CN202380642U - Ladder rib - Google Patents
Ladder rib Download PDFInfo
- Publication number
- CN202380642U CN202380642U CN 201120562575 CN201120562575U CN202380642U CN 202380642 U CN202380642 U CN 202380642U CN 201120562575 CN201120562575 CN 201120562575 CN 201120562575 U CN201120562575 U CN 201120562575U CN 202380642 U CN202380642 U CN 202380642U
- Authority
- CN
- China
- Prior art keywords
- muscle
- wall
- main
- ribs
- distance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model relates to a ladder rib, which is characterized by comprising a pair of main ribs which are respectively disposed on the left side and the right side and parallel to each other and a plurality of stepping ribs which are perpendicularly and fixedly connected between the two main ribs and sequentially distributed at intervals along the extending direction of the main ribs. The stepping ribs located at the two ends and the middle of the main ribs are top mold ribs, and the stepping ribs located at other parts of the main ribs are framework ribs. The distance between end portions of the top mold ribs and the main ribs close to corresponding end portions is equal and larger than the distance between corresponding end portions of the framework ribs and the main ribs close to the corresponding end portions. The length of each top mold rib is = wall thickness - reserved wall expansion value. The ladder rib is capable of effectively avoiding deviation caused by the fact that shear wall reinforcement is affected by subsequent handling, ensures construction quality of shear walls, and also is fast and convenient in construction and strong in operability.
Description
Technical field
The utility model relates to a kind of ladder muscle.
Background technology
Shear wall structure is a kind of structure commonly used in the modern architecture; At present owing to shear wall body of wall reinforcing bar is just simply formed by the colligation of transverse reinforcement and vertical reinforcement; Therefore influenced by subsequent handling such as template installation, concreting etc., cause mass defects such as body of wall reinforcing bar off normal and protective layer thickness deficiency.Traditional job practices can only be through the operation of joining a regular shift or class of mounting reinforcing steel bars worker when the concreting; Come the reinforcing bar of off normal is corrected; Consumption worker not only consuming time; And since construction quality depend on reinforcing bar footman operating personnel sense of responsibility and with the cooperating of concreting operation, so construction quality is unstable.
Summary of the invention
In order to solve existing in prior technology the problems referred to above; The utility model provides a kind of ladder muscle, and it not only can effectively avoid shear wall body of wall reinforcing bar influenced by subsequent handling and the off normal phenomenon that produces, guarantees the construction quality of shear wall; And it is convenient to construct, workable.
The utility model technical scheme is to constitute like this; A kind of ladder muscle is characterized in that: it comprises that a pair of left and right sides and parallel each other main muscle and Duo Gen vertical fixing of being divided into is connected between two main muscle and along the main muscle bearing of trend muscle of marking time spaced apart successively; The muscle of marking time that is positioned at main muscle two ends and middle part is the backform muscle, and the muscle of marking time that is positioned at other position of main muscle is the skeleton muscle; Each end of each root backform muscle is with identical near the distance between the main muscle of respective end and greater than the respective end of each root skeleton muscle and near the distance between the main muscle of this respective end, the length=thickness of wall body of each root backform muscle-reservation body of wall swell value.
Said reservation body of wall swell value is preferably 2mm.
Colligation between ladder muscle and the shear wall body of wall reinforcing bar is for ease fixed; When the length bearing of trend level of waiting to build cavity along body of wall when the main muscle of said ladder muscle was set up, adjacent two distances between the muscle of marking time=perpendicular placed body of wall to wait to build in the cavity and wait to build the distance between the length bearing of trend of cavity two vertical reinforcements adjacent one another are along body of wall; When the height bearing of trend of waiting to build cavity along body of wall when the main muscle of said ladder muscle vertically set up, adjacent two distance=horizontal cross of marking time between the muscle were arranged at that body of wall is waited to build in the cavity and wait to build the distance between the height bearing of trend of cavity two horizontal reinforcements adjacent one another are along body of wall.
For effective control body of wall protective layer thickness, the diameter x2 of the distance=thickness of wall body-body of wall protective layer thickness-main muscle between two main muscle.
The operating principle of the utility model technique scheme is explained as follows: during construction; Can the length bearing of trend level frame that the ladder muscle waits to build cavity along body of wall be established or waits that along body of wall the height bearing of trend of building cavity vertically sets up; Making being cross-linked of the main muscle of ladder muscle and the muscle of marking time carry out colligation between position and vertical reinforcement or the horizontal reinforcement fixes; Form stable reinforced bar support structure; Prevent to build the skew that process produces, the end through the backform rod leans the location and can guarantee the thickness of wall body of building template.
Compared to prior art; The utlity model has following advantage: the utility model is simple in structure, and is easy to use, and fastness is strong; The off normal phenomenon that not only can effectively avoid shear wall body of wall reinforcing bar influenced by subsequent handling and produce; Guarantee the construction quality of shear wall, and it is convenient to construct, workable.
Description of drawings
Fig. 1 is the example structure sketch map of a kind of ladder muscle of providing of the utility model.
Fig. 2 is the user mode sketch map of Fig. 1, and the main muscle of ladder muscle waits that along body of wall the length bearing of trend level of building cavity sets up among the figure, one or two colligation place of only having drawn among the figure, and all the other are corresponding to be cross-linked the place and also will to carry out corresponding colligation and fix.
Label declaration among the figure: 1, main muscle, 2, the backform muscle, 3, the skeleton muscle, 4, vertical reinforcement, 5, colligation place.
The specific embodiment
Below in conjunction with the Figure of description and the specific embodiment the utility model content is elaborated:
Be illustrated in figure 1 as the example structure sketch map of a kind of ladder muscle that the utility model provides, it is characterized in that: it comprises and a pair ofly is divided into the left and right sides and parallel each other main muscle 1 and the Duo Gen vertical fixing is connected between two main muscle 1 and along the main muscle 1 bearing of trend muscle of marking time spaced apart successively; The muscle of marking time that is positioned at main muscle 1 two ends and middle part is a backform muscle 2, and the muscle of marking time that is positioned at main muscle 1 other position is a skeleton muscle 3; Each end of each root backform muscle 2 is with identical near the distance between the main muscle 1 of respective end and greater than the respective end of each root skeleton muscle 3 and near the distance between the main muscle 1 of this respective end, the length=thickness of wall body of each root backform muscle 2-reservation body of wall swell value.
Said reservation body of wall swell value is 2mm.
When the length bearing of trend level of waiting to build cavity along body of wall when the main muscle 1 of said ladder muscle was set up, adjacent two distances between the muscle of marking time=perpendicular placed body of wall to wait to build in the cavity and wait to build the distance between the length bearing of trend of cavity two vertical reinforcements 4 adjacent one another are along body of wall; When the height bearing of trend of waiting to build cavity along body of wall when the main muscle 1 of said ladder muscle vertically set up, adjacent two distance=horizontal cross of marking time between the muscle were arranged at that body of wall is waited to build in the cavity and wait to build the distance between the height bearing of trend of cavity two horizontal reinforcements adjacent one another are along body of wall.
The diameter x2 of the distance=thickness of wall body-body of wall protective layer thickness-main muscle 1 between two main muscle 1.
The length of the backform muscle 2 at edge is exposed in two main muscle 1 ends can be identical or different, and when ladder muscle horizontal positioned, the length that two main muscle 1 expose can be identical; When the ladder muscle was vertically placed, the alternative shear wall vertical reinforcement of ladder muscle at this moment, according to job specfication, staggered in order to make butt joint, and the length that two main muscle 1 expose can be different.
Claims (5)
1. ladder muscle is characterized in that: it comprises and a pair ofly is divided into the left and right sides and parallel each other main muscle (1) and many vertical fixing are connected between two main muscle (1) and along main muscle (1) the bearing of trend muscle of marking time spaced apart successively; The muscle of marking time that is positioned at main muscle (1) two ends and middle part is backform muscle (2), and the muscle of marking time that is positioned at other position of main muscle (1) is skeleton muscle (3); Each end of each root backform muscle (2) is with identical near the distance between the main muscle (1) of respective end and greater than the respective end of each root skeleton muscle (3) and near the distance between the main muscle (1) of this respective end, the length=thickness of wall body of each root backform muscle (2)-reservation body of wall swell value.
2. ladder muscle according to claim 1 is characterized in that: said reservation body of wall swell value is 2mm.
3. ladder muscle according to claim 1 and 2 is characterized in that: a certain at least end end of two main muscle (1) is with the most different near the distance between the backform muscle (2) of this end.
4. ladder muscle according to claim 1 and 2; It is characterized in that: when the length bearing of trend level of waiting to build cavity along body of wall when the main muscle (1) of said ladder muscle was set up, adjacent two distances between the muscle of marking time=perpendicular placed body of wall to wait to build in the cavity and wait to build the distance between the length bearing of trend of cavity two vertical reinforcements (4) adjacent one another are along body of wall; When the height bearing of trend of waiting to build cavity along body of wall when the main muscle (1) of said ladder muscle vertically set up, adjacent two distance=horizontal cross of marking time between the muscle were arranged at that body of wall is waited to build in the cavity and wait to build the distance between the height bearing of trend of cavity two horizontal reinforcements adjacent one another are along body of wall.
5. ladder muscle according to claim 1 and 2 is characterized in that: the diameter x2 of the distance=thickness of wall body between two main muscle (1)-body of wall protective layer thickness-main muscle (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120562575 CN202380642U (en) | 2011-12-29 | 2011-12-29 | Ladder rib |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120562575 CN202380642U (en) | 2011-12-29 | 2011-12-29 | Ladder rib |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202380642U true CN202380642U (en) | 2012-08-15 |
Family
ID=46629154
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201120562575 Expired - Lifetime CN202380642U (en) | 2011-12-29 | 2011-12-29 | Ladder rib |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202380642U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108590039A (en) * | 2018-05-07 | 2018-09-28 | 五冶集团上海有限公司 | A kind of the ladder muscle and its application method of control shear wall vertical reinforcement spacing |
CN109537813A (en) * | 2018-11-14 | 2019-03-29 | 五冶集团上海有限公司 | Application of the ladder muscle in shear force wall reinforcing steel bar spacing and protective layer thickness control |
-
2011
- 2011-12-29 CN CN 201120562575 patent/CN202380642U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108590039A (en) * | 2018-05-07 | 2018-09-28 | 五冶集团上海有限公司 | A kind of the ladder muscle and its application method of control shear wall vertical reinforcement spacing |
CN109537813A (en) * | 2018-11-14 | 2019-03-29 | 五冶集团上海有限公司 | Application of the ladder muscle in shear force wall reinforcing steel bar spacing and protective layer thickness control |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106884541B (en) | Positioning assembly, positioning device and positioning method for reserved dowel bars in shear wall | |
KR101462202B1 (en) | Form traveller for through bridge | |
CN103774749A (en) | Large-span prestressed concrete F plate frame structure system | |
CN208396106U (en) | Detachable bed die steel bar truss floor support plate | |
CN202380642U (en) | Ladder rib | |
CN206216902U (en) | Prefabricated bar body reinforcing bar binding tire film | |
US10202765B2 (en) | Deck panel for construction | |
CN204370803U (en) | A kind of adjustable column template reinforces mould | |
CN203640278U (en) | Stair construction die shelf | |
CN205976457U (en) | Aluminum alloy building formwork | |
CN102071801A (en) | Positioning method and structure for hollow pipes in concrete hollow slab | |
CN203200982U (en) | Steel bar truss buckling hanging type floor support plate | |
CN217175688U (en) | Assembled formwork connecting structure | |
CN205296583U (en) | Novel box post | |
CN104695604B (en) | Cassette ceiling high intensity thinner tube hollow pipe anti-floating stopping means and prepare instrument | |
CN110565864B (en) | Inclined roof truss floor plate and construction method thereof | |
CN208266661U (en) | Cable-stayed bridge wide cut beam lattice main beam structure and combinations thereof template system | |
CN205976216U (en) | A steel structrual concrete supporting beam | |
CN103334582A (en) | Method for installing and constructing short-leg shear wall formwork supporting system | |
CN203603333U (en) | Steel bar truss and steel bar truss building bearing plate and steel bar truss composite slab thereof | |
CN202164729U (en) | Knee brace structure between beams of different heights | |
CN203420470U (en) | Installation construction structure of short-limb shear-wall formwork supporting system | |
CN202969887U (en) | Bidirectional-stress full-house scaffold for structure construction of subway stations | |
CN206299120U (en) | A kind of arch formwork for placing | |
CN206299119U (en) | B types section bar and building girder construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 350015 Block A, Zhongjian Strait Business Plaza, 60 Rujiangxi Road, Mawei District, Fuzhou City, Fujian Province (Free Trade Test Zone) Patentee after: CSCEC Strait Construction and Development Co., Ltd. Address before: 350000 No. 3 Construction Company of No. 148 Beihuan Middle Road, Fuzhou City, Fujian Province Patentee before: The Third Company of China Seventh Engineering Bureau Co., Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20120815 |