CN115341753A - Template for shear keys of steel structure roof support and template supporting method - Google Patents
Template for shear keys of steel structure roof support and template supporting method Download PDFInfo
- Publication number
- CN115341753A CN115341753A CN202211053817.6A CN202211053817A CN115341753A CN 115341753 A CN115341753 A CN 115341753A CN 202211053817 A CN202211053817 A CN 202211053817A CN 115341753 A CN115341753 A CN 115341753A
- Authority
- CN
- China
- Prior art keywords
- template
- shear key
- locating lever
- positioning
- roof support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention provides a template for a shear key of a steel structure roof support, which relates to the technical field of support shear resistance and comprises a positioning rod, a balancing weight and a shaping box capable of accommodating the shear key; an opening is formed in the upper end of the shaping box, and the balancing weight is placed in the shaping box; the locating lever is equipped with a plurality of, and a plurality of locating lever level can be dismantled the connection and be in the upper end of stereotype case, the one end that the stereotype case was kept away from to the locating lever is equipped with the fixed knot structure of locating lever on the steel construction column cap is fixed. The invention further provides a method for erecting the template for the shear key of the steel structure roof support. The problem that construction quality is difficult to guarantee due to the fact that a common template is adopted to manufacture a box or shear key grooves are reserved in modes of pre-embedded extruded plates and the like in the prior art is solved.
Description
Technical Field
The invention relates to the technical field of support shearing resistance, in particular to a template for a steel structure roof support shearing resistance key and a template supporting method.
Background
The steel structure has the characteristics of high strength, light dead weight, good integral rigidity and strong deformation resistance, so the steel structure is particularly suitable for building large-span, ultrahigh and extra-heavy buildings; the reinforced concrete structure utilizes the steel bars to bear tension and the concrete to bear pressure, and has the advantages of firmness, durability, good fireproof performance, steel saving and low cost compared with a steel structure, and the like. Therefore, the steel structure and the reinforced concrete structure are combined and used in a plurality of engineering projects to utilize the respective performance advantages to achieve the purposes of economy, applicability and durability.
In the design of the existing steel structure support, a shear key is arranged when the shearing force exceeds the friction force between a column head and concrete, a shear key groove is reserved on a support position shear key template construction site in a mode of generally manufacturing a box by adopting a common template or adopting a pre-embedded extruded sheet and the like, and after the concrete pouring is finished, fillers are removed to carry out shear key construction. However, the common templates and the extruded sheets have small mass, disturbance deviation is very easily received in the construction process, and the condition of incomplete removal is easily caused in the process of removing the templates and the extruded sheets, so that the construction quality of the shear keys of the steel structure roof is difficult to ensure.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides a template for a steel structure roof support shear key and a template supporting method, which solve the problem that the construction quality is difficult to ensure because a common template is adopted to manufacture a box or a pre-embedded extruded sheet is adopted to reserve a shear key groove in the prior art.
In order to realize the purpose, the invention adopts the following technical scheme:
a template for a steel structure roof support shear key comprises a positioning rod, a balancing weight and a shaping box capable of accommodating the shear key;
an opening is formed in the upper end of the shaping box, and the balancing weight is placed in the shaping box;
the locating lever is equipped with a plurality of, and a plurality of locating lever level can be dismantled the connection and be in the upper end of stereotype case, the one end that the stereotype case was kept away from to the locating lever is equipped with the fixed knot structure of locating lever on the steel construction column cap is fixed.
Preferably, fixed knot constructs includes the slider, is equipped with the confession on the slider the through-hole that the locating lever passed, the vertical locating plate that has set firmly on the slider, the locating plate is close to one side and the slider of design case are close to one side of design case is in the coplanar, be equipped with the external screw thread on the locating lever, the cover is equipped with the position sleeve on the locating lever, be equipped with in the position sleeve with external screw thread fit's internal thread, just the position sleeve is located the slider is kept away from one side of design case.
Preferably, the locating lever includes two sets of vertical fixation's locating lever group, and every locating lever group includes two locating levers that are parallel to each other, and four locating levers form similar "well" font structure, the connection can be dismantled in the one-to-one respectively to stereotype case upper end opening four sides the below of four locating levers.
Preferably, four locating lever below rigid couplings have and hold the positioning reinforcement skeleton of balancing weight, positioning reinforcement skeleton is located the design incasement.
The invention also provides a method for erecting the template for the shear key of the steel structure roof support, which comprises the following steps:
s1: adjusting the fixing structure to perform primary positioning;
s2: and pouring concrete into the column cap, and reserving the concrete amount of the shear key groove.
S3: placing the shaping box and the positioning steel bar framework in a column cap, and adjusting the fixing structure to perform accurate positioning;
s4: placing a balancing weight;
s5: and taking out the template.
Preferably, in the step S1, 30mm is reserved between the positioning plate and the column head during the preliminary positioning.
Preferably, in the step S4, after the balancing weight is placed, the concrete condition in the column cap is checked, and the concrete is timely supplemented.
Preferably, in the step S5, the fixing structure is firstly removed, and then the counter weight, the positioning rod and the positioning steel skeleton are taken out, without taking out the shaping box.
Compared with the prior art, the invention has the following beneficial effects:
the fixing structure is adopted, so that the position can be conveniently adjusted on site according to the size of the column head, and the positioning is accurate; adopt detachable design case, when demolising this template, need not reject the design case, avoid rejecting the in-process and easily appear rejecting the condition unclean, guarantee steel construction roofing shear key construction quality.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention.
Drawings
FIG. 1 is a schematic diagram of an embodiment of the present invention.
FIG. 2 is a schematic diagram of an embodiment of the present invention.
FIG. 3 is a schematic diagram of an embodiment of the present invention.
In the above drawings: 1. positioning a rod; 2. a balancing weight; 3. shaping box; 41. a slider; 411. a through hole; 42. positioning a plate; 43. a positioning sleeve; 5. and (5) positioning the steel reinforcement framework.
Detailed Description
In order to make the technical means, the creation features, the achievement purposes and the functions of the invention clearer and easier to understand, the technical scheme of the invention is further explained in the following with the accompanying drawings and the embodiments.
As shown in fig. 1 to 3, an embodiment of the present invention provides a template for a shear key of a steel structure roof support, including a positioning rod 1, a balancing weight 2, and a shaping box 3 capable of accommodating the shear key; an opening is formed in the upper end of the shaping box 3, and the balancing weight 2 is placed in the shaping box 3; locating lever 1 is equipped with a plurality of, and the connection can be dismantled to a plurality of locating lever 1 level in the upper end of stereotype case 3, the one end that stereotype case 3 was kept away from to locating lever 1 is equipped with locating lever 1 fixes the fixed knot structure on the steel construction column cap.
The shaping box 3 provides a space for installing the shear key; the fixing device is characterized in that the fixing rods 1 are arranged and used for fixing the shaping box 3, at least two fixing rods 1 are arranged, and when the number of the fixing rods 1 is two, the end part, which is not connected with the shaping box 3, of each fixing rod 1 is limited on a column head through a fixing structure, so that the movement of the shaping box 3 in the horizontal direction is limited to a certain extent, the movement of the shaping box 3 is avoided, the position can be adjusted on site according to requirements, and the construction size and the accurate positioning of the shear key groove are well guaranteed; the shaping box 3 is detachably connected with the positioning rod 1, so that when the template is disassembled, the positioning rod 1 can be disassembled without disassembling the shaping box 3, and the condition that the template is not completely disassembled easily in the disassembling process is avoided; the fixing structure can be conveniently disassembled and repeatedly utilized for many times, so that the cost is saved; the balancing weight 2 can provide gravity, has played certain effect to the fixed of the position of design case 3 to, balancing weight 2 can play the extrusion to the concrete, not only can avoid former reservation template filler mode probably to cause the space outside, can better guarantee other position concrete compactness except that the shear force key recess.
The length, the width and the length of the groove of the shear key are reduced to manufacture the balancing weight 2 according to the requirement, so that the balancing weight 2 can be conveniently and smoothly placed in the shaping box 3; the shaping box 3 is made of a disassembly-free metal template and can be bound with the positioning rod 1 through a steel wire.
As shown in fig. 1 to 3, fixed knot constructs including slider 41, is equipped with the confession on the slider 41 the through-hole 411 that locating lever 1 passed, the vertical locating plate 42 that has set firmly on slider 41, locating plate 42 is close to one side of stereotype case 3 is close to with slider 41 one side of stereotype case 3 is in the coplanar, be equipped with the external screw thread on locating lever 1, the cover is equipped with position sleeve 43 on locating lever 1, be equipped with in the position sleeve 43 with the internal thread of external screw thread fit, just position sleeve 43 is located slider 41 is kept away from one side of stereotype case 3. The sliding block 41 can move on the positioning rod 1, and the positioning plate 42 is arranged, so that during positioning, the sliding block 41 and the positioning plate 42 are both in contact with the column head and are in threaded fit with the positioning rod 1 through the positioning sleeve 43, and the positioning sleeve 43 and the column head clamp and fix the positioning plate 42 to prevent the positioning rod 1 from driving the shaping box 3 to horizontally move.
As shown in fig. 1, the positioning rod 1 includes two groups of positioning rods fixed vertically, each group of positioning rods includes two positioning rods 1 parallel to each other, the four positioning rods 1 form a structure similar to a shape like a Chinese character 'jing', and the four positioning rods 1 are matched with a fixing structure arranged at the end part, so that the fixing effect can be improved; the four sides of the upper end opening of the shaping box 3 are respectively in one-to-one correspondence and detachably connected below the four positioning rods 1, so that the balancing weight 2 can be conveniently placed.
As shown in fig. 2, the fixed connection of four locating levers 1 below has and holds the positioning reinforcement skeleton 5 of balancing weight 2, positioning reinforcement skeleton 5 is located in the case 3 of finalizing the design. The positioning steel bar framework 5 is manufactured by a steel reduced rule with the diameter of 10mm being 20 mm; when demolising, having demolishd the design case 3 back, through rebound locating lever 1 alright take out positioning reinforcement skeleton 5 together with balancing weight 2, be convenient for remove balancing weight 2.
The invention also provides a method for erecting the template for the shear key of the steel structure roof support, which comprises the following steps:
s1: adjusting the fixing structure to perform primary positioning;
s2: and pouring concrete into the column cap, and reserving the concrete amount of the shear key groove.
S3: placing the shaping box 3 and the positioning steel bar framework 5 in a column head, and adjusting a fixing structure to perform accurate positioning;
s4: placing a balancing weight 2;
s5: and taking out the template.
In the step S1, 30mm is reserved between the positioning plate 42 and the column head during the initial positioning. And a reserved amount is reserved, so that the subsequent positioning is accurately adjusted.
Because in S2 step, can not accurately reserve shear key recess concrete volume, in order to compensate the not enough of concrete volume, in S4 step, after balancing weight 2 placed, the inspection column cap in the concrete condition, in time supply concreting. After the balancing weight 2 is placed, the concrete vibrating rod can be matched to extrude the surrounding concrete, so that the compactness of the concrete is ensured.
In the step S5, the fixing structure is firstly dismantled, then the balancing weight 2, the positioning rod 1 and the positioning steel bar framework 5 are taken out, the shaping box 3 does not need to be taken out, and quality risks that an original template and a filler clamp slag, and the removal is not clean are avoided.
Finally, the above embodiments are only for illustrating the technical solutions of the present invention and not for limiting, although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that modifications or equivalent substitutions may be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention, and all of them should be covered in the claims of the present invention.
Claims (8)
1. The utility model provides a template for steel construction roofing support shear key which characterized in that: comprises a positioning rod (1), a balancing weight (2) and a shaping box (3) capable of accommodating a shear key;
an opening is formed in the upper end of the shaping box (3), and the balancing weight (2) is placed in the shaping box (3);
locating lever (1) is equipped with a plurality of, and a plurality of locating lever (1) level can be dismantled the connection and be in the upper end of stereotype case (3), the one end that stereotype case (3) were kept away from in locating lever (1) is equipped with locating lever (1) fixes the fixed knot structure on the steel construction column cap.
2. The template for the shear key of the steel structure roof support as claimed in claim 1, wherein: fixed knot constructs includes slider (41), is equipped with the confession on slider (41) through-hole (411) that locating lever (1) passed, vertically on slider (41) have set firmly locating plate (42), locating plate (42) are close to one side of design case (3) is close to with slider (41) one side of design case (3) is in the coplanar, be equipped with the external screw thread on locating lever (1), the cover is equipped with position sleeve (43) on locating lever (1), be equipped with in position sleeve (43) with external screw-thread fit's internal thread, just position sleeve (43) are located slider (41) are kept away from one side of design case (3).
3. The template for the shear key of the steel structure roof support as claimed in claim 1, wherein: locating lever (1) includes two sets of vertical fixation's locating lever group, and every group locating lever group includes two locating levers (1) that are parallel to each other, and four locating levers (1) form similar "well" font structure, design case (3) upper end opening four sides respectively the one-to-one can dismantle the connection in the below of four locating levers (1).
4. The template for the shear key of the steel structure roof support as claimed in claim 3, wherein: four locating levers (1) below rigid couplings have and hold positioning steel skeleton (5) of balancing weight (2), positioning steel skeleton (5) are located in case (3) are stereotyped.
5. A method for erecting a formwork for a steel structure roof support shear key according to any one of claims 1 to 4, comprising the steps of:
s1: adjusting the fixing structure to perform primary positioning;
s2: and pouring concrete into the column cap, and reserving the concrete amount of the shear key groove.
S3: placing the shaping box (3) and the positioning steel bar framework (5) in a column cap, and adjusting the fixing structure to perform accurate positioning;
s4: placing a balancing weight (2);
s5: and taking out the template.
6. The method for erecting the template for the shear key of the steel structure roof support as claimed in claim 5, wherein: in the step S1, 30mm is reserved between the positioning plate (42) and the column head during preliminary positioning.
7. A method for erecting a template for a steel structure roof support shear key according to claim 5, wherein: in the S4 step, after the balancing weight (2) is placed, the concrete condition in the column cap is checked, and the concrete is supplemented in time.
8. A method for erecting a template for a steel structure roof support shear key according to claim 5, wherein: in the step S5, the fixing structure is firstly dismantled, then the balancing weight (2), the positioning rod (1) and the positioning steel bar framework (5) are taken out, and the shaping box (3) does not need to be taken out.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211053817.6A CN115341753B (en) | 2022-08-31 | 2022-08-31 | Template for shear key of steel structure roof support and template supporting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211053817.6A CN115341753B (en) | 2022-08-31 | 2022-08-31 | Template for shear key of steel structure roof support and template supporting method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN115341753A true CN115341753A (en) | 2022-11-15 |
CN115341753B CN115341753B (en) | 2023-08-11 |
Family
ID=83956681
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211053817.6A Active CN115341753B (en) | 2022-08-31 | 2022-08-31 | Template for shear key of steel structure roof support and template supporting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115341753B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090064610A1 (en) * | 2005-04-13 | 2009-03-12 | Interconstec Co., Ltd. | Segments for building spliced prestressed concrete grider and method of manufacturing the segments |
CN202718135U (en) * | 2012-08-28 | 2013-02-06 | 冯计锁 | Prestress baffle type assembly prefabricated reinforced concrete tower crane foundation |
CN103835303A (en) * | 2012-11-20 | 2014-06-04 | 贵阳铝镁设计研究院有限公司 | Shear resisting method and structure for cast-in-place reinforced concrete |
CN105113353A (en) * | 2015-08-11 | 2015-12-02 | 江苏万融工程科技有限公司 | Novel rapid-assembly type anti-shearing concrete pavement |
CN205077352U (en) * | 2015-08-11 | 2016-03-09 | 江苏万融工程科技有限公司 | Novel anti -shearing concrete road surface of rapid Assembly formula |
CN107097330A (en) * | 2017-07-03 | 2017-08-29 | 安徽宝业建工集团有限公司 | Possess the PC wallboard moulds that framework of steel reinforcement integrally enters mould function |
CN112127546A (en) * | 2020-09-11 | 2020-12-25 | 浙江工业大学 | End plate connection type assembly type prefabricated reinforced concrete beam and design method thereof |
CN215803205U (en) * | 2021-06-25 | 2022-02-11 | 中国十七冶集团有限公司 | A customization box that is used for steel construction column bottom shear key preformed groove |
-
2022
- 2022-08-31 CN CN202211053817.6A patent/CN115341753B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090064610A1 (en) * | 2005-04-13 | 2009-03-12 | Interconstec Co., Ltd. | Segments for building spliced prestressed concrete grider and method of manufacturing the segments |
CN202718135U (en) * | 2012-08-28 | 2013-02-06 | 冯计锁 | Prestress baffle type assembly prefabricated reinforced concrete tower crane foundation |
CN103835303A (en) * | 2012-11-20 | 2014-06-04 | 贵阳铝镁设计研究院有限公司 | Shear resisting method and structure for cast-in-place reinforced concrete |
CN105113353A (en) * | 2015-08-11 | 2015-12-02 | 江苏万融工程科技有限公司 | Novel rapid-assembly type anti-shearing concrete pavement |
CN205077352U (en) * | 2015-08-11 | 2016-03-09 | 江苏万融工程科技有限公司 | Novel anti -shearing concrete road surface of rapid Assembly formula |
CN107097330A (en) * | 2017-07-03 | 2017-08-29 | 安徽宝业建工集团有限公司 | Possess the PC wallboard moulds that framework of steel reinforcement integrally enters mould function |
CN112127546A (en) * | 2020-09-11 | 2020-12-25 | 浙江工业大学 | End plate connection type assembly type prefabricated reinforced concrete beam and design method thereof |
CN215803205U (en) * | 2021-06-25 | 2022-02-11 | 中国十七冶集团有限公司 | A customization box that is used for steel construction column bottom shear key preformed groove |
Also Published As
Publication number | Publication date |
---|---|
CN115341753B (en) | 2023-08-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107965065B (en) | Buckling support Combined type pre-embedded member construction method | |
CN215168054U (en) | Independent supporting device for post-cast strip template | |
CN216239746U (en) | Narrow and small space concrete structure template is propped up and is established device | |
CN115341753A (en) | Template for shear keys of steel structure roof support and template supporting method | |
CN211873837U (en) | One-step forming supporting and reinforcing system for reversed ridge of kitchen and bathroom | |
CN210049579U (en) | Formwork system of concrete thin-shell dome structure | |
CN113494182A (en) | One-step forming supporting and reinforcing system for reversed ridges of kitchens and bathrooms and construction method thereof | |
CN212266159U (en) | Prefabricated case roof beam body preformed hole template | |
CN212984635U (en) | Go up anti-roof beam and hang mould reinforcing apparatus | |
CN211074042U (en) | Prefabricated case roof beam centre form fixing device | |
CN211369523U (en) | Template system of expansion joint shear force wall | |
CN210067457U (en) | Deviation-preventing aluminum mould frame for wall beam prefabrication | |
CN215760384U (en) | Mechanical connection frame body wall connecting piece | |
CN202380642U (en) | Ladder rib | |
CN206625545U (en) | A kind of double shear wall movement joint support meanss | |
CN219060870U (en) | Shaping template for shear wall construction at deformation joint | |
CN201850763U (en) | Hollow floor slab template for construction | |
CN211341779U (en) | Connecting and locking device for building template | |
CN216239739U (en) | Mould device for pressing windowsill top | |
CN212105127U (en) | Recyclable reserved hole mold fixing device | |
CN210105275U (en) | U-shaped card seat | |
CN216340853U (en) | Building engineering construction template device | |
CN220030668U (en) | Die for avoiding cracking of bottom end of T-shaped beam | |
CN217601689U (en) | Horizontal structure seam pulling system for non-bearing wall of full cast-in-place outer wall | |
CN111997359B (en) | Turnover type descending plate accurate positioning mould hanging system and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |