CN115496467A - Material park-leaving management and control method, system and electronic device - Google Patents

Material park-leaving management and control method, system and electronic device Download PDF

Info

Publication number
CN115496467A
CN115496467A CN202211066420.0A CN202211066420A CN115496467A CN 115496467 A CN115496467 A CN 115496467A CN 202211066420 A CN202211066420 A CN 202211066420A CN 115496467 A CN115496467 A CN 115496467A
Authority
CN
China
Prior art keywords
park
leaving
result
materials
image information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211066420.0A
Other languages
Chinese (zh)
Inventor
侯君
胡波
孙忠光
周晓明
苏长涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Haier Technology Co Ltd
Haier Smart Home Co Ltd
Haier Uplus Intelligent Technology Beijing Co Ltd
Original Assignee
Qingdao Haier Technology Co Ltd
Haier Smart Home Co Ltd
Haier Uplus Intelligent Technology Beijing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haier Technology Co Ltd, Haier Smart Home Co Ltd, Haier Uplus Intelligent Technology Beijing Co Ltd filed Critical Qingdao Haier Technology Co Ltd
Priority to CN202211066420.0A priority Critical patent/CN115496467A/en
Publication of CN115496467A publication Critical patent/CN115496467A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
    • G06K17/0029Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device the arrangement being specially adapted for wireless interrogation of grouped or bundled articles tagged with wireless record carriers
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/018Certifying business or products
    • G06Q30/0185Product, service or business identity fraud

Abstract

The application discloses a management and control method and system for material leaving a park and an electronic device, and relates to the technical field of park management. The control method for the material delivery garden comprises the following steps: obtaining the park-leaving request information of the goods and materials to be released; generating a material park-out certificate according to the park-out request information; the material park-leaving voucher is obtained by performing multiple process checks on the park-leaving request information corresponding to the material to be released; and obtaining the garden leaving permission for the materials to be delivered out of the garden based on the material garden leaving voucher. Through the embodiment that this application provided, realize accomplishing each flow that the goods and materials goes out the garden through the computer and verify, not only can great improvement goods and materials efficiency of going out the garden, the flow is more normal moreover to have real-time electronic record to trace back.

Description

Material park-leaving management and control method, system and electronic device
Technical Field
The application relates to the technical field of park management, in particular to a management and control method, a system and an electronic device for material park export.
Background
The material is used as a core resource and is important for enterprise development. For a large number of substances, they are usually stored in different warehouses in different categories, with a number of warehouses containing different substances forming a park. Thus, the campus usually contains different warehouses, which in turn store different materials.
It is important to manage the flow of material in a campus. Especially in the process of discharging the materials, how to manage the discharging of the materials from the garden is an especially important ring. In the prior art, the park-leaving management of the materials in the park still adopts a traditional mode, the park-leaving request is carried out in a manual mode, and the paper file is used for transacting the park-leaving procedure, so that the materials are left out of the park. The traditional manual mode for realizing the material delivery from the garden has at least the following defects:
1. paper materials are delivered out of the garden, so that counterfeiting is easy to occur, and the examination, approval and signature process takes long time;
2. the paper materials are stored, inquired and traced in the process of leaving the garden, so that great manpower and cost are wasted, and the tracing effect is poor.
3. Paper material leaving procedures, whether a material list on the leaving procedures is consistent with materials on a vehicle or not, and the paper material leaving procedures cannot be easily verified. Particularly, under the condition that valuable materials of different models are discharged from the park, the risk that low-price materials are used as high-price materials exists, and great difficulty is increased for checking the discharge of the valuable materials from the park. When the security of the garden faces tens of thousands of materials and hundreds of thousands of materials, the verification and the differentiation are difficult.
Therefore, how to manage the material leaving the park is a technical problem to be solved urgently at present.
Disclosure of Invention
In view of this, the present application provides a method, a system, and an electronic device for managing and controlling material leaving from a garden, which implement that each process check of material leaving from the garden is completed through a computer, not only can greatly improve the efficiency of material leaving from the garden, but also the process is more standard, and a real-time electronic record is available for tracing.
In a first aspect, the present application provides a method for managing and controlling a material delivery yard, including:
acquiring garden leaving request information of materials to be released;
generating a material park-out certificate according to the park-out request information; the material park-leaving voucher is obtained by performing multiple process checks on the park-leaving request information corresponding to the material to be released;
and acquiring the park leaving permission of the park leaving of the goods and materials to be released based on the goods and materials park leaving voucher.
Preferably, according to the method for managing and controlling the material delivery park provided by the application,
the generating of the material park-out voucher according to the park-out request information comprises the following steps:
acquiring first image information corresponding to the garden leaving request information from a preset cloud database;
verifying the first image information, and determining a first verification result that the garden leaving request information passes;
and storing the first examination result in the cloud database, and generating the material park-making voucher based on the first examination result.
Preferably, according to the method for managing and controlling the material delivery park provided by the application,
the generating the material garden selling voucher based on the first examination result comprises:
generating a first garden-going two-dimensional code image based on the first examination result and the first image information;
identifying the first outgoing two-dimensional code image, verifying the first verification result and the first image information, and determining a second verification result that the first verification result and the first image information both pass;
and storing the second examination result in the cloud database, and generating the material park output certificate based on the second examination result.
Preferably, according to the method for managing and controlling the material delivery park provided by the application,
the generating the material park-making voucher based on the second examination result comprises:
generating task information for loading the materials to be discharged out of the garden based on the second examination result;
and uploading loading image information for loading the materials to be discharged to the cloud database based on the task information, and generating the material discharging certificate based on the loading image information.
Preferably, according to the method for managing and controlling material delivery park provided by the application,
the generating the material park-out voucher based on the loading image information comprises:
generating a second garden-going two-dimensional code image based on the loading image information and the second examination result;
identifying the second outgoing two-dimensional code image, respectively checking the loaded image information, the second checking result, the first checking result and the first image information, and determining a third checking result that the loaded image information, the second checking result, the first checking result and the first image information pass;
and storing the third audit result in the cloud database, and generating the material park-out certificate based on the third audit result.
Preferably, according to the method for managing and controlling the material delivery park provided by the application,
the material to be discharged at least comprises: target materials; each target material is provided with a radio frequency component,
after the step of generating a first outgoing two-dimensional code image based on the first review result and the first image information, the method further includes:
under the condition that a plurality of target materials are taken out of the garden, a preset radio frequency inductor is utilized to identify a radio frequency assembly corresponding to each target material so as to verify target material-out request information corresponding to the target materials; and
after the generating of the second outgoing two-dimensional code image based on the loading image information and the second examination result, the method further includes:
under the condition that a plurality of target materials are discharged from the park, the radio frequency inductor is utilized to identify the radio frequency assembly corresponding to each target material so as to verify a target material discharge certificate corresponding to the target material.
In a second aspect, the present application further provides a management and control system for material park delivery, including:
the request end sends out garden output request information for requesting materials to be output to a garden;
the auditing end receives the park output request information sent by the request end, generates a material park output certificate according to the park output request information, and feeds the material park output certificate back to the request end; the material park-leaving voucher is obtained by performing multiple process checks on the park-leaving request information corresponding to the material to be released;
and the request end acquires the park-leaving permission of the park-leaving of the goods and materials to be released based on the goods and materials park-leaving voucher.
Preferably, according to the management and control system for material delivery from a park provided by the application, the auditing end comprises a main auditing end;
the supervisor auditing end acquires first image information corresponding to the garden leaving request information from a preset cloud database;
the supervisor auditing end verifies the first image information and determines a first auditing result that the garden leaving request information passes;
and the supervisor auditing end stores the first auditing result in the cloud database.
Preferably, according to the management and control system of material delivery garden that this application provided, the system still includes:
the request end obtains the first checking result from the cloud database, and generates a first garden outlet two-dimensional code image based on the first checking result and the first image information.
Preferably, according to the management and control system for material delivery from a yard provided by the present application, the audit end comprises a warehouse audit end;
the warehouse checking end identifies the first garden outlet two-dimensional code image, checks the first checking result and the first image information, and determines a second checking result that the first checking result and the first image information both pass;
and the warehouse auditing end stores the second auditing result in the cloud database.
Preferably, according to the management and control system of goods and materials delivery garden that this application provided, the system still includes:
the request terminal acquires the second auditing result from the cloud database and generates task information for loading the materials to be discharged out of the garden based on the second auditing result;
the requesting end uploads loading image information for loading the materials to be discharged to the cloud database on the basis of the task information;
the request terminal acquires the loading image information from the cloud database and generates a second log-out two-dimensional code image based on the loading image information and the second examination result.
Preferably, according to the management and control system for material park export, the auditing end comprises a park export auditing end;
the park-out auditing end identifies the second park-out two-dimensional code image, respectively verifies the loaded image information, the second auditing result, the first auditing result and the first image information, and determines a third auditing result that the loaded image information, the second auditing result, the first auditing result and the first image information all pass;
the garden leaving auditing terminal stores the third auditing result in the cloud database;
and the park-out auditing end generates the material park-out certificate based on the third auditing result, and stores the material park-out certificate in the cloud database.
Preferably, according to the management and control system for material leaving a garden provided by the present application, the material to be removed from the garden at least includes: target materials; each target material is provided with a radio frequency component,
the system further comprises:
under the condition that a plurality of target materials are taken out of the garden, the warehouse auditing end identifies the radio frequency component corresponding to each target material by using a preset radio frequency inductor so as to verify the target material-taken out request information corresponding to the target materials; and
and the park-out auditing end identifies the radio frequency component corresponding to each target material by using the radio frequency inductor under the condition that a plurality of target materials are park-out so as to verify the park-out voucher of the target materials corresponding to the target materials.
In a third aspect, the present application further provides a management and control device for material delivery, including:
the information acquisition module is used for acquiring park output request information of the to-be-park output materials;
the certificate generation module is used for generating a material park-out certificate according to the park-out request information; the material park-leaving voucher is obtained by performing multiple process checks on the park-leaving request information corresponding to the material to be released;
and the park taking out permission module is used for obtaining the park taking out permission of the park to be taken out of the park based on the park taking out voucher of the material.
In a fourth aspect, the present application further provides an electronic device, including a memory and a processor, where the memory stores a computer program, and the processor is configured to execute, through the computer program, a management and control method for implementing the material park export according to any one of the above.
In a fifth aspect, the present application further provides a computer-readable storage medium, where the computer-readable storage medium includes a stored program, where the program is executed when running to implement a method for managing and controlling a material park according to any one of the above.
In a sixth aspect, the present application further provides a computer program product, which includes a computer program, and when the computer program is executed by a processor, the method for managing and controlling the park of materials as described in any one of the above.
According to the control method, the control system and the electronic device for material park leaving, the park leaving request information of the material to be released is obtained; generating a material garden-out certificate according to the garden-out request information; the material park-leaving voucher is obtained by performing multiple process checks on the park-leaving request information corresponding to the material to be released; and acquiring the park leaving permission of the park leaving of the goods and materials to be released based on the goods and materials park leaving voucher. The check of each process of material leaving the garden is completed through the computer, the efficiency of material leaving the garden can be greatly improved, the process is more standard, and real-time electronic recording can be carried out.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the application and, together with the description, serve to explain the principles of the application.
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, and it is obvious for those skilled in the art to obtain other drawings without inventive exercise.
Fig. 1 is a hardware environment diagram of a management and control method for a material delivery yard according to an embodiment of the present application;
fig. 2 is a schematic flow chart of a material yard delivery control method provided in the present application;
FIG. 3 is a schematic flow chart of step S200 in FIG. 2 provided herein;
FIG. 4 is a schematic flow chart of step S330 in FIG. 3 provided herein;
FIG. 5 is a schematic flow chart of step S430 in FIG. 4 provided herein;
FIG. 6 is a schematic flow chart of step S520 in FIG. 5 provided herein;
FIG. 7 is a schematic application diagram of a management and control system for material delivery from a park according to the present application;
fig. 8 is a schematic structural view of a material yard management and control device provided in the present application;
fig. 9 is a schematic structural diagram of an electronic device provided in the present application.
Detailed Description
In order to make the technical solutions better understood by those skilled in the art, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only partial embodiments of the present application, but not all embodiments. All other embodiments obtained by a person of ordinary skill in the art based on the embodiments in the present application without making any creative effort shall fall within the protection scope of the present application.
It should be noted that the terms "first," "second," and the like in the description and claims of this application and in the accompanying drawings are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used is interchangeable under appropriate circumstances such that the embodiments of the application described herein are capable of operation in sequences other than those illustrated or described herein. Moreover, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
The following describes a control method, a system and an electronic device for material delivery park according to the present application with reference to fig. 1 to 9.
According to one aspect of the embodiment of the application, a control method for material park export is provided. The control method for material park export is widely applied to intelligent digital control application scenes such as intelligent homes (Smart Home), intelligent homes, intelligent household equipment ecology, intelligent residence ecology and the like. Optionally, in this embodiment, the method for managing and controlling material leaving garden may be applied to a hardware environment formed by the terminal device 102 and the server 104 as shown in fig. 1. As shown in fig. 1, the server 104 is connected to the terminal device 102 through a network, and may be configured to provide a service (e.g., an application service) for the terminal or a client installed on the terminal, provide a database on or independent of the server for providing a data storage service for the server 104, and configure a cloud computing and/or edge computing service on or independent of the server for providing a data operation service for the server 104.
The network may include, but is not limited to, at least one of: wired networks, wireless networks. The wired network may include, but is not limited to, at least one of: wide area networks, metropolitan area networks, local area networks, which may include, but are not limited to, at least one of the following: WIFI (Wireless Fidelity), bluetooth. Terminal equipment 102 can be and not be limited to PC, the cell-phone, the panel computer, intelligent air conditioner, intelligent cigarette machine, intelligent refrigerator, intelligent oven, intelligent kitchen range, intelligent washing machine, intelligent water heater, intelligent washing equipment, intelligent dish washer, intelligent projection equipment, the intelligent TV, intelligent clothes hanger, intelligent (window) curtain, intelligence audio-visual, smart jack, intelligent stereo set, intelligent audio amplifier, intelligent new trend equipment, intelligent kitchen guarding's equipment, intelligent bathroom equipment, the intelligence robot of sweeping the floor, the intelligence robot of wiping the window, intelligence robot of mopping the floor, intelligent air purification equipment, intelligent steam ager, intelligent microwave oven, intelligent kitchen guarding, intelligent clarifier, intelligent water dispenser, intelligent lock etc..
As shown in fig. 2, which is a schematic view illustrating an implementation flow of a method for managing and controlling a material delivery yard according to an embodiment of the present application, the method for managing and controlling a material delivery yard may include, but is not limited to, steps S100 to S300.
S100, acquiring garden leaving request information of materials to be released;
s200, generating a material park-out certificate according to the park-out request information; the material park-leaving voucher is obtained by performing multiple process checks on the park-leaving request information corresponding to the material to be released;
s300, obtaining the park leaving permission of the park leaving of the goods and materials to be released based on the goods and materials park leaving voucher.
In step S100 of some embodiments, park export request information of the materials to be exported is obtained.
It can be understood that, the back-end program of the computer obtains the park output request information of the materials to be park output, and the park output request information is generated at the request end and transmitted to the back-end program through data transmission. For example, the requesting end user is a truck driver, that is, the truck driver lists a detailed list of materials to be taken out of the truck according to actual requirements, and simultaneously, the face photographing terminal can be used for face photographing to obtain face image information corresponding to the truck driver, and the detailed list of the materials to be taken out of the truck and the face image information are stored in the cloud database to be called by a back-end program.
In step S200 of some embodiments, a material park export voucher is generated according to the park export request information.
It can be understood that, after the step of obtaining the park export request information of the to-be-exported goods and materials in step S100 is executed, the specific execution steps may be: the method comprises the steps of firstly obtaining first image information corresponding to garden exit request information from a preset cloud database, verifying the first image information, determining a first verification result which the garden exit request information passes through, storing the first verification result in the cloud database, and generating a material garden exit certificate based on the first verification result.
It should be noted that the material park export voucher is obtained by performing multiple process checks on the park export request information corresponding to the material to be exported.
In step S300 of some embodiments, a park leaving permission of the park leaving of the to-be-released material is obtained based on the material park leaving voucher.
It can be understood that after the step of generating the material park export voucher according to the park export request information in the step S200 is completed, the specific steps may be:
the back-end program generates a material park-leaving certificate according to park-leaving request information, the material park-leaving certificate is stored in a cloud database, a request end of a truck driver can inquire the cloud database regularly, if the material park-leaving certificate is inquired to be stored in the cloud database, the material park-leaving certificate is called, a park-leaving permission of a material park to be left is obtained according to the material park-leaving certificate, the material park-leaving permission to be left can be carried normally according to the park-leaving permission, for example, when the truck driver drives an automobile, materials to be left are loaded in the automobile, when the automobile drives to a park gate, a management and control system of the material park-leaving can automatically identify whether the material park-leaving permission exists, and if the material park-leaving permission exists, a gateway of the park gate is opened, so that the automobile loaded with the materials to be left can normally leave the park.
In some embodiments, as shown with reference to fig. 3, step S200 may also include, but is not limited to, steps S310 to S330.
S310, acquiring first image information corresponding to the garden leaving request information from a preset cloud database;
s320, checking the first image information, and determining a first checking result that the garden leaving request information passes;
s330, storing the first examination result in the cloud database, and generating the material park output certificate based on the first examination result.
In step S310 of some embodiments, first image information corresponding to the gardening request information is acquired from a preset cloud database.
It may be understood that, the computer backend program may acquire, from the cloud database, first image information corresponding to the log departure request information, where the first image information at least includes: the face image information of the truck driver and a detailed list of materials to be discharged.
The detailed list of the materials to be discharged may be image information, or may be chart information obtained after the system performs filling configuration.
In step S320 of some embodiments, the first image information is verified, and a first verification result that the gardening request information passes is determined.
It is understood that after the step of obtaining the first image information corresponding to the gardening request information from the preset cloud database in step S310 is completed, the specific steps may be: and the computer back-end program checks the first image information, and when the check is successful, a first checking result that the garden request information passes is determined.
The corresponding business logic can be that a supervisor auditing end acquires first image information corresponding to the garden leaving request information from a preset cloud database; and the master auditing end verifies the first image information and determines a first auditing result that the garden leaving request information passes.
In step S330 of some embodiments, the first review result is stored in the cloud database, and the material park export voucher is generated based on the first review result.
It can be understood that, after the step of verifying the first image information and determining the first verification result that the gardening request information passes through in step S320 is performed, the specific performing steps may be: the computer program stores a first audit result obtained in the step S320 in the cloud database, generates a first garden two-dimensional code image based on the first audit result and the first image information, identifies the first garden two-dimensional code image, verifies the first audit result and the first image information, determines a second audit result that the first audit result and the first image information pass, stores the second audit result in the cloud database, and generates the material garden proof based on the second audit result.
In some embodiments, as shown with reference to fig. 4, step S330 may also include, but is not limited to, steps S410 to S430.
S410, generating a first garden outlet two-dimensional code image based on the first examination result and the first image information;
s420, identifying the first outgoing two-dimensional code image, checking the first checking result and the first image information, and determining a second checking result that the first checking result and the first image information both pass;
s430, storing the second examination result in the cloud database, and generating the material park output certificate based on the second examination result.
In step S410 of some embodiments, a first out-of-round two-dimensional code image is generated based on the first review result and the first image information.
As can be understood, the computer backend program generates a first garden outlet two-dimensional code image based on the first review result and the first image information in the cloud database, and displays the first garden outlet two-dimensional code image in the display area of the request end.
It should be noted that the request terminal may be a truck driver terminal, and more specifically, may be a WeChat applet or preset software, and may display the first two-dimensional code image.
In step S420 of some embodiments, the first outgoing two-dimensional code image is identified, the first audit result and the first image information are checked, and a second audit result that both the first audit result and the first image information pass is determined.
It can be understood that after the step S410 of generating the first outgoing two-dimensional code image based on the first review result and the first image information is performed, the specific steps may be: and the computer back-end program identifies the first two-dimension code image, verifies the first verification result and the first image information, more specifically, verifies whether the first verification result passes the verification, and verifies the first image information again, and when the first verification result and the first image information pass the verification, a second verification result is obtained.
In a specific service level, a first two-dimensional code image for outputting the garden can be displayed for a request end (a truck driver) to a warehouse auditing end, the warehouse auditing end scans the first two-dimensional code image for outputting the garden by using preset software or a WeChat small program, identifies the first two-dimensional code image for outputting the garden, verifies the first auditing result and the first image information, and determines a second auditing result which is passed by both the first auditing result and the first image information.
In step S430 of some embodiments, the second review result is stored in the cloud database, and the material park export voucher is generated based on the second review result.
It can be understood that after the steps of identifying the first outgoing two-dimensional code image, verifying the first verification result and the first image information, and determining a second verification result that both the first verification result and the first image information pass are performed in step S420, the specific steps may be: and storing a second examination result in a cloud database, generating task information for loading the materials to be discharged from the garden based on the second examination result, uploading loading image information for loading the materials to be discharged from the garden to the cloud database based on the task information, and generating the materials discharging certificate based on the loading image information.
In some embodiments, as shown with reference to fig. 5, step S430 may also include, but is not limited to, steps S510 to S520.
S510, based on the second examination result, generating task information for loading the to-be-discharged garden material;
s520, uploading loading image information for loading the materials to be discharged to the cloud database based on the task information, and generating the materials discharging certificate based on the loading image information.
In step S510 of some embodiments, task information for loading the to-be-discharged materials is generated based on the second review result.
It can be understood that the computer back-end program automatically generates task information for loading the to-be-discharged materials based on the second audit result obtained through the audit of the warehouse audit end, sends the task information for loading the to-be-discharged materials to the request end, and stores the task information in the cloud database.
In step S520 of some embodiments, loading image information for completing loading of the to-be-discharged materials is uploaded to the cloud database based on the task information, and the material discharge voucher is generated based on the loading image information.
It can be understood that after the step of performing step S510 to generate the task information for loading the to-be-discharged materials based on the second examination result, the specific performing steps may be: and uploading, by a computer back-end program, loading image information for loading the to-be-discharged materials to the cloud database based on the task information obtained in the step S510, generating a second discharged two-dimensional code image based on the loading image information and the second audit result, identifying the second discharged two-dimensional code image, respectively auditing the loading image information, the second audit result, the first audit result and the first image information, determining a third audit result that the loading image information, the second audit result, the first audit result and the first image information all pass, storing the third audit result in the cloud database, and generating a material discharge certificate based on the third audit result.
It should be noted that, the request end uploads the loading image information for completing loading the to-be-discharged materials to the request end based on the task information obtained in step S510, and the back-end program of the computer uploads the loading image information for completing loading the to-be-discharged materials to the cloud database on the control request end.
In some embodiments, as shown with reference to fig. 6, step S520 may also include, but is not limited to, steps S610 to S630.
S610, generating a second garden outlet two-dimensional code image based on the loading image information and the second checking result;
s620, identifying the second outgoing two-dimensional code image, respectively checking the loaded image information, the second checking result, the first checking result and the first image information, and determining a third checking result that the loaded image information, the second checking result, the first checking result and the first image information pass;
and S630, storing the third audit result in the cloud database, and generating the material park-out certificate based on the third audit result.
In step S610 of some embodiments, a second outgoing two-dimensional code image is generated based on the loading image information and the second review result.
The method includes the steps that a computer back-end program generates a second garden exit two-dimensional code image based on loaded image information and a second checking result in a cloud database, the second garden exit two-dimensional code image is stored in the cloud database, and meanwhile the second garden exit two-dimensional code image is transmitted to a request end, so that a truck driver corresponding to the request end utilizes the second garden exit two-dimensional code image to conduct approval of a garden exit checking end.
In step S620 of some embodiments, the second outgoing two-dimensional code image is identified, the loaded image information, the second audit result, the first audit result, and the first image information are respectively checked, and a third audit result that the loaded image information, the second audit result, the first audit result, and the first image information all pass is determined.
It can be understood that after the step S610 of generating the second outgoing two-dimensional code image based on the loading image information and the second examination result is performed, the specific steps may be:
and a computer back-end program identifies a second round two-dimensional code output image displayed by a request end to respectively check the loaded image information, the second checking result, the first checking result and the first image information, and when the loaded image information, the second checking result, the first checking result and the first image information pass through checking authentication and check is correct, a third checking result which determines that the loaded image information, the second checking result, the first checking result and the first image information pass is obtained.
It should be noted that the corresponding actual business process may be: the request end displays a second garden-going two-dimensional code image, the garden-going auditing end identifies the second garden-going two-dimensional code image, respectively verifies the loading image information, the second auditing result, the first auditing result and the first image information, and determines a third auditing result that the loading image information, the second auditing result, the first auditing result and the first image information all pass.
In step S630 of some embodiments, the third audit result is stored in the cloud database, and the material park export certificate is generated based on the third audit result.
It is understood that, after the step of S620 is executed, the specific execution steps may be: the computer back-end program stores the third audit result in the cloud database; and generating the material output certificate by a computer back-end program based on the third audit result, storing the material output certificate in the cloud database, so that the request end can call the material output certificate from the cloud database, and acquiring the output permission of the material to be output from the park according to the material output certificate.
In some embodiments, the to-be-disembarked supplies include at least: target materials; each of the target materials is configured with a radio frequency component,
after the step of generating a first outgoing two-dimensional code image based on the first review result and the first image information, the method further includes:
under the condition that a plurality of target materials are taken out of the garden, a preset radio frequency inductor is utilized to identify a radio frequency assembly corresponding to each target material so as to verify target material-out request information corresponding to the target materials; and
after the generating of the second outgoing two-dimensional code image based on the loading image information and the second examination result, the method further includes:
under the condition that a plurality of target materials are taken out of the park, the radio frequency sensor is utilized to identify the radio frequency assembly corresponding to each target material so as to verify the target material park-taking voucher corresponding to the target material.
It can be understood that, when the target materials are included in the materials to be discharged from the park, each target material is provided with a radio frequency component for radio frequency identification induction when the target materials are discharged from the park so as to check whether the quantity of the target materials is correct.
Specifically, under the condition that a plurality of target materials are taken out of the garden, a preset radio frequency inductor is utilized to identify a radio frequency component corresponding to each target material so as to verify target material-out request information corresponding to the target materials; and under the condition that a plurality of target materials are taken out of the park, identifying the radio frequency assembly corresponding to each target material by using the radio frequency inductor so as to verify the target material park-out certificate corresponding to the target material.
The target material is the important material divided according to the actual requirement.
The application discloses management and control method, system and electronic device for material leaving, and the management and control method for material leaving comprises the following steps: obtaining the park-leaving request information of the goods and materials to be released; generating a material park-out certificate according to the park-out request information; the material park-leaving voucher is obtained by performing multiple process checks on park-leaving request information corresponding to the to-be-released material; and obtaining the garden leaving permission for the materials to be delivered out of the garden based on the material garden leaving voucher. Through the embodiment that this application provided, realize accomplishing each flow verification that goods and materials went out the garden through the computer, not only can great improvement goods and materials efficiency of going out the garden, the flow is more standard moreover to have real-time electronic record to trace back.
The following describes a control system for material park export, and a control system for material park export described below and a control method for material park export described above may be referred to correspondingly.
Optionally, this application provides a management and control system of goods and materials play garden, includes:
the request end sends out park-leaving request information for requesting the park-leaving of the materials to be bought;
the auditing end receives the park output request information sent by the request end, generates a material park output certificate according to the park output request information, and feeds the material park output certificate back to the request end; the material park-leaving voucher is obtained by performing multiple process checks on park-leaving request information corresponding to the to-be-released material;
and the request end acquires the park-leaving permission of the park-leaving of the goods and materials to be released based on the goods and materials park-leaving voucher.
Optionally, according to the control system for material delivery from a yard provided by the present application, the auditing end includes a main auditing end;
the supervisor auditing end acquires first image information corresponding to the park leaving request information from a preset cloud database;
the supervisor auditing end verifies the first image information and determines a first auditing result which passes the garden leaving request information;
and the supervisor auditing end stores the first auditing result in the cloud database.
Optionally, according to the management and control system for material delivery park provided by the application, the system further includes:
the request end obtains the first auditing result from the cloud database, and generates a first garden-going two-dimensional code image based on the first auditing result and the first image information.
Optionally, according to the control system for material delivery from a garden provided by the application, the audit end includes a warehouse audit end;
the warehouse checking end identifies the first garden outlet two-dimensional code image, checks the first checking result and the first image information, and determines a second checking result that the first checking result and the first image information both pass;
and the warehouse auditing end stores the second auditing result in the cloud database.
Optionally, according to a management and control system for material delivery park provided by the present application, the system further includes:
the request end acquires the second examination result from the cloud database, and generates task information for loading the to-be-discharged materials based on the second examination result;
the requesting end uploads loading image information for loading the materials to be discharged to the cloud database on the basis of the task information;
the request terminal acquires the loading image information from the cloud database and generates a second log-out two-dimensional code image based on the loading image information and the second examination result.
Optionally, according to the control system for material delivery from a park provided by the application, the auditing end includes a delivery auditing end;
the park-out auditing end identifies the second park-out two-dimensional code image, respectively verifies the loaded image information, the second auditing result, the first auditing result and the first image information, and determines a third auditing result that the loaded image information, the second auditing result, the first auditing result and the first image information all pass;
the garden leaving auditing terminal stores the third auditing result in the cloud database;
and the park-out auditing end generates the material park-out certificate based on the third auditing result, and stores the material park-out certificate in the cloud database.
Optionally, according to the management and control system for leaving a garden with materials provided by the present application, the materials to be left the garden at least include: target materials; each of the target materials is configured with a radio frequency component,
the system further comprises:
under the condition that a plurality of target materials are taken out of the garden, the warehouse auditing end identifies the radio frequency component corresponding to each target material by using a preset radio frequency inductor so as to verify the target material-taken out request information corresponding to the target materials; and
and the garden exit auditing end identifies the radio frequency component corresponding to each target material by using the radio frequency inductor under the condition that a plurality of target materials are discharged from the garden so as to verify the target material garden exit voucher corresponding to the target material.
As shown in fig. 7, it can be understood that the request end may be a truck driver end, and may use a wechat applet or preset software to execute a plurality of processes of the management and control system for material delivery from the yard.
The cloud database is used for storing data information of a plurality of approval processes in a management and control system for material delivery.
The auditing end at least comprises but is not limited to: and the manager auditing end, the warehouse auditing end and the park-out auditing end are used for performing multi-level auditing and verification on the information of the request end, and the material park-out certificate can be generated only if the requirements are met, so that the request end obtains park permission according to the material park-out certificate.
Radio Frequency Identification (RFID), radio Frequency Identification (RFID): the method is one of automatic identification technologies, and non-contact bidirectional data communication is performed in a radio frequency mode, and a recording medium (an electronic tag or a radio frequency card) is read and written in the radio frequency mode, so that the aims of identifying a target and exchanging data are fulfilled.
Specific examples may be: and the truck driver uploads the image information of the driver and the list information of the goods and materials to be taken out of the park to the cloud database, when the updated image information of the driver and the list information of the goods and materials to be taken out of the park exist in the cloud database, the auditing end is in charge of primarily auditing the driver and the goods and materials, a first auditing result is obtained after the auditing is passed, if the auditing is not passed, the truck driver returns the process node to the truck driver, and relevant information is uploaded again. The first audit result is stored in the cloud database, a first garden-out two-dimensional code image is generated based on the first audit result, a truck driver shows the first garden-out two-dimensional code image to a warehouse audit terminal to request for audit, the warehouse audit terminal conducts audit on the truck driver, a second audit result is obtained after the audit is passed, and task information for loading to-be-out garden materials is generated based on the second audit result. And storing the task information in a cloud database, and sending the task information to a truck driver, wherein the truck driver uploads loading image information for completing loading of the materials to be discharged to the cloud database based on the task information.
And generating a second garden outlet two-dimensional code image by the computer back-end program based on the loading image information and the second checking result, and displaying the second garden outlet two-dimensional code image at a request end corresponding to the truck driver.
The park-out auditing end identifies the second park-out two-dimensional code image, respectively verifies the loaded image information, the second auditing result, the first auditing result and the first image information, and determines a third auditing result that the loaded image information, the second auditing result, the first auditing result and the first image information all pass; and storing the third audit result in the cloud database, and generating the material park-out voucher based on the third audit result.
When materials to be discharged are target materials and each target material is provided with a radio frequency component, after the step of generating a first discharging two-dimensional code image based on the first examination result and the first image information, under the condition that a plurality of target materials are discharged, a preset radio frequency inductor is used for identifying the radio frequency component corresponding to each target material so as to examine target discharging request information corresponding to the target materials; and
after a second park-out two-dimensional code image is generated based on the loading image information and the second checking result, under the condition that a plurality of target materials are park-out, the radio frequency inductor is utilized to identify the radio frequency assembly corresponding to each target material so as to check the target material park-out certificate corresponding to the target material.
The application discloses a management and control system for material leaving a garden, which is used for acquiring the information of a request for leaving the garden for material to be left the garden; generating a material park-out certificate according to the park-out request information; the material park-leaving voucher is obtained by performing multiple process checks on park-leaving request information corresponding to the to-be-released material; and acquiring the park leaving permission of the park leaving of the goods and materials to be released based on the goods and materials park leaving voucher. Through the embodiment that this application provided, realize accomplishing each flow that the goods and materials goes out the garden through the computer and verify, not only can great improvement goods and materials efficiency of going out the garden, the flow is more normal moreover to have real-time electronic record to trace back.
The following describes a control device for material park export, and a control method for material park export described below and a control device for material park export may be referred to in correspondence with each other.
Referring to fig. 8, it is shown that a management and control device for material delivery park provided by the present application includes:
the information obtaining module 810 is configured to obtain park export request information of the to-be-exported goods and materials;
a credential generation module 820, configured to generate a material garden export credential according to the garden export request information; the material park-leaving voucher is obtained by performing multiple process checks on park-leaving request information corresponding to the to-be-released material;
and a get-out-of-park permission module 830, configured to obtain a go-out-of-park permission for the material to be sent out of the park based on the material go-out-of-park credential.
Preferably, according to the management and control device for material park leaving provided by the application, the credential generation module 820 is specifically configured to acquire, from a preset cloud database, first image information corresponding to the park leaving request information;
verifying the first image information, and determining a first verification result that the garden leaving request information passes;
and storing the first examination result in the cloud database, and generating the material park output certificate based on the first examination result.
Preferably, according to the control device for material park export, provided by the application, the voucher generating module 820 is specifically configured to generate a first park export two-dimensional code image based on the first audit result and the first image information;
identifying the first garden outlet two-dimensional code image, checking the first checking result and the first image information, and determining a second checking result which passes the first checking result and the first image information;
and storing the second examination result in the cloud database, and generating the material park-making voucher based on the second examination result.
Preferably, according to the management and control device for material park leaving provided by the application, the credential generating module 820 is specifically configured to generate task information for loading the material to be park leaving based on the second audit result;
and uploading loading image information for loading the materials to be discharged to the cloud database based on the task information, and generating the material discharging certificate based on the loading image information.
Preferably, according to the control device for material delivery from a garden provided by the application, the generation credential module 820 is specifically configured to generate a second two-dimensional code image for delivery from a garden based on the loading image information and the second review result;
identifying the second outgoing two-dimensional code image, respectively checking the loaded image information, the second checking result, the first checking result and the first image information, and determining a third checking result that the loaded image information, the second checking result, the first checking result and the first image information pass;
and storing the third audit result in the cloud database, and generating the material park-out certificate based on the third audit result.
Preferably, according to the device for managing and controlling material leaving a garden provided by the present application, the credential module 820 is generated, where the material to be left a garden at least includes: target materials; each target material is provided with a radio frequency component,
after the step of generating a first park export two-dimensional code image based on the first audit result and the first image information, the method is further specifically configured to identify a radio frequency component corresponding to each target material by using a preset radio frequency inductor under the condition that a plurality of target materials are brought out of the park, so as to verify target park export request information corresponding to the target materials; and
after the second park-out two-dimensional code image is generated based on the loading image information and the second examination result, the radio frequency sensor is used for identifying the radio frequency component corresponding to each target material under the condition that the target materials are park-out specifically, so that the target material park-out certificate corresponding to the target material is examined.
The application discloses a management and control device for material leaving a garden, which is used for acquiring leaving request information of materials to be left the garden; generating a material garden-out certificate according to the garden-out request information; the material park-leaving voucher is obtained by performing multiple process checks on the park-leaving request information corresponding to the material to be released; and obtaining the garden leaving permission for the materials to be delivered out of the garden based on the material garden leaving voucher. Through the embodiment that this application provided, realize accomplishing each flow that the goods and materials goes out the garden through the computer and verify, not only can great improvement goods and materials efficiency of going out the garden, the flow is more normal moreover to have real-time electronic record to trace back.
Fig. 9 illustrates a physical structure diagram of an electronic device, and as shown in fig. 9, the electronic device may include: a processor (processor) 910, a communication Interface (Communications Interface) 920, a memory (memory) 930, and a communication bus 940, wherein the processor 910, the communication Interface 920, and the memory 930 communicate with each other via the communication bus 940. Processor 910 may invoke logic instructions in memory 930 to perform a method for regulating the shipment of materials, the method comprising: acquiring park output request information of the to-be-park-output materials; generating a material garden-out certificate according to the garden-out request information; the material park-leaving voucher is obtained by performing multiple process checks on the park-leaving request information corresponding to the material to be released; and acquiring the park leaving permission of the park leaving of the goods and materials to be released based on the goods and materials park leaving voucher.
Furthermore, the logic instructions in the memory 930 may be implemented in the form of software functional units and stored in a computer readable storage medium when the software functional units are sold or used as independent products. Based on such understanding, the technical solution of the present application or portions thereof that substantially contribute to the prior art may be embodied in the form of a software product stored in a storage medium and including instructions for causing a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the method according to the embodiments of the present application. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and other various media capable of storing program codes.
In another aspect, the present application further provides a computer program product, where the computer program product includes a computer program, the computer program may be stored on a computer-readable storage medium, and when the computer program is executed by a processor, the computer is capable of executing a method for managing and controlling a material park provided by the above methods, where the method includes: acquiring garden leaving request information of materials to be released; generating a material park-out certificate according to the park-out request information; the material park-leaving voucher is obtained by performing multiple process checks on park-leaving request information corresponding to the to-be-released material; and acquiring the park leaving permission of the park leaving of the goods and materials to be released based on the goods and materials park leaving voucher.
In another aspect, the present application further provides a computer-readable storage medium, where the computer-readable storage medium includes a stored program, where the program executes a method for managing and controlling a material park provided by the foregoing methods when running, and the method includes: acquiring park output request information of the to-be-park-output materials; generating a material garden-out certificate according to the garden-out request information; the material park-leaving voucher is obtained by performing multiple process checks on the park-leaving request information corresponding to the material to be released; and obtaining the garden leaving permission for the materials to be delivered out of the garden based on the material garden leaving voucher.
The above-described embodiments of the apparatus are merely illustrative, and the units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one position, or may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of the present embodiment. One of ordinary skill in the art can understand and implement it without inventive effort.
Through the above description of the embodiments, those skilled in the art will clearly understand that each embodiment may be implemented by software plus a necessary general hardware platform, and may also be implemented by hardware. With this understanding in mind, the above-described technical solutions may be embodied in the form of a software product, which can be stored in a computer-readable storage medium such as ROM/RAM, magnetic disk, optical disk, etc., and includes instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to execute the methods described in the embodiments or some parts of the embodiments.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present application, and not to limit the same; although the present application has been described in detail with reference to the foregoing embodiments, it should be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions in the embodiments of the present application.

Claims (15)

1. A control method for material park delivery is characterized by comprising the following steps:
acquiring garden leaving request information of materials to be released;
generating a material park-out certificate according to the park-out request information; the material park-leaving voucher is obtained by performing multiple process checks on the park-leaving request information corresponding to the material to be released;
and acquiring the park leaving permission of the park leaving of the goods and materials to be released based on the goods and materials park leaving voucher.
2. The method for managing and controlling material leaving park of claim 1,
the generating of the material park-offering voucher according to the park-offering request information comprises:
acquiring first image information corresponding to the garden leaving request information from a preset cloud database;
verifying the first image information, and determining a first verification result that the garden leaving request information passes;
and storing the first examination result in the cloud database, and generating the material park output certificate based on the first examination result.
3. The method for managing and controlling a material delivery park of claim 2,
the generating the material park-making voucher based on the first examination result comprises:
generating a first garden-going two-dimensional code image based on the first examination result and the first image information;
identifying the first outgoing two-dimensional code image, verifying the first verification result and the first image information, and determining a second verification result that the first verification result and the first image information both pass;
and storing the second examination result in the cloud database, and generating the material park-making voucher based on the second examination result.
4. The method as claimed in claim 3, wherein the step of managing the material park is further performed,
the generating the material park-making voucher based on the second examination result comprises:
generating task information for loading the materials to be discharged out of the garden based on the second examination result;
and uploading loading image information for loading the materials to be discharged to the cloud database based on the task information, and generating the material discharging certificate based on the loading image information.
5. The method for managing and controlling material leaving park of claim 4,
the generating the material park-out voucher based on the loading image information comprises:
generating a second garden-going two-dimensional code image based on the loading image information and the second examination result;
identifying the second outgoing two-dimensional code image, respectively checking the loaded image information, the second checking result, the first checking result and the first image information, and determining a third checking result that the loaded image information, the second checking result, the first checking result and the first image information pass;
and storing the third audit result in the cloud database, and generating the material park-out certificate based on the third audit result.
6. The method for managing and controlling material leaving garden as claimed in claim 5, wherein the material to be left garden at least comprises: target materials; each target material is provided with a radio frequency component,
after the step of generating a first outgoing two-dimensional code image based on the first review result and the first image information, the method further includes:
under the condition that a plurality of target materials are taken out of the garden, a preset radio frequency inductor is utilized to identify a radio frequency assembly corresponding to each target material so as to verify target material-out request information corresponding to the target materials; and
after the generating of the second outgoing two-dimensional code image based on the loading image information and the second examination result, the method further includes:
under the condition that a plurality of target materials are taken out of the park, the radio frequency sensor is utilized to identify the radio frequency assembly corresponding to each target material so as to verify the target material park-taking voucher corresponding to the target material.
7. The utility model provides a management and control system of goods and materials play garden which characterized in that includes:
the request end sends out park-leaving request information for requesting the park-leaving of the materials to be bought;
the auditing end receives the park output request information sent by the request end, generates a material park output certificate according to the park output request information, and feeds the material park output certificate back to the request end; the material park-leaving voucher is obtained by performing multiple process checks on the park-leaving request information corresponding to the material to be released;
and the request end acquires the park-leaving permission of the park-leaving of the goods and materials to be released based on the goods and materials park-leaving voucher.
8. The management and control system for material park export according to claim 7, wherein the auditing end comprises a supervisor auditing end;
the supervisor auditing end acquires first image information corresponding to the park leaving request information from a preset cloud database;
the supervisor auditing end verifies the first image information and determines a first auditing result that the garden leaving request information passes;
and the supervisor auditing end stores the first auditing result in the cloud database.
9. The system for managing and controlling a material delivery park of claim 8, wherein the system further comprises:
the request end obtains the first auditing result from the cloud database, and generates a first garden-going two-dimensional code image based on the first auditing result and the first image information.
10. The control system for material yard discharge according to claim 9, wherein the auditing terminals include warehouse auditing terminals;
the warehouse auditing end identifies the first log-out two-dimensional code image, verifies the first auditing result and the first image information, and determines a second auditing result that the first auditing result and the first image information both pass;
and the warehouse auditing end stores the second auditing result in the cloud database.
11. The system for managing and controlling a material delivery park of claim 10, wherein the system further comprises:
the request end acquires the second examination result from the cloud database, and generates task information for loading the to-be-discharged materials based on the second examination result;
the requesting end uploads loading image information for loading the materials to be discharged to the cloud database on the basis of the task information;
the request terminal acquires the loading image information from the cloud database and generates a second log-out two-dimensional code image based on the loading image information and the second examination result.
12. The system according to claim 11, wherein the auditing terminals include a park-leaving auditing terminal;
the park-out auditing end identifies the second park-out two-dimensional code image, respectively verifies the loaded image information, the second auditing result, the first auditing result and the first image information, and determines a third auditing result that the loaded image information, the second auditing result, the first auditing result and the first image information all pass;
the garden leaving auditing terminal stores the third auditing result in the cloud database;
and the park-out auditing end generates the material park-out certificate based on the third auditing result, and stores the material park-out certificate in the cloud database.
13. The system according to claim 12, wherein the system for managing the materials leaving the park at least comprises: target materials; each target material is provided with a radio frequency component,
the system further comprises:
under the condition that a plurality of target materials are taken out of the garden, the warehouse auditing end identifies the radio frequency component corresponding to each target material by using a preset radio frequency inductor so as to verify the target material-taken out request information corresponding to the target materials; and
and the park-out auditing end identifies the radio frequency component corresponding to each target material by using the radio frequency inductor under the condition that a plurality of target materials are park-out so as to verify the park-out voucher of the target materials corresponding to the target materials.
14. The utility model provides a management and control device of goods and materials garden which characterized in that includes:
the information acquisition module is used for acquiring the park output request information of the goods and materials to be output;
the certificate generation module is used for generating a material park-out certificate according to the park-out request information; the material park-leaving voucher is obtained by performing multiple process checks on the park-leaving request information corresponding to the material to be released;
and the park taking out permission module is used for obtaining the park taking out permission of the park to be taken out of the park based on the park taking out voucher of the material.
15. An electronic device comprising a memory and a processor, characterized in that the memory has stored therein a computer program, the processor being arranged to execute the method of any of claims 1 to 6 by means of the computer program.
CN202211066420.0A 2022-08-31 2022-08-31 Material park-leaving management and control method, system and electronic device Pending CN115496467A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211066420.0A CN115496467A (en) 2022-08-31 2022-08-31 Material park-leaving management and control method, system and electronic device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211066420.0A CN115496467A (en) 2022-08-31 2022-08-31 Material park-leaving management and control method, system and electronic device

Publications (1)

Publication Number Publication Date
CN115496467A true CN115496467A (en) 2022-12-20

Family

ID=84468416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211066420.0A Pending CN115496467A (en) 2022-08-31 2022-08-31 Material park-leaving management and control method, system and electronic device

Country Status (1)

Country Link
CN (1) CN115496467A (en)

Similar Documents

Publication Publication Date Title
CN110889710B (en) Device information management method, server, and storage medium
CN110765149B (en) Intelligent device full life cycle monitoring query and user identity recognition binding system
CN104392299A (en) Business information processing method and system
CN108351771A (en) Maintain the control for the restricted data during being deployed to cloud computing environment
CN104240013A (en) Door access control method and door access control platform
WO2017143811A1 (en) Information processing method and device for hotel room card
CN105184114B (en) A kind of system of digital publishing
CN104240014A (en) Door access control method and door access control platform
CN108022148A (en) System is supported in a kind of robot lease
CN115690938A (en) Product quality monitoring method and system, storage medium and electronic device
CN111932200A (en) Remote bidding evaluation system
CN109087065B (en) Intelligent device management method and system
CN101253758A (en) Providing a service using an electronic capture device
CN110768992A (en) Shared device operation monitoring method, device, server and storage medium
CN106997503A (en) Movie theatre intellectualized management system
JP6913245B2 (en) Agricultural product supply system and method, agricultural product transaction processing method
CN115496467A (en) Material park-leaving management and control method, system and electronic device
CN108806233A (en) ammeter data checking method and device
CN110766827A (en) Unlocking method and device
CN107944950A (en) The method and apparatus of order data processing, computer equipment, readable storage medium storing program for executing
CN114819524A (en) Shop online authorization method, system, storage medium and electronic device
CN115496524A (en) Store visiting method and device, storage medium and electronic device
CN113743964B (en) Product supervision system and method
CN102752151B (en) Measuring and controlling product management method and device based on flexibility testing technology
CN110619399A (en) Management platform and management method of intelligent equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination