CN115434290A - 一种水电站整改及河流连通性修复结构 - Google Patents

一种水电站整改及河流连通性修复结构 Download PDF

Info

Publication number
CN115434290A
CN115434290A CN202210869542.7A CN202210869542A CN115434290A CN 115434290 A CN115434290 A CN 115434290A CN 202210869542 A CN202210869542 A CN 202210869542A CN 115434290 A CN115434290 A CN 115434290A
Authority
CN
China
Prior art keywords
fish
section
bank
channel
right bank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210869542.7A
Other languages
English (en)
Inventor
金志军
王猛
姜鹏
单承康
陈凡
赵再兴
常理
马卫忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
PowerChina Ecological Environment Design and Research Co Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
PowerChina Ecological Environment Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd, PowerChina Ecological Environment Design and Research Co Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN202210869542.7A priority Critical patent/CN115434290A/zh
Publication of CN115434290A publication Critical patent/CN115434290A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/08Fish passes or other means providing for migration of fish; Passages for rafts or boats
    • E02B8/085Devices allowing fish migration, e.g. fish traps
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Revetment (AREA)

Abstract

本发明提供了一种水电站整改及河流连通性修复结构,包括水电站、左岸过鱼通道、右岸过鱼通道和生态流量下放设施。本发明在已建水电站基础上增加过鱼通道和生态流量下放设施,可有效解决已建水电站生态整改的问题;根据水电站已有布置,利用边坡、发电尾水坝段牛腿、泄洪闸坝段闸墩和右岸回填平台将左岸过鱼通道、右岸过鱼通道和生态流量下放设施这些增设的生态设施进行结合布置,在减少对枢纽改造情况下,兼顾了发电效益和生态效益,实现了发电效益增加和水资源高效利用的同时,满足了生态流量下放和高效过鱼的水电站整改要求。

Description

一种水电站整改及河流连通性修复结构
技术领域
本发明涉及一种水电站整改及河流连通性修复结构,属于水电站生态整改领域。
背景技术
水电是清洁可再生能源,在解决用电、优化能源结构、促进地方经济社会发展方面发挥了重要作用,但用于引水或蓄水拦河建筑物均会阻碍水生动物的自由移动,而水生动物种群高度依赖于支持其生长、越冬、产卵、避难等生物行为的河流栖息地连通性特征。以往部分已建水电站已不满足当今时代环保要求,并对河流生态系统造成不利影响,不但阻隔了珍稀特有水生生物前往不同栖息地的通道,甚至造成坝下河段出现严重的减脱水情况,现如今,这些不满足生态保护要求的水电站被要求整改,而未按规定泄放生态流量或河流连通性不满足水生生物保护要求是导致这些水电站要求被整改的主要原因。
如何结合水电站整体布置及因地制宜地制定整改措施是水电站整改面临的主要难点。水电站整改是在坝体整体安全稳定基础上开展,不但要考虑原有防洪、供水、发电等功能,还要对造成的河段减脱水、阻碍水生生物洄游等河流不连通问题采取修复措施,如何在维持或提升水电站原有功能的基础上保障坝下河段生态流量的同时确保鱼类过坝洄游是水电站整改、生态功能提升面临的主要问题。
发明内容
为解决上述技术问题,本发明提供了一种水电站整改及河流连通性修复结构,该水电站整改及河流连通性修复结构在提升水电站原有功能的基础上,确保坝下河段生态流量和鱼类过坝洄游,解决了因水电站建设造成的河段阻隔问题,在确保工程安全、充分利用水资源的基础上,实现河流连通性修复目的。
本发明通过以下技术方案得以实现。
本发明提供的一种水电站整改及河流连通性修复结构,包括水电站、左岸过鱼通道、右岸过鱼通道和生态流量下放设施,所述水电站为已建水电站,左岸过鱼通道、右岸过鱼通道和生态流量下放设施为结合已建水电站进行布置的补建的生态设施,所述水电站包括横向依次对接的左岸发电厂房坝段、泄洪闸坝段、右岸挡水坝段、右岸回填平台,左岸发电厂房坝段沿左岸山体构建,左岸发电厂房坝段内有发电机组,发电机组下游段有发电尾水渠,在发电尾水渠和左岸山体之间有左岸边坡,发电尾水渠内布置有进口集鱼通道,左岸边坡上布置有左岸通道段,左岸通道段连通至右岸挡水坝段;所述右岸回填平台上布置有左岸过鱼通道与生态流量下放设施结合段、右岸过鱼通道回填平台段、右岸过鱼通道与生态流量下放设施结合段和生态机组。
所述左岸过鱼通道借助已建水电站结构从左岸跨过河流通往右岸,左岸过鱼通道由左岸过鱼通道主进口、左岸过鱼通道副进口、进口集鱼通道、左岸通道段、跨发电厂房段、跨厂泄坝段挡洪墙段、跨泄洪闸段、右岸通道段、左岸过鱼通道与生态流量下放设施结合段和左岸过鱼通道出口组成;左岸过鱼通道进口布置在左岸发电厂房坝段下游左侧河岸,出口布置在右岸挡水坝段上游,左岸过鱼通道的左岸通道段下部依次连通左岸过鱼通道副进口、进口集鱼通道和左岸过鱼通道主进口,左岸过鱼通道的左岸通道段上部通过跨发电厂房段、跨厂泄坝段挡洪墙段、跨泄洪闸段、右岸通道段、左岸过鱼通道与生态流量下放设施结合段连通至右岸挡水坝段的右岸过鱼通道出口。
所述右岸过鱼通道布置在右岸回填平台上,右岸过鱼通道由导鱼横堰、右岸过鱼通道进口、导鱼纵堰、右岸过鱼通道回填平台段、右岸过鱼通道与生态流量下放设施结合段和右岸过鱼通道出口组成;所述右岸过鱼通道进口左侧为导鱼横堰,右岸过鱼通道进口右侧为导鱼纵堰;所述右岸过鱼通道进口上游接右岸过鱼通道回填平台段、右岸过鱼通道与生态流量下放设施结合段和右岸过鱼通道出口。
所述生态流量下放设施布置在水电站右岸回填平台上,生态流量下放设施由进水渠、储水池、发电引水管道、生态机组、发电厂房和消力池组成;生态机组安装于发电厂房,生态机组下游有消力池,消力池下游出口位置有导鱼横堰,进水渠布置在右岸挡水坝段上,进水渠左侧为左岸过鱼通道出口,进水渠右侧为右岸过鱼通道出口。
所述左岸过鱼通道的跨发电厂房段布置在左岸发电厂房坝段的牛腿上;所述跨厂泄坝段挡洪墙段布置在厂泄坝段挡洪墙上;所述跨泄洪闸段布置在泄洪闸坝段的闸墩上;所述右岸通道段布置在右岸回填平台上;所述左岸过鱼通道与左岸过鱼通道与生态流量下放设施结合段布置在储水池上。
所述进口集鱼通道由导流墙、引流槽、拦鱼网栅、边墙和底板组成,底板铺设于底部,边墙隔断进口集鱼通道和左岸通道段,导流墙和引流槽交错成倾斜延伸面垂直置于发电尾水渠中;引流槽的位置有拦鱼网栅连接相邻两块导流墙。
所述生态机组前级通过发电引水管道接储水池,储水池接至进水渠,进水渠位于右岸挡水坝段临水面并设右岸过鱼通道出口和左岸过鱼通道出口。
所述右岸挡水坝段上布置有左岸过鱼通道出口、进水渠和右岸过鱼通道出口,左岸过鱼通道出口、进水渠和右岸过鱼通道出口底板高程低于库区运行低水位,左岸过鱼通道出口、进水渠和右岸过鱼通道出口上设置有节制闸,左岸过鱼通道出口引库区水进入左岸过鱼通道与生态流量下放设施结合段,右岸过鱼通道出口引库区水进入右岸过鱼通道与生态流量下放设施结合段,进水渠引库区水进入储水池。
所述左岸过鱼通道与生态流量下放设施结合段和右岸过鱼通道与生态流量下放设施结合段布置在储水池上方;所述从左岸过鱼通道出口进入左岸过鱼通道与生态流量下放设施结合段的水流一部分流向右岸通道段并从左岸过鱼通道副进口流出,一部分从左岸过鱼通道与生态流量下放设施结合段上的溢流边墙溢流至溢流池;所述从右岸过鱼通道出口进入右岸过鱼通道与生态流量下放设施结合段的水流一部分流向右岸过鱼通道回填平台段并从右岸过鱼通道出口流出,一部分从右岸过鱼通道与生态流量下放设施结合段上的溢流边墙溢流至溢流池。
本发明的有益效果在于:在已建水电站基础上增加过鱼通道和生态流量下放设施,可有效解决已建水电站生态整改的问题;结合水电站已有布置,利用边坡、发电尾水坝段牛腿、泄洪闸坝段闸墩和右岸回填平台来布置左岸过鱼通道、右岸过鱼通道和生态流量下放设施,减少对枢纽改造的同时,恢复了河流连通性;左岸过鱼通道和右岸过鱼通道进口布置考虑发电尾水诱鱼的同时,结合物理障碍和流速障碍布置,实现精准集鱼,大大提高了进口诱集鱼效果;左岸过鱼通道的进口集鱼通道利用导流墙和引流槽将沿程的发电尾水引进进口通道并流向进口,达到过流断面增大的同时过流流量同时增加,大大提高了左岸过鱼通道主进口的诱鱼范围和诱鱼效果;右岸过鱼通道导鱼横堰结合生态机组发电尾水布置,不但起到消力池的作用,也作为鱼上溯的物理障碍,起到引导上溯鱼类进入右岸过鱼通道进口的作用;右岸过鱼通道导鱼纵堰结合岸边护坡的需求来布置,在起到生态护坡的同时,消除了右岸过鱼通道进口侧涡流对鱼类上溯影响,并引导上溯鱼类沿导鱼纵堰进入进口;相比单侧过鱼通道,左岸过鱼通道和右岸过鱼通道结合运行增加了集鱼范围,提高了集鱼效果,确保了不同工况下的集鱼保证率;过鱼通道与生态流量下放设施结合布置,通过溢流措施,实现了在库水位变幅情况下过鱼通道水深、流量维持不变的目的的同时,将溢出水量用于生态机组发电,实现水资源高效利用,增加了发电效益的同时,提高了过鱼通道运行稳定性、集鱼效果和过鱼效果。
附图说明
图1是本发明至少一种实施方式的平面布置结构图;
图2是一种实施方式中图1的内部整体布置平面图;
图3是图2中左岸通道段的布置平面图;
图4是图2中A-A断面的横剖面图;
图5是图2中跨厂泄坝段挡洪墙段的纵剖面图;
图6是图2中B-B剖面的横剖面图;
图7是图2中C-C断面的横剖面图;
图8是图1中右岸回填平台的纵剖面图;
图9是图2中生态流量下放设施结合段的布置平面图;
图10是图2中D-D断面的横剖面图;
图11是图2中E-E断面的横剖面图;
图12是图2中F-F断面的横剖面图;
图13是图2中鱼上溯方向和鱼下行路径的示意图;
图14是另一种实施方式中图1的内部整体布置平面图。
图中:11-左岸发电厂房坝段,12-泄洪闸坝段,13-右岸挡水坝段, 14-左岸山体,15-厂泄坝段挡洪墙,16-右岸挡洪墙,17-右岸回填平台,18-右岸山体,111-发电机组,112-左岸边坡,113-发电尾水渠, 114-进厂道路,115-牛腿,121-六孔泄洪闸,122-消力池,123-闸墩, 21-左岸过鱼通道主进口,22-左岸过鱼通道副进口,23-进口集鱼通道, 24-左岸通道段,25-跨发电厂房段,26-跨厂泄坝段挡洪墙段,27-跨泄洪闸段,28-右岸通道段,29-左岸过鱼通道与生态流量下放设施结合段,210-左岸过鱼通道出口,231-导流墙,232-引流槽,233-拦鱼网栅,234-边墙,235-底板,291-溢流边墙,292-导鱼板,293-拦鱼网,31-导鱼横堰,32-右岸过鱼通道进口,33-导鱼纵堰,34-右岸过鱼通道回填平台段,35-右岸过鱼通道与生态流量下放设施结合段, 36-右岸过鱼通道出口,351-溢流边墙,352-导鱼板,353-拦鱼网,41- 进水渠,42-储水池,43-发电引水管道,44-生态机组,45-发电厂房, 46-消力池,421-储水池边墙。
具体实施方式
下面进一步描述本发明的技术方案,但要求保护的范围并不局限于所述。
实施例1
如图1至图14所示的一种水电站整改及河流连通性修复结构,包括横向依次对接的左岸发电厂房坝段11、泄洪闸坝段12、右岸挡水坝段13,左岸发电厂房坝段11沿左岸山体14构建,左岸发电厂房坝段11 内有发电机组111,发电机组111下游段有发电尾水渠113,在发电尾水渠113和左岸山体14之间有左岸边坡112,发电尾水渠113内布置有进口集鱼通道23,左岸边坡112内布置有左岸通道段24,左岸通道段 24连通至右岸挡水坝段13;右岸挡水坝段13内布置有右岸过鱼通道与生态流量下放设施结合段35,右岸过鱼通道与生态流量下放设施结合段35下游连通布置有右岸过鱼通道回填平台段34并通过右岸过鱼通道进口32开口,在右岸挡水坝段13下游位置,有生态机组44布置于右岸过鱼通道回填平台段34侧方。
实施例2
基于实施例1,左岸通道段24上部通过跨发电厂房段25、跨厂泄坝段挡洪墙段26、跨泄洪闸段27、右岸通道段28、左岸过鱼通道与生态流量下放设施结合段29连通至右岸挡水坝段13的右岸过鱼通道出口36。
实施例3
基于实施例1,生态机组44安装于发电厂房45,生态机组44下游有消力池46,消力池46下游出口位置有导鱼横堰31,右岸过鱼通道回填平台段34下游端靠近导鱼横堰31的位置开设右岸过鱼通道进口32。
实施例4
基于实施例1,左岸通道段24呈“Z”字型布置,左岸通道段24 下部有左岸过鱼通道副进口22连通于进口集鱼通道23;左岸通道段24 由内部隔板隔成多个池室。
实施例5
基于实施例1,进口集鱼通道23由导流墙231、引流槽232、拦鱼网栅233、边墙234和底板235组成,底板235铺设于底部,边墙234隔断进口集鱼通道23和左岸通道段24,导流墙231和引流槽232交错成倾斜延伸面垂直置于发电尾水渠113中;引流槽232的位置有拦鱼网栅233连接相邻两块导流墙231。
实施例6
基于实施例2,跨发电厂房段25布置在左岸发电厂房坝段11的牛腿115上;跨厂泄坝段挡洪墙段26布置在厂泄坝段挡洪墙15上;跨泄洪闸段27布置在泄洪闸坝段12的闸墩123上;右岸通道段28布置在右岸回填平台17上;左岸过鱼通道与生态流量下放设施结合段29布置在储水池42上。
实施例7
基于实施例1,生态机组44前级通过发电引水管道43接储水池42,储水池42接至进水渠41,进水渠41位于右岸挡水坝段13临水面并设右岸过鱼通道出口36。
实施例8
基于实施例1,右岸过鱼通道回填平台段34呈“Z”字型布置,右岸过鱼通道回填平台段34下部与右岸过鱼通道进口32相连,右岸过鱼通道回填平台段34上部与右岸过鱼通道与生态流量下放设施结合段 35相连,右岸过鱼通道回填平台段34被布置于内部的隔板隔成多个池室。
实施例9
基于实施例1,右岸挡水坝段13上布置有左岸过鱼通道出口210、进水渠41和右岸过鱼通道出口36,左岸过鱼通道出口210、进水渠41 和右岸过鱼通道出口36底板高程低于库区运行低水位,左岸过鱼通道出口210、进水渠41和右岸过鱼通道出口36上设置有节制闸,左岸过鱼通道出口210引库区水进入左岸过鱼通道与生态流量下放设施结合段29,右岸过鱼通道出口36引库区水进入右岸过鱼通道与生态流量下放设施结合段35,进水渠41引库区水进入储水池42。
实施例10
基于上述实施例,如图1至图13所示,水电站为已建水电站,主要由左岸发电厂房坝段11、泄洪闸坝段12、右岸挡水坝段13、左岸山体14、厂泄坝段挡洪墙15、右岸挡洪墙16、右岸回填平台17和右岸山体18组成。左岸发电厂房坝段11包括有发电机组111、左岸边坡112、发电尾水渠113、进厂道路114和位于发电尾水出口上方的牛腿115,发电尾水渠113宽度为36.0m,泄洪闸坝段包括有六孔泄洪闸121、消力池122和闸墩123。水电站库水位低运行水位为2382.0m,高运行水位为2387.0m,水电站坝顶高程为2390.0m。水电站工程任务为发电,水库具有周调节性能,水电站的发电机组111在水库蓄水、电站机组检修及长蓄短发(蓄水时间长,发电时间短)过程中不发电,且发电机组最小引水发电流量大于被要求下泄的最低生态流量。水电站在不发电情况下,会造成坝下河段出现减水现象。水电站因为阻隔鱼类洄游和造成坝下河段减脱水而被要求整改。
本发明实质上是在已建水电站基础上增加过鱼通道和生态流量下放设施。
如图2所示,过鱼通道包括左岸过鱼通道和右岸过鱼通道,左岸过鱼通道2由左岸过鱼通道主进口21、左岸过鱼通道副进口22、进口集鱼通道23、左岸通道段24、跨发电厂房段25、跨厂泄坝段挡洪墙段 26、跨泄洪闸段27、右岸通道段28、左岸过鱼通道与生态流量下放设施结合段29和左岸过鱼通道出口210组成;
如图2所示,左岸过鱼通道主进口21临近发电尾水渠113流速最大处,及靠近高程为2362.0m的凸台下游布置,凸台为发电尾水渠高程最高处,凸台处过鱼断面减少,导致凸台处流速最大,在发电机组111 两台机组满发情况下,临凸台下游为鱼类上溯极限位置;左岸过鱼通道副进口22临近发电机组111出水口布置;左岸过鱼通道主进口21与左岸过鱼通道副进口22的直线距离l等于100.0m;
左岸过鱼通道主进口21高程为2362.1m,左岸过鱼通道副进口22 高程为2363.1m;
如图3所示,进口集鱼通道23下游端与左岸过鱼通道主进口21相接、上游端与左岸过鱼通道副进口22相接;进口集鱼通道23由八个导流墙231、七个引流槽232、若干拦鱼网栅233、边墙234和底板235组成;第i个引流槽引流流量为Qi,那么引进进口集鱼通道23的诱鱼流量为
Figure BDA0003760016100000101
232导流墙231与发电尾水渠113主流之间的夹角为2度;如图13所示,引流槽232是位于相邻导流墙231之间的用于将发电尾水引导进入进口集鱼通道23的引流通道;引流槽232设置有拦鱼网栅233,防止进入进口集鱼通道内的鱼通过引流槽232进入发电尾水渠113;边墙234是左岸通道段24的边墙;底板235坡度i为1%;
左岸过鱼通道副进口22的过流宽度a等于0.3,左岸过鱼通道主进口23过流宽度为6.0m,左岸过鱼通道主进口23过流宽度是发电尾水渠过流宽度的六分之一,大大增加了进口诱集鱼范围;
左岸通道段24布置在左岸边坡112上,左岸通道段24呈“Z”字型布置,左岸通道段24下部与副进口22相连,左岸通道段24上部与跨发电厂房通道段25相连,左岸通道段24被布置于内部的隔板隔成一个个池室。左岸通道下部高程为2363.1m,左岸通道上部高程为2375.77m,左岸通道段爬升12.67m;
如图5和图6所示,跨发电厂房段25布置在左岸发电厂房坝段11 的牛腿115上;
如图5所示,厂泄坝段挡洪墙通道段26布置在厂泄坝段挡洪墙15 上;
如图7和图8所示,跨泄洪闸坝通道段27布置在泄洪闸坝段12闸墩123上;
如图8所示,右岸通道段28布置在右岸回填平台17上;
如图9所示,左岸过鱼通道与生态流量下放设施结合段29布置在生态流量下放设施4的储水池42上;左岸过鱼通道与生态流量下放设施结合段29的溢流边墙291墙长为d1,d1等于50.0m;左岸过鱼通道与生态流量下放设施结合段29的底板高程为2380.5m;如图11和图12所示,溢流边墙291上设置有防止鱼进入储水池42的拦鱼网293;左岸过鱼通道与生态流量下放设施结合段29上游端溢流边墙高度为h1,h1等于6.5m,下游端溢流边墙高度为h2,h2等于2.0m;如图9所示,左岸过鱼通道与生态流量下放设施结合段29布置有导鱼板292,导鱼板呈“鱼骨型”,导鱼板是用于制造主流来引导鱼类上溯和下行;
如图9所示,左岸过鱼通道出口210布置在右岸挡水坝段13上,左岸过鱼通道出口210底板高程低于水电站库区运行低水位,左岸过鱼通道出口210上设置有节制闸,左岸过鱼通道出口210引库区水进入左岸过鱼通道与生态流量下放设施结合段29,左岸过鱼通道出口210引水流量为Q1,流入左岸过鱼通道出口的水量部分溢出至储水池42,部分流入左岸过鱼通道下游段。
如图2所示,右岸过鱼通道3由导鱼横堰31、右岸过鱼通道进口32、导鱼纵堰33、右岸过鱼通道回填平台段34、右岸过鱼通道与生态流量下放设施结合段35和右岸过鱼通道出口36组成;
导鱼横堰31斜向右岸过鱼通道进口32布置,导鱼堰31位于消力池 46末端,导鱼堰31可以引导河道中的鱼进入右岸过鱼通道进口32;
导鱼纵堰33布置在右岸过鱼通道进口32下游段岸边,导鱼纵堰33 由块石堆积而成,导鱼纵堰33是为了消除右岸过鱼通道进口32附近的涡流,并引导右岸鱼群进入右岸过鱼通道进口32。
如图2所示,右岸过鱼通道回填平台段34布置在右岸回填平台17 上,右岸过鱼通道回填平台段34呈“Z”字型布置,右岸过鱼通道回填平台段34下部与右岸过鱼通道进口32相连,右岸过鱼通道回填平台段 34上部与右岸过鱼通道与生态流量下放设施结合段35相连,右岸过鱼通道回填平台段34被布置于内部的隔板隔成一个个池室;
右岸过鱼通道与生态流量下放设施结合段35布置在生态流量下放设施4的储水池42上;右岸过鱼通道与生态流量下放设施结合段35 的溢流边墙351长为d2,d2等于50.0m;右岸过鱼通道与生态流量下放设施结合段35的底板高程为2380.5m;如图11和图12所示,溢流边墙 351上设置有防止鱼进入储水池42的拦鱼网353;右岸过鱼通道与生态流量下放设施结合段35上游端溢流边墙高度为h3,h3等于6.5m,下游端溢流边墙高度为h4,h4等于2.0m;右岸过鱼通道与生态流量下放设施结合段35布置有导鱼板352用于制造主流来引导鱼类上溯和下行;
如图9所示,右岸过鱼通道出口36布置在右岸挡水坝段13上,右岸过鱼通道出口36底板高程低于水电站库区运行低水位,右岸过鱼通道出口36上设置有节制闸,右岸过鱼通道出口36引库区水进入右岸过鱼通道与生态流量下放设施结合段35,右岸过鱼通道出口36引水流量为Q2,流入右岸过鱼通道出口的水量部分溢出至储水池42,部分流入右岸过鱼通道下游段。
如图2所示,生态流量下放设施4由进水渠41、储水池42、发电引水管道43、生态机组44、发电厂房45和消力池46组成;
如图9所示,进水渠41布置在右岸挡水坝段13上,引库区水进入生态流量下放设施4,进水渠41底板高程为2381.5m,进水渠41设置有节制闸,进水渠41引水流量为Q3
储水池42上游端与左岸过鱼通道出口210、右岸过鱼通道出口36 和进水渠41相连,储水池下游端与发电引水管道43相连;储水池有挡水边墙421,储水池边墙421最高高程为2390.0m,与坝顶高程相等;储水池边墙421最低高程为2382.5m,与相结合过鱼通道的边墙高程相等;左岸过鱼通道与生态流量下放设施结合段29和右岸过鱼通道与生态流量下放设施结合段35部分水量可通过溢流边墙291和溢流边墙 351进入储水池42,溢流边墙总长度为200.0m;左岸过鱼通道与生态流量下放设施结合段29溢出流量为Q4,右岸过鱼通道与生态流量下放设施结合段35溢出流量为Q5;储水池42中的水来自进水渠41、右岸过鱼通道与生态流量下放设施结合段35和左岸过鱼通道与生态流量下放设施结合段29这三部分,进入储水池的水流量为(Q3+Q4+Q5),即生态机组44发电流量为(Q3+Q4+Q5)。
进入左岸过鱼通道2的右岸通道段28、跨泄洪闸段27、跨厂泄坝段挡洪墙段26、跨发电厂房段25和左岸通道段24的流量和水深相等,流量均为(Q1-Q4)。
进入右岸过鱼通道3的右岸过鱼通道回填平台段34和右岸过鱼通道进口32的流量和水深相等,流量为(Q2-Q5)。
当水电站库水位为高运行水位时,及水库水位为2387.0m时,左岸过鱼通道与生态流量下放设施结合段29的水深从6.5m减少至1.5m,右岸过鱼通道与生态流量下放设施结合段35的水深也从6.5m减少至 1.5m;左岸过鱼通道的右岸通道段28、跨泄洪闸段27、跨厂泄坝段挡洪墙段26、跨发电厂房段25和左岸通道段24的水深维持在1.5m;右岸过鱼通道的右岸过鱼通道回填平台段34的水深维持在1.5m;
当水电站库水位为低运行水位时,及水库水位为2382.0m时,左岸过鱼通道与生态流量下放设施结合段29和右岸过鱼通道与生态流量下放设施结合段35水量不会溢出至储水池42;左岸过鱼通道的右岸通道段28、跨泄洪闸段27、跨厂泄坝段挡洪墙段26、跨发电厂房段25 和左岸通道段24的水深维持在1.5m;右岸过鱼通道的右岸过鱼通道回填平台段34的水深维持在1.5m。
当水电站原发电机组111发电时,可选择关闭右岸过鱼通道出口 36和进水渠41,此时左岸过鱼通道作为鱼类上溯和下行通道,原机组发电尾水作为下游生态流量的同时诱导坝下鱼类进入左岸过鱼通道进口。
当水电站原两台机组不发电时,可选择关闭左岸过鱼通道出口 210,此时右岸过鱼通道作为鱼类上溯和下行通道,生态机组发电尾水作为下游生态流量的同时诱导坝下鱼类进入右岸过鱼通道进口。
当水电站原两台机组发电和新增生态机组同时发电时,此时左岸过鱼通道和右岸过鱼通道同时作为鱼类上溯和下行通道,原两台机组发电尾水和新增生态机组发电尾水同时作为下游生态流量和诱鱼水流。
实施例11
基于上述实施例,如图14所示,左岸过鱼通道与生态流量下放设施相结合部位、右岸过鱼通道与生态流量下放设施相结合部位还有另外一种常规布置方式,这种布置方式下左岸过鱼通道与生态流量下放设施结合段29和右岸过鱼通道与生态流量下放设施结合段35合为一个,此种布置情况下,左岸过鱼通道和右岸过鱼通道共用溢流边墙和一个过鱼通道出口。

Claims (9)

1.一种水电站整改及河流连通性修复结构,包括水电站、左岸过鱼通道、右岸过鱼通道和生态流量下放设施,所述水电站为已建水电站,左岸过鱼通道、右岸过鱼通道和生态流量下放设施为结合已建水电站进行布置的补建的生态设施,其特征在于:所述水电站包括横向依次对接的左岸发电厂房坝段(11)、泄洪闸坝段(12)、右岸挡水坝段(13)、右岸回填平台(17),左岸发电厂房坝段(11)沿左岸山体(14)构建,左岸发电厂房坝段(11)内有发电机组(111),发电机组(111)下游段有发电尾水渠(113),在发电尾水渠(113)和左岸山体(14)之间有左岸边坡(112),发电尾水渠(113)内布置有进口集鱼通道(23),左岸边坡(112)上布置有左岸通道段(24),左岸通道段(24)连通至右岸挡水坝段(13);所述右岸回填平台(17)上布置有左岸过鱼通道与生态流量下放设施结合段(29)、右岸过鱼通道回填平台段(34)、右岸过鱼通道与生态流量下放设施结合段(35)和生态机组(44)。
2.如权利要求1所述的水电站整改及河流连通性修复结构,其特征在于:所述左岸过鱼通道借助已建水电站结构从左岸跨过河流通往右岸,所述左岸过鱼通道由左岸过鱼通道主进口(21)、左岸过鱼通道副进口(22)、进口集鱼通道(23)、左岸通道段(24)、跨发电厂房段(25)、跨厂泄坝段挡洪墙段(26)、跨泄洪闸段(27)、右岸通道段(28)、左岸过鱼通道与生态流量下放设施结合段(29)和左岸过鱼通道出口(210)组成;左岸过鱼通道进口布置在左岸发电厂房坝段(11)下游左侧河岸,出口布置在右岸挡水坝段(13)上游,左岸过鱼通道的左岸通道段(24)下部依次连通左岸过鱼通道副进口(22)、进口集鱼通道(23)和左岸过鱼通道主进口(21),左岸过鱼通道的左岸通道段(24)上部通过跨发电厂房段(25)、跨厂泄坝段挡洪墙段(26)、跨泄洪闸段(27)、右岸通道段(28)、左岸过鱼通道与生态流量下放设施结合段(29)连通至右岸挡水坝段(13)的右岸过鱼通道出口(36)。
3.如权利要求1所述的水电站整改及河流连通性修复结构,其特征在于:所述右岸过鱼通道布置在右岸回填平台(17)上,右岸过鱼通道由导鱼横堰(31)、右岸过鱼通道进口(32)、导鱼纵堰(33)、右岸过鱼通道回填平台段(34)、右岸过鱼通道与生态流量下放设施结合段(35)和右岸过鱼通道出口(36)组成;所述右岸过鱼通道进口(32)左侧为导鱼横堰(31),右岸过鱼通道进口(32)右侧为导鱼纵堰(33);所述右岸过鱼通道进口(32)上游接右岸过鱼通道回填平台段(34)、右岸过鱼通道与生态流量下放设施结合段(35)和右岸过鱼通道出口(36)。
4.如权利要求1所述的水电站整改及河流连通性修复结构,其特征在于:所述生态流量下放设施布置在水电站右岸回填平台(17)上,生态流量下放设施由进水渠(41)、储水池(42)、发电引水管道(43)、生态机组(44)、发电厂房(45)和消力池(46)组成;生态机组(44)安装于发电厂房(45),生态机组(44)下游有消力池(46),消力池(46)下游出口位置有导鱼横堰(31),进水渠(41)布置在右岸挡水坝段(13)上,进水渠(41)左侧为左岸过鱼通道出口(210),进水渠(41)右侧为右岸过鱼通道出口(36)。
5.如权利要求2所述的水电站整改及河流连通性修复结构,其特征在于:所述左岸过鱼通道的跨发电厂房段(25)布置在左岸发电厂房坝段(11)的牛腿(115)上;所述跨厂泄坝段挡洪墙段(26)布置在厂泄坝段挡洪墙(15)上;所述跨泄洪闸段(27)布置在泄洪闸坝段(12)的闸墩(123)上;所述右岸通道段(28)布置在右岸回填平台(17)上;所述左岸过鱼通道与左岸过鱼通道与生态流量下放设施结合段(29)布置在储水池(42)上。
6.如权利要求1所述的水电站整改及河流连通性修复结构,其特征在于:所述进口集鱼通道(23)由导流墙(231)、引流槽(232)、拦鱼网栅(233)、边墙(234)和底板(235)组成,底板(235)铺设于底部,边墙(234)隔断进口集鱼通道(23)和左岸通道段(24),导流墙(231)和引流槽(232)交错成倾斜延伸面垂直置于发电尾水渠(113)中;引流槽(232)的位置有拦鱼网栅(233)连接相邻两块导流墙(231)。
7.如权利要求1所述的水电站整改及河流连通性修复结构,其特征在于:所述生态机组(44)前级通过发电引水管道(43)接储水池(42),储水池(42)接至进水渠(41),进水渠(41)位于右岸挡水坝段(13)临水面并设右岸过鱼通道出口(36)和左岸过鱼通道出口(210)。
8.如权利要求1所述的水电站整改及河流连通性修复结构,其特征在于:所述右岸挡水坝段(13)上布置有左岸过鱼通道出口(210)、进水渠(41)和右岸过鱼通道出口(36),左岸过鱼通道出口(210)、进水渠(41)和右岸过鱼通道出口(36)底板高程低于库区运行低水位,左岸过鱼通道出口(210)、进水渠(41)和右岸过鱼通道出口(36)上设置有节制闸,左岸过鱼通道出口(210)引库区水进入左岸过鱼通道与生态流量下放设施结合段(29),右岸过鱼通道出口(36)引库区水进入右岸过鱼通道与生态流量下放设施结合段(35),进水渠(41)引库区水进入储水池(42)。
9.如权利要求1所述的水电站整改及河流连通性修复结构,其特征在于:所述左岸过鱼通道与生态流量下放设施结合段(29)和右岸过鱼通道与生态流量下放设施结合段(35)布置在储水池(41)上方;所述从左岸过鱼通道出口(210)进入左岸过鱼通道与生态流量下放设施结合段(29)的水流一部分流向右岸通道段(28)并从左岸过鱼通道副进口(22)流出,一部分从左岸过鱼通道与生态流量下放设施结合段(29)上的溢流边墙(291)溢流至溢流池(41);所述从右岸过鱼通道出口(36)进入右岸过鱼通道与生态流量下放设施结合段(35)的水流一部分流向右岸过鱼通道回填平台段(34)并从右岸过鱼通道出口(36)流出,一部分从右岸过鱼通道与生态流量下放设施结合段(35)上的溢流边墙(351)溢流至溢流池(41)。
CN202210869542.7A 2022-07-22 2022-07-22 一种水电站整改及河流连通性修复结构 Pending CN115434290A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210869542.7A CN115434290A (zh) 2022-07-22 2022-07-22 一种水电站整改及河流连通性修复结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210869542.7A CN115434290A (zh) 2022-07-22 2022-07-22 一种水电站整改及河流连通性修复结构

Publications (1)

Publication Number Publication Date
CN115434290A true CN115434290A (zh) 2022-12-06

Family

ID=84241038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210869542.7A Pending CN115434290A (zh) 2022-07-22 2022-07-22 一种水电站整改及河流连通性修复结构

Country Status (1)

Country Link
CN (1) CN115434290A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116289787A (zh) * 2022-12-08 2023-06-23 中国电建集团贵阳勘测设计研究院有限公司 一种鱼类三场二通道互连互通与库区生态陷阱避让系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000290980A (ja) * 1999-04-09 2000-10-17 Hokoku Kogyo Co Ltd 水力発電装置を備えた魚道設備
CN203668895U (zh) * 2013-12-09 2014-06-25 中国水电顾问集团华东勘测设计研究院有限公司 一种高山峡谷水电站的捕鱼设施
CN106759168A (zh) * 2017-01-18 2017-05-31 中国电建集团北京勘测设计研究院有限公司 一种兼顾环保及排沙需求的发电引水建筑物布置结构
CN112195880A (zh) * 2020-07-06 2021-01-08 中国电建集团华东勘测设计研究院有限公司 适用于高陡狭窄地形的坝后式厂房全鱼道系统及施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000290980A (ja) * 1999-04-09 2000-10-17 Hokoku Kogyo Co Ltd 水力発電装置を備えた魚道設備
CN203668895U (zh) * 2013-12-09 2014-06-25 中国水电顾问集团华东勘测设计研究院有限公司 一种高山峡谷水电站的捕鱼设施
CN106759168A (zh) * 2017-01-18 2017-05-31 中国电建集团北京勘测设计研究院有限公司 一种兼顾环保及排沙需求的发电引水建筑物布置结构
CN112195880A (zh) * 2020-07-06 2021-01-08 中国电建集团华东勘测设计研究院有限公司 适用于高陡狭窄地形的坝后式厂房全鱼道系统及施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
苏加林;路振刚;: "丰满水电站重建工程枢纽布置研究", 水利水电技术, no. 06, 20 June 2016 (2016-06-20), pages 12 - 13 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116289787A (zh) * 2022-12-08 2023-06-23 中国电建集团贵阳勘测设计研究院有限公司 一种鱼类三场二通道互连互通与库区生态陷阱避让系统
CN116289787B (zh) * 2022-12-08 2024-05-24 中国电建集团贵阳勘测设计研究院有限公司 一种鱼类三场二通道互连互通与库区生态陷阱避让系统

Similar Documents

Publication Publication Date Title
CN108570973B (zh) 一种适应高水头坝不同水深变幅的槽式集鱼前室
Larinier Location of fishways
CN211200321U (zh) 一种低水头堰坝过鱼通道结构
WO2014201742A1 (zh) 一种泥石流排导槽规划设计方法及其应用
CN115434290A (zh) 一种水电站整改及河流连通性修复结构
CN105804029A (zh) 生态闸门补水式鱼道进口装置
CN109469029A (zh) 一种鱼类集运鱼系统
CN111350171A (zh) 用于泥沙含量高水头波动大的低水头坝鱼道
CN109356097B (zh) 用于沟水处理的排水隧洞进口结构
CN116464004A (zh) 一种泄洪渠与鱼道联合系统
CN215052778U (zh) 一种水利工程进水口水力集清漂浮物网栅
CN115977041A (zh) 一种可调节的短程鱼道系统
CN106013009A (zh) 一种多反坡式消力池
CN113338244A (zh) 水利工程进水口水力集清漂浮物网栅系统
CN114808878A (zh) 一种往复式共侧墙鱼道结构
CN209482272U (zh) 一种鱼类集运鱼系统
CN105019414B (zh) 山区水电工程狭窄取水口用复合闸室结构
CN112195880B (zh) 适用于高陡狭窄地形的坝后式厂房全鱼道系统及施工方法
CN210857147U (zh) 一种鱼道进口集鱼系统旁侧分散补水系统布置装置
CN210459143U (zh) 一种利用导流堤及船闸实现过鱼功能的组合结构
CN209178086U (zh) 一种用于污水处理厂尾水深度处理的人工湿地
CN212103957U (zh) 用于泥沙含量高水头波动大的低水头坝鱼道
CN220057781U (zh) 一种结合分散补水子系统的集鱼系统
CN217810805U (zh) 一种市区河道处带消力池的护坡结构
CN217352360U (zh) 一种适用于中小型阶梯状堰坝的盘旋式鱼道

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination