动呈竖直状态,带动第一电动伸缩杆24呈竖直状态后,停留一段时间,使得成型成功的文丘里阀阀体内部残留的液压油进行控油,此时仍可以通过连通管31对气囊30进行充气,使得气囊30呈膨胀状态后能够与文丘里阀阀体的内壁相抵接,然后控制弧形磁石块32与文丘里阀阀体之间脱离,使得文丘里阀阀体的底部与移动块26相抵接,通过不断控制第三电动伸缩杆29伸出端的伸出和缩回,带动移动块26能够反复推动其顶部的文丘里阀阀体上下往复移动,加快其内部液压油的排出,并且在其上下移动的同时,呈膨胀状态的气囊30与文丘里阀阀体的内壁相接触,也可以对其内壁残留的液压油进行刮除清理,并且气囊30在与文丘里阀阀体的最小处内壁相接触时,可通过外部的输气机构停止输气,使气囊30的体积缩小,方便气囊30经过文丘里阀阀体的最小处,从而能够对文丘里阀阀体内壁的残留的液压油清理干净。而且清理出来的液压油也能够顺着圆杆43向下流至第一电动伸缩杆24的外壁,甚至在长期对成型成功的文丘里阀阀体内壁的液压油进行清理的过程中,部分清理的液压油会向下流入滑槽8内,对第一电动伸缩杆24以及电动滑块23都具有一定的润滑效果。As a technical optimization scheme of the present invention, two fourth electric telescopic rods 22 are installed inside the mold 3, and arc-shaped push plates 21 are installed on the protruding ends of the two fourth electric telescopic rods 22, and the processing table 1 Two rectangular grooves 6 are provided on the top of the top near the box body 2 and the mold 3 side, and the bottom of the processing table 1 is located directly below the two rectangular grooves 6 and is slidably equipped with a collection box 7 . The tubular blank 41 processed by the first processing mechanism and the second processing mechanism can be moved to the Inside the mold 3, after the above-mentioned molding process, the mold 3 is opened, and the two fourth electric telescopic rods 22 provided inside the mold 3 drive the arc-shaped push plate 21 to push the molded Venturi valve body upwards to At the top of the mold 3, the electric slider 23 can drive the fixed plate 4 and the cleaning block 25 to move together to the same linear position as the Venturi valve body, and then the first electric telescopic rod 24 drives the round rod 43 and its After the moving block 26 on the outer wall moves to a position close to the Venturi valve body, air is blown toward the inside of the Venturi valve body through the air outlet 28, which can accelerate the discharge of hydraulic oil adhering to the inside of the Venturi valve body. If the molding of the cylindrical tube blank 41 inside the mold 3 fails, the cleaning block 25 can be driven deep into the inside of the cylindrical tube blank 41 by the first electric telescopic rod 24, and then the arc magnet block 32 in the protruding state is magnetically attracted to it. Finally, the external drive mechanism drives the rotating block and the first electric telescopic rod 24 to rotate downwards, and the cylindrical tube blank 41 that drives the magnetic attraction rotates to the top of another rectangular groove 6, so that the arc magnet block 32 and the forming The failed cylindrical tube blanks 41 are separated from each other, and the failed cylindrical tube blanks 41 can be dropped down to another collection box 7 for collection; after the cylindrical tube blanks 41 inside the mold 3 are successfully formed, the cleaning block 25 stretches into the inside of the Venturi valve body that has been molded successfully, and after being fixed by the arc-shaped magnet block 32 and its magnetic attraction, the rotating block is turned upwards to be in a vertical state, and after driving the first electric telescopic rod 24 to be in a vertical state, Stay for a period of time, so that the residual hydraulic oil inside the successfully formed Venturi valve body is controlled. At this time, the air bag 30 can still be inflated through the connecting pipe 31, so that the air bag 30 can be inflated with the venturi valve body. The inner walls are abutted against each other, and then the arc-shaped magnet block 32 is controlled to disengage from the Venturi valve body, so that the bottom of the Venturi valve body abuts against the moving block 26. By continuously controlling the extension of the third electric telescopic rod 29 extension and retract, drive the moving block 26 to repeatedly push the Venturi valve body on the top to move up and down, to speed up the discharge of the internal hydraulic oil, and when it moves up and down, the air bag 30 in the inflated state and the Venturi valve valve The inner wall of the Venturi valve body is in contact, and the residual hydraulic oil on the inner wall can also be scraped and cleaned, and when the air bag 30 is in contact with the inner wall of the smallest part of the Venturi valve body, the air delivery can be stopped through the external air delivery mechanism, so that The reduced volume of the airbag 30 facilitates the passage of the airbag 30 through the smallest part of the Venturi valve body, so that the residual hydraulic oil on the inner wall of the Venturi valve can be cleaned. Moreover, the cleaned hydraulic oil can also flow down to the outer wall of the first electric telescopic rod 24 along the round rod 43, and even in the process of cleaning the hydraulic oil on the inner wall of the Venturi valve valve body that has been successfully formed for a long time, the partially cleaned The hydraulic oil will flow down into the chute 8 and have a certain lubricating effect on the first electric telescopic rod 24 and the electric slider 23 .

本发明中,使用者使用该装置时,可将焊接后的多个筒状管坯41放置在箱体2内,使其在第二斜板13顶部滑动的过程中自动的根据直径大小进行分类,直径合格的筒状管坯41会落在第一转动板11顶部进行收集,并借助第二转动板16的向下转动,使得多个位于第一转动板11顶部的筒状管坯41能够排列整齐。In the present invention, when the user uses the device, a plurality of welded tubular blanks 41 can be placed in the box body 2, so that they can be automatically classified according to the diameter during the process of sliding on the top of the second inclined plate 13. , the diameter qualified cylindrical tube blank 41 will fall on the top of the first rotating plate 11 for collection, and with the help of the downward rotation of the second rotating plate 16, a plurality of cylindrical tube blanks 41 at the top of the first rotating plate 11 can be Orderly rows.

在第一转动板11顶部的筒状管坯41排列整齐后,可通过外部的另一个驱动机构驱动转轴转动,能够带动第一转动板11以转轴为圆心向下翻转一定角度,使得多个筒状管坯41一端均能够与竖板的内壁相抵接,方便箱体2内部的视觉识别设备对多个筒状管坯41进行识别,对多个筒状管坯41的长度进行检测。After the tubular blanks 41 on the top of the first rotating plate 11 are arranged neatly, another external drive mechanism can be used to drive the rotating shaft to rotate, which can drive the first rotating plate 11 to turn downwards at a certain angle with the rotating shaft as the center, so that multiple tubes One end of the tubular blanks 41 can be in contact with the inner wall of the riser, so that the visual recognition equipment inside the box body 2 can identify the plurality of tubular blanks 41 and detect the lengths of the multiple tubular blanks 41 .

在第一转动板11顶部的长度不合格的筒状管坯41清理完成后,可通过第一电动伸缩杆24的伸出端带动清洁块25继续伸入至合格筒状管坯41的内部,对筒状管坯41内部的焊渣或其他杂物进行刮除清理,在清洁块25伸入至筒状管坯41内后,两个第三电动伸缩杆29的伸出端带动移动块26在圆杆43外壁滑动,清洁块25移动至筒状管坯41另一端后,第三电动伸缩杆29伸出端带动移动块26与筒状管坯41的一端相抵接,对筒状管坯41的一端进行封堵,而筒状管坯41的另一端会同样受到来自移动块26的推力与竖板内壁的橡胶垫19相抵接,进而完成对筒状管坯41两端的密封,然后可通过外部的输气机构与连接端27相连接,使得外部的输气机构可将气通过移动块26外壁的多个出气口28排出至筒状管坯41的内部,对筒状管坯41的气密性进行检测,避免焊接部位出现漏气,影响后续成型。After the cleaning of the unqualified tubular blank 41 at the top of the first rotating plate 11 is completed, the protruding end of the first electric telescopic rod 24 can drive the cleaning block 25 to continue to extend into the inside of the qualified cylindrical blank 41, Scrape and clean the welding slag or other sundries inside the cylindrical tube blank 41. After the cleaning block 25 extends into the cylindrical tube blank 41, the extended ends of the two third electric telescopic rods 29 drive the moving block 26 After the outer wall of the round rod 43 slides and the cleaning block 25 moves to the other end of the cylindrical tube blank 41, the extended end of the third electric telescopic rod 29 drives the moving block 26 to abut against one end of the cylindrical tube blank 41, and the cylindrical tube blank 41 is sealed at one end, and the other end of the tubular blank 41 is also pushed by the moving block 26 to abut against the rubber pad 19 on the inner wall of the riser, thereby completing the sealing of both ends of the cylindrical blank 41, and then the The external gas transmission mechanism is connected with the connection end 27, so that the external gas transmission mechanism can discharge the gas to the inside of the cylindrical tube blank 41 through a plurality of gas outlets 28 on the outer wall of the moving block 26, and the cylindrical tube blank 41 The air tightness is tested to avoid air leakage at the welding part and affect the subsequent molding.

在多个出气口28排气的过程中,部分气体可通过连通管31排出至气囊30的内部,使得气囊30呈充气膨胀状态,在对筒状管坯41内部进行清理以及对其气密性进行检测后,第一电动伸缩杆24带动清洁块25从筒状管坯41内部移出的过程中,气囊30会对筒状管坯41内部残留的灰尘进行清理,便于后续液压油的注入以及液压油的重复使用。During the exhausting process of multiple gas outlets 28, part of the gas can be discharged to the inside of the airbag 30 through the connecting pipe 31, so that the airbag 30 is in an inflated state, and the inside of the cylindrical tube blank 41 is cleaned and its airtightness is improved. After the detection, when the first electric telescopic rod 24 drives the cleaning block 25 to move out from the inside of the cylindrical tube blank 41, the air bag 30 will clean up the residual dust inside the cylindrical tube blank 41, which is convenient for the subsequent injection of hydraulic oil and hydraulic pressure. Oil reuse.

第一转动板11顶部的筒状管坯41经过多项检测后,留存下来的合格筒状管坯41可通过第二转动板16底部的打磨带17与筒状管坯41的外壁相抵接,通过转动中的打磨带17可对筒状管坯41外壁的焊渣以及其他杂物进行打磨清理,经过处理后的筒状管坯41可通过转动中的打磨带17带动筒状管坯41移动至模具3的内部进行成型加工,成型的文丘里阀阀体可通过第四电动伸缩杆22带动弧形推板21向上推出至模具3顶部,此时可通过电动滑块23带动清洁块25等部件一同移动至与文丘里阀阀体同一直线位置后,通过出气口28朝着文丘里阀阀体内部进行吹气,可加快文丘里阀阀体内部粘附的液压油排出。After the cylindrical tube blank 41 on the top of the first rotating plate 11 has undergone several tests, the remaining qualified cylindrical tube blank 41 can abut against the outer wall of the cylindrical tube blank 41 through the grinding belt 17 at the bottom of the second rotating plate 16 , The welding slag and other sundries on the outer wall of the cylindrical tube blank 41 can be polished and cleaned by the rotating grinding belt 17, and the processed cylindrical tube blank 41 can be driven by the rotating grinding belt 17 to move the cylindrical tube blank 41 To the inside of the mold 3 for molding processing, the formed Venturi valve body can be pushed upward to the top of the mold 3 through the fourth electric telescopic rod 22 to drive the arc-shaped push plate 21. At this time, the electric slider 23 can be used to drive the cleaning block 25, etc. After the components are moved to the same linear position as the Venturi valve body, air is blown toward the inside of the Venturi valve body through the air outlet 28, which can accelerate the discharge of the hydraulic oil adhered inside the Venturi valve body.

筒状管坯41成型成功后,清洁块25伸入至成型成功的文丘里阀阀体的内部,通过弧形磁石块32与其磁吸固定后,由转动块带动第一电动伸缩杆24呈竖直状态后,停留一段时间,使得成型成功的文丘里阀阀体内部残留的液压油能够进行控油处理,此时仍可以通过连通管31对气囊30进行充气并与文丘里阀阀体的内壁相抵接,通过不断控制第三电动伸缩杆29伸出端的伸出和缩回,带动移动块26能够反复推动其顶部的文丘里阀阀体上下往复移动,呈膨胀状态的气囊30与文丘里阀阀体的内壁相接触,也可以对其内壁残留的液压油进行刮除清理,能够对文丘里阀阀体内壁的残留的液压油清理干净。After the cylindrical tube blank 41 is successfully formed, the cleaning block 25 extends into the inside of the successfully formed Venturi valve body, and after being fixed by the arc-shaped magnet block 32 and its magnetic attraction, the first electric telescopic rod 24 is driven by the rotating block to form a vertical position. After the straight state, stay for a period of time, so that the residual hydraulic oil inside the successfully formed Venturi valve body can be treated for oil control. At this time, the air bag 30 can still be inflated through the connecting pipe 31 and offset against the inner wall of the Venturi valve body. Then, by continuously controlling the extension and retraction of the third electric telescopic rod 29 extension end, the moving block 26 can be driven to repeatedly push the Venturi valve body on its top to move up and down, and the air bag 30 in the expanded state and the Venturi valve valve The inner wall of the valve body is in contact with each other, and the residual hydraulic oil on the inner wall can also be scraped and cleaned, and the residual hydraulic oil on the inner wall of the Venturi valve can be cleaned.

以上公开的本发明优选实施例只是用于帮助阐述本发明。优选实施例并没有详尽叙述所有的细节,也不限制该发明仅为所述的具体实施方式。显然,根据本说明书的内容,可作很多的修改和变化。本说明书选取并具体描述这些实施例,是为了更好地解释本发明的原理和实际应用,从而使所属技术领域技术人员能很好地理解和利用本发明。本发明仅受权利要求书及其全部范围和等效物的限制。The preferred embodiments of the invention disclosed above are only to help illustrate the invention. The preferred embodiments are not exhaustive in all detail, nor are the inventions limited to specific embodiments described. Obviously, many modifications and variations can be made based on the contents of this specification. This description selects and specifically describes these embodiments in order to better explain the principle and practical application of the present invention, so that those skilled in the art can well understand and utilize the present invention. The invention is to be limited only by the claims, along with their full scope and equivalents.

Claims (10)

1.一种文丘里阀阀体成型工艺,其特征在于,该工艺包含以下步骤:1. A Venturi valve body forming process is characterized in that the process comprises the following steps: 步骤一:根据阀体口径最小处直径的展开长度和阀体轴线方向展开长度下料,并焊接成筒状管坯(41);Step 1: blanking according to the developed length of the smallest diameter of the valve body and the developed length in the axial direction of the valve body, and welding into a cylindrical tube blank (41); 步骤二:将筒状管坯(41)放置在模具(3)内,合上模具(3),使用封压堵头(42)和可移动压力注油嘴(39)对筒状管坯(41)的两端进行封堵;Step 2: Place the cylindrical tube blank (41) in the mold (3), close the mold (3), use the sealing plug (42) and the movable pressure oil nozzle (39) to seal the cylindrical tube blank (41 ) are blocked at both ends; 步骤三:使用液压系统(34)带动液压成型系统(36),将液压油注入筒状管坯(41)内,直至筒状管坯(41)的外壁与模具(3)的内壁紧密贴合;Step 3: Use the hydraulic system (34) to drive the hydraulic forming system (36), and inject hydraulic oil into the cylindrical tube blank (41) until the outer wall of the cylindrical tube blank (41) is closely attached to the inner wall of the mold (3) ; 步骤四:在步骤三进行的同时,左侧的液压机自动推动系统(35)带动推进机构(38)在液压机导向套(37)内向右移动,并同时推动可移动压力注油嘴(39)、锁紧工艺环(40)、筒状管坯(41)向右侧移动,以减少筒状管坯(41)成型过程中的壁厚减薄量;Step 4: While step 3 is being carried out, the hydraulic press automatic propulsion system (35) on the left side drives the propulsion mechanism (38) to move to the right in the hydraulic press guide sleeve (37), and simultaneously pushes the movable pressure oil nozzle (39), lock Tighten the process ring (40) and move the tubular blank (41) to the right to reduce the wall thickness reduction during the forming process of the tubular blank (41); 步骤五:待模具(3)内的筒状管坯(41)成型后,控制液压成型系统(36)泄压,使筒状管坯(41)内的液压油排出后,打开模具(3),取出成型后的文丘里阀阀体,成型加工完成。Step 5: After the tubular tube blank (41) in the mold (3) is formed, control the hydraulic forming system (36) to release the pressure so that the hydraulic oil in the tubular tube blank (41) is discharged, and then open the mold (3) , take out the formed Venturi valve body, and the forming process is completed. 2.根据权利要求1所述的一种文丘里阀阀体成型工艺,其特征在于,所述模具(3)的两端均安装有锁紧工艺环(40),两个锁紧工艺环(40)可分别对封压堵头(42)和可移动压力注油嘴(39)进行锁紧。2. a kind of Venturi valve body forming process according to claim 1, is characterized in that, the two ends of described mold (3) are all equipped with locking technology ring (40), two locking technology rings ( 40) The sealing plug (42) and the movable pressure grease nozzle (39) can be locked respectively. 3.根据权利要求1所述的一种文丘里阀阀体成型工艺,其特征在于,所述可移动压力注油嘴(39)的内部设有注油管路,液压油通过注油管路进入筒状管坯(41)的内部。3. A Venturi valve body molding process according to claim 1, characterized in that an oil injection pipeline is provided inside the movable pressure oil injection nozzle (39), and the hydraulic oil enters the cylindrical shape through the oil injection pipeline. The inside of the tube blank (41). 4.一种文丘里阀阀体成型装置,该装置应用于上述权利要求1中的成型工艺,且该装置包含有加工台(1),其特征在于,所述加工台(1)的顶部通过多个支撑柱安装有箱体(2),且加工台(1)的顶部还通过支撑柱与模具(3)的底端相连接,箱体(2)的内部设有用于对筒状管坯(41)进行分拣的第一处理机构,加工台(1)的顶部还设有用于对筒状管坯(41)内部进行清理和检测的第二处理机构。4. A Venturi valve valve body molding device, which is applied to the molding process in the above-mentioned claim 1, and the device includes a processing table (1), characterized in that the top of the processing table (1) passes through A plurality of support columns are equipped with a box body (2), and the top of the processing table (1) is also connected with the bottom end of the mold (3) through the support column, and the inside of the box body (2) is provided with a (41) The first processing mechanism for sorting. The top of the processing table (1) is also equipped with a second processing mechanism for cleaning and testing the inside of the cylindrical tube blank (41). 5.根据权利要求4所述的一种文丘里阀阀体成型装置,其特征在于,所述第一处理机构包括第一斜板(12),第一斜板(12)安装在箱体(2)的内部,且箱体(2)内部位于第一斜板(12)的下方还安装有第二斜板(13),第二斜板(13)靠近高的一端和低的一端分别开设有第一下料口(14)和第二下料口(15),箱体(2)靠近第二斜板(13)低的一端外壁开设有第三下料口(9)。5. A kind of Venturi valve body forming device according to claim 4, characterized in that, said first processing mechanism comprises a first swash plate (12), and the first swash plate (12) is installed in the casing ( 2), and the inside of the box (2) is located below the first slant plate (12) and a second slant plate (13) is installed, and the second slant plate (13) is respectively opened near the high end and the low end. There are a first feeding port (14) and a second feeding port (15), and the casing (2) is provided with a third feeding port (9) near the lower end outer wall of the second inclined plate (13). 6.根据权利要求5所述的一种文丘里阀阀体成型装置,其特征在于,所述箱体(2)内部位于第二斜板(13)的下方通过转轴呈倾斜状态转动安装有第一转动板(11),且第一转动板(11)的底部等距开设有多个通槽(20),第一转动板(11)的两个侧面均安装有竖板,且其中一个竖板内壁粘接有橡胶垫(19)。6. A Venturi valve valve body forming device according to claim 5, characterized in that, the inside of the box (2) is located below the second slant plate (13) and is installed with a second slant plate (13) in an inclined state through a rotating shaft. A rotating plate (11), and the bottom of the first rotating plate (11) is equidistantly provided with a plurality of through grooves (20), the two sides of the first rotating plate (11) are equipped with vertical plates, and one of the vertical plates The plate inner wall is bonded with a rubber pad (19). 7.根据权利要求6所述的一种文丘里阀阀体成型装置,其特征在于,所述箱体(2)与第三下料口(9)相对立的一侧外壁开设有第四下料口(5),第四下料口(5)内转动安装有第二转动板(16),且第二转动板(16)靠近第一转动板(11)的一侧安装有打磨带(17),第四下料口(5)位于第二转动板(16)下方还安装有密封门(18)。7. A Venturi valve valve body forming device according to claim 6, characterized in that, the outer wall of the box body (2) opposite to the third feeding port (9) is provided with a fourth bottom Material port (5), the second rotating plate (16) is installed in the fourth feeding port (5), and the second rotating plate (16) is equipped with a polishing belt ( 17), the fourth feeding port (5) is located below the second rotating plate (16) and is also equipped with a sealed door (18). 8.根据权利要求4所述的一种文丘里阀阀体成型装置,其特征在于,所述第二处理机构包括电动滑块(23),加工台(1)的顶部开设有滑槽(8),电动滑块(23)安装在滑槽(8)的内部,电动滑块(23)的顶部安装有固定板(4),且固定板(4)顶部靠近箱体(2)的一侧转动安装有转动块,转动块远离固定板(4)的一侧外壁安装有第一电动伸缩杆(24),第一电动伸缩杆(24)的伸出端安装有圆杆(43),且圆杆(43)远离第一电动伸缩杆(24)的一端安装有清洁块(25),箱体(2)靠近固定板(4)的一侧外壁开设有供第一电动伸缩杆(24)带动清洁块(25)移动至箱体(2)内部的开口(10)。8. A kind of Venturi valve valve body molding device according to claim 4, is characterized in that, described second processing mechanism comprises electric slide block (23), and the top of processing table (1) offers chute (8 ), the electric slider (23) is installed inside the chute (8), the top of the electric slider (23) is equipped with a fixed plate (4), and the top of the fixed plate (4) is close to the side of the box body (2) The rotation block is installed with a rotating block, and the first electric telescopic link (24) is installed on the side outer wall of the rotating block away from the fixed plate (4), and a round bar (43) is installed on the extended end of the first electric telescopic link (24), and A cleaning piece (25) is installed on the end of the round rod (43) away from the first electric telescopic rod (24), and the outer wall of the side of the box body (2) near the fixed plate (4) is provided with the first electric telescopic rod (24) Drive the cleaning block (25) to move to the opening (10) inside the box body (2). 9.根据权利要求8所述的一种文丘里阀阀体成型装置,其特征在于,所述清洁块(25)的外壁开设有凹槽,凹槽内安装有第二电动伸缩杆(33),第二电动伸缩杆(33)的伸出端安装有弧形磁石块(32),清洁块(25)的靠近圆杆(43)的一侧外壁安装有两个第三电动伸缩杆(29),且两个第三电动伸缩杆(29)的伸出端共同连接有移动块(26),移动块(26)与圆杆(43)的外壁滑动配合,移动块(26)的外壁安装有用于与外部输气机构相连接的连接端(27),且移动块(26)靠近清洁块(25)的一侧外壁开设有多个出气口(28),清洁块(25)靠近移动块(26)的一侧外壁安装有气囊(30),气囊(30)与移动块(26)之间安装有连通管(31)。9. A Venturi valve body forming device according to claim 8, characterized in that, the outer wall of the cleaning block (25) is provided with a groove, and a second electric telescopic rod (33) is installed in the groove , the extended end of the second electric telescopic rod (33) is equipped with an arc-shaped magnet block (32), and the outer wall of the side of the cleaning block (25) near the round rod (43) is equipped with two third electric telescopic rods (29 ), and the extended ends of the two third electric telescopic rods (29) are jointly connected with a moving block (26), the moving block (26) is slidingly matched with the outer wall of the round rod (43), and the outer wall of the moving block (26) is installed There is a connecting end (27) for connecting with an external gas transmission mechanism, and the outer wall of the side of the moving block (26) close to the cleaning block (25) is provided with a plurality of air outlets (28), and the cleaning block (25) is close to the moving block An air bag (30) is installed on one side outer wall of (26), and a communicating pipe (31) is installed between the air bag (30) and the moving block (26). 10.根据权利要求9所述的一种文丘里阀阀体成型装置,其特征在于,所述模具(3)的内部安装有两个第四电动伸缩杆(22),且两个第四电动伸缩杆(22)的伸出端均安装有弧形推板(21),加工台(1)的顶部靠近箱体(2)和模具(3)一侧均开设有两个矩形槽(6),加工台(1)的底部位于两个矩形槽(6)正下方均滑动安装有收集箱(7)。10. A venturi valve valve body forming device according to claim 9, characterized in that, two fourth electric telescopic rods (22) are installed inside the mold (3), and the two fourth electric telescopic rods (22) The protruding ends of the telescopic rods (22) are equipped with arc-shaped push plates (21), and the top of the processing table (1) is provided with two rectangular grooves (6) on the side close to the box body (2) and the mold (3). , the bottom of the processing table (1) is located directly below the two rectangular grooves (6) and is slidably equipped with a collection box (7).
CN202211682872.1A 2022-12-27 2022-12-27 Venturi valve body forming process and forming device Active CN115971320B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211682872.1A CN115971320B (en) 2022-12-27 2022-12-27 Venturi valve body forming process and forming device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211682872.1A CN115971320B (en) 2022-12-27 2022-12-27 Venturi valve body forming process and forming device

Publications (2)

Publication Number Publication Date
CN115971320A true CN115971320A (en) 2023-04-18
CN115971320B CN115971320B (en) 2023-06-20

Family

ID=85975453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211682872.1A Active CN115971320B (en) 2022-12-27 2022-12-27 Venturi valve body forming process and forming device

Country Status (1)

Country Link
CN (1) CN115971320B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006014272B3 (en) * 2006-03-28 2007-09-06 Sungwoo Hitech Co., Ltd. High pressure deforming-pressing system used in the production of front components and bumpers in the automobile industry comprises a fixed lower and upper molds, moving lower and upper molds and pressure injection devices
CN101893462A (en) * 2010-06-28 2010-11-24 江阴市节流装置厂有限公司 Extension-type Venturi tube and processing method and application method thereof
CN105728538A (en) * 2016-03-22 2016-07-06 张国君 Manufacturing system and method for Venturi valve
CN210650840U (en) * 2019-09-23 2020-06-02 城步鑫瑞生态农业发展有限公司 Kiwi fruit screening processingequipment
CN113275249A (en) * 2021-06-22 2021-08-20 上海应用技术大学 Device for sorting coating fixture sleeves
CN214555347U (en) * 2020-12-25 2021-11-02 湖北鑫西能金属制品有限公司 A sorting device for copper rods with different diameters

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006014272B3 (en) * 2006-03-28 2007-09-06 Sungwoo Hitech Co., Ltd. High pressure deforming-pressing system used in the production of front components and bumpers in the automobile industry comprises a fixed lower and upper molds, moving lower and upper molds and pressure injection devices
CN101893462A (en) * 2010-06-28 2010-11-24 江阴市节流装置厂有限公司 Extension-type Venturi tube and processing method and application method thereof
CN105728538A (en) * 2016-03-22 2016-07-06 张国君 Manufacturing system and method for Venturi valve
CN210650840U (en) * 2019-09-23 2020-06-02 城步鑫瑞生态农业发展有限公司 Kiwi fruit screening processingequipment
CN214555347U (en) * 2020-12-25 2021-11-02 湖北鑫西能金属制品有限公司 A sorting device for copper rods with different diameters
CN113275249A (en) * 2021-06-22 2021-08-20 上海应用技术大学 Device for sorting coating fixture sleeves

Also Published As

Publication number Publication date
CN115971320B (en) 2023-06-20

Similar Documents

Publication Publication Date Title
CN110039566A (en) A kind of chip sorting equipment of the high reliablity with dedusting function
CN107121105B (en) Detection apparatus for axle length and hole size in axle check out test set
CN115971320B (en) Venturi valve body forming process and forming device
CN116890126A (en) A step chain sleeve inner hole processing device and processing method
CN116586457B (en) Electric welding cold drawing precision tube production device for automobile electric control shock absorption and production method thereof
CN110940471A (en) Differential pressure pipe air tightness detection tool
WO2014062077A1 (en) A pig for cleaning and/or inspecting a pipeline as well as a method for operating such pig
CN218121311U (en) Flaw detection device for hydrogen energy automobile pipeline machining
CN205996048U (en) A kind of thin metallic tubd pipe-expanding machine with automatic feeding
CN113652646B (en) Technological method for surface coating treatment of cutter and treatment device thereof
CN115592450A (en) Automatic loading and unloading system and method for a CNC lathe
CN221245602U (en) Powder magnetic separation device
CN116357295B (en) Telescopic self-cleaning underground television
CN114227430B (en) Automatic deburring device for metal pipe fittings
CN116577039A (en) A device for detecting the tightness of automobile oil filter
CN117073931A (en) Air tightness detection device for charging connector
CN111957591A (en) Pipe detecting device suitable for plastic pipe
CN220018865U (en) Equipment for detecting tightness of automobile engine oil filter
CN117283465A (en) Sand blasting device for inner tube of square tube heat exchanger
CN118635884B (en) Automatic assembly equipment, assembly method and application in regulating valve manufacturing
CN222255039U (en) Cavity sealing tool
CN111747100A (en) Airflow-driven cigarette separating device and separating method
CN221109654U (en) Sizing and rounding device for aviation pipeline
CN116351922B (en) Plate bending machine capable of automatically discharging
CN117182535A (en) Equipment for assembling valve core and O-shaped ring

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Forming Process and Forming Device for Venturi Valve Body

Granted publication date: 20230620

Pledgee: Nanjing Bank Co.,Ltd. Nanjing North Branch

Pledgor: JIANGSU AIDI ELECTROMECHANICAL EQUIPMENT INDUSTRY CO.,LTD.

Registration number: Y2024980011128

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20230620

Pledgee: Nanjing Bank Co.,Ltd. Nanjing North Branch

Pledgor: JIANGSU AIDI ELECTROMECHANICAL EQUIPMENT INDUSTRY CO.,LTD.

Registration number: Y2024980011128

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Venturi valve body forming process and forming device

Granted publication date: 20230620

Pledgee: Nanjing Bank Co.,Ltd. Nanjing North Branch

Pledgor: JIANGSU AIDI ELECTROMECHANICAL EQUIPMENT INDUSTRY CO.,LTD.

Registration number: Y2025980010599

PE01 Entry into force of the registration of the contract for pledge of patent right