CN115880068A - Power processing method and device, computer readable storage medium and computer equipment - Google Patents

Power processing method and device, computer readable storage medium and computer equipment Download PDF

Info

Publication number
CN115880068A
CN115880068A CN202211521270.8A CN202211521270A CN115880068A CN 115880068 A CN115880068 A CN 115880068A CN 202211521270 A CN202211521270 A CN 202211521270A CN 115880068 A CN115880068 A CN 115880068A
Authority
CN
China
Prior art keywords
transaction
green
month
result
determining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211521270.8A
Other languages
Chinese (zh)
Inventor
程晓春
程宏
王宇
王立
祁波
张辰达
王兴存
王沁
喻乐
程翠
邢天龙
韩蓬
彭依
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202211521270.8A priority Critical patent/CN115880068A/en
Publication of CN115880068A publication Critical patent/CN115880068A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a power processing method, a power processing device, a computer readable storage medium and computer equipment. Wherein, the method comprises the following steps: determining an annual transaction index of renewable energy power of a target object; acquiring a green electricity transaction result obtained after green electricity transaction is carried out according to the green electricity transaction requirement of the current transaction month; acquiring a first green electricity shortage of a last transaction month of a current transaction month; acquiring a green certificate transaction result based on an annual transaction index, a green certificate transaction result and a first green certificate shortage, and acquiring a target green certificate transaction result; and determining a second green electricity shortage of the current transaction month based on the target green evidence transaction result, wherein the second green electricity shortage is used for performing excess transaction under the condition that the current transaction month is the last month in the preset transaction years of the target object. The invention solves the technical problem that the responsibility for consuming the renewable energy power is difficult to be accurately completed.

Description

Power processing method and device, computer readable storage medium and computer equipment
Technical Field
The invention relates to the technical field of new energy and energy conservation, in particular to a power processing method, a power processing device, a computer readable storage medium and computer equipment.
Background
In the related art, a power consumer needs to complete renewable energy power consumption responsibility in a year-based period, and there are various ways to complete the renewable energy power consumption responsibility, but it is difficult to determine an effective and accurate power processing strategy to complete the renewable energy power consumption responsibility based on the various ways.
Therefore, in the related art, there is a technical problem that it is difficult to accurately complete the renewable energy power consumption responsibility.
In view of the above problems, no effective solution has been proposed.
Disclosure of Invention
The embodiment of the invention provides a power processing method, a power processing device, a computer readable storage medium and computer equipment, which are used for at least solving the technical problem that the responsibility of power consumption of renewable energy sources is difficult to accurately complete.
According to an aspect of an embodiment of the present invention, there is provided a power processing method including: determining an annual transaction index of renewable energy power of a target object; obtaining a green electricity transaction result obtained after green electricity transaction is carried out according to the green electricity transaction requirement of the current transaction month; acquiring a first green electricity shortage of a last transaction month of a current transaction month; acquiring a target green certificate transaction result obtained by performing green certificate transaction based on the annual transaction index, the green certificate transaction result and the first green certificate shortage; and determining a second green electricity shortage of the current transaction month based on the target green certificate transaction result, wherein the second green electricity shortage is used for carrying out excess transaction under the condition that the current transaction month is the last month in the preset transaction years of the target object.
Optionally, the obtaining of the green certificate transaction result based on the annual transaction index, the green certificate transaction result and the first green certificate shortage, and the obtained target green certificate transaction result includes: determining a first green certificate trading result of the current trading month in a first green certificate trading period based on the annual trading index and the first green electricity shortage; determining a second green certificate transaction result of the current transaction month in a second green certificate transaction period based on the annual transaction index, the first green certificate transaction result and the green power transaction result; determining a third green license transaction requirement of the current transaction month in a third green license period; determining a third green license transaction result of the current transaction month obtained after green license transaction is carried out based on the third green license transaction requirement; a target green certificate transaction result is determined based on the first green certificate transaction result, the second green certificate result, and the third green certificate transaction result.
Optionally, determining a first green license transaction result of the current transaction month in the first green license transaction period based on the annual transaction index and the first green power shortage, including: determining a first predicted power usage amount of a current transaction month during a first green license transaction period; determining a first green license transaction demand of the current transaction month in a first green license transaction period based on the first predicted power consumption, the annual transaction index and the first green electricity shortage; and determining a first green certificate transaction result obtained after green certificate transaction is carried out based on the first green certificate transaction requirement.
Optionally, determining a second green certificate transaction result of the current transaction month in a second green certificate transaction period based on the annual transaction index, the first green certificate transaction result and the green power transaction result, including: determining a second predicted power consumption of the current transaction month in a second green license transaction period based on the first green license transaction result and the green electricity transaction result; determining a second green certificate transaction requirement of the current transaction month in a second green certificate transaction period based on the second predicted electricity consumption and the annual transaction index; and determining a second green certificate transaction result obtained after green certificate transaction is carried out based on the second green certificate transaction requirement.
Optionally, determining a second green electricity shortage of the current transaction month based on the target green certificate transaction result includes: determining a third predicted power usage of the current transaction month during a third green license transaction period; and determining a second green electricity shortage based on the third predicted electricity consumption, the second green certificate transaction result and the third green certificate transaction result in the target green certificate transaction result.
Optionally, the method further includes: and under the condition that the current trading month is not the last month in the preset trading years of the target object, performing power trading on the next trading month of the current trading month based on the second green electricity shortage to obtain a third green electricity shortage of the next trading month.
According to another aspect of the embodiments of the present invention, there is also provided a power processing apparatus including: a first determination module for determining an annual transaction index of renewable energy power of a target object; the first acquisition module is used for acquiring a green electricity transaction result obtained after green electricity transaction is carried out according to the green electricity transaction requirement of the current transaction month; the second acquisition module is used for acquiring a first green electricity shortage of a last transaction month of the current transaction month; the third acquisition module is used for acquiring a target green certificate transaction result obtained by performing green certificate transaction on the basis of the annual transaction index, the green electric transaction result and the first green electric shortage; and the fourth determining module is used for determining a second green electricity shortage of the current trading month based on the target green certificate trading result, wherein the second green electricity shortage is used for carrying out excess trading under the condition that the current trading month is the last month in the preset trading years of the target object.
Optionally, the third obtaining module includes: the first determining unit is used for determining a first green certificate trading result of the current trading month in a first green certificate trading period based on the annual trading index and the first green electricity shortage; the second determination unit is used for determining a second green certificate transaction result of the current transaction month in a second green certificate transaction period based on the annual transaction index, the first green certificate transaction result and the green power transaction result; the third determining unit is used for determining a third green certificate trading demand of the current trading month in a third green certificate period; the fourth determining unit is used for determining a third green certificate trading result of the current trading month obtained after green certificate trading is carried out based on the third green certificate trading requirement; a fifth determining unit configured to determine a target green letter transaction result based on the first green letter transaction result, the second green letter transaction result, and the third green letter transaction result.
According to another aspect of the embodiments of the present invention, there is also provided a computer-readable storage medium including a stored program, wherein when the program runs, the apparatus where the computer-readable storage medium is located is controlled to execute any one of the above power processing methods.
According to another aspect of the embodiments of the present invention, there is also provided a computer device, including: a memory and a processor, the memory storing a computer program; a processor for executing a computer program stored in the memory, the computer program when executed causing the processor to perform any of the above power processing methods.
In the embodiment of the invention, a mode of determining the green electricity shortage of each transaction month one by one based on annual transaction indexes and adjusting a next month green electricity transaction strategy based on the green electricity shortage of the current month is adopted, the green electricity transaction result after the green electricity transaction of the current transaction month is obtained, the target green certificate transaction result obtained by performing green certificate transaction according to the first green electricity shortage of the previous transaction month, the green electricity transaction result and the annual transaction index of the target object is obtained, the second green electricity shortage of the current transaction month is determined based on the target green certificate transaction result, if the current transaction month is the last month in the preset transaction years of the target object, the determined second green electricity shortage can be directly used for performing over-amount transaction, so that the annual transaction index of the energy and electricity based on the target object is realized, the technical effect of orderly and accurately completing the annual index by using different electricity transaction modes is realized, and the technical problem that the renewable energy and electricity consumption responsibility can not be completed accurately is solved.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the invention and do not constitute a limitation of the invention. In the drawings:
FIG. 1 is a flow diagram of a power processing method provided in accordance with an embodiment of the invention;
FIG. 2 is a flow diagram of a monthly transaction policy provided in accordance with an alternative embodiment of the present invention;
FIG. 3 is a flow diagram of a yearly transaction policy provided in accordance with an alternative embodiment of the present invention;
fig. 4 is a block diagram of a power processing device according to an embodiment of the present invention.
Detailed Description
In order to make the technical solutions of the present invention better understood, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that the terms "first," "second," and the like in the description and claims of the present invention and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used is interchangeable under appropriate circumstances such that the embodiments of the invention described herein are capable of operation in sequences other than those illustrated or described herein. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
Description of the terms
The renewable energy power consumption responsibility weight is the proportion target of the renewable energy electric quantity in the power consumption.
Green electricity, in the process of producing electricity, the emission of carbon dioxide is zero or approaches to zero, compared with electricity produced by other methods, the impact on the environment is lower, and electricity produced by renewable energy power generation equipment is green electricity.
The green certificate, namely the green power certificate, is an electronic certificate with a unique identification code for a national method for the non-water renewable energy online electricity quantity per megawatt hour of a power generation enterprise, and is a unique certificate for confirming and attribute proving of the non-water renewable energy electricity generation quantity and consuming green power.
In accordance with an embodiment of the present invention, there is provided a method embodiment of power processing, it being noted that the steps illustrated in the flowchart of the figure may be carried out in a computer system such as a set of computer-executable instructions, and that while a logical order is illustrated in the flowchart, in some cases, the steps illustrated or described may be carried out in an order different than here.
Fig. 1 is a flowchart of a power processing method provided according to an embodiment of the present invention, as shown in fig. 1, the method including the steps of:
step S102, determining an annual transaction index of renewable energy power of a target object;
step S104, acquiring a green electricity transaction result obtained after green electricity transaction is carried out according to the green electricity transaction requirement of the current transaction month;
step S106, acquiring a first green electricity shortage of a last transaction month of the current transaction month;
step S108, acquiring a green certificate transaction result and a first green certificate shortage based on annual transaction indexes to perform green certificate transaction, and acquiring a target green certificate transaction result;
and step S110, determining a second green electricity shortage of the current transaction month based on the target green certificate transaction result, wherein the second green electricity shortage is used for carrying out excess transaction under the condition that the current transaction month is the last month in the preset transaction years of the target object.
Through the steps, the green electricity shortage of each transaction month is determined one by one based on the annual transaction indexes, the green electricity transaction result after the green electricity transaction is carried out on the current transaction month is obtained, the first green electricity shortage of the previous transaction month, the green electricity transaction result and the target green certificate transaction result obtained by carrying out green certificate transaction on the annual transaction index of the target object are obtained, the second green electricity shortage of the current transaction month is determined based on the target green certificate transaction result, if the current transaction month is the last month in the preset transaction years of the target object, the determined second green electricity shortage can be directly used for carrying out excess transaction, wherein the target object can be any one power user, the annual transaction index of renewable energy power based on the target object is realized, the technical effect of the annual index is orderly and accurately finished by using different power transaction modes, and the technical problem that the renewable energy power responsibility is difficult to accurately finish the renewable energy power consumption is solved.
The green electric trade is developed by taking year and month as a period, the green certificate trade is developed by taking working day as a period, namely, the target object can perform green electric trade once per year or per month, and the green certificate trade can be performed once per day.
As an optional embodiment, the obtaining of the target green license transaction result obtained by performing green license transaction based on the annual transaction index, the green power transaction result and the first green power shortage comprises: determining a first green license transaction result of the current transaction month in a first green license transaction period based on the annual transaction index and the first green power shortage; determining a second green certificate transaction result of the current transaction month in a second green certificate transaction period based on the annual transaction index, the first green certificate transaction result and the green power transaction result; determining a third green license transaction requirement of the current transaction month within a third green license period; determining a third green license transaction result of the current transaction month obtained after green license transaction is carried out based on the third green license transaction requirement; a target green certificate transaction result is determined based on the first green certificate transaction result, the second green certificate result, and the third green certificate transaction result.
As can be seen from the above description, since the green electricity transaction and the green certificate transaction have different development periods, in order to accurately determine the second green electricity shortage of the current transaction month, in this embodiment, the current transaction month is divided into a plurality of green certificate transaction periods, and the results of the green certificate transaction are determined according to the different green certificate transaction periods. Meanwhile, because the green certificate transactions are performed a plurality of times in the current transaction month, and in order to make the determined green certificate transaction result each time more referential, in the embodiment, when determining the green certificate transaction results respectively corresponding to different green certificate transaction periods, in addition to the annual transaction index and the first green electricity shortage, the green certificate transaction result of the current transaction month or the green certificate transaction result of the last green certificate transaction is also taken as a consideration, for example, the first green certificate transaction result is determined based on the annual transaction index and the first green electricity shortage, the second green certificate transaction result is determined based on the annual transaction index, the first green certificate transaction result and the green certificate transaction result, and the like.
As an alternative embodiment, determining a first green transaction result of the current transaction month during the first green transaction period based on the annual transaction index and the first green electricity shortage comprises: determining a first predicted power usage amount of a current transaction month during a first green license transaction period; determining a first green license transaction demand of the current transaction month in a first green license transaction period based on the first predicted power consumption, the annual transaction index and the first green electricity shortage; and determining a first green certificate transaction result obtained after green certificate transaction is carried out based on the first green certificate transaction requirement. Through predicting the electricity consumption of the target object in the first green certificate trading period of the current trading month, and combining the annual trading index and the first green electricity shortage, the first green certificate trading demand of the target object in the first green certificate trading period can be more accurately determined, and therefore the accuracy of a first green certificate result obtained by green certificate trading based on the first green certificate trading demand can be improved.
As an alternative embodiment, determining a second green transaction result within a second green transaction period of the current transaction month based on the annual transaction index, the first green transaction result and the green electricity transaction result includes: determining a second predicted power consumption of the current transaction month in a second green license transaction period based on the first green license transaction result and the green electricity transaction result; determining a second green license transaction demand of the current transaction month during a second green license transaction period based on the second predicted power consumption and the annual transaction index; and determining a second green certificate transaction result obtained after green certificate transaction is carried out based on the second green certificate transaction requirement. Similar to the process when determining the first green license transaction result, in order to accurately grasp the electric power transaction progress of the current transaction month when determining the second green license transaction requirement, the embodiment further uses the first green license transaction result as a referable influence factor when determining the second green license transaction requirement, so that the second green license result obtained by performing green license transaction based on the second green license transaction requirement can be more accurate and is more conducive to completing the annual transaction index of the target object.
As an alternative embodiment, the determining the second green electricity shortage of the current transaction month based on the target green certificate transaction result comprises: determining a third predicted power usage amount for the current transaction month during a third green license transaction period; and determining a second green electricity shortage based on the third predicted electricity consumption, the second green certificate transaction result and the third green certificate transaction result in the target green certificate transaction result. When the third green license transaction result is determined and the second green license shortage is determined to be in the same time period, in order to timely determine the second green license shortage of the current transaction month, green license transaction can be directly carried out according to the determined third green license transaction requirement, the third green license transaction result is obtained, the second green license transaction result and the third green license transaction result can be obtained before the second green license shortage is determined, and the second green license shortage of the current transaction month can be determined on the basis of the third predicted power consumption and the previous two green license transaction results by predicting the power consumption of the current transaction month in the third green license transaction period.
It should be noted that, the first green certificate trading period, the second green certificate trading period and the third green certificate trading period may be divided according to actual application requirements, and may be divided equally or non-equally, for example, may be divided according to the top, middle and bottom of each month. Each month may be divided into another number of green transaction periods according to application requirements, for example, the current transaction month may be divided into two green transaction periods according to the first half month and the second half month, in which case the current transaction month may be performed according to the operations of the first green transaction period and the third green transaction period, or may be divided into three or more green transaction periods, in which case the first green transaction period of each month is performed according to the operation of the first green transaction period, the last green transaction period of each month is performed according to the operation of the third green transaction period, and the rest of the green transaction periods are performed according to the operation of the second green transaction period.
As an alternative embodiment, the method further includes: and under the condition that the current transaction month is not the last month in the preset transaction years of the target object, performing power transaction on the next transaction month of the current transaction month based on the second green electricity shortage to obtain a third green electricity shortage of the next transaction month. In this embodiment, each time the green electricity shortage of one transaction month is determined, the green electricity shortage is used for determining the power processing requirement of the next transaction month, so that the strategies of green electricity transaction and green certificate transaction can be adjusted in time in the next transaction month, wherein when the current transaction month is the first month in the preset transaction year of the target object, the green electricity shortage of the previous transaction month does not need to be acquired, the power processing strategy can be determined directly according to the predicted power consumption of the current month, for example, the first green certificate transaction requirement can be determined directly according to the predicted power consumption in the first green certificate transaction period, and the like.
Based on the above embodiments and alternative embodiments, the present invention provides an alternative implementation, which is described below.
An optional embodiment of the invention provides a multi-market trading participation method considering renewable energy consumption responsibility, aiming at power users (such as electricity selling companies), and the renewable energy consumption responsibility assessment is completed by participating in green electricity trading, green certificate trading and renewable energy excess consumption trading markets more smoothly and orderly.
Alternative embodiments of the present invention address the issue of monthly and yearly transaction participation throughout the year.
Fig. 2 is a flow chart of monthly trading strategy provided according to an alternative embodiment of the present invention, as shown in fig. 2, in which each month is divided into top, middle and bottom ten days and divided into three business modules, namely energy management, greenery and evidentiary trading.
1. Last ten days
The energy utilization management module: the method mainly comprises the steps of predicting the electricity consumption Q1 in the current month for the first time, and calculating to obtain the first green electricity consumption requirements R1, R1= (W x Q1) in the current month according to the renewable energy consumption responsibility weight index W;
the green electricity transaction module: obtaining the green electricity requirement S = R/2 in the month;
the green certificate transaction module: firstly, obtaining the green certificate requirement D1= R/2 in this month, and secondly, participating in the transaction to obtain the green certificate T1.
2. Middle ten days
The green electricity transaction module: firstly, participating in the green electricity transaction in the month to obtain green electricity P1;
the energy utilization management module: predicting the electricity consumption Q2 in the month for the second time, and calculating to obtain the green electricity consumption requirement R2 in the second time in the month according to the renewable energy consumption responsibility weight index W and the last transaction result in the month, wherein R2= W x Q2-P1-T1;
the green certificate transaction module: firstly, obtaining the green certificate requirement D2= R2 in this month, and secondly, participating in the transaction to obtain the green certificate T2.
The energy utilization management module: predicting the electricity consumption Q3 in the month for the third time, and calculating to obtain the green electricity consumption requirement R3 in the month for the third time according to the renewable energy consumption responsibility weight index W and the two transaction results in the month, wherein R3= W x Q3-P1-T1-P2-T2;
the green certificate transaction module: firstly, obtaining the green certificate requirement D3= R3 in the month, and then participating in the transaction to obtain the green certificate T3;
the energy utilization management module: the final green electricity deficit J of this month is obtained from the above data, J = R3-T3.
Fig. 3 is a flow chart of annual transaction strategy provided according to an alternative embodiment of the invention, and as shown in fig. 3, the alternative embodiment of the invention divides the whole year into three types of 1 month, 2-11 months and 12 months, and into four business modules, namely, energy management, green electricity transaction, green certificate transaction and excess consumption transaction.
1. 1 month
According to the flow shown in fig. 2, the final shortage J1 of green electricity for 1 month is finally formed.
2. 2-11 months
Determining that the shortage of the green electricity in the previous month needs to be considered when the green electricity in the current month is required, wherein the calculation process takes 2 months as an example: r2=2 month first expected power consumption Q2 and renewable energy consumption responsibility weight index W +1 month green electricity final shortage J1, and the rest of the procedure is the same as 1 month.
3. 12 month
Annual renewable energy excess consumption trading can be developed. Namely, after the green electricity transaction, the green certificate transaction and the third predicted electricity consumption in 12 months are completed in the last ten days of 12 months, the transaction demand H of the excess consumption is determined, wherein H = J12 is the final green electricity shortage in 12 months.
In conclusion, through the scheme of the optional embodiment of the invention, the power consumer can complete the renewable energy consumption responsibility weight based on various market transaction modes in a long period of the whole year.
According to an embodiment of the present invention, there is also provided an electric power processing apparatus, and fig. 4 is a block diagram of a structure of the electric power processing apparatus according to the embodiment of the present invention, as shown in fig. 4, the apparatus includes: a first determining module 41, a first obtaining module 42, a second obtaining module 43, a third obtaining module 44 and a second determining module 45, which are explained below.
A first determination module 41 for determining an annual transaction index of renewable energy power of the target object; a first obtaining module 42, connected to the first determining module 41, for obtaining a green electricity transaction result obtained after performing green electricity transaction according to a green electricity transaction requirement of a current transaction month; a second obtaining module 43, connected to the first obtaining module 42, for obtaining the first green electricity shortage of the last trading month of the current trading month; a third obtaining module 44, connected to the second obtaining module 43, for obtaining a target green license transaction result obtained by performing green license transaction based on the annual transaction index, the green power transaction result and the first green power shortage; and a second determining module 45, connected to the third obtaining module 44, for determining a second green electricity shortage of the current transaction month based on the target green certificate transaction result, where the second green electricity shortage is used for performing excess transaction when the current transaction month is the last month in the preset transaction years of the target object.
As an alternative embodiment, the third obtaining module includes: a first determining unit, configured to determine a first green certificate trading result of the current trading month in a first green certificate trading period based on the annual trading index and the first green electricity shortage; the second determination unit is used for determining a second green certificate transaction result of the current transaction month in a second green certificate transaction period based on the annual transaction index, the first green certificate transaction result and the green power transaction result; a third determining unit, for determining a third green certificate trading demand of the current trading month in a third green certificate period; the fourth determining unit is used for determining a third green certificate trading result of the current trading month obtained after green certificate trading is carried out based on the third green certificate trading requirement; a fifth determining unit configured to determine a target green letter transaction result based on the first green letter transaction result, the second green letter transaction result, and the third green letter transaction result.
According to an embodiment of the present invention, there is also provided a computer-readable storage medium including a stored program, where the program, when executed, controls an apparatus in which the computer-readable storage medium is located to execute any one of the above-mentioned power processing methods.
According to an embodiment of the present invention, there is also provided a computer apparatus including: a memory and a processor, the memory storing a computer program; a processor for executing a computer program stored in the memory, the computer program when executed causing the processor to perform any of the above power processing methods.
The above-mentioned serial numbers of the embodiments of the present invention are only for description, and do not represent the advantages and disadvantages of the embodiments.
In the above embodiments of the present invention, the descriptions of the respective embodiments have respective emphasis, and for parts that are not described in detail in a certain embodiment, reference may be made to related descriptions of other embodiments.
In the embodiments provided in the present application, it should be understood that the disclosed technical content can be implemented in other manners. The above-described apparatus embodiments are merely illustrative, and for example, the division of the units may be a logical division, and in actual implementation, there may be another division, for example, multiple units or components may be combined or may be integrated into another system, or some features may be omitted, or may not be executed. In addition, the shown or discussed coupling or direct coupling or communication connection between each other may be an indirect coupling or communication connection through some interfaces, units or modules, and may be electrical or in other forms.
The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one position, or may be distributed on a plurality of units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of the embodiment.
In addition, functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit. The integrated unit may be implemented in the form of hardware, or may also be implemented in the form of a software functional unit.
The integrated unit, if implemented in the form of a software functional unit and sold or used as a stand-alone product, may be stored in a computer readable storage medium. Based on such understanding, the technical solution of the present invention may be embodied in the form of a software product, which is stored in a storage medium and includes instructions for causing a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the method according to the embodiments of the present invention. And the aforementioned storage medium includes: a U-disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a removable hard disk, a magnetic or optical disk, and other various media capable of storing program codes.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and amendments can be made without departing from the principle of the present invention, and these modifications and amendments should also be considered as the protection scope of the present invention.

Claims (10)

1. A method of power processing, comprising:
determining an annual transaction index of renewable energy power of a target object;
obtaining a green electricity transaction result obtained after green electricity transaction is carried out according to the green electricity transaction requirement of the current transaction month;
acquiring a first green electricity shortage of a last transaction month of the current transaction month;
acquiring a target green certificate transaction result obtained by performing green certificate transaction on the basis of the annual transaction index, the green certificate transaction result and the first green certificate shortage;
determining a second green electricity shortage of the current trading month based on the target green evidence trading result, wherein the second green electricity shortage is used for performing excess trading under the condition that the current trading month is the last month in the preset trading years of the target object.
2. The method of claim 1, wherein obtaining a target green license transaction result for conducting a green license transaction based on the annual transaction index, the green electricity transaction result and the first green electricity shortage comprises:
determining a first green license transaction result of the current transaction month during a first green license transaction period based on the annual transaction index and the first green electricity shortage;
determining a second green certificate transaction result within a second green certificate transaction period of the current transaction month based on the annual transaction index, the first green certificate transaction result and the green electricity transaction result;
determining a third green transaction requirement for the current transaction month within a third green period;
determining a third green license transaction result of the current transaction month obtained after green license transaction is carried out based on the third green license transaction requirement;
determining the target green letter transaction result based on the first green letter transaction result, the second green letter transaction result and the third green letter transaction result.
3. The method of claim 2, wherein determining a first green transaction result for the current transaction month during a first green transaction period based on the annual transaction metrics and the first green electricity deficit comprises:
determining a first predicted power usage amount for the current transaction month during a first green license transaction period;
determining a first green license transaction demand for the current transaction month during the first green license transaction period based on the first predicted power usage, the annual transaction index, and the first green electricity deficit;
and determining the first green certificate transaction result obtained after green certificate transaction is carried out based on the first green certificate transaction requirement.
4. The method of claim 2, wherein determining a second green transaction result for the current transaction month during a second green transaction period based on the annual transaction metrics, the first green transaction result, and the green electricity transaction result comprises:
determining a second predicted power consumption amount of the current transaction month during a second green license transaction period based on the first green license transaction result and the green electricity transaction result;
determining a second green letter transaction demand for the current transaction month during the second green letter transaction period based on the second predicted power usage and the annual transaction index;
and determining a second green certificate trading result obtained after green certificate trading is carried out based on the second green certificate trading demand.
5. The method of claim 2, wherein determining a second blackout deficit for the current trading month based on the target blackout trading result comprises:
determining a third predicted power usage of the current transaction month during a third green license transaction period;
and determining the second green electricity shortage based on the third predicted electricity consumption, the second green certificate transaction result and a third green certificate transaction result in the target green certificate transaction result.
6. The method of claim 1, further comprising:
and under the condition that the current transaction month is not the last month in the preset transaction years of the target object, performing power transaction on the next transaction month of the current transaction month based on the second green electricity shortage to obtain a third green electricity shortage of the next transaction month.
7. An electric power processing device characterized by comprising:
a first determination module for determining an annual transaction index of renewable energy power of a target object;
the first acquisition module is used for acquiring a green electricity transaction result obtained after green electricity transaction is carried out according to the green electricity transaction requirement of the current transaction month;
the second acquisition module is used for acquiring a first green electricity shortage of a last transaction month of the current transaction month;
the third acquisition module is used for acquiring a target green license transaction result obtained by performing green license transaction on the basis of the annual transaction index, the green power transaction result and the first green power shortage;
and the second determining module is used for determining a second green electricity shortage of the current transaction month based on the target green certificate transaction result, wherein the second green electricity shortage is used for carrying out excess transaction under the condition that the current transaction month is the last month in the preset transaction years of the target object.
8. The apparatus of claim 7, wherein the third obtaining module comprises:
a first determination unit, configured to determine a first green license transaction result of the current transaction month during a first green license transaction period based on the annual transaction index and the first green electricity shortage;
a second determination unit, configured to determine a second green certificate transaction result of the current transaction month in a second green certificate transaction period based on the annual transaction index, the first green certificate transaction result and the green electric transaction result;
a third determining unit, configured to determine a third green license transaction requirement of the current transaction month in a third green license period;
a fourth determining unit, configured to determine a third green license transaction result of the current transaction month obtained after performing green license transaction based on the third green license transaction requirement;
a fifth determination unit configured to determine the target credential transaction result based on the first credential transaction result, the second credential transaction result, and the third credential transaction result.
9. A computer-readable storage medium, characterized in that the computer-readable storage medium includes a stored program, wherein the apparatus in which the computer-readable storage medium is located is controlled to execute the power processing method according to any one of claims 1 to 6 when the program is executed.
10. A computer device, comprising: a memory and a processor, wherein the processor is configured to,
the memory stores a computer program;
the processor configured to execute a computer program stored in the memory, the computer program when executed causing the processor to perform the power processing method of any one of claims 1 to 6.
CN202211521270.8A 2022-11-30 2022-11-30 Power processing method and device, computer readable storage medium and computer equipment Pending CN115880068A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211521270.8A CN115880068A (en) 2022-11-30 2022-11-30 Power processing method and device, computer readable storage medium and computer equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211521270.8A CN115880068A (en) 2022-11-30 2022-11-30 Power processing method and device, computer readable storage medium and computer equipment

Publications (1)

Publication Number Publication Date
CN115880068A true CN115880068A (en) 2023-03-31

Family

ID=85764950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211521270.8A Pending CN115880068A (en) 2022-11-30 2022-11-30 Power processing method and device, computer readable storage medium and computer equipment

Country Status (1)

Country Link
CN (1) CN115880068A (en)

Similar Documents

Publication Publication Date Title
Matthew et al. Electricity consumption and human capital development in Nigeria: Exploring the implications for economic growth
Xu et al. Power portfolio optimization in deregulated electricity markets with risk management
Kristiansen The flow based market coupling arrangement in Europe: Implications for traders
Graf et al. Measuring competitiveness of the EPEX spot market for electricity
CN111415061B (en) Comprehensive evaluation method and device for renewable energy power system
CN109087213B (en) Distributed electric power spot market transaction simulation method
CN109118012B (en) Industrial dynamic multi-dimensional energy consumption cost prediction method, system, storage medium and terminal
Möst et al. Market power in the German wholesale electricity market
CN110363584A (en) A kind of electricity electricity charge accounting system
CN112001576A (en) Accounting method for electric power consumption of renewable energy source
CN107705055A (en) Power network technology innovation project backlog control method based on bill of quantities
CN110797872B (en) Method, device, equipment and storage medium for configuring energy storage capacity of user side
Ali et al. Integrating forecasting service and Gen2 blockchain into a local energy trading platform to promote sustainability goals
CN106228466A (en) Design method and system for electricity purchasing combination scheme of electric power retail company
Kaps et al. When the wind of change blows, build batteries? Optimum renewable generation and energy storage investments
CN115880068A (en) Power processing method and device, computer readable storage medium and computer equipment
CN103366258A (en) Method for evaluating indexes of hydroelectric production management system
CN112381436B (en) Time-by-time electric load generation method and device, electronic equipment and storage medium
CN103620420B (en) System and method for determining communal facility cost savings
Vonsien et al. Cost-effectiveness of Li-Ion battery storage with a special focus on photovoltaic systems in private households
Baltputnis et al. Estimating the benefit from independent aggregation in the day-ahead market
CN111598629A (en) Method for determining monthly transaction demand of electric power market based on monthly industrial power consumption prediction
CN112614006A (en) Load prediction method, device, computer readable storage medium and processor
CN113743743B (en) Screening method and device for transaction combination of electricity selling company
Wieschhaus et al. Economic interactions between electricity reserve markets and wholesale electricity markets

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination