CN210483090U - Construction is with platform of unloading - Google Patents

Construction is with platform of unloading Download PDF

Info

Publication number
CN210483090U
CN210483090U CN201920968610.9U CN201920968610U CN210483090U CN 210483090 U CN210483090 U CN 210483090U CN 201920968610 U CN201920968610 U CN 201920968610U CN 210483090 U CN210483090 U CN 210483090U
Authority
CN
China
Prior art keywords
wall
bolt
platform
mounting bracket
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920968610.9U
Other languages
Chinese (zh)
Inventor
王博
高旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920968610.9U priority Critical patent/CN210483090U/en
Application granted granted Critical
Publication of CN210483090U publication Critical patent/CN210483090U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a construction is with platform of unloading, the fixed connection seat of installation on the wall body, the both sides of fixed connection seat are bolted connection respectively has the three rope of dragging, and drags the one end of rope and have the locating lever through bolted connection, the welding of one side of locating lever has the mounting bracket, first through-hole has been seted up to one side of mounting bracket, and the inside fixing bolt that pegs graft of first through-hole, rectangular notch has been seted up to one side of mounting bracket, and rectangular notch inner wall has the connecting rod through bolted connection. The utility model discloses in, through being provided with fixed connection seat, locating lever, mounting bracket, add muscle pole, install on the both sides locating lever of mounting bracket and drag the leader, drag the one end of leader and be connected with the fixed connection seat, install the muscle pole in the bottom of mounting bracket simultaneously, install fixing bolt in the one end of mounting bracket simultaneously, can fully fix the mounting bracket, improved the security.

Description

Construction is with platform of unloading
Technical Field
The utility model relates to a construction technical field especially relates to a construction is with platform of unloading.
Background
The construction is a production movement performed by people to construct various building products in a certain space and time according to a specific design blueprint by using various building materials and mechanical equipment. The method comprises the whole production process from construction preparation, earth breaking and engineering completion acceptance. In the process, construction preparation, construction organization design and management, earthwork engineering, blasting engineering, foundation engineering, reinforcing steel bar engineering, template engineering, scaffold engineering, concrete engineering, prestressed concrete engineering, masonry engineering, steel structure engineering, wood structure engineering, structure installation engineering and the like are carried out.
When carrying out building construction, generally need install the platform of unloading at the construction operation face, but traditional platform simple structure of unloading, and the platform of unloading can not carry out the hoist and mount operation, all be by the tower crane with article handling to the platform of unloading, but need a small amount of articles of handling in the work progress, if continue to use the tower crane, work efficiency is lower.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the platform of unloading for construction that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a construction is with platform of unloading, includes the fixed connection seat of installation on the wall body, the both sides of fixed connection seat are bolted connection respectively has the three pilot rope of dragging, and drags the one end of pilot rope and have the locating lever through bolted connection, one side welding of locating lever has the mounting bracket, first through-hole has been seted up to one side of mounting bracket, and the inside fixing bolt that pegs graft of first through-hole, the rectangle notch has been seted up to one side of mounting bracket, and the rectangle notch inner wall has the connecting rod through bolted connection, there is the reinforcement pole bottom both sides of mounting bracket through bolted connection, and passes through the bolt stability with the wall body and be connected, there is the guardrail bar at the top of mounting bracket through bolted connection, and there is the installation pole bottom of.
Preferably, the outer wall of the guardrail rod is sleeved with the anti-skidding sleeve, and the guardrail rod is stably connected with the wall body through the bolt.
Preferably, the outer wall both sides of guardrail bar have the dead lever through bolted connection, and the spout has all been seted up at the top of dead lever.
Preferably, the two sides of the top of the inner wall of the sliding groove are connected with moving wheels in a sliding mode, and one side of each moving wheel is connected with a supporting plate through a rotating shaft.
Preferably, the tops of the two support plates are connected with a mounting platform through bolts, and the top of the mounting platform is connected with an electric winch through bolts.
Preferably, the external switch of the electric winch is electrically connected with an external power supply through a power transmission line, and the bottom of the steel wire rope on the electric winch is connected with a hook through a buckle.
Preferably, the second through hole has been seted up to the outer wall both sides of mounting bracket, and the inside rotation axis of pegging graft of second through hole, there is the returning face plate one side of rotation axis through bolted connection, and top one side of returning face plate and have the traction block through bolted connection, and the outer wall bolt of traction block has the haulage rope.
The utility model has the advantages that:
1. the utility model provides a platform of unloading for construction through being provided with fixed connection seat, locating lever, mounting bracket, adds the muscle pole, installs on the locating lever of the both sides of mounting bracket and drags the leader, drags the one end of leader and is connected with the fixed connection seat, installs the muscle pole in the bottom of mounting bracket simultaneously, installs fixing bolt in the one end of mounting bracket simultaneously, can fully fix the mounting bracket, has improved the security;
2. the utility model provides a platform of unloading for construction, through being provided with returning face plate, connecting rod, traction block, axis of rotation, through the traction block side-mounting obtain the haulage rope drive returning face plate and overturn through the axis of rotation, install the connecting rod in returning face plate bottom simultaneously, increased the security of returning face plate, be convenient for go up unloading;
3. the utility model provides a construction is with platform of unloading through being provided with backup pad, dead lever, mounting platform, electric capstan, when carrying out the article of small quantity and hoist, articulates electric capstan's couple on article, and when the handling was to the mounting bracket on, through pulling mounting platform, can drive mounting platform and remove on the dead lever, further place article on the mounting bracket, and is very simple and convenient, and has improved work efficiency.
Drawings
Fig. 1 is a schematic sectional structural view of an unloading platform for building construction provided by the utility model;
fig. 2 is a schematic side view of the mounting platform of the discharging platform for building construction according to the present invention;
fig. 3 is the utility model provides a construction is with returning face plate schematic structure of platform of unloading.
In the figure: 1 fixing bolt, 2 mounting brackets, 3 installation poles, 4 dead levers, 5 fixed connection seats, 6 drag the rope, 7 guardrail bars, 8 antiskid covers, 9 electronic capstan winch, 10 mounting platform, 11 backup pads, 12 spouts, 13 traction block, 14 locating levers, 15 connecting rods, 16 returning plates, 17 ribbed bars, 18 travelling wheels, 19 axis of rotation.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Reference will now be made in detail to embodiments of the present patent, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present patent and are not to be construed as limiting the present patent.
In the description of this patent, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings for the convenience of describing the patent and for the simplicity of description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the patent.
In the description of this patent, it is noted that unless otherwise specifically stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
Example 1
Referring to fig. 1-2, a platform of unloading for construction, including the fixed connection seat 5 of installation on the wall body, the both sides of fixed connection seat 5 have been bolted the three respectively and have been dragged rope 6, and the one end of dragging rope 6 has locating lever 14 through bolted connection, there is mounting bracket 2 one side welding of locating lever 14, first through-hole has been seted up to one side of mounting bracket 2, and inside grafting of first through-hole has fixing bolt 1, the rectangle notch has been seted up to one side of mounting bracket 2, and the rectangle notch inner wall has connecting rod 15 through bolted connection, there is reinforced bar 17 bottom both sides of mounting bracket 2 through bolted connection, and reinforced bar 17 passes through the bolt stabilization with the wall body and is connected, there is guardrail bar 7 at the top of mounting bracket 2 through bolted connection, and there is installation pole 3 bottom of guardrail bar 7 through.
Wherein, the outer wall of guardrail bar 7 has cup jointed antiskid cover 8, and guardrail bar 7 passes through the bolt stability with the wall body and is connected, there is dead lever 4 in the outer wall both sides of guardrail bar 7 through bolted connection, and spout 12 has all been seted up at the top of dead lever 4, inner wall top both sides sliding connection of spout 12 has removal wheel 18, and one side of removing wheel 18 is connected with backup pad 11 through the pivot, there is mounting platform 10 at the top of two backup pads 11 through bolted connection, and there is electric capstan winch 9 at the top of mounting platform 10 through bolted connection, electric capstan winch 9's external switch passes through power transmission line electric connection with external power source, and electric capstan winch 9 goes up the wire rope bottom and is connected with the couple through the.
Example 2
Referring to fig. 3, a platform of unloading for construction, still include the second through-hole that 2 outer wall both sides of mounting bracket were seted up, and the inside second through-hole is pegged graft there is axis of rotation 19, there is returning face plate 16 one side of axis of rotation 19 through bolted connection, and there is the clutch blocks 13 top one side of returning face plate 16 and through bolted connection, the outer wall bolt of clutch blocks 13 has connect the haulage rope, it drives returning face plate 16 and overturns through axis of rotation 19 to install the haulage rope through returning face plate 13 one side, install connecting rod 15 in returning face plate 16 bottom simultaneously, the security of returning face plate 16 has been increased, be convenient for go on go up unloading.
The working principle is as follows: a dragging rope 6 is arranged on the positioning rods 14 at the two sides of the mounting rack 2, one end of the dragging rope 6 is connected with the fixed connecting seat 5, meanwhile, a reinforcing bar 17 is arranged at the bottom of the mounting frame 2, a fixing bolt 1 is arranged at one end of the mounting frame 2, the mounting frame 2 can be fully fixed, the safety is improved, the hauling cable arranged at one side of the hauling block 13 drives the overturning plate 16 to overturn through the rotating shaft 19, meanwhile, the connecting rod 15 is arranged at the bottom of the turnover plate 16, so that the safety of the turnover plate 16 is improved, the loading and unloading are convenient, when a small amount of articles are hoisted, the hook of the electric capstan 9 is hung on the articles, when the articles are hoisted to the mounting rack 2, by pulling the mounting platform 10, the mounting platform 10 can be driven to move on the fixing rod 4, articles are further placed on the mounting frame 2, the mounting platform is very simple and convenient, and the working efficiency is improved.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The discharging platform for building construction comprises a fixed connection seat (5) installed on a wall body, and is characterized in that three dragging ropes (6) are respectively bolted on two sides of the fixed connection seat (5), one end of each dragging rope (6) is connected with a positioning rod (14) through a bolt, a mounting frame (2) is welded on one side of each positioning rod (14), a first through hole is formed in one side of each mounting frame (2), a fixing bolt (1) is inserted into each first through hole, a rectangular notch is formed in one side of each mounting frame (2), the inner wall of each rectangular notch is connected with a connecting rod (15) through a bolt, reinforcing rods (17) are connected to two sides of the bottom of each mounting frame (2) through bolts, each reinforcing rod (17) is stably connected with the wall body through a bolt, and a guard rail (7) is connected to the top of each mounting frame (2) through a bolt, and the bottom of the guardrail rod (7) is connected with an installation rod (3) through a bolt.
2. The discharging platform for building construction according to claim 1, wherein an anti-skid sleeve (8) is sleeved on the outer wall of the guardrail rod (7), and the guardrail rod (7) is stably connected with the wall body through bolts.
3. The discharging platform for building construction as claimed in claim 2, wherein the guard rail (7) is connected with fixing rods (4) at two sides of the outer wall through bolts, and the top of each fixing rod (4) is provided with a sliding groove (12).
4. The discharging platform for building construction according to claim 3, wherein the sliding chute (12) is slidably connected with moving wheels (18) at two sides of the top of the inner wall, and one side of the moving wheels (18) is connected with a support plate (11) through a rotating shaft.
5. The discharging platform for building construction according to claim 4, wherein the top of the two supporting plates (11) is connected with the mounting platform (10) through bolts, and the top of the mounting platform (10) is connected with the electric capstan (9) through bolts.
6. The discharging platform for building construction according to claim 5, wherein the external switch of the electric winch (9) is electrically connected with an external power supply through a power line, and the bottom of the wire rope on the electric winch (9) is connected with the hook through a buckle.
7. The discharging platform for building construction according to claim 1, wherein second through holes are formed in two sides of the outer wall of the mounting frame (2), a rotating shaft (19) is inserted into each second through hole, one side of the rotating shaft (19) is connected with a turnover plate (16) through a bolt, a traction block (13) is connected to one side of the top of the turnover plate (16) through a bolt, and a traction rope is bolted to the outer wall of the traction block (13).
CN201920968610.9U 2019-06-26 2019-06-26 Construction is with platform of unloading Expired - Fee Related CN210483090U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920968610.9U CN210483090U (en) 2019-06-26 2019-06-26 Construction is with platform of unloading

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920968610.9U CN210483090U (en) 2019-06-26 2019-06-26 Construction is with platform of unloading

Publications (1)

Publication Number Publication Date
CN210483090U true CN210483090U (en) 2020-05-08

Family

ID=70514722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920968610.9U Expired - Fee Related CN210483090U (en) 2019-06-26 2019-06-26 Construction is with platform of unloading

Country Status (1)

Country Link
CN (1) CN210483090U (en)

Similar Documents

Publication Publication Date Title
CN103086279B (en) Vertical transportation construction method for building construction
CN208120594U (en) A kind of section of jurisdiction for subway work vertical transport system automatically grabs handler
CN210483090U (en) Construction is with platform of unloading
CN109457560B (en) Rail carrying device for shield tunnel construction
CN107060474A (en) A kind of sleeve-type chimney people goods shunting vertical transferring apparatus and construction method
CN212127348U (en) Material lifting device for civil construction
CN209854554U (en) Supplementary car of installing and removing of template
CN212532083U (en) Truss type combined arch bridge small component dismantling stabilizing device
CN213387531U (en) Durable counterweight type portable crane
AU2014100878A4 (en) Apparatus and method for excavating a cavity and setting an object at least partially therein
CN114014182A (en) Auxiliary transportation device for loader
CN208120593U (en) Intelligent remote controls full-automatic subway work vertical conveying device
CN208700131U (en) A kind of wind-screening dust-suppressing device for coal mine bridge-type grab ship unloader funnel
CN205419582U (en) Floor hoist
CN201857225U (en) Hoisting device for bridge crane frame
CN219792150U (en) Hoisting mechanism and split type hoisting system
CN111173522A (en) Construction method for hoisting and descending air shaft shield machine
CN218346884U (en) Partition plate construction auxiliary device
CN214059574U (en) Building material transportation lifting mechanism
CN209193441U (en) Vertical shaft simple lifting appliance
CN113501437B (en) Foundation pit portal type slag discharging and lifting device
CN211644368U (en) Lifting device for bucket of manual hole digging pile
CN216711390U (en) Template installation trolley device
CN218058163U (en) Construction operation platform convenient to waste material handling
CN210162229U (en) Crane hook head cable joint pouring support structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200508

Termination date: 20210626

CF01 Termination of patent right due to non-payment of annual fee