CN115504361A
CN115504361A CN202211430251.4A CN202211430251A CN115504361A CN 115504361 A CN115504361 A CN 115504361A CN 202211430251 A CN202211430251 A CN 202211430251A CN 115504361 A CN115504361 A CN 115504361A
Authority
CN
China
Prior art keywords
frame
weight
sliding table
building materials
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211430251.4A
Other languages
Chinese (zh)
Inventor
靳义新
徐兴华
卢博霖
王娟
张绍华
陈宾法
董书林
刘秉正
高峰
李荣忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dahan Technology Co ltd
Original Assignee
Dahan Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dahan Technology Co ltd filed Critical Dahan Technology Co ltd
Priority to CN202211430251.4A priority Critical patent/CN115504361A/en
Publication of CN115504361A publication Critical patent/CN115504361A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details

Abstract

The invention discloses a lifting device for rodlike building materials in a construction site, and mainly relates to the field of lifting tools. Comprises a hanging tool, a balancing mechanism and a lifting tool mechanism which are arranged from top to bottom in sequence; the lifting appliance mechanism comprises a sliding table with a transverse linear stroke, a bearing plate which extends in the same direction as the stroke direction of the sliding table is fixed on the sliding table, the center of the bearing plate is fixed with the sliding table, and the bearing plate is used for fixing building materials; the balance mechanism comprises a balance weight frame with a transverse linear stroke, wherein a balance weight block is arranged in the balance weight frame, and the linear stroke of the balance weight frame is parallel to and opposite to the sliding table. The invention has the beneficial effects that: the lifting device can enable the gravity center of the bar-shaped building material to be far away from a lifting point and enter a floor when the bar-shaped building material is lifted, greatly reduces the working difficulty and labor intensity of workers in a receiving area, and improves the operation safety.

Description

Bar-shaped building material hoisting device for construction site
Technical Field
The invention relates to the field of hoisting tools, in particular to a lifting device for rodlike building materials on a construction site.
Background
On the construction site, long and thin rod-shaped building materials such as reinforcing steel bars and section steel need to be hoisted, particularly, the reinforcing steel bars are large in consumption, and need to be hoisted and fed to floors in building construction, the hoisting workload of the reinforcing steel bars is large, the danger is high, and the method is a link for safety management and supervision on the construction site.
When lifting the reinforcing bar in the high-rise building body, if the top layer platform, then directly through the workman cooperation on the platform supplementary fall can, but if between the floor, just the workman that needs the corresponding position draws the direction to the reinforcing bar inwards, lets the reinforcing bar pass through the uncovered of the floor outside and falls into in the floor. The outer wall of floor all is open state in the construction, some direct mount guardrails, add after some installation framed bent and establish the guardrail, because the hoisting point is in central authorities, and there are davit, hoist cable etc. and building body to cause the interference in space above, the workman wants to obtain the reinforcing bar enough, it is more difficult, need the station to lean on outer (nevertheless can not lean on the guardrail) relatively, and draw the most of reinforcing bar on dragging the floor board, just there are higher danger and the degree of difficulty itself, and need great physical power. Because daily lifting capacity is big, the workman is in order to obtain the reinforcing bar for the convenience, often has the condition of the operation of breaking rules and regulations, for example excessively be close to the guardrail or demolish the guardrail even, makes things convenient for the reinforcing bar to get into the floor to and stand to go on enough reinforcing bars circumstances such as framed bent, these circumstances are through building site investigation and statistics, account for than higher in the record of breaking rules and regulations, are the main source of construction site risk factor. However, due to the fact that the range of floor construction is large, the lifting amount is large, the supervision difficulty is high, and the difficulty in taking and pulling the reinforcing steel bars is high, so that the violation is often prohibited. The danger of this operation is further increased.
Disclosure of Invention
The invention aims to provide a lifting device for rod-shaped building materials in a construction site, which can enable the gravity center of the rod-shaped building materials to be far away from a lifting point and enter a floor when the rod-shaped building materials are lifted, greatly reduces the working difficulty and labor intensity of workers in a receiving area, and improves the operation safety.
In order to achieve the purpose, the invention is realized by the following technical scheme:
a lifting device for rodlike building materials on a construction site comprises a hanger, a balance mechanism and a lifting appliance mechanism which are sequentially arranged from top to bottom;
the hanger is used for being matched with hoisting equipment for hoisting;
the lifting appliance mechanism comprises a sliding table with a transverse linear stroke, a bearing plate which extends in the same direction as the stroke direction of the sliding table is fixed on the sliding table, the center of the bearing plate is fixed with the sliding table, and the bearing plate is used for fixing building materials;
the balance mechanism comprises a balance weight frame with a transverse linear stroke, wherein a balance weight block is arranged in the balance weight frame, and the linear stroke of the balance weight frame is parallel to and opposite to the sliding table.
The balance mechanism comprises a guide frame, the guide frame is of a frame structure, a guide channel extending in a straight line is arranged in the guide frame, and a straight line track is arranged in the guide channel;
the weight frame comprises a weight box positioned in the guide channel, the outer wall of the weight box is provided with a guide wheel, the guide wheel is matched with the linear track, the counterweight block is arranged in the weight box,
the guide channel is provided with a rack fixed on the guide frame along the length direction of the guide channel, one side of the weight box is rotatably provided with a walking gear meshed with the rack, and the weight box is fixedly provided with a walking motor driving the walking gear.
The both ends of weight box are equipped with uncovered, the shrouding is installed to detachable on the uncovered, be equipped with the multilayer saddle along its direction of height on the inner wall of weight box, the balancing weight prevents on the saddle.
And an electronic level meter is arranged in the middle of the guide frame, and the electronic level meter and the walking motor perform signal feedback.
The lifting appliance mechanism comprises a strip-shaped frame, the length direction of the strip-shaped frame is consistent with the sliding direction of the sliding table, a linear guide rail and a lead screw extending along the length direction of the strip-shaped frame are mounted on the strip-shaped frame in parallel, a sliding block is matched on the linear guide rail, a screw is matched on the lead screw, and the screw and the sliding block are both mounted on the sliding table.
The one end of bar frame is equipped with the lead screw motor who is used for driving the lead screw, the one end that lead screw motor was kept away from to the bar frame is fixed with the balancing piece, the weight of balancing piece is unanimous with lead screw motor.
Hanging holes are respectively formed in two ends of the bearing plate, and retaining rings penetrate through the hanging holes.
Compared with the prior art, the invention has the beneficial effects that:
through the device, the building material can be translated and offset from the lifting point, and the offset of the counter weight is compensated through the reverse translation of the weight box, so that the influence of the offset of the building material from the lifting point is balanced, and the center of gravity of the building material can be extended into floors as far as possible after the building material is lifted to the height of a target area. The work difficulty and the labor intensity of workers in the receiving area are greatly reduced, the workers do not need to risk the workers, and the violation hidden danger of the link is fundamentally solved.
Drawings
Fig. 1 is an initial state front view of the present invention.
Fig. 2 is a perspective view of fig. 1 of the present invention.
Fig. 3 is a side view of fig. 1 of the present invention.
Fig. 4 is a front view of the present invention in a feeding state.
FIG. 5 is a schematic view of the feeding state of the present invention.
Fig. 6 is a schematic view from the bottom of the present invention.
Fig. 7 is a disassembled schematic view of the balance mechanism assembly of the present invention.
Fig. 8 is a schematic diagram of the spreader mechanism of the present invention with components broken away.
Reference numerals shown in the drawings:
1. a hanging tool; 2. a guide frame; 3. a linear track; 4. a rack; 5. a weight box; 6. a reinforcing plate; 7. a guide wheel; 8. a counterweight block; 9. a saddle; 10. a traveling gear; 11. a strip-shaped frame; 12. a linear guide rail; 13. a slider; 14. a lead screw; 15. a screw nut; 16. a sliding table; 17. a bearing plate; 18. a retaining ring; 19. a sling; 20. inserting a frame; 21. an upper slot; 22. lower slot, 23, bracket.
Detailed Description
The invention will be further illustrated with reference to the following specific examples. It should be understood that these examples are for illustrative purposes only and are not intended to limit the scope of the present invention. Further, it should be understood that various changes or modifications of the present invention may be made by those skilled in the art after reading the teaching of the present invention, and these equivalents also fall within the scope of the present application.
The instruments, reagents, materials and the like used in the following examples are conventional instruments, reagents, materials and the like in the prior art and are commercially available in a normal manner unless otherwise specified. Unless otherwise specified, the experimental methods, detection methods, and the like described in the following examples are conventional experimental methods, detection methods, and the like in the prior art.
The embodiment is as follows: bar-shaped building materials overhead hoist of job site
Comprises a hanging tool 1, a balancing mechanism and a lifting tool mechanism which are arranged from top to bottom in sequence;
1) Hanging tool 1
The hanger 1 is used for being matched with a lifting hook of hoisting equipment in a hooking mode, and the matching with the hoisting equipment is achieved.
The hanger 1 comprises a fixed frame, the fixed frame is used for being fixedly installed with the balance mechanism, and in the example, the fixed frame is welded and fixed at the central position above the guide frame 2 of the balance mechanism.
The top of the fixing frame is fixed with a hook or a hanging ring in the middle, the hook is selected to be a hook with a lock to prevent unhooking, and the hook can be directly matched with the sling 19 to realize hooking.
2) Balancing mechanism
The balance mechanism comprises a guide frame 2, the guide frame 2 is a frame type frame structure extending linearly and horizontally, and the guide frame 2 is obtained by welding square steel sectional materials and is a sliding channel extending linearly.
The inside guide way that has the straight line level and extend of leading truck 2, be equipped with the counterweight housing that has the straight line stroke along guide way in the leading truck 2, its concrete structure is:
the guide channel is internally provided with a linear track 3 fixed in the guide frame 2, the linear track 3 is provided with six linear tracks as shown in the figure in the example, the six linear tracks are respectively arranged on the upper part and the lower part of the guide channel, and the two linear tracks are respectively arranged on the left and the right sides of the guide channel and are distributed side by side up and down, so that the left and right sliding stroke of the counterweight frame is more stable, and the counterweight balance is facilitated.
Be equipped with slot 21 and lower slot 22 on the both ends terminal surface of leading truck 2 respectively, it is U type plate rack structure respectively to go up slot 21 and lower slot 22, the both ends of leading truck 2 are equipped with respectively and insert frame 20, insert frame 20 and pass through the tubular product welding, insert frame 20 and last slot 21 and lower slot 22 activity are pegged graft, and the slot through two upper and lower positions carries out reliable spacing to inserting frame 20, strengthens the reliability of blocking, the top side of inserting frame 20 is equipped with bracket 23 for keep off in last slot 21 top, the cooperation prevents to insert frame 20 and runs through, makes to insert frame 20 and can keep off at last slot 21 and under between slot 22, also blocks the both ends at direction passageway, can enough be convenient for take out the counter weight frame and maintain, can be with direction passageway both ends shutoff again.
The guide channel is provided with a rack 4 fixed on the guide frame 2 along the length direction of the guide channel, the outer side of the rack 4 is fixed on the strip-shaped plate, and the fixing with the guide frame 2 is realized through the strip-shaped plate and the mounting plate.
The weight carrier includes weight box 5, weight box 5 is equipped with open rectangle box structure for both ends, be equipped with round gusset plate 6 on weight box 5's the outer wall, installation leading wheel 7 on gusset plate 6, leading wheel 7 cooperatees with sharp track 3, the mounted position one-to-one of the two, leading wheel 7 is V type wheel, has V type race at its global, the inboard terminal surface of sharp track 3 has the track groove that corresponds with the V type race of leading wheel 7. In order to improve the sliding stability, two groups of guide wheels 7 are fixedly installed along the depth direction of the weight box 5, and the total number of the guide wheels is 12 in each group of 6 (corresponding to the linear track 3).
The installation is fixed with the shrouding on the uncovered at 5 both ends of weight box (for the convenience of demonstrate inner structure, the shrouding is not shown in the drawing), shrouding accessible bolt is fixed with weight box 5, it has one row of balancing weight 8 to list along its direction of height in the weight box 5, be equipped with multilayer saddle 9 along its direction of height on the inner wall of weight box 5, the both sides of balancing weight 8 fall on saddle 9, conveniently insert and take out balancing weight 8, are convenient for set up counter weight. And carry on spacingly and stably to the position of balancing weight 8 through the saddle 9 that is located balancing weight 8 upper and lower place, especially the balancing weight 8 that is located the top surface avoids beating and unstability based on misoperation under the spacing of saddle 9. The number of the balancing weights 8 can be adjusted as required. Thereby adjusting the degree of counterweight balance.
The rotatable walking gear 10 of installing in one side of weight box 5, walking gear 10 and rack 4 meshing, fixed mounting has the walking motor on the weight box 5, its output shaft based on the gearbox with walking gear 10 drive to the realization is to the drive control of weight box 5 straight-line travel.
The middle part of leading truck 2 installs the electron spirit level, electron spirit level and walking motor signal feedback, the electron spirit level is used for obtaining the swing angle of leading truck 2 to judge its horizontality, and based on the relative position of swing angle feedback control weight box 5. The pivot angle tends to 0 by the position of the weight box 5 away from the center.
3) Lifting appliance mechanism
The hoist mechanism includes strip frame 11 of fixed mounting in 2 bottom central authorities of leading truck, the length direction of strip frame 11 is unanimous with leading truck 2, strip frame 11 includes two relative straight boards that set up side by side, installs two front and back symmetries between two straight boards and sets up side by side linear guide 12, be equipped with slider 13 rather than sliding fit on linear guide 12, slider 13's bottom is fixed with slip table 16, still is equipped with the lead screw 14 with the rotatable installation of strip frame 11 between two linear guide 12, the cooperation has screw 15 on the lead screw 14, screw 15 installs on slip table 16, strip frame 11's one end is equipped with the lead screw 14 motor that is used for driving lead screw 14, through the rotation of lead screw 14, realizes the regulation of 16 sliding position of slip table and the drive of linear stroke. And a balance block is fixed at one end of the strip-shaped frame 11, which is far away from the motor of the screw 14, and the weight of the balance block is consistent with that of the motor of the screw 14 and is used for balancing the weight at two ends. The whole strip-shaped frame 11 is of a structure with balanced and symmetrical left and right weight.
The bottom of slip table 16 is passed through welded fastening and is had the bearing plate 17 of rectangular shape, the top and the 16 bottom welding of slip table of the central authorities of bearing plate 17, the length direction of bearing plate 17 is unanimous with the length direction of linear slide rail, the both ends of bearing plate 17 are equipped with the hanging hole respectively, it has buckle 18 to run through in the hanging hole, it has hoist cable 19 to collude the cooperation in the buckle 18, hoist cable 19 can be wire rope, also can be metal chain, not confine to this example, can adopt any rope form instrument that has enough bearing effect, realizes tying up fixedly to bar-shaped building materials such as reinforcing bar.
When the binding device is used, the rod-shaped building materials are bundled and fixed at the positions which are symmetrical relative to the center by adopting the conventional common binding method, and then are lifted.
The bearing plate 17 has the main function of providing allowance for feeding in two directions, and the side building materials are translated through the left-right sliding of the central sliding table 16, so that the gravity center of the building materials can be deviated and sent to the position near a falling point.
The working mode of the device is as follows:
the weight box 5 is arranged in the center of the guide frame 2, the sliding table 16 is also arranged in the center of the guide frame 2, and the device is in a self-balancing state under the condition that lifting objects are not added;
based on the guide frame 2 of this device and the subassembly of fixed mounting on guide frame 2 to and bar frame 11 and the subassembly of fixed mounting on bar frame 11 are the balanced subassembly of counter weight about relative length direction, so when slip table 16 and counter weight frame are located central authorities, the counter weight is balanced about whole device keeps, and about after the hook hanger 1 lifts by crane is balanced state.
The hoisting equipment hoists the device to a building material stacking position based on the hanger 1;
through the retaining rings 18 at the two ends of the bearing plate 17, the sling 19 or other tools are combined to bundle and fix the rod-shaped building materials such as the reinforcing steel bars;
hoisting equipment lifts, the device fixed with the building materials for side loading is lifted to a target position,
one end of the rod-shaped building material close to the building body is close to the floor between the target positions;
judging whether hovering is needed or not according to the situation, and waiting for the building materials to be stable;
after the building material is in a stable hovering state, a walking motor and a screw rod 14 motor are started simultaneously, the screw rod 14 motor drives the screw rod 14 to rotate so that a bearing plate 17 can translate towards one end of a building body, the walking motor drives the walking gear 10 to rotate so that the weight box 5 can translate in the reverse direction, the building material translation enables the gravity center of the building material to deviate from the weight bias caused by the central hoisting point, the weight bias is offset through the reverse movement of the weight box 5, and therefore the building material can be conveyed between floors without obvious loss of balance;
based on the fact that the building materials can be fed in a mode of deviating from the lifting points, workers do not need to receive the building materials at the edges of the floors, but wait for the building materials to be partially fed between the floors and hover stably in the areas far away from the falling points, and then approach the building materials to receive and unload the building materials.
Through the device, after the building materials are translated and deviate from the lifting points, the deviation of the balance weights is compensated through the reverse translation of the weight box 5, so that the influence of the deviation of the building materials from the lifting points is balanced, and the gravity center position of the building materials can be deep between floors as far as possible after the building materials are lifted to the height of a target area. The most important effect is that the building material falls and automatically goes deep, the link of active receiving of workers is replaced, the building material is not dragged and received by the workers any more, the building material is lifted and laid, the falling point work is mainly carried out by the lifting link, the work difficulty and the labor intensity of the workers in the receiving area are greatly reduced, the workers do not need to risk the falling point work, and the violation hidden danger of the link is fundamentally solved.

Claims (7)

1. A lifting device for rodlike building materials on a construction site is characterized by comprising a hanger, a balance mechanism and a lifting appliance mechanism which are sequentially arranged from top to bottom;
the hanger is used for being matched with hoisting equipment for hoisting;
the lifting appliance mechanism comprises a sliding table with a transverse linear stroke, a bearing plate which extends in the same direction as the stroke direction of the sliding table is fixed on the sliding table, the center of the bearing plate is fixed with the sliding table, and the bearing plate is used for fixing building materials;
the balance mechanism comprises a balance weight frame with a transverse linear stroke, wherein a balance weight block is arranged in the balance weight frame, and the linear stroke of the balance weight frame is parallel to and opposite to the sliding table.
2. The lifting device for the rodlike building materials on the construction site as claimed in claim 1, wherein the balancing mechanism comprises a guide frame, the guide frame is of a frame structure, a guide channel extending in a straight line is arranged in the guide frame, and a straight line rail is arranged in the guide channel;
the weight frame comprises a weight box positioned in the guide channel, the outer wall of the weight box is provided with a guide wheel, the guide wheel is matched with the linear track, the counterweight block is arranged in the weight box,
the guide channel is provided with a rack fixed on the guide frame along the length direction of the guide channel, one side of the weight box is rotatably provided with a walking gear meshed with the rack, and the weight box is fixedly provided with a walking motor driving the walking gear.
3. The lifting device for the rodlike building materials in the construction site as claimed in claim 2, wherein openings are formed in two ends of the weight box, sealing plates are detachably mounted on the openings, a plurality of layers of pallets are arranged on the inner wall of the weight box along the height direction of the weight box, and the weight blocks are prevented from being arranged on the pallets.
4. The lifting device for the rodlike building materials on the construction site as claimed in claim 2, wherein an electronic level is mounted in the middle of the guide frame, and the electronic level is fed back with signals of a walking motor.
5. The hoisting device for the rod-shaped building materials in the construction site as claimed in claim 1, wherein the hoisting mechanism comprises a strip-shaped frame, the length direction of the strip-shaped frame is consistent with the sliding direction of the sliding table, a linear guide rail and a lead screw extending along the length direction of the strip-shaped frame are mounted on the strip-shaped frame in parallel, a sliding block is matched on the linear guide rail, a nut is matched on the lead screw, and the nut and the sliding block are both mounted on the sliding table.
6. The lifting device for the rodlike building materials in the construction site as claimed in claim 5, wherein a lead screw motor for driving a lead screw is arranged at one end of the strip-shaped frame, a balance block is fixed at one end of the strip-shaped frame, which is far away from the lead screw motor, and the weight of the balance block is consistent with that of the lead screw motor.
7. The hoisting device for the rodlike building materials in the construction site as claimed in claim 1, wherein hanging holes are formed in two ends of the bearing plate respectively, and retaining rings penetrate through the hanging holes.
CN202211430251.4A 2022-11-16 2022-11-16 Bar-shaped building material hoisting device for construction site Pending CN115504361A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211430251.4A CN115504361A (en) 2022-11-16 2022-11-16 Bar-shaped building material hoisting device for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211430251.4A CN115504361A (en) 2022-11-16 2022-11-16 Bar-shaped building material hoisting device for construction site

Publications (1)

Publication Number Publication Date
CN115504361A true CN115504361A (en) 2022-12-23

Family

ID=84513818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211430251.4A Pending CN115504361A (en) 2022-11-16 2022-11-16 Bar-shaped building material hoisting device for construction site

Country Status (1)

Country Link
CN (1) CN115504361A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1379889A (en) * 1972-06-07 1975-01-08 Safety Tech Inc Horizontal load carrier
JPH06171889A (en) * 1992-12-04 1994-06-21 Fujita Corp Load transport device
JPH10218549A (en) * 1997-02-04 1998-08-18 Daisue Kensetsu Kk Lifting device
CN207129869U (en) * 2017-05-16 2018-03-23 陈重 A kind of crane equipment that lifting force is obtained by counterweight
CN108185897A (en) * 2017-12-26 2018-06-22 同济大学 A kind of truss-like window cleaning equipment horizontal extension hanging basket
CN215558297U (en) * 2021-08-17 2022-01-18 河北中重冷轧材料有限公司 Efficient lifting appliance for replacing tension measuring roller of rolling mill

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1379889A (en) * 1972-06-07 1975-01-08 Safety Tech Inc Horizontal load carrier
JPH06171889A (en) * 1992-12-04 1994-06-21 Fujita Corp Load transport device
JPH10218549A (en) * 1997-02-04 1998-08-18 Daisue Kensetsu Kk Lifting device
CN207129869U (en) * 2017-05-16 2018-03-23 陈重 A kind of crane equipment that lifting force is obtained by counterweight
CN108185897A (en) * 2017-12-26 2018-06-22 同济大学 A kind of truss-like window cleaning equipment horizontal extension hanging basket
CN215558297U (en) * 2021-08-17 2022-01-18 河北中重冷轧材料有限公司 Efficient lifting appliance for replacing tension measuring roller of rolling mill

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《建筑工人职业技能培训教材》编, 中国建材工业出版社 *

Similar Documents

Publication Publication Date Title
CN114634093B (en) Hoist device of prefabricated stair
CN102482035A (en) Article storage facility
CN115504361A (en) Bar-shaped building material hoisting device for construction site
JP2008266891A (en) Curtain wall mounting method and device
KR100723643B1 (en) Turning device for hoist
CN109516409A (en) Flooring construction tower crane turns device for hoisting
EP3718945A1 (en) A method for elevator shaft construction and guide rail installation
CN217808295U (en) Tool type packaging block material box type suspension cage
CN217079762U (en) A frame that slides for assembled steel construction building construction
CN220393185U (en) High-rise conveying device for building construction site
CN116534563B (en) Assembled building wallboard transmission device
CN220098269U (en) Hoisting device of overhaul equipment for coal mine
JPH0681481A (en) Material hoisting/lowering equipment
CN211545747U (en) Engineering machine tool structure hangs commentaries on classics device
CN209702229U (en) Flooring construction tower crane turns device for hoisting
CN211998557U (en) Track type lifting machine tool on balcony beam
CN211998537U (en) MG type double-beam door type lifting device
CN217599530U (en) Perpendicular conveyer of circulation for brickwork engineering material
CN210483090U (en) Construction is with platform of unloading
JPH1179660A (en) Control method for arc-moving type cable crane
CN209396616U (en) A kind of vertical spin coal lifting system
KR200415071Y1 (en) Turning Device for Hoist
KR20010094164A (en) Dust protector for construction works
KR20090090082A (en) Rotating device of hook
CN115849246A (en) Elevator positioning structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination