CN115638600A - Cold insulation time prediction system - Google Patents

Cold insulation time prediction system Download PDF

Info

Publication number
CN115638600A
CN115638600A CN202210756017.4A CN202210756017A CN115638600A CN 115638600 A CN115638600 A CN 115638600A CN 202210756017 A CN202210756017 A CN 202210756017A CN 115638600 A CN115638600 A CN 115638600A
Authority
CN
China
Prior art keywords
refrigerator
time
predicted
control unit
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210756017.4A
Other languages
Chinese (zh)
Inventor
中村智裕
中川雅至
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Intellectual Property Management Co Ltd
Original Assignee
Panasonic Intellectual Property Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Intellectual Property Management Co Ltd filed Critical Panasonic Intellectual Property Management Co Ltd
Publication of CN115638600A publication Critical patent/CN115638600A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides a cold insulation time prediction system which can predict cold insulation time in power failure in advance before power failure. A cold insulation time prediction system is provided with a refrigerator (10) and a server control unit (41), wherein the refrigerator (10) is provided with a cooler (20) for cooling the interior of the refrigerator, and when the occurrence of a power failure is predicted in advance, the server control unit (41) obtains a predicted cold insulation time in the case of a power failure on the basis of the set interior temperature of the refrigerator (10) or the interior temperature actually measured, and notifies the user of the predicted cold insulation time. Thus, the predicted cold-keeping time in the case of power failure is obtained by the server control unit (41) and notified to the user, so that the cold-keeping state in the refrigerator (10) in the case of power failure can be grasped, and food management in the refrigerator can be performed in the event of power failure.

Description

Cold insulation time prediction system
Technical Field
The present invention relates to a cold insulation time prediction system.
Background
Patent document 1 discloses the following technique: when a power failure of the commercial power supply occurs and the power supply is recovered, the temperature of the storage room is detected by the temperature detection unit, and when the temperature of the storage room is higher than a predetermined notification temperature, the notification is performed by the power failure notification unit.
Documents of the prior art
Patent literature
Patent document 1: japanese patent laid-open publication No. 2013-160422
Disclosure of Invention
Technical problems to be solved by the invention
The invention provides a cold insulation time prediction system capable of predicting cold insulation time under the condition of power failure in advance before power failure.
Technical solution for solving technical problem
The cold insulation time prediction system according to the present invention is characterized by comprising a refrigerator including a cooler for cooling the inside of the refrigerator, and a control unit for obtaining a predicted cold insulation time at the time of a power failure based on a set inside temperature of the refrigerator or an inside temperature actually measured when the occurrence of the power failure is predicted in advance, and notifying a user of the predicted cold insulation time.
Effects of the invention
The cold insulation time prediction system of the present invention is configured to calculate the predicted cold insulation time in the case of power failure by the control unit and notify the calculated predicted cold insulation time to the user, and therefore, the cold insulation state in the refrigerator in the case of power failure can be grasped, and food management in the refrigerator can be performed in the case of power failure.
Drawings
Fig. 1 is a longitudinal sectional view of a refrigerator according to embodiment 1.
Fig. 2 is a block diagram showing a cold insulation time prediction system.
Fig. 3 is a graph showing an example of the predicted cooling time of the refrigerating compartment.
Fig. 4 is a graph showing an example of the case where the predicted cooling time is generated based on the actual measured value of the interior temperature of the refrigerating room.
Fig. 5 is an explanatory diagram showing an example of display of the touch panel of the terminal device in embodiment 1.
Fig. 6 is a sequence diagram showing an example of the case where the cold insulation time is predicted by the database based on the information acquired in advance in embodiment 1.
Fig. 7 is a sequence diagram showing another example in the case where the cold insulation time is predicted by the database based on the information acquired in advance in embodiment 1.
Fig. 8 is a sequence diagram showing an example of the case where the cooling time is predicted by using the database in embodiment 1.
Fig. 9 is a timing chart showing an example of the case where the refrigerator predicts the cooling time in embodiment 1.
Fig. 10 is a sequence diagram showing an example of the case where the terminal device predicts the cooling time in embodiment 1.
Fig. 11 is a time chart showing an example of the case where the cold retention time is predicted using the measured value in embodiment 1.
Fig. 12 is a sequence diagram showing an example of the case where the cold insulation time is predicted using the database in embodiment 2.
Fig. 13 is a timing chart showing an example of the case where the cooling time is predicted using the measured values in embodiment 2.
Fig. 14 is a timing chart showing an example of the case where the cooling time is predicted using the actual measurement values in embodiment 2.
Fig. 15 is a timing chart showing an example of the case where the refrigeration system predicts the cooling time using the actually measured value in embodiment 2.
Fig. 16 is a sequence diagram showing an example of the case where the terminal device predicts the cooling time using the actual measurement value in embodiment 2.
Description of the reference numerals
1. Cold insulation time prediction system
10. Cold storage
11. Shell body
12. Refrigerating chamber
13. Freezing chamber
14. Partition wall
15. Door with a door panel
16. Drawer
17. Pipeline
18. Discharge port for refrigeration
19. Discharge port for refrigeration
20. Cooling device
21. Cooling fan
22. Air door
23. Compressor with a compressor housing having a discharge port
30. Refrigerator control unit
31. Refrigerator communication unit
32. Cooling part
33. Sensor unit
34. Storage part of refrigerator
35. Temperature sensor for refrigerating chamber
36. Temperature sensor for freezing chamber
37. Ambient temperature sensor
40. Refrigerator management server
41. Server control unit
42. Server communication unit
43. Server storage unit
44. Cold insulation management database
50. Terminal device
51. Terminal control unit
52. Terminal communication unit
53. Touch panel
54. Terminal storage unit
55. Application program for supporting cold insulation (Support app, also called Support application)
60. Power failure prediction server
GN Global network (Global network)
Detailed Description
(knowledge findings which form the basis of the present invention, etc.)
In the case where the present inventors have conceived of the present invention, there is known a technique in which the temperature of the storage room is detected by the temperature detection unit when the commercial power supply is interrupted and the power supply is restored, and the power interruption notification unit notifies the storage room of the interruption when the temperature of the storage room is higher than a predetermined notification temperature.
In the conventional technology, the notification is performed when the temperature in the refrigerator becomes high when the power supply is recovered from the power failure state, but if the cooling time in the refrigerator when the power failure occurs is known before the power failure, the user can manage the food and the like in the refrigerator. However, the inventors have found that it is difficult to predict the cooling time in the storage, and have devised the present invention to solve this problem.
Accordingly, the present invention provides a cold insulation time prediction system capable of predicting cold insulation time in the case of a power failure in advance before the power failure.
Hereinafter, embodiments will be described in detail with reference to the drawings. Here, unnecessary detailed description may be omitted. For example, detailed descriptions of already known matters and repetitive descriptions of substantially the same structure may be omitted.
The drawings and the following description are provided to enable those skilled in the art to fully understand the present invention, and are not intended to limit the scope of the present invention (claims).
(embodiment mode 1)
Hereinafter, embodiment 1 will be described with reference to the drawings.
[1-1. Structure ]
Fig. 1 is a longitudinal sectional view of a refrigerator 10 according to embodiment 1.
As shown in fig. 1, the refrigerator 10 includes a box-shaped housing 11 whose front surface is open. A refrigerating chamber 12 is formed above the casing 11, and a freezing chamber 13 is formed below the casing 11. A partition wall 14 is provided between the refrigerating chamber 12 and the freezing chamber 13.
The refrigerator 10 is provided with an openable and closable side door 15 at an opening portion of the front surface of the refrigerating chamber 12. A drawer 16 for storing foods is provided in the freezing chamber 13.
Duct 17 communicating in the vertical direction is provided behind refrigerating room 12 and freezing room 13 of refrigerator 10.
A plurality of refrigerating discharge ports 18 communicating with duct 17 are formed behind refrigerating room 12.
A plurality of freezing discharge ports 19 communicating with duct 17 are formed behind freezing chamber 13.
At a position corresponding to the rear of freezing room 13 in duct 17, cooler 20 functioning as an evaporator is disposed. A cooling fan 21 is disposed above the cooler 20 of the duct 17. A damper 22 for adjusting the amount of cold air cooled by the cooler 20 to be delivered to the refrigerating chamber 12 by driving of the cooling fan 21 is provided at a position of the duct 17 corresponding to the partition wall 14.
A compressor 23 is disposed at the rear upper portion of the refrigerating compartment 12. The compressor 23, a condenser not shown, an expansion mechanism, and the cooler 20 are connected by refrigerant pipes to constitute a refrigeration cycle.
The refrigerant is discharged from the compressor 23, cooled to a predetermined temperature, and heat-exchanged with the air flowing through the duct 17 to generate cold air.
The cold air is circulated to refrigerating room 12 or freezing room 13 by cooling fan 21, thereby cooling refrigerating room 12 and freezing room 13.
[1-1-2. Structure of Cold insulation time prediction System ]
Next, a cooling time prediction system 1 using the refrigerator 10 described above will be described.
Fig. 2 is a block diagram showing the cool keeping time prediction system 1.
As shown in fig. 2, the cool keeping time prediction system 1 is a system in which a facility connected to a global network GN controls a refrigerator 10 via the global network GN. The global network GN includes communication networks such as the internet, a telephone network, and the like.
The cold insulation time prediction system 1 includes a refrigerator 10, a refrigerator management server 40, and a terminal device 50.
First, a control structure of the refrigerator 10 will be described.
The refrigerator 10 includes a refrigerator control unit 30, a refrigerator communication unit 31, a cooling unit 32, and a sensor unit 33.
The refrigerator control unit 30 is configured by a processor such as a CPU or MPU that executes programs, and includes a refrigerator storage unit 34. The refrigerator control unit 30 reads a control program stored in the refrigerator storage unit 34, and controls the refrigerator 10 by cooperation of hardware and software.
The refrigerator storage unit 34 has a storage area for storing a program executed by the refrigerator control unit 30 and data processed by the refrigerator control unit 30.
The refrigerator storage unit 34 stores various data such as a control program executed by the refrigerator control unit 30 and setting data regarding settings of the refrigerator 10. The refrigerator storage unit 34 has a nonvolatile storage area. The refrigerator storage unit 34 may include a volatile storage area, and constitute an operation area of the refrigerator control unit 30.
The refrigerator communication unit 31 includes communication hardware conforming to a predetermined communication standard, and communicates with the devices connected to the global network GN according to the predetermined communication standard under the control of the refrigerator control unit 30. The refrigerator communication unit 31 communicates with the refrigerator management server 40 in accordance with a predetermined communication standard. The communication standard used by refrigerator communication unit 31 may be a wireless communication standard (e.g., ieee802.11a/11b/11g/11n/11ac, bluetooth (registered trademark)), or a wired communication standard.
The cooling unit 32 cools each storage chamber of the refrigerator 10 by means for cooling each storage chamber of the refrigerator 10, such as the compressor 23, the cooling fan 21, and the damper 22, under the control of the refrigerator control unit 30.
The sensor unit 33 includes various sensors such as a temperature sensor for detecting the temperature inside the refrigerator 10 and an opening/closing sensor for detecting opening/closing of the door 15 and the drawer 16 provided in the refrigerator 10, and outputs the detection value of each sensor to the refrigerator control unit 30.
As shown in fig. 1, the sensor portion 33 includes a refrigerating compartment temperature sensor 35 and a freezing compartment temperature sensor 36 as temperature sensors.
The refrigerating compartment temperature sensor 35 is provided at a predetermined position of the refrigerating compartment 12, and detects the temperature in the refrigerating compartment 12.
The freezing chamber temperature sensor 36 is provided at a predetermined position of the freezing chamber 13, and detects the temperature in the freezer compartment 13.
The ambient temperature sensor 37 is provided at a predetermined position outside the refrigerator 10, and detects the ambient temperature of the refrigerator 10.
The refrigerator control unit 30 performs control in any one of the normal operation mode and the pre-cooling operation mode in which the temperature in the refrigerator 10 is lower than that in the normal operation mode.
In the normal operation mode, refrigerator 10 can perform cooling operation on refrigerating room 12 and/or freezing room 13 at the levels of "weak", "medium", and "strong", respectively.
For example, in the case of the normal operation mode, refrigerating room 12 is set to 5 ℃ in the case of "weak", 4 ℃ in the case of "medium", and 3 ℃ in the case of "strong". In the case of the pre-cooling operation mode, the refrigerating compartment 12 is set to 3 ℃.
For example, in the case of the normal operation mode, the freezing chamber 13 is set to-18 ℃ in the case of "weak", to-20 ℃ in the case of "medium", and to-22 ℃ in the case of "strong". The freezing chamber 13 is set to-28 ℃ in the pre-cooling operation mode.
Next, the configuration of the refrigerator management server 40 will be described.
The refrigerator management server 40 includes a server control unit 41 and a server communication unit 42.
The server control unit 41 is configured by a processor such as a CPU or MPU that executes programs, and includes a server storage unit 43. The server control unit 41 reads a control program stored in the server storage unit 43, and controls each unit of the refrigerator management server 40 by cooperating (cooperating) hardware and software.
The server storage unit 43 has a storage area for storing the program executed by the server control unit 41 and the data processed by the server control unit 41. The server storage unit 43 stores various data such as a control program executed by the server control unit 41, setting data regarding the setting of the refrigerator management server 40, and the cooling management database 44. The server storage unit 43 has a nonvolatile storage area. The server storage unit 43 may include a volatile storage area, and constitute an operation area of the server control unit 41.
The cooling management database 44 is a database that stores various information regarding the operation control of the refrigerator 10. The cold insulation management database 44 stores therein a refrigerator ID, information on predicted cold insulation time of the refrigerator 10, and the like.
The server communication unit 42 includes communication hardware conforming to a predetermined communication standard, and communicates with a device connected to the global network GN according to the predetermined communication standard under the control of the server control unit 41. In the present embodiment, the server communication unit 42 communicates with the refrigerator 10, the terminal device 50, and the power outage prediction server.
As described above, the cold insulation management database 44 stores the predicted cold insulation time information of the refrigerator 10.
The predicted cold insulation time information is obtained in advance from the internal temperature and the ambient temperature of refrigerating room 12 or freezing room 13, and the storage amount in refrigerating room 12 or freezing room 13 by experiments or the like for refrigerating room 12 and freezing room 13 for each of refrigerating rooms 10, and is formed as a database by obtaining the cold insulation time of refrigerating room 12 or freezing room 13.
Fig. 3 is a graph showing an example of the predicted cooling time of refrigerating room 12.
As shown in fig. 3, for example, when the temperature in refrigerator 12 is 5 ℃ and the ambient temperature in refrigerator 10 is 16 ℃, 25 ℃, and 32 ℃, respectively, the cooling time corresponding to the storage amount of refrigerator 12 is obtained. In the example of fig. 3, it is understood that the cooling time is 8 hours when the storage temperature of refrigerating room 12 is 5 ℃, the ambient temperature is 25 ℃, and the storage amount of refrigerating room 12 is 50%, for example.
Similarly, a predicted cold-insulation time of freezing room 13 is obtained in advance based on the temperature inside freezing room 13, the ambient temperature, and the storage amount of freezing room 13, and a database is created.
The cooling time is a time until the temperature reaches 10 ℃ in the refrigerating room 12, and a time until the temperature reaches-15 ℃ in the freezing room 13.
This time is set in consideration of the influence on the food in the refrigerator, but the reference temperature of the cooling time may be changed as appropriate. For example, the reference temperature of the cooling time may be set to be lower than 10 ℃ or higher than 10 ℃ for refrigerating room 12. Similarly, the reference temperature of the cooling time may be set to be lower than-15 ℃ or higher than-15 ℃ in the freezing chamber 13.
In this case, in the present embodiment, in addition to creating a database of predicted cooling time information in advance, the cooling time may be generated based on, for example, actual measured values of the interior temperatures of refrigerating room 12 and freezing room 13.
Fig. 4 is a graph showing an example of the case where the predicted cooling time is generated based on the actual measured value of the interior temperature of refrigerating room 12.
In this case, first, the refrigerator control unit 30 detects the temperature inside the refrigerator in a state where the compressor 23 is not driven, for example, when the compressor 23 is stopped or during defrosting, by the sensor unit 33, and transmits the detected value to the refrigerator management server 40 via the refrigerator communication unit 31.
The refrigerating compartment temperature information and the freezing compartment temperature information are detected temperature information of the refrigerating compartment 12 or the freezing compartment 13 detected by the sensor portion 33.
The server control unit 41 of the refrigerator management server 40 calculates the prediction of the increase in the internal temperature based on the received change in the detected value of the internal temperature. For example, a temperature increase prediction curve (also referred to as a temperature increase prediction curve) is generated as shown in fig. 4 by predicting the subsequent temperature increase in the interior of the refrigerator based on the change in the detected value of the temperature in the interior of the refrigerator every 5 minutes.
The server control unit 41 obtains the cold insulation time when the power failure has currently occurred, based on the predicted cold insulation time stored in the cold insulation management database 44 or the temperature increase prediction curve of the predicted cold insulation time calculated by the server control unit 41. The cooling time is transmitted to the terminal device 50 described later.
Next, the configuration of the terminal device 50 will be described.
The terminal device 50 includes a terminal control section 51, a terminal communication section 52, and a touch panel 53.
The terminal control unit 51 is configured by a processor such as a CPU or MPU that executes programs, and includes a terminal storage unit 54. The terminal control unit 51 reads a control program stored in the terminal storage unit 54, and controls each unit of the terminal device 50 by cooperation of hardware and software.
The terminal device 50 has a cold-keeping support application installed therein in advance. The terminal control unit 51 reads the cold insulation support application 55 from the terminal storage unit 54 and executes it, thereby notifying the user of the predicted cold insulation time by the terminal device 50.
The terminal storage unit 54 has a storage area for storing a program executed by the terminal control unit 51 and data processed by the terminal control unit 51. The terminal storage unit 54 stores various data such as a control program executed by the terminal control unit 51, setting data regarding settings of the terminal device 50, the cooling support application 55, and a user ID. The terminal storage unit 54 has a nonvolatile storage area. The terminal storage unit 54 may include a volatile storage area, and constitute an operation area of the terminal control unit 51.
The terminal communication section 52 includes communication hardware conforming to a predetermined communication standard, and communicates with a device connected to the global network GN according to the predetermined communication standard under the control of the terminal control section 51. The terminal communication unit 52 communicates with the refrigerator management server 40 according to a predetermined communication standard by the function of the cooling support application 55. The communication standard used by the terminal communication unit 52 is a wireless communication standard.
The touch panel 53 includes a display panel such as a liquid crystal display panel and a touch sensor provided so as to overlap with the display panel or be integrated therewith. The display panel displays various images under the control of the terminal control section 51. The touch sensor detects a touch operation and outputs the touch operation to the terminal control unit 51. The terminal control unit 51 executes processing corresponding to a touch operation based on an input from the touch sensor.
For example, alarm information based on weather information such as a typhoon, blackout risk prediction information, and the like are transmitted as Push notifications from the blackout prediction server 60 to the terminal device 50. The push notification may be transmitted to the terminal device 50 at a predetermined date and time, for example, no. 1 per month.
When the terminal device 50 has transmitted alarm information or the like from the power failure prediction server 60, the terminal control unit 51 executes the cold retention support application 55 to request the cold storage management server 40 for the prediction result of the cold retention time. When the result of prediction of the cooling time is transmitted from the refrigerator management server 40 in response to the request, the cooling times of the refrigerating room 12 and the freezing room 13 of the refrigerator 10 in the case where the power failure occurs are displayed on the touch panel 53.
Note that, instead of pushing the notification, the user may execute the cooling support application 55 to predict the cooling time.
[1-2. Actions, etc. ]
Next, the operations of the refrigerator 10 and the cool-retention time prediction system 1 in embodiment 1 will be described.
First, with reference to fig. 5 and 6, an operation when the cooling time is predicted based on the database stored in the cooling management database 44 of the refrigerator management server 40 will be described.
Fig. 5 is an explanatory diagram showing a display example of the touch panel of the terminal device 50. Fig. 6 is a sequence diagram showing an example of predicting the cooling time using the database based on the information acquired in advance.
As shown in fig. 6, in the present embodiment, the refrigerator 10 periodically measures the current internal temperature and the ambient temperature, and transmits the measurement results to the refrigerator management server 40.
The refrigerator management server 40 causes the server storage unit 43 to store the transmitted in-refrigerator temperature information and ambient temperature information.
As shown in fig. 6, when a push notification (push notification) such as alarm information is transmitted from the power failure prediction server 60, the terminal control unit 51 of the terminal device 50 displays a confirmation button for confirming the cooling time in the case of power failure on the touch panel 53.
Specifically, as shown in fig. 5 (a), when the push notification is transmitted, the terminal control unit 51 of the terminal device 50 starts (starts) the cold-keeping support application. When the cooling support application is started, the touch panel of the terminal device 50 displays the current operation mode of the refrigerator 10 (in fig. 5, the display operation mode is the normal mode) and a confirmation button for predicting the cooling time.
When the user operates the confirmation button, the terminal control unit 51 causes the touch panel to display an icon for selecting the storage amount of the refrigerator 10, as shown in fig. 5 (b).
The user operates the selection icon of the storage amount, inputs the storage amount of the refrigerating chamber, and operates the "next" icon. Similarly, the user inputs the storage amount of the freezing chamber (not shown).
When the user operates the confirmation button, the terminal device 50 instructs the storage amount in the refrigerator input by the user to be transmitted to the refrigerator management server 40.
When the storage amount in the refrigerator is transmitted to the refrigerator management server 40, the server control unit 41 of the refrigerator management server 40 selects a corresponding predicted cooling time from the database stored in the cooling management database 44 based on the transmitted storage amount information, the previously stored temperature information in the refrigerator, and the ambient temperature information, and transmits the predicted cooling time to the terminal device 50.
As shown in fig. 5 (c), the terminal device 50 displays the predicted cooling time transmitted from the refrigerator management server 40 on the touch panel 53.
The predicted cold insulation time may be displayed not only in the time from the current time to 10 ℃ but also in the interior temperature after several hours, for example, in the refrigerating room 12.
In this case, for example, when frozen plastic bottles (beverage bottles) or the like are put into the storage of refrigerating room 12 or freezing room 13, a proposal may be made to extend the predicted cooling time.
In this case, for example, the user may select the volume of the plastic bottle, and the extension time of the predicted cooling time corresponding to the volume of the plastic bottle may be displayed.
Fig. 7 is a sequence diagram showing another example in the case where the cooling time is predicted by the database based on the information acquired in advance.
In the present embodiment, the refrigerator 10 is configured to automatically acquire the storage amount in the refrigerator. That is, the refrigerator 10 regularly measures the current temperature inside the refrigerator and the ambient temperature, automatically measures the storage amount inside the refrigerator, and transmits the measurement result to the refrigerator management server 40. The storage amount in the storage is measured based on, for example, illuminance, weight, image, and the like in the storage.
The refrigerator management server 40 causes the server storage unit 43 to store the transmitted in-refrigerator temperature information and ambient temperature information.
When the user operates the confirmation button in response to the push notification, the confirmation operation information of the terminal device 50 is transmitted to the refrigerator management server 40.
When it is confirmed that the operation information is transmitted to the refrigerator management server 40, the server control unit 41 of the refrigerator management server 40 selects (extracts) the corresponding predicted cold retention time from the database stored in the cold retention management database 44 based on the previously stored in-compartment temperature information, ambient temperature information, and storage amount information, and transmits the predicted cold retention time to the terminal device 50.
The terminal device 50 displays the predicted cooling time transmitted from the refrigerator management server 40 on the touch panel 53.
Fig. 8 is a sequence diagram showing an example of the case where the cold insulation time is predicted by using the database.
As shown in fig. 8, when a push notification such as alarm information is transmitted from the power failure prediction server 60, the terminal control unit 51 of the terminal device 50 displays a confirmation button for confirming the cooling time in the case of power failure on the touch panel 53.
When the user operates the confirmation button, the terminal device 50 instructs the refrigerator 10 to measure the current temperature in the refrigerator, the ambient temperature, and the storage amount in the refrigerator, and transmits the measurement result to the refrigerator management server 40.
When the measurement result is transmitted to the refrigerator management server 40, as described above, the server control unit 41 of the refrigerator management server 40 selects the corresponding predicted cooling time from the database stored in the cooling management database 44 based on the in-compartment temperature information, the ambient temperature information, and the storage amount information in the refrigerator transmitted from the refrigerator 10, and transmits the predicted cooling time to the terminal device 50.
The terminal device 50 displays the predicted cooling time transmitted from the refrigerator management server 40 on the touch panel 53.
Fig. 9 is a timing chart showing an example of the case where the refrigerator 10 predicts the cooling time.
In the present embodiment, the refrigerator storage unit 34 stores a database of predicted cooling time information in advance.
As shown in fig. 9, in the present embodiment, when a push notification such as alarm information is transmitted from the power failure prediction server 60, the terminal control unit 51 of the terminal device 50 displays a confirmation button for confirming the cooling time in the case of power failure on the touch panel 53.
When the user operates the confirmation button, the terminal device 50 instructs the refrigerator 10 to measure the current temperature in the refrigerator, the ambient temperature, and the storage amount in the refrigerator.
The refrigerator control unit 30 selects a corresponding predicted cooling time from the database stored in the refrigerator storage unit 34 based on the in-storage temperature information, the ambient temperature information, and the storage amount information obtained by the measurement, and transmits the predicted cooling time to the terminal device 50.
The terminal device 50 displays the predicted cooling time transmitted from the refrigerator 10 on the touch panel 53.
In this case, as shown in fig. 6, the predicted cooling time may be selected by the refrigerator control unit 30 by inputting the storage amount in the refrigerator 10 by the user via the terminal device 50 and transmitting the storage amount information to the refrigerator 10.
In this example, the predicted cooling time can be obtained by the refrigerator 10 without using the refrigerator management server 40, and the terminal device 50 can display the predicted cooling time. Therefore, even when there is no device connected to the global network GN such as Wi-Fi (registered trademark), the predicted cold insulation time can be obtained as long as there is a short-range communication device such as Bluetooth (registered trademark).
Fig. 10 is a sequence diagram showing an example of the terminal device 50 when the cold insulation time is predicted.
In the present embodiment, a database of the predicted cooling time information is stored in advance in the terminal storage unit 54.
As shown in fig. 10, in the present embodiment, when a push notification such as alarm information is transmitted from the power failure prediction server 60, the terminal control unit 51 of the terminal device 50 displays a confirmation button for confirming the cooling time in the case of power failure on the touch panel 53.
When the user operates the confirmation button, the terminal device 50 instructs the refrigerator 10 to measure the current temperature in the refrigerator, the ambient temperature, and the storage amount in the refrigerator.
The refrigerator control unit 30 transmits the measured in-compartment temperature information, ambient temperature information, and storage amount information in the compartment to the terminal device 50.
The terminal control unit 51 selects the corresponding predicted cooling time from the database stored in the terminal storage unit 54 based on the interior temperature information, the ambient temperature information, and the storage amount information transmitted from the refrigerator 10, and displays the predicted cooling time on the touch panel 53.
In this case, as shown in fig. 6, the user (i.e., user) may input the storage amount in the refrigerator 10 via the terminal device 50, and the terminal control unit 51 may select the predicted cooling time based on the storage temperature information transmitted from the refrigerator 10, the ambient temperature information, and the input storage amount information.
In this example, the predicted cooling time can be obtained in the refrigerator 10 without using the refrigerator management server 40, and the terminal device 50 can display the predicted cooling time. Therefore, even when there is no device connected to the global network GN such as Wi-Fi (registered trademark), the predicted cool keeping time can be obtained by using a short-range communication device such as Bluetooth (registered trademark).
Next, an operation when the refrigerator management server 40 predicts the cooling time based on the actual measurement value (actual measurement value) will be described.
Fig. 11 is a timing chart showing an example of the case where the cold-retention time is predicted by using the measured values.
As shown in fig. 11, when a push notification such as alarm information is transmitted from the power failure prediction server 60, the terminal control unit 51 of the terminal device 50 displays a confirmation button for confirming the cooling time in the case of power failure on the touch panel 53.
When the user operates the confirmation button, the terminal device 50 instructs transmission of the predicted cooling time to the refrigerator management server 40.
In the refrigerator management server 40, the detected value of the interior temperature in the state where the compressor 23 is stopped is transmitted from the refrigerator 10 to the refrigerator management server 40 in advance, and as described above, the server control unit 41 of the refrigerator management server 40 calculates the temperature rise prediction curve of the predicted cold-holding time based on the interior temperature transmitted from the refrigerator 10, obtains the cold-holding time in the case where the power failure occurs at the current time point, and transmits the predicted cold-holding time to the terminal device 50.
The terminal device 50 displays the predicted cooling time transmitted from the refrigerator management server 40 on the touch panel 53.
In this case, as described above, the temperature in the refrigerator after several hours has elapsed may be displayed, and a proposal may be made to extend the predicted cooling time.
The operation when the cooling time is predicted based on the measured value has been described above, but the present invention is not limited to this.
For example, the refrigerator management server 40 may be configured to transmit the detected value of the internal temperature at which the compressor 23 stored in the refrigerator storage unit 34 in advance is in the stopped state to the refrigerator management server 40 when the user operates the confirmation button without acquiring the internal temperature information of the refrigerator 10 in advance. In this case, it is preferable that the latest detected value of the interior temperature, that is, the detected value of the interior temperature at which the compressor 23 is stopped, be transmitted to the refrigerator management server 40 before the user operates the confirmation button. At least 2 detected values of the in-refrigerator temperature transmitted to the refrigerator management server 40 are required. The detected value of the interior temperature transmitted to the refrigerator management server 40 may be more than 2. Further, the detected value of the in-bank temperature may be stored in a temperature sensor.
In addition, as in the case of predicting the cooling time using the database, the device for predicting the cooling time may be not only the refrigerator management server 40 but also the refrigerator 10 or the terminal device 50.
[1-3. Effects, etc. ]
As described above, the present embodiment includes the refrigerator 10 including the cooler 20 for cooling the inside of the refrigerator 10 and the server control unit 41 (control unit) that, when the occurrence of a power failure is predicted in advance, the server control unit 41 obtains the predicted cooling time at the time of the power failure based on the set inside temperature of the refrigerator 10 or the inside temperature actually measured, and notifies the user of the predicted cooling time.
Thus, the server control unit 41 obtains the predicted cooling time at the time of power failure and notifies the user of the obtained time, so that the cooling state in the refrigerator 10 at the time of power failure can be grasped, and food management in the refrigerator can be performed at the time of power failure.
In the present embodiment, the server control unit 41 (control unit) includes a database of cooling time obtained in advance based on the set internal temperature and the ambient temperature, and the server control unit 41 obtains the predicted cooling time at the time of power failure based on the database.
This makes it possible to easily predict the cooling time based on the database.
In the present embodiment, the server control unit 41 (control unit) acquires the interior temperature actually measured when cooling of the refrigerator 10 is stopped, and the server control unit 41 obtains the predicted cooling time at the time of power failure based on the acquired interior temperature.
This makes it possible to predict the cooling time during a power failure based on the actual measured value of the temperature in the storage.
In the present embodiment, the server control unit 41 (control unit) acquires the ambient temperature of the refrigerator 10 and the storage amount in the refrigerator, and obtains the predicted cooling time at the time of power failure based on the internal temperature, the ambient temperature, and the storage amount.
This makes it possible to predict the cooling time during a power failure.
In the present embodiment, the terminal device 50 is provided to be able to communicate with the refrigerator 10 and the refrigerator management server 40, and the terminal device 50 displays the predicted cooling time obtained by the server control unit 41 and notifies the user of the predicted cooling time.
This makes it possible to notify the user of the predicted cooling time at the time of power failure by using the terminal device 50.
(embodiment mode 2)
Next, embodiment 2 of the present invention will be explained.
[2-1. Structure ]
In the present embodiment, the refrigerator 10 and the cold retention time prediction system 1 have the same configurations as those of embodiment 1, and therefore the description will be given using the drawings used in the description of embodiment 1, and the same reference numerals are given to the same parts, and the description thereof will be omitted.
In embodiment 1, the cooling time is predicted before the power failure, but in the present embodiment, the cooling time is predicted during the power failure.
Similarly to embodiment 1, the refrigerator management server 40 is provided with a cold insulation management database 44, and the cold insulation management database 44 stores the predicted cold insulation time information of the refrigerator 10 in the database.
In embodiment 1, the server control unit 41 obtains the predicted cooling time based on the interior temperature information, the ambient temperature information, and the storage amount information of the refrigerator 10, but it is difficult to obtain these information during the power outage.
Therefore, in the present embodiment, for example, a battery or the like (a battery or the like that can be driven only by the sensor unit 33 and the refrigerator communication unit 31 of the refrigerator 10) that can drive only the sensor unit 33 and the refrigerator communication unit 31 of the refrigerator 10 is included, and the actual measurement value of the interior temperature is transmitted to the refrigerator management server 40 using the battery at the time of power failure. Then, the server control unit 41 predicts the cooling time from the cooling management database 44 based on the inside temperature information.
Note that, as in embodiment 1, the cooling time may be generated based on the actual measured values of the interior temperatures of refrigerating room 12 and freezing room 13.
In this case, first, the refrigerator control unit 30 detects the interior temperature of the refrigerator in a state where the compressor 23 is not driven, for example, when the compressor 23 is stopped or during defrosting, by the sensor unit 33, and transmits the detected value to the refrigerator management server 40 via the refrigerator communication unit 31.
The server control unit 41 of the refrigerator management server 40 calculates the prediction of the increase in the internal temperature based on the received change in the detected value of the internal temperature.
At this time, in the present embodiment, since power failure is occurring, the refrigerator 10 is stopped at the present time point, and the interior temperature of the refrigerator 10 cannot be obtained.
Therefore, when the cooling time is to be predicted based on the actual measurement value of the temperature in the storage, the cooling time may be predicted based on the actual measurement value obtained before the power failure. Further, as described above, the actual measurement value of the internal temperature may be transmitted to the refrigerator management server 40 using the battery at the time of power failure.
In addition, the refrigerator management server 40 is in a state where it is impossible to determine whether or not the refrigerator 10 is in a power failure state at the time of power failure.
Therefore, for example, communication can be performed from the refrigerator management server 40 to the refrigerator 10 at every predetermined time, and if there is a response (reply), it can be determined that there is no power failure.
Similarly, when the cold-storage time is predicted based on the actual measurement value, it may be determined that the power failure has occurred when the actual measurement value of the interior temperature is not transmitted from the refrigerator 10 for a certain period of time.
The user may operate the terminal device 50 to transmit information on the power failure state to the refrigerator management server 40.
[2-2. Actions, etc. ]
Next, the operations of the refrigerator 10 and the cold retention time prediction system 1 in embodiment 2 will be described.
First, with reference to fig. 12, an operation when the cooling time is predicted based on the database stored in the cooling management database 44 of the refrigerator management server 40 will be described.
Fig. 12 is a sequence diagram showing an example of the case where the cold insulation time is predicted by using the database.
As shown in fig. 12, the refrigerator 10 regularly measures the current temperature and the ambient temperature in the refrigerator, automatically measures the storage amount in the refrigerator, and transmits the measurement result to the refrigerator management server 40.
The refrigerator management server 40 causes the server storage unit 43 to store the transmitted in-compartment temperature information, ambient temperature information, and storage amount information.
When the user operates the confirmation button of the terminal device 50 during a power outage, the confirmation operation information of the terminal device 50 is transmitted to the refrigerator management server 40.
When the confirmation operation information is transmitted to the refrigerator management server 40, the server control unit 41 of the refrigerator management server 40 extracts the predicted cooling time corresponding to the temperature information, the ambient temperature information, and the storage amount information transmitted from the refrigerator 10 from the database stored in the cooling management database 44.
In this case, since the power failure is occurring, new in-compartment temperature information, ambient temperature information, and storage amount information are not transmitted from the refrigerator 10, and therefore, the cooling time can be predicted based on the in-compartment temperature information, ambient temperature information, and storage amount information transmitted immediately before the power failure.
As described above, for example, the refrigerator management server 40 can communicate with the refrigerator 10 at predetermined time intervals, and can determine that power is off when there is no response. Therefore, the refrigerator management server 40 stores the time of the power failure in advance, and calculates the remaining cooling time by subtracting the time from the power failure to the time when the user operates the confirmation button from the predicted cooling time.
The terminal device 50 displays the remaining cooling time transmitted from the refrigerator management server 40 on the touch panel 53. And simultaneously displaying the temperature in the warehouse.
In this case, as in embodiment 1, the temperature in the refrigerator after several hours has elapsed may be displayed, and a proposal to extend the predicted cooling time may be displayed.
Next, the operation when the refrigerator management server 40 predicts the cooling time based on the actual measurement value will be described.
Fig. 13 is a timing chart showing an operation when the cooling time is predicted by using the measured values.
In the present embodiment, for example, the following structure is adopted: the storage system includes a battery or the like that can drive only the sensor unit 33 and the refrigerator communication unit 31 of the refrigerator 10, and transmits an actual measurement value of the interior temperature to the refrigerator management server 40 using the battery at the time of power failure. Further, a configuration may be adopted in which an actual measurement value of the internal temperature can be transmitted to the refrigerator management server 40 by a temperature sensor used in power failure other than the refrigerator. In this case, the temperature sensor used in the power failure is driven by a battery, and has the same function as the sensor unit 33 and the refrigerator communication unit 31 of the refrigerator 10.
As shown in fig. 13, when the user operates the confirmation button of the terminal device 50, the user instructs the terminal device 50 to transmit the predicted cooling time to the refrigerator management server 40.
The refrigerator management server 40 calculates a temperature rise prediction curve of the predicted cooling time based on a detection value of the temperature in the refrigerator during the power failure, which is transmitted in advance, and obtains the predicted cooling time.
Then, the refrigerator management server 40 calculates the remaining cooling time based on the predicted cooling time and transmits the calculated remaining cooling time to the terminal device 50.
The terminal device 50 displays the remaining cooling time and/or the internal temperature transmitted from the refrigerator management server 40 on the touch panel 53.
Next, an operation when the cooling time is predicted based on the measured value will be described.
Fig. 14 is a timing chart showing an example of predicting the cooling time from the actual measurement values.
In the present embodiment, for example, the following structure is adopted: the battery or the like including the refrigerator control unit 30, the sensor unit 33, and the refrigerator communication unit 31 that can drive the refrigerator 10 can transmit the actual measured value of the internal temperature to the refrigerator management server 40 using the battery at the time of power failure.
Further, a configuration may be adopted in which an actual measurement value of the internal temperature can be transmitted to the refrigerator management server 40 by a temperature sensor used in a power outage other than the refrigerator 10. In this case, the temperature sensor used in the power outage has the same function as the refrigerator control unit 30, the sensor unit 33, and the refrigerator communication unit 31 of the refrigerator 10.
As shown in fig. 14, when the user operates the confirmation button of the terminal device 50, the terminal device 50 instructs the refrigerator 10 to measure the current internal temperature, and the internal temperature information including the measurement result is transmitted to the refrigerator management server 40. The in-house temperature information also includes a result of measuring the in-house temperature in the power outage before the user operates the confirmation button. At least 2 results obtained by measuring the temperature in the refrigerator are transmitted to the refrigerator management server 40. The number of results obtained by measuring the internal temperature transmitted to the refrigerator management server 40 may be more than 2. In this case, the refrigerator storage unit 34 stores the interior temperature during the power failure. In addition, the sensor unit 33 may have a function of storing the temperature in the refrigerator during a power failure, when the refrigerator control unit 30 is not driven.
When the interior temperature information is transmitted to the refrigerator management server 40, the server control unit 41 of the refrigerator management server 40 calculates a temperature rise prediction curve of the predicted cold insulation time based on the interior temperature information, obtains the predicted cold insulation time, calculates the remaining cold insulation time based on the predicted cold insulation time, and then transmits the calculated remaining cold insulation time to the terminal device 50.
Further, when the user operates the confirmation button, the terminal device 50 may instruct the refrigerator 10 to measure the current temperature in the refrigerator and transmit the measurement result to the refrigerator management server 40. In this case, when the measurement result is transmitted to the refrigerator management server 40, the server control unit 41 of the refrigerator management server 40 calculates a temperature rise prediction curve of the predicted cooling time based on the detection value of the interior temperature during the power outage transmitted in advance, obtains the predicted cooling time, calculates the remaining cooling time based on the predicted cooling time, and transmits the calculated remaining cooling time to the terminal device 50.
The terminal device 50 displays the remaining cooling time and/or the temperature in the refrigerator transmitted from the refrigerator management server 40 on the touch panel 53.
Next, the operation of the refrigerator 10 when the cooling time is predicted based on the actual measurement value will be described.
Fig. 15 is a timing chart showing an example of the case where the refrigerator 10 predicts the cooling time from the actual measurement value.
In the present embodiment, for example, the following structure is adopted: the battery or the like including the refrigerator control unit 30, the sensor unit 33, and the refrigerator communication unit 31 that can drive the refrigerator 10 can transmit the remaining cooling time and/or the measured value of the interior temperature to the terminal device 50 using the battery at the time of power failure.
Further, a configuration may be adopted in which the remaining cooling time and/or the actual measurement value of the interior temperature can be transmitted to the terminal device 50 by a temperature sensor used in a power outage other than the refrigerator 10. In this case, the temperature sensor used in the power failure is driven by a battery, and has the same functions as the refrigerator control unit 30, the sensor unit 33, and the refrigerator communication unit 31 of the refrigerator 10.
As shown in fig. 15, when the user operates the confirmation button of the terminal device 50, the terminal device 50 instructs the refrigerator 10 to measure the current interior temperature, and the predicted cooling time and/or the remaining cooling time are/is obtained based on the interior temperature information including the measurement result.
The in-house temperature information also includes a result of measuring the in-house temperature during the power outage before the user operates the confirmation button. At least 2 results were obtained by measuring the temperature in the library. The result of measuring the temperature in the reservoir may be more than 2. In this case, the refrigerator storage unit 34 stores the interior temperature during the power outage. In addition, the sensor unit 33 may have a function of storing the temperature in the refrigerator during a power failure, when the refrigerator control unit 30 is not driven.
The refrigerator control unit 30 calculates a temperature rise prediction curve of the predicted cooling time based on the actually measured temperature in the refrigerator, obtains the predicted cooling time, calculates the remaining cooling time based on the predicted cooling time, and transmits the remaining cooling time to the terminal device 50.
The terminal device 50 displays the remaining cooling time and/or the temperature in the refrigerator transmitted from the refrigerator 10 on the touch panel 53.
In this example, the refrigerator 10 can obtain the remaining cooling time without using the refrigerator management server 40, and the terminal device 50 can display the remaining cooling time. Therefore, even when a device such as Wi-Fi (registered trademark) connected to the global network GN cannot be used during power failure, the remaining cool retention time and/or the temperature in the storage can be obtained as long as a short-range communication device such as Bluetooth (registered trademark) is present.
Next, the operation when the terminal device 50 predicts the cooling time based on the actual measurement value will be described.
Fig. 16 is a sequence diagram showing an example of the case where the terminal device 50 predicts the cooling time using the actual measurement value.
In the present embodiment, for example, the following structure is adopted: the battery or the like including the sensor unit 33 and the refrigerator communication unit 31 that can drive the refrigerator 10 can transmit an actual measured value of the interior temperature to the terminal device 50 using the battery at the time of power failure.
Further, a configuration may be adopted in which an actual measurement value of the interior temperature can be transmitted to the terminal device 50 by a temperature sensor used in a power failure other than the refrigerator 10. In this case, the temperature sensor used in the power outage has the same function as the refrigerator control unit 30, the sensor unit 33, and the refrigerator communication unit 31 of the refrigerator 10.
As shown in fig. 16, when the user operates the confirmation button of the terminal device 50, the terminal device 50 instructs the refrigerator 10 to measure the current interior temperature, and the interior temperature information including the measurement result is transmitted to the terminal device 50.
The in-house temperature information also includes the result of measuring the in-house temperature during the power outage before the user operates the confirmation button. At least 2 results of measuring the temperature in the library transmitted to the terminal device 50 are required. The number of results obtained by measuring the temperature in the library transmitted to the terminal device 50 may be more than 2. In this case, the refrigerator storage unit 34 stores the interior temperature during the power failure. However, the sensor unit 33 may have a function of storing the interior temperature during the power outage, without driving the refrigerator control unit 30.
The terminal control unit 51 calculates a temperature rise prediction curve of the predicted cooling time based on the interior temperature information transmitted from the refrigerator 10, obtains the predicted cooling time, and calculates the remaining cooling time based on the predicted cooling time.
The terminal device 50 displays the calculated remaining cooling time and/or the calculated interior temperature on the touch panel 53.
[2-3. Effects, etc. ]
As described above, the present embodiment includes the refrigerator 10 including the cooler 20 for cooling the inside of the refrigerator 10, and the server control unit 41 (control unit) 41 for obtaining the predicted cooling time based on the set inside temperature of the refrigerator 10 or the actually measured inside temperature when the power failure occurs, and notifying the user of the predicted cooling time.
Thus, the server control unit 41 obtains the remaining cooling time during the power outage and notifies the user of the obtained cooling time, so that the cooling state in the refrigerator 10 at the time of the power outage can be grasped, and food management in the refrigerator can be performed at the time of the power outage.
In the present embodiment, the server control unit 41 (control unit) includes a database in which cooling time based on the set internal temperature and the ambient temperature is obtained in advance, and the server control unit 41 obtains the remaining cooling time during the power failure based on the database.
This makes it possible to easily predict the cooling time based on the database.
In the present embodiment, the server control unit 41 (control unit) acquires the measured interior temperature during the power outage of the refrigerator 10, and the server control unit 41 determines the remaining cooling time during the power outage based on the acquired interior temperature.
This makes it possible to predict the cooling time during power failure based on the actual measured value of the interior temperature.
In the present embodiment, the server control unit 41 (control unit) acquires the ambient temperature of the refrigerator 10 and the storage amount in the refrigerator, and obtains the remaining cooling time during the power failure based on the internal temperature, the ambient temperature, and the storage amount.
This makes it possible to predict the cooling time during a power outage.
In the present embodiment, the refrigerator management server 40 capable of communicating with the refrigerator 10 is provided, the refrigerator includes a sensor unit for detecting the temperature in the refrigerator and a battery for supplying power to the sensor unit during a power failure, and the refrigerator transmits the temperature in the refrigerator to the refrigerator management server 40 during the power failure.
This makes it possible to predict the cooling time during a power outage.
In the present embodiment, the terminal device 50 is provided to be able to communicate with the refrigerator 10 and the refrigerator management server 40, and the terminal device 50 displays the predicted cooling time obtained by the server control unit 41 and notifies the user of the predicted cooling time.
This enables the terminal device 50 to notify the user of the predicted cooling time at the time of power failure.
Embodiments 1 and 2 are described as examples of the technique described in the present application. However, the technique of the present invention is not limited to this, and can be applied to embodiments in which changes, substitutions, additions, omissions, and the like are made.
Industrial applicability of the invention
As described above, the cold insulation time prediction system according to the present invention can confirm the cold insulation time at the time of power failure, and can be suitably used as a cold insulation time prediction system that can manage food in a warehouse based on the cold insulation time.

Claims (7)

1. A cold-holding time prediction system, comprising:
a refrigerator including a cooler for cooling the inside of the refrigerator; and
and a control unit which, when the occurrence of a power failure is predicted in advance, obtains a predicted cooling time at the time of power failure based on a set interior temperature of the refrigerator or an actually measured interior temperature, and notifies a user of the predicted cooling time.
2. The cool-retention time prediction system according to claim 1,
the control section includes: a database for obtaining a cold insulation time based on the temperature in the set storage in advance,
the control unit obtains the predicted cold insulation time during power failure based on the database.
3. The cool keeping time prediction system according to claim 1,
the control unit acquires an interior temperature actually measured when cooling of the refrigerator is stopped,
the control unit obtains a predicted cold insulation time at the time of power failure based on the acquired temperature in the storage.
4. The cool keeping time prediction system according to claim 1,
the control unit obtains an ambient temperature of the refrigerator and a storage amount in the refrigerator, and obtains a predicted cold insulation time based on the temperature in the refrigerator, the ambient temperature, and the storage amount.
5. The cool keeping time prediction system according to claim 2,
the control unit obtains an ambient temperature of the refrigerator and a storage amount in the refrigerator, and obtains a predicted cold insulation time based on the temperature in the refrigerator, the ambient temperature, and the storage amount.
6. The cool keeping time prediction system according to any one of claims 1 to 5,
comprising a refrigerator management server capable of communicating with the refrigerator,
the control unit is a server control unit of the refrigerator management server.
7. The cool keeping time prediction system according to claim 6,
comprising a terminal device capable of communicating with the refrigerator and the refrigerator management server,
the terminal device displays the predicted cooling time obtained by the server control unit and notifies the user of the predicted cooling time.
CN202210756017.4A 2021-07-05 2022-06-30 Cold insulation time prediction system Pending CN115638600A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021111332A JP2023008072A (en) 2021-07-05 2021-07-05 Cold insulation time predicting system
JP2021-111332 2021-07-05

Publications (1)

Publication Number Publication Date
CN115638600A true CN115638600A (en) 2023-01-24

Family

ID=84940302

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210756017.4A Pending CN115638600A (en) 2021-07-05 2022-06-30 Cold insulation time prediction system

Country Status (3)

Country Link
JP (1) JP2023008072A (en)
CN (1) CN115638600A (en)
TW (1) TW202305293A (en)

Also Published As

Publication number Publication date
JP2023008072A (en) 2023-01-19
TW202305293A (en) 2023-02-01

Similar Documents

Publication Publication Date Title
JP6123909B2 (en) Refrigerator, refrigerator management system, and refrigerator control method
JP6305122B2 (en) Refrigerator and network system equipped with refrigerator
US9091475B2 (en) Diagnostic method for a refrigerator and refrigerator using the same
CN110428262B (en) Device and method for detecting abnormal state
EP3040658B1 (en) Home appliance with a power-consumption output device
EP2982916A1 (en) Refrigerator
KR20170139371A (en) Refrigerator with managing freshness based on context awareness, server, portable device, and method of managing freshness
KR20170139374A (en) Refrigerator with temperature context awareness and method of controlling thereof
US9671153B2 (en) Low-temperature storage
CN115638600A (en) Cold insulation time prediction system
JP4468337B2 (en) Refrigerator and refrigerator half-door judgment method
US20200018537A1 (en) Digital smart real showcase warning system, method, and program
CN115585602A (en) Cold insulation time prediction system
KR101705530B1 (en) Refrigerator
CN109751830B (en) Refrigeration equipment and method and device for detecting state of refrigeration equipment
JP2023089435A (en) Information processing device, program, abnormality detection method, abnormality detection system, and cooling storage shed
KR102526627B1 (en) Artificial Intelligence Refrigerator system and Control method of the same
KR20200107236A (en) Apparatus and system for sensing of food condition, and method for sensing thereof
CN110873511A (en) Refrigerator capable of updating control software
KR100902139B1 (en) Method for controlling in a showcase
US20220307756A1 (en) Refrigerator with dynamic multi-zone anti-sweat heating system
JP2017120178A (en) Refrigerator, refrigerator management system, and refrigerator control method
JP2023055023A (en) Home appliance system
WO2021240683A1 (en) Refrigerator communication system
JP2010014379A (en) Refrigerator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication