CN115906791A - Method and device for generating analysis report about construction project data - Google Patents
Method and device for generating analysis report about construction project data Download PDFInfo
- Publication number
- CN115906791A CN115906791A CN202310220775.9A CN202310220775A CN115906791A CN 115906791 A CN115906791 A CN 115906791A CN 202310220775 A CN202310220775 A CN 202310220775A CN 115906791 A CN115906791 A CN 115906791A
- Authority
- CN
- China
- Prior art keywords
- data
- project
- report
- image
- analysis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a method and a device for generating an analysis report of construction project data, wherein the method comprises the following steps: after acquiring project data, receiving application demand information of a user, wherein the application demand information comprises: project object data, project site data, application device data; searching a background image based on the project site data and the application equipment data, and generating a plurality of data grids based on the number of data items contained in the project object data; combining the data grids with the background image to form an analysis table, and adding the project data to the analysis table to generate an analysis report. According to the method and the device, after the project data are obtained, the analysis report with the corresponding format and meeting the user requirements is manufactured based on the application requirement information of the user, the project data are added into the analysis report, the whole process is fast, the report with the fixed format does not need to be adjusted, the workload of manufacturing the report is reduced, and the manufacturing efficiency is improved.
Description
Technical Field
The invention relates to the technical field of report processing, in particular to a method and a device for generating an analysis report related to construction project data.
Background
As economy develops, power demand increases, and related power construction projects also increase. Each power construction project is long in duration and various in related content, and in order to control the quality and safety of the project, various data of the project need to be tracked and managed in real time so as to control the progress and cooperative work of the project.
One of the commonly used data management methods is to generate a data analysis report, and a manager performs real-time tracking management on data through the analysis report so as to perform subsequent project work. The current commonly used method for generating the analysis report is as follows: the user builds a report form in a corresponding format in advance, the management system identifies the data type corresponding to the project data according to the data content after acquiring the project data, and the data is added to a corresponding table to form an analysis report based on the data type.
However, the existing method for making the analysis report has the following problems: the report forms are single in format, when a user needs to perform tracking management on data with different requirements or apply analysis on the report forms on different application platforms, the report forms need to be adjusted again to adapt to the formats of different service platforms, so that the workload of making the report forms is increased, and the efficiency of making the report forms is reduced.
Disclosure of Invention
The invention provides a method and a device for generating an analysis report of construction project data, wherein the method can be used for making the analysis report with a corresponding format and meeting the requirements of a user by using application requirement information of the user without adjusting the report with a fixed format, so that the workload of making the report is reduced, and the making efficiency is improved.
The first aspect of the embodiment of the present invention provides a method for generating an analysis report about construction project data, where the method includes:
after acquiring project data, receiving application requirement information of a user, wherein the application requirement information comprises: project object data, project site data, application device data;
searching a background image based on the project site data and the application equipment data, and generating a plurality of data grids based on the number of data items contained in the project object data;
combining the data grids with the background image to form an analysis table, and adding the project data to the analysis table to generate an analysis report.
In a possible implementation manner of the first aspect, the searching for a background image based on the project site data and the application device data includes:
respectively identifying project semantics corresponding to the project site data and equipment semantics corresponding to the application equipment data by utilizing a surface semantic identification algorithm;
searching a site image containing a corresponding item site according to the item semantics, and searching a plurality of equipment images containing corresponding item equipment according to the equipment semantics;
combining a plurality of the device images with the venue image to generate a background image.
In a possible implementation manner of the first aspect, after the step of combining the plurality of device images and the venue image to generate the background image, the method further includes:
acquiring image colorimetric values, which are input by a user, of each equipment image and each field image to obtain a plurality of image colorimetric values;
and rendering the background images according to the colorimetric values of the images respectively, and sending the plurality of rendered background images to a user terminal for the user to check and select.
In a possible implementation manner of the first aspect, the generating a plurality of data grids based on the number of data items included in the item object data includes:
extracting a plurality of data types from the project object data, and counting the type number of the data types, wherein each data type corresponds to a project device contained in the project object;
and editing and generating a plurality of data grids according to the type quantity.
In a possible implementation manner of the first aspect, the combining the multiple data grids and the background image to form an analysis table in a corresponding format includes:
identifying a plurality of device outlines contained in the background image to obtain a plurality of image outlines;
and acquiring the vertex coordinates of each image contour, and adding each data mesh to the background image according to each vertex coordinate to form an analysis table.
In a possible implementation manner of the first aspect, the adding the project data to the analysis table to generate an analysis report includes:
searching a corresponding target data type in a plurality of data types based on the type of each item data;
and adding the project data into a data network of the analysis table according to the target data type to generate an analysis report.
In a possible implementation manner of the first aspect, after the step of adding the project data to the analysis table to generate an analysis report, the method further includes:
searching a historical rendering format from a preset database, wherein the historical rendering format is a format for performing visual rendering on a historical analysis report on an interface after the historical analysis report is generated according to the same project object data at the first time;
and performing visual rendering on the analysis report according to the historical rendering format.
A second aspect of an embodiment of the present invention provides an analysis report generation apparatus for construction project data, including:
the receiving module is used for receiving application requirement information of a user after acquiring the project data, wherein the application requirement information comprises: project object data, project site data and application equipment data;
the searching and generating module is used for searching a background image based on the project site data and the application equipment data and generating a plurality of data grids based on the number of data items contained in the project object data;
and the report generation module is used for combining the data grids and the background image to form an analysis table and adding the project data to the analysis table to generate an analysis report.
In a possible implementation manner of the second aspect, the searching and generating module is further configured to:
respectively identifying project semantics corresponding to the project site data and equipment semantics corresponding to the application equipment data by utilizing a surface semantic identification algorithm;
searching a field image containing a corresponding field according to the item semantics, and searching a plurality of equipment images containing corresponding item equipment according to the equipment semantics;
combining a plurality of the device images with the venue image to generate a background image.
In a possible implementation manner of the second aspect, after the step of combining the plurality of device images and the venue image to generate the background image, the apparatus further includes:
the acquisition chromatic value module is used for acquiring the image chromatic values of each equipment image and each field image input by a user to obtain a plurality of image chromatic values;
and the image rendering module is used for rendering the background images according to the chromatic values of the images respectively and sending the plurality of rendered background images to the user terminal for the user to check and select.
In a possible implementation manner of the second aspect, the searching and generating module is further configured to:
extracting a plurality of data types from the project object data, and counting the type number of the data types, wherein each data type corresponds to a project device contained in the project object;
and editing and generating a plurality of data grids according to the type quantity.
In a possible implementation manner of the second aspect, the report generation module is further configured to:
identifying a plurality of device outlines contained in the background image to obtain a plurality of image outlines;
and acquiring the vertex coordinates of each image contour, and adding each data mesh to the background image according to each vertex coordinate to form an analysis table.
In a possible implementation manner of the second aspect, the report generation module is further configured to:
searching a corresponding target data type in a plurality of data types based on the type of each item data;
and adding the project data into a data network of the analysis table according to the target data type to generate an analysis report.
In a possible implementation manner of the second aspect, the apparatus further includes:
the system comprises a rendering format obtaining module, a rendering format searching module and a rendering format display module, wherein the rendering format obtaining module is used for searching a historical rendering format from a preset database, and the historical rendering format is a format for performing visual rendering on a historical analysis report on an interface after the historical analysis report is generated according to the same project object data at a first time;
and the report rendering module is used for performing visual rendering on the analysis report according to the historical rendering format.
Compared with the prior art, the method and the device for generating the analysis report of the construction project data have the advantages that: the method and the device can receive the application demand information of the user after acquiring the project data, make the analysis report with the corresponding format and in accordance with the user demand based on the application demand information of the user, and add the project data into the analysis report, so that the whole process is fast, the report with the fixed format does not need to be adjusted, the workload of making the report is reduced, and the making efficiency is improved.
Drawings
Fig. 1 is a schematic flow chart illustrating an analytic report generation method for construction project data according to an embodiment of the present invention;
FIG. 2 is a diagram illustrating an image effect of a background image according to an embodiment of the present invention;
fig. 3 is a schematic structural diagram of an analysis report generation apparatus for construction project data according to an embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The currently common analytic report making method can only fill the data of the user into a table with a preset format, and when the user needs to perform tracking management on the data with different requirements or apply the analytic report on different application platforms, the analytic report needs to be adjusted greatly, so that the workload of making the analytic report is increased, and the efficiency of making the analytic report is reduced.
In order to solve the above problem, the method for generating an analysis report related to construction project data provided in the embodiments of the present application will be described and illustrated in detail by the following specific embodiments.
Referring to fig. 1, a flowchart of an analytic report generation method for construction project data according to an embodiment of the present invention is shown.
In an implementation manner, the analysis report generation method for the construction project data may be applied to a background computer, a background server, or a cloud system. The background computer, the background server or the cloud system can be in communication connection with the user terminal, and the user can send related data to the cloud system through the user terminal so that the cloud system can make corresponding reports and generate corresponding data reports for the user to refer to.
As an example, the method for generating an analysis report on construction project data may include:
s11, after the project data are obtained, receiving application requirement information of a user, wherein the application requirement information comprises: project object data, project site data, and application device data.
In an embodiment, the project data may be related data of a current construction project of a user, may also be related data of a project to be developed, and may also be data of a project operation that has just been completed.
In one embodiment, the application requirement information may be information input by a user at a user terminal, and may include project object data, project site data, application device data, and the like.
The project object data can be various types of data related to projects, and each project object corresponds to one type. For example, the electric power engineering project includes types of an electric power meter, a signal pipeline, a generator, a supercharger, engineering start-up time, the number of constructors, the number of inspectors and the like, and each type corresponds to one type of data.
The project site data may be a specific construction site of the power project, or an application site of the project, or a blueprint site of an area where the project is started.
The application device data may be for each device specifically used by the project, including: construction steel, generators, transport vehicles, transformers, etc.
In a certain implementation manner, a user can send a report making request to the cloud system through the user terminal, and then the cloud system responds to the report making request to search in the database to obtain corresponding project data.
And then, the user can input the application requirement information through the user terminal and execute the subsequent report generation operation according to the application requirement information. Because the application requirement information contains data, application objects, site background and the like required by the user for making the report, the report meeting the application requirement of the user can be made by combining the data, and the user does not need to adjust the report according to the personal application requirement, so that the efficiency of making the report is improved.
S12, searching a background image based on the project site data and the application equipment data, and generating a plurality of data grids based on the number of data items contained in the project object data.
In an embodiment, a background image for making a report may be searched for by using project site data and application device data, then a plurality of data grids may be generated according to the number of data items included in project object data, and a report of a corresponding format may be generated by combining the background image and the data grids.
The traditional report forms are all white-background black words, and a user can imagine and analyze the project only through data on the report forms and then perform subsequent business development.
The background image for making the report can be searched by combining project site data and application equipment data, the background image is used as the background of the report, a user can quickly and visually analyze the report through the colorful background image, meanwhile, the background image comprises a plurality of data grids, the grids can be filled with each project data, and then corresponding analysis processing can be carried out by combining the background image and the data.
In an alternative embodiment, the project site data and the application device data each have their corresponding images, and in order to combine the images of the site and the device to generate a background image meeting the application requirements, step S12 may include the following sub-steps:
and S121, respectively identifying project semantics corresponding to the project site data and equipment semantics corresponding to the application equipment data by using a surface layer semantic identification algorithm.
In an embodiment, the cloud system may identify, by a surface semantic identification algorithm, a project semantic corresponding to the project site data and an equipment semantic corresponding to the application equipment data.
Optionally, a pre-trained semantic recognition model may also be used to recognize the project semantics corresponding to the project site data and recognize the device semantics corresponding to the application device data.
The specific identification mode can be adjusted according to the actual application requirements.
S122, searching a site image containing a corresponding item site according to the item semantics, and searching a plurality of equipment images containing corresponding item equipment according to the equipment semantics.
In one implementation, the corresponding image may be looked up in the network based on the project semantics, thereby obtaining a venue image containing the corresponding project venue. Similarly, a plurality of corresponding images can be searched in the network by the device semantics, so that a plurality of device images containing corresponding project devices are obtained.
For example, if the power project is a power plant constructed from xx to xx, the site image may be site data of an area where xx to xx are located. For the convenience of more intuitive viewing by the user, the site image may be image data of the satellite layer in the map application program from xx road to xx road.
Similarly, the device data may be image data of a device real object.
And S123, combining the plurality of equipment images and the field image to generate a background image.
In one embodiment, multiple device images may be superimposed in the venue image, forming a background image.
In an alternative embodiment, the device image may be zoomed first, and then the zoomed device image may be superimposed on the venue image to form the background image.
Referring to fig. 2, an image effect diagram of a background image provided by an embodiment of the present invention is shown.
For example, the power project is a power plant built from xx to xx, and the synthesized background image may include a site from xx to xx, and images of facilities such as plants and furnaces, as shown in fig. 2.
In order to further increase the display effect of the image, wherein, as an example, after step S123, the method may further include the steps of:
s21, obtaining image colorimetric values of each equipment image and each field image input by a user to obtain a plurality of image colorimetric values.
Specifically, the user may input an image colorimetric value regarding the device image through the user terminal, and may also input an image colorimetric value regarding the field image.
The image chrominance values may be chrominance values corresponding to user-selected colors.
And S22, rendering the background images according to the chromatic values of the images respectively, and sending the plurality of rendered background images to a user terminal for the user to check and select.
In an embodiment, the rendering manner may be one-by-one, and may be rendered with a plurality of chrominance values simultaneously.
For example, there is one field image and five device images. Correspondingly, the field image corresponds to a chromatic value, and the five equipment images correspond to five chromatic values, and six chromatic values are total.
Rendering the background images by six chromatic values respectively to obtain six background images; or the chromatic value corresponding to the field image can be used for rendering the field image, and then the chromatic value corresponding to the equipment image is used for rendering the equipment image; the method also can be used for rendering the field image by utilizing the chromatic value corresponding to the field image, and simultaneously rendering five equipment images by utilizing the chromatic value corresponding to one equipment image; or, the field image can be rendered by using the chromatic values corresponding to the field image, and five equipment images can be rendered by using the chromatic values corresponding to the two equipment images; or, the field image can be rendered by using the chromatic value corresponding to one device image, and one, two pieces of 8230or five device images can be rendered by using the chromatic value corresponding to the field image.
The specific rendering mode can be adjusted according to actual needs.
In order to add corresponding project data to the background image, it is necessary to generate a data mesh to which data can be added according to the content of the project object data.
Wherein, as an example, step S12 may comprise the following sub-steps:
s124, extracting a plurality of data types from the project object data, and counting the type number of the data types, wherein each data type corresponds to one project device contained in the project object.
And S125, editing and generating a plurality of data grids according to the type quantity.
Specifically, the semantics of each data in the project object data may be identified, and then the multiple semantics may be input into the aggregation classification model for classification to obtain multiple classification categories, where each classification category corresponds to one data type, so as to obtain multiple data types.
Then, the number of data types can be counted to obtain a type number value. Finally, a plurality of data grids may be generated by the number of types.
The data grid may be a blank grid in a chart. Corresponding data may be filled in the blank grid.
It should be noted that the data grid may be a data grid similar to that in the excel table, and the format or size of the data grid may be preset by the user.
And S13, combining the data grids with the background image to form an analysis table, and adding the project data to the analysis table to generate an analysis report.
In one embodiment, a plurality of data grids may be added to the background image to form an analysis form, which contains both the data grids that can fill in data and the background content required by the application requirements.
And finally, adding project data into the data grid to form an analysis report.
In one embodiment, if the data grid is added to the background image at will, the background image may be very confused, and subsequent viewing by the user is affected, and in order to enhance the viewing experience of the user, the step S13 may include the following sub-steps:
s131, identifying a plurality of device outlines contained in the background image to obtain a plurality of image outlines.
S132, acquiring the vertex coordinates of each image contour, and adding each data mesh to the background image according to each vertex coordinate to form an analysis table.
Taking fig. 2 as an example, a substation, an incinerator, and the like are included in the drawing. The image outline of the transformer substation and the image outline of the incinerator can be obtained by identifying the background image.
Next, vertex coordinates of the image contour of the substation and the image contour of the incinerator, which may be coordinates of the image contour in the image, may be acquired.
And finally, adding the data mesh into the background image by taking the vertex coordinates as the endpoint coordinates of the data mesh.
After the vertex coordinates of the image contour of the transformer substation and the vertex coordinates of the image contour of the incinerator are obtained, the data mesh can be added to the coordinates by taking the vertex coordinates of the image contour of the transformer substation as the coordinates of the lower left corner of the square data mesh, so that the background image comprises the data mesh.
After adding the grid, in order to accurately add the project data to the grid, wherein, as an example, the step S13 may include the following sub-steps:
and S133, searching a corresponding target data type in the plurality of data types based on the type of each item of data.
And S134, adding the project data into the data network of the analysis table according to the target data type to generate an analysis report.
Specifically, the data type of the project data may be determined, and the data type of the project data may be matched with the data type of the data grid. And if the two data types are matched to be the same, adding the project data into the corresponding data grids so as to generate an analysis report.
The analysis report contains the site background and the equipment image which are required to be displayed by the application, and the report also contains corresponding data, so that a user can perform corresponding business analysis by combining the data and the corresponding background. And the generated report combines each image and data, and can more intuitively display the actual situation of the project so as to meet the application requirements of the user.
In order to further enhance the presentation effect of the analysis report, as an example, the method may further include:
s14, searching a historical rendering format from a preset database, wherein the historical rendering format is a format for performing visual rendering on a historical analysis report on an interface after the historical analysis report is generated according to the same project object data at the first time.
And S15, performing visual rendering on the analysis report according to the historical rendering format.
Specifically, the historical rendering format may be a visual rendering format in which the user generates the historical analysis report according to the same project object data at the previous time, where the visual rendering format may be a format of a user terminal, and specifically, the visual rendering may be performed on images or data in the analysis report.
And finally, performing visual rendering on the analysis report according to a historical rendering format, and sending the rendered analysis report to a corresponding user terminal, specifically, a user terminal triggering a report generation task, so that the user terminal can display the report to a user for viewing.
For example, the historical rendering format is to highlight and render the data of the incinerator, and the incinerator data of the newly generated analysis report can be highlighted and rendered according to the historical rendering format.
In this embodiment, an embodiment of the present invention provides a method for generating an analysis report about construction project data, which has the following beneficial effects: the method and the device can receive the application demand information of the user after acquiring the project data, make the analysis report with the corresponding format and in accordance with the user demand based on the application demand information of the user, and add the project data into the analysis report, so that the whole process is fast, the report with the fixed format does not need to be adjusted, the workload of making the report is reduced, and the making efficiency is improved.
An embodiment of the present invention further provides an analysis report generating device related to construction project data, and referring to fig. 3, a schematic structural diagram of the analysis report generating device related to construction project data according to an embodiment of the present invention is shown.
The analytic report generation device for construction project data may include:
a receiving module 301, configured to receive application requirement information of a user after acquiring project data, where the application requirement information includes: project object data, project site data, application device data;
a searching and generating module 302, configured to search for a background image based on the project site data and the application device data, and generate a plurality of data grids based on the number of data items included in the project object data;
a report generating module 303, configured to combine the multiple data grids with the background image to form an analysis table, and add the project data to the analysis table to generate an analysis report.
Optionally, the searching and generating module is further configured to:
respectively identifying project semantics corresponding to the project site data and equipment semantics corresponding to the application equipment data by utilizing a surface semantic identification algorithm;
searching a field image containing a corresponding field according to the item semantics, and searching a plurality of equipment images containing corresponding item equipment according to the equipment semantics;
combining a plurality of the device images with the venue image to generate a background image.
Optionally, after the step of combining the plurality of device images with the field image to generate the background image, the apparatus further includes:
the acquisition chromatic value module is used for acquiring the image chromatic values of each equipment image and each field image input by a user to obtain a plurality of image chromatic values;
and the image rendering module is used for rendering the background images according to the colorimetric values of the images respectively, and sending the plurality of rendered background images to the user terminal for the user to view and select.
Optionally, the searching and generating module is further configured to:
extracting a plurality of data types from the project object data, and counting the type quantity of the data types, wherein each data type corresponds to a project device contained in the project object;
and editing and generating a plurality of data grids according to the type quantity.
Optionally, the report generating module is further configured to:
identifying a plurality of device contours contained in the background image to obtain a plurality of image contours;
and acquiring the vertex coordinates of each image contour, and adding each data mesh to the background image according to each vertex coordinate to form an analysis table.
Optionally, the report generating module is further configured to:
searching a corresponding target data type in a plurality of data types based on the type of each item data;
and adding the project data into a data network of the analysis table according to the target data type to generate an analysis report.
Optionally, the apparatus further comprises:
the rendering format acquiring module is used for searching a historical rendering format from a preset database, wherein the historical rendering format is a format for performing visual rendering on a historical analysis report on an interface after the historical analysis report is generated according to the same project object data at a first time;
and the report rendering module is used for performing visual rendering on the analysis report according to the historical rendering format.
It can be clearly understood by those skilled in the art that, for convenience and brevity, the specific working process of the apparatus described above may refer to the corresponding process in the foregoing method embodiment, and is not described herein again.
Further, an embodiment of the present application further provides an electronic device, including: the system comprises a memory, a processor and a computer program stored on the memory and capable of running on the processor, wherein the processor executes the program to realize the analysis report generation method related to the construction project data according to the embodiment.
Further, an embodiment of the present application further provides a computer-readable storage medium, where a computer-executable program is stored, where the computer-executable program is used to enable a computer to execute the analysis report generation method for construction project data according to the foregoing embodiment.
While the foregoing is directed to the preferred embodiment of the present invention, it will be understood by those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention.
Claims (10)
1. An analytic report generation method for construction project data, the method comprising:
after acquiring project data, receiving application demand information of a user, wherein the application demand information comprises: project object data, project site data and application equipment data;
searching a background image based on the project site data and the application equipment data, and generating a plurality of data grids based on the number of data items contained in the project object data;
combining the data grids with the background image to form an analysis table, and adding the project data to the analysis table to generate an analysis report.
2. The analytical report generation method for construction project data according to claim 1, wherein said searching for a background image based on said project site data and said application device data comprises:
respectively identifying project semantics corresponding to the project site data and equipment semantics corresponding to the application equipment data by utilizing a surface layer semantic identification algorithm;
searching a site image containing a corresponding item site according to the item semantics, and searching a plurality of equipment images containing corresponding item equipment according to the equipment semantics;
combining a plurality of the device images with the venue image to generate a background image.
3. The analytical report generation method for construction project data according to claim 2, wherein after the step of combining a plurality of the equipment images with the site image to generate a background image, the method further comprises:
acquiring image colorimetric values, which are input by a user, of each equipment image and each field image to obtain a plurality of image colorimetric values;
and rendering the background images according to the colorimetric values of the images respectively, and sending the plurality of rendered background images to a user terminal for the user to view and select.
4. The method according to claim 1, wherein the generating a plurality of data grids based on the number of data items included in the project object data includes:
extracting a plurality of data types from the project object data, and counting the type number of the data types, wherein each data type corresponds to a project device contained in the project object;
and editing and generating a plurality of data grids according to the type quantity.
5. The method of claim 4, wherein combining the plurality of data grids with the background image to form an analysis form of a corresponding format comprises:
identifying a plurality of device outlines contained in the background image to obtain a plurality of image outlines;
and acquiring the vertex coordinates of each image contour, and adding each data mesh to the background image according to each vertex coordinate to form an analysis table.
6. The analytical report generation method for construction project data according to claim 5, wherein the adding the project data to the analytical form generation analytical report includes:
searching a corresponding target data type in a plurality of data types based on the type of each item data;
and adding the project data into a data network of the analysis table according to the target data type to generate an analysis report.
7. The analytical report generation method for construction project data according to any one of claims 1 to 6, wherein after the step of adding the project data to the analytical form to generate an analytical report, the method further comprises:
searching a historical rendering format from a preset database, wherein the historical rendering format is a format for performing visual rendering on a historical analysis report on an interface after the historical analysis report is generated according to the same project object data at the first time;
and performing visual rendering on the analysis report according to the historical rendering format.
8. An analytic report generation apparatus for construction project data, the apparatus comprising:
the receiving module is used for receiving application requirement information of a user after acquiring the project data, wherein the application requirement information comprises: project object data, project site data and application equipment data;
the searching and generating module is used for searching a background image based on the project site data and the application equipment data and generating a plurality of data grids based on the number of data items contained in the project object data;
and the report generation module is used for combining the data grids and the background image to form an analysis table and adding the project data to the analysis table to generate an analysis report.
9. An electronic device, comprising: a memory, a processor and a computer program stored on the memory and operable on the processor, wherein the processor implements the method of generating an analysis report on construction project data according to any one of claims 1 to 7 when executing the program.
10. A computer-readable storage medium, characterized in that the computer-readable storage medium stores a computer-executable program for causing a computer to execute the analytic report generating method on construction project data according to any one of claims 1 to 7.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310220775.9A CN115906791B (en) | 2023-03-09 | 2023-03-09 | Analysis report generation method and device for construction project data |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310220775.9A CN115906791B (en) | 2023-03-09 | 2023-03-09 | Analysis report generation method and device for construction project data |
Publications (2)
Publication Number | Publication Date |
---|---|
CN115906791A true CN115906791A (en) | 2023-04-04 |
CN115906791B CN115906791B (en) | 2023-05-30 |
Family
ID=85733754
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310220775.9A Active CN115906791B (en) | 2023-03-09 | 2023-03-09 | Analysis report generation method and device for construction project data |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115906791B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102792322A (en) * | 2009-09-30 | 2012-11-21 | 天宝导航有限公司 | Visual organization of information via associated geospatial data |
US20170139983A1 (en) * | 2012-09-07 | 2017-05-18 | Splunk Inc. | Data Model Selection and Application Based on Data Sources |
US20190347837A1 (en) * | 2018-05-14 | 2019-11-14 | Virtualitics, Inc. | Systems and Methods for High Dimensional 3D Data Visualization |
CN110689255A (en) * | 2019-09-23 | 2020-01-14 | 广州轨道交通建设监理有限公司 | Engineering supervision enterprise integrated service management system |
CN111259642A (en) * | 2020-01-17 | 2020-06-09 | 青梧桐有限责任公司 | Report generation method and system based on map technology |
CN113886508A (en) * | 2021-09-14 | 2022-01-04 | 上海创远仪器技术股份有限公司 | Method, device, processor and computer readable storage medium for realizing report generation processing by combining map and dynamic data analysis |
CN115204130A (en) * | 2022-07-05 | 2022-10-18 | 上海枝子信息科技有限公司 | Complete report generation method |
CN115658796A (en) * | 2022-09-01 | 2023-01-31 | 安徽电信规划设计有限责任公司 | Visual display method and system for map grid data |
-
2023
- 2023-03-09 CN CN202310220775.9A patent/CN115906791B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102792322A (en) * | 2009-09-30 | 2012-11-21 | 天宝导航有限公司 | Visual organization of information via associated geospatial data |
US20170139983A1 (en) * | 2012-09-07 | 2017-05-18 | Splunk Inc. | Data Model Selection and Application Based on Data Sources |
US20190095062A1 (en) * | 2012-09-07 | 2019-03-28 | Splunk Inc. | Data model selection and application based on data sources |
US20190347837A1 (en) * | 2018-05-14 | 2019-11-14 | Virtualitics, Inc. | Systems and Methods for High Dimensional 3D Data Visualization |
CN110689255A (en) * | 2019-09-23 | 2020-01-14 | 广州轨道交通建设监理有限公司 | Engineering supervision enterprise integrated service management system |
CN111259642A (en) * | 2020-01-17 | 2020-06-09 | 青梧桐有限责任公司 | Report generation method and system based on map technology |
CN113886508A (en) * | 2021-09-14 | 2022-01-04 | 上海创远仪器技术股份有限公司 | Method, device, processor and computer readable storage medium for realizing report generation processing by combining map and dynamic data analysis |
CN115204130A (en) * | 2022-07-05 | 2022-10-18 | 上海枝子信息科技有限公司 | Complete report generation method |
CN115658796A (en) * | 2022-09-01 | 2023-01-31 | 安徽电信规划设计有限责任公司 | Visual display method and system for map grid data |
Non-Patent Citations (1)
Title |
---|
俞镇;: "镇江民政基础建设项目管理系统的开发与应用研究", 办公自动化 * |
Also Published As
Publication number | Publication date |
---|---|
CN115906791B (en) | 2023-05-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110880200A (en) | Intelligent checking and accepting method for GIM model engineering based on three-dimensional reconstruction technology | |
CN110196892B (en) | Comprehensive protective land monitoring platform based on Internet of things and method thereof | |
CN111985161A (en) | Transformer substation three-dimensional model reconstruction method | |
CN112579845B (en) | Industrial big data display geographic information system platform | |
CN110660125B (en) | Three-dimensional modeling device for power distribution network system | |
CN109598056B (en) | Method and system for measuring urban construction land form compactness and storage medium | |
CN115796712B (en) | Regional land ecosystem carbon reserve estimation method and device and electronic equipment | |
CN112613339A (en) | Automatic identification and examination method and device for electrical drawings | |
CN112685820A (en) | Digital power station delivery method, medium and equipment based on BIM and GIS | |
CN111602157A (en) | Supplier supply chain risk analysis method | |
CN114881508A (en) | Data processing method, device and equipment for power grid index report | |
CN114581794A (en) | Geographic digital twin information acquisition method and device, electronic equipment and storage medium | |
CN115906791B (en) | Analysis report generation method and device for construction project data | |
CN113642850A (en) | Data fusion method and terminal for power distribution network planning | |
CN112288171A (en) | Data processing method, device and system | |
CN117034384A (en) | Digital three-dimensional simulation method for high-voltage equipment of power grid substation | |
CN114610947A (en) | Visual display method and device for energy power supply planning data | |
CN113255499B (en) | Digital automatic modeling method for secondary loop of transformer substation cable | |
CN110472103B (en) | Construction business form management method, system, storage medium and electronic terminal | |
CN113916244A (en) | Method and device for setting inspection position, electronic equipment and readable storage medium | |
CN113191336A (en) | Electric power hidden danger identification method and system based on image identification | |
CN112686480B (en) | Cost estimation system and method based on standard cost system | |
CN114417457B (en) | Planning project online multidimensional collaborative site selection system based on CIM technology | |
CN116630543B (en) | Three-dimensional live-action one-stop processing platform based on BS architecture | |
CN116778330B (en) | Remote sensing target extraction method, electronic device and computer readable storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |