CN1153247A - Continuous bed mortar soleplate method - Google Patents
Continuous bed mortar soleplate method Download PDFInfo
- Publication number
- CN1153247A CN1153247A CN 96119831 CN96119831A CN1153247A CN 1153247 A CN1153247 A CN 1153247A CN 96119831 CN96119831 CN 96119831 CN 96119831 A CN96119831 A CN 96119831A CN 1153247 A CN1153247 A CN 1153247A
- Authority
- CN
- China
- Prior art keywords
- backing plate
- seat
- soleplate
- hole
- slurry
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Foundations (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
A construction method for foundation bearing plates of movable load (apparatus) features that when pouring concrete foundation, uniformly arranged more bearing plates are put on plane of concrete foundation and the foundation bearing plate supporting system composed of more bearing plates is used as framework of apparatus foundation. The mortar for plate may be honding mortar No.25-100. Its advantages are less working amount and special bearing plates for steel rail, short construction period, high installation accuracy and ensuring quality of engineering.
Description
The present invention relates to a kind of job practices one continuous bed mortar soleplate method of Equipment Foundations backing plate of dynamic loading.
When developing a mine installation heavy type or large-scale dynamic loading electromechanical equipment, particularly on basic ground, need to be equipped with the engineering of annular rail in advance, basic ground is proposed higher levelness requirement, its traditional Equipment Foundations plastic sheet construction method adopts intermittently seat slurry method, generally be according to rail center size pre-embedded bolt when the pouring ground concrete, treat to grind the basis after the concrete setting, dig out seat slurry hole again at the concrete foundation position, flushing grouting, the configuration backing plate, the special-purpose backing plate of rail is installed then, is settled rail at last.This job practices ubiquity following problem: workload is big, long construction period, and the special-purpose backing plate quantity of rail is many, and horizontal accuracy is difficult for support to be held, and is difficult to reach installation specification, and often workmanship can't guarantee.Simultaneously, because basic ground horizontal accuracy is low, easily causes rail strength, rigidity to weaken, and also can cause mechanical oscillation thus, sinking at rail amount of deflection, mechanical oscillation and bearing can form vicious circle between the three, has shortened the equipment operating period.
The objective of the invention is defective at existing job practices existence, provide a kind of and grind that workload is little, the special-purpose backing plate of rail is few, can reach the continuous bed mortar soleplate method that the horizontal accuracy requirement is installed, it is not easy to cause rail strength, rigidity to weaken and sink at rail amount of deflection, mechanical oscillation and bearing and forms normal circulation between the three.
The objective of the invention is to realize: a kind of job practices of Equipment Foundations backing plate of dynamic loading by following technical proposals, it is when the cast base concrete, reserve the backing plate seat slurry hole and the anchor (bolt) hole of required setting, place the concrete foundation surface with equally distributed seat slurry plastic sheet form, and the frame construction on the bearing plate bearing system constitution equipment basis of forming by a plurality of seat slurry plastic sheets.Above-mentioned backing plate seat slurry can be selected the 25#-100# masonry mortar for use according to the requirement that the dynamic loading Equipment Foundations are installed.
The present invention is further described below in conjunction with embodiment.
A kind of continuous bed mortar soleplate method, be when the concreting basis, place on the concrete foundation face with a plurality of seat slurry plastic sheet forms, and the frame construction on the bearing plate bearing system constitution equipment basis of forming by a plurality of seat slurry plastic sheets, its operational sequence is: the backing plate seat slurry hole and the anchor (bolt) hole that reserve required setting when building base concrete, the base concrete initial set about 314 hours after, with stir the seat concrete grout pour into give stay the hole in and make firm by ramming, smash to starching the float gage layer in order to clapping slurry, after concrete surface water mark disappears, can settle backing plate and measure circularity and absolute altitude, backing plate upper surface absolute altitude limit deviation is ± 0.5mm, backing plate is placed in and uses hand hammer chock plate to knock the backing plate face after the seat slurry is gone up, make its steady decline, after backing plate circularity and absolute altitude are measured, make real the backing plate circumferential concrete, make into firm, concrete surface should be lower than backing plate face 2-5mm.Check backing plate absolute altitude and circularity once more before the initial set of seat concrete grout.Stone bolt and seat slurry plastic sheet carry out concreting synchronously, at any time adjust the center to center distance of bolt group, to guarantee the installation accuracy requirement, moist curing backing plate simultaneously waters, the length in seat slurry hole and width are than the length and the big 60-80mm of width of backing plate, and seat slurry hole is sunk to the surface of base degree of depth and is not less than 50mm.Backing plate can adopt common A3 steel plate, and width is greater than stone bolt center to center distance 30-50mm, and length is 50-100mm.The seat concrete grout is selected the 25#-100# masonry mortar for use, and its cementitious materials adopts plasticity phase and sclerosis later stage all to keep the non-shrinkage cement little with bleeding of microdilatancy or little contraction state, and sand adopts medium sand, and the stone granularity is 5-15mm.
Advantage of the present invention is: a traditional seat slurry method generally be after concrete foundation is solidified fully again Dig out seat slurry hole and operate, this law need not to cut a hole the hole and can construct continuously, and horizontal accuracy is easily transferred, and saves Labour, shortening duration, seat slurry layer and the synchronously sclerosis of basic layer, bonding power increases between them, can The contact area that guarantees backing plate reaches good state, embodies continuous operability and the integral body of installation Continuity.
For example, four concentrated machines in the iron ore constituency, Shanxi Taiyuan Iron and Steel Co. point mountain, about 400 tons of equipment gross weight, Its four concentrated machine track pads are installed the method for the present invention that all adopts, and have reached quality and have once tested Fold lattice, satisfy the requirement of design and installation technology, saved a large amount of manpower and financial resources, shortened the worker Phase, improved construction quality and operating efficiency, guaranteed that the normal operation of concentrated machine is used.
Claims (6)
1, a kind of job practices of Equipment Foundations backing plate---connect bed mortar soleplate method, during the concreting basis, place on the concrete foundation face with a plurality of equally distributed seat slurry plastic sheet forms, and the frame construction on the bearing plate bearing system constitution equipment basis of forming by a plurality of seat slurry plastic sheets, it is characterized in that:
Reserve the backing plate seat slurry hole and the anchor (bolt) hole of required setting when 1) concreting is basic;
2) when base concrete initial set after 3-4 hour, a seat concrete grout that stirs poured into to give stays in the hole and make firm by ramming, smash continuously to slurry float gage layer in order to clapping slurry;
3) after concrete surface water mark disappears, can settle backing plate and measure circularity and absolute altitude, backing plate is placed in and uses hand hammer chock plate to knock the backing plate face after the seat slurry is gone up, and makes its steady decline;
4) after backing plate circularity and absolute altitude are measured, make real backing plate seat concrete grout all around, make it firm;
5) concreting is carried out in anchor (bolt) hole and backing plate seat slurry hole synchronously, and adjusts the center to center distance of bolt group at any time;
6) check backing plate absolute altitude and circularity once more before the initial set of seat concrete grout, moist curing then waters.
2, continuous bed mortar soleplate method according to claim 1 is characterized in that: the length in backing plate seat slurry hole and width are than the length and the big 60-80mm of width of backing plate, and seat slurry hole is sunk to the surface of base degree of depth and is not less than 50mm.
3, continuous bed mortar soleplate method according to claim 1 is characterized in that: backing plate can adopt the A3 steel plate, and width is greater than stone bolt center to center distance 30-50mm, and length is 50-100mm.
4, continuous bed mortar soleplate method according to claim 1 is characterized in that: backing plate upper surface absolute altitude limit deviation is ± 0.5mm.
5, continuous bed mortar soleplate method according to claim 1 is characterized in that: seat concrete grout surface should be lower than backing plate face 2-5mm.
6, continuous bed mortar soleplate method according to claim 1, it is characterized in that: the seat concrete grout is selected the 25#-100# masonry mortar for use, cementitious materials is the non-shrinkage cement little with bleeding that plasticity phase and sclerosis later stage all keeps microdilatancy or little contraction state, sand is medium sand, and the stone granularity is 5-15mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 96119831 CN1073655C (en) | 1996-09-26 | 1996-09-26 | Continuous bed mortar soleplate method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 96119831 CN1073655C (en) | 1996-09-26 | 1996-09-26 | Continuous bed mortar soleplate method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1153247A true CN1153247A (en) | 1997-07-02 |
CN1073655C CN1073655C (en) | 2001-10-24 |
Family
ID=5125979
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 96119831 Expired - Fee Related CN1073655C (en) | 1996-09-26 | 1996-09-26 | Continuous bed mortar soleplate method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1073655C (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101705692B (en) * | 2009-11-27 | 2011-02-09 | 温州中城建设集团有限公司 | Molding construction method of large-scale equipment foundation deep reserved foundation bolt hole |
CN101397799B (en) * | 2007-09-28 | 2012-02-01 | 中国二十冶集团有限公司 | Flowing grouting method installed on apparatus foundation |
CN102943484A (en) * | 2012-12-01 | 2013-02-27 | 新余钢铁集团有限公司 | Tapered-iron pulp-bedding rapid leveling method for large-size and middle-size equipment installation |
CN103669392A (en) * | 2013-12-06 | 2014-03-26 | 中国一冶集团有限公司 | One-step forming method for device multi-point bed mortar |
CN111005572A (en) * | 2019-11-15 | 2020-04-14 | 中国三冶集团有限公司 | Installation control method for steel coil transportation walking beam of rolling mill |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101845821B (en) * | 2009-03-24 | 2012-05-23 | 五冶集团上海有限公司 | Obliquity control method for basic cushion iron of large tilting equipment |
-
1996
- 1996-09-26 CN CN 96119831 patent/CN1073655C/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101397799B (en) * | 2007-09-28 | 2012-02-01 | 中国二十冶集团有限公司 | Flowing grouting method installed on apparatus foundation |
CN101705692B (en) * | 2009-11-27 | 2011-02-09 | 温州中城建设集团有限公司 | Molding construction method of large-scale equipment foundation deep reserved foundation bolt hole |
CN102943484A (en) * | 2012-12-01 | 2013-02-27 | 新余钢铁集团有限公司 | Tapered-iron pulp-bedding rapid leveling method for large-size and middle-size equipment installation |
CN103669392A (en) * | 2013-12-06 | 2014-03-26 | 中国一冶集团有限公司 | One-step forming method for device multi-point bed mortar |
CN111005572A (en) * | 2019-11-15 | 2020-04-14 | 中国三冶集团有限公司 | Installation control method for steel coil transportation walking beam of rolling mill |
Also Published As
Publication number | Publication date |
---|---|
CN1073655C (en) | 2001-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101634149B (en) | Prestressed anchor foundation pit support and construction method | |
CN108411802A (en) | A kind of underwater method for repairing pile foundation and scour hole | |
CN106758562A (en) | The installation method that track foundation built-in fitting is integrally fixed with track | |
CN110468725B (en) | Rear mounting construction method for side pier support of swivel bridge | |
KR20060093092A (en) | The use of the bearing installation is involved the precast block and it for construction method of the bearing installation and the replacing methodof bearing installation | |
CN101397799A (en) | Flowing grouting method installed on apparatus foundation | |
CN1073655C (en) | Continuous bed mortar soleplate method | |
CN208235575U (en) | A kind of assembly concrete retaining wall having enough to meet the need | |
CN108560579A (en) | The pre-buried parallels construction method of spring | |
CN102943484B (en) | Tapered-iron pulp-bedding rapid leveling method for large-size and middle-size equipment installation | |
CN101457529A (en) | Seat slurry plastic sheet construction method | |
CN205399499U (en) | Waterproofing membrane basic unit | |
CN209011152U (en) | Tower crane based on bonded prestressed concrete | |
CN207295497U (en) | A kind of interim steel pipe support base steel plate installation leveling structure | |
CN218880884U (en) | Prestressed anchorage cable mixing pile foundation pit retaining structure | |
CN205077361U (en) | Interim steel sheet construction road | |
CN216712592U (en) | Novel roadbed applying foamed light soil | |
CN219973272U (en) | Expansion type fan foundation with hollow strip steel lining | |
CN219809628U (en) | Tower crane attachment part anchoring structure | |
CN217174750U (en) | Prestressing force anti-floating anchor rod waterproof construction | |
CN217174888U (en) | Movable steel pipe pile concrete enlarges basis | |
CN214784016U (en) | Pipe jacking working well supporting structure | |
CN112281906B (en) | Assembly type transformer foundation structure and construction method thereof | |
CN212052852U (en) | Newly-increased retaining wall structure of active large-deformation roadbed | |
CN215996931U (en) | A mounting structure for coal grinds |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C57 | Notification of unclear or unknown address | ||
DD01 | Delivery of document by public notice |
Addressee: Zhou Zhenhua Document name: Notice of first review |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |