CN115309303A - Control method and device for construction area, electronic equipment and readable storage medium - Google Patents

Control method and device for construction area, electronic equipment and readable storage medium Download PDF

Info

Publication number
CN115309303A
CN115309303A CN202210947177.7A CN202210947177A CN115309303A CN 115309303 A CN115309303 A CN 115309303A CN 202210947177 A CN202210947177 A CN 202210947177A CN 115309303 A CN115309303 A CN 115309303A
Authority
CN
China
Prior art keywords
construction
panoramic image
map
point location
displaying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210947177.7A
Other languages
Chinese (zh)
Other versions
CN115309303B (en
Inventor
郑文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Huichuan Internet Of Things Technology Science And Technology Co ltd
Original Assignee
Fujian Huichuan Internet Of Things Technology Science And Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Huichuan Internet Of Things Technology Science And Technology Co ltd filed Critical Fujian Huichuan Internet Of Things Technology Science And Technology Co ltd
Priority to CN202210947177.7A priority Critical patent/CN115309303B/en
Publication of CN115309303A publication Critical patent/CN115309303A/en
Application granted granted Critical
Publication of CN115309303B publication Critical patent/CN115309303B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/01Input arrangements or combined input and output arrangements for interaction between user and computer
    • G06F3/048Interaction techniques based on graphical user interfaces [GUI]
    • G06F3/0481Interaction techniques based on graphical user interfaces [GUI] based on specific properties of the displayed interaction object or a metaphor-based environment, e.g. interaction with desktop elements like windows or icons, or assisted by a cursor's changing behaviour or appearance
    • G06F3/04817Interaction techniques based on graphical user interfaces [GUI] based on specific properties of the displayed interaction object or a metaphor-based environment, e.g. interaction with desktop elements like windows or icons, or assisted by a cursor's changing behaviour or appearance using icons
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/01Input arrangements or combined input and output arrangements for interaction between user and computer
    • G06F3/048Interaction techniques based on graphical user interfaces [GUI]
    • G06F3/0484Interaction techniques based on graphical user interfaces [GUI] for the control of specific functions or operations, e.g. selecting or manipulating an object, an image or a displayed text element, setting a parameter value or selecting a range
    • G06F3/04842Selection of displayed objects or displayed text elements
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/01Input arrangements or combined input and output arrangements for interaction between user and computer
    • G06F3/048Interaction techniques based on graphical user interfaces [GUI]
    • G06F3/0484Interaction techniques based on graphical user interfaces [GUI] for the control of specific functions or operations, e.g. selecting or manipulating an object, an image or a displayed text element, setting a parameter value or selecting a range
    • G06F3/04845Interaction techniques based on graphical user interfaces [GUI] for the control of specific functions or operations, e.g. selecting or manipulating an object, an image or a displayed text element, setting a parameter value or selecting a range for image manipulation, e.g. dragging, rotation, expansion or change of colour
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/01Input arrangements or combined input and output arrangements for interaction between user and computer
    • G06F3/048Interaction techniques based on graphical user interfaces [GUI]
    • G06F3/0487Interaction techniques based on graphical user interfaces [GUI] using specific features provided by the input device, e.g. functions controlled by the rotation of a mouse with dual sensing arrangements, or of the nature of the input device, e.g. tap gestures based on pressure sensed by a digitiser
    • G06F3/0488Interaction techniques based on graphical user interfaces [GUI] using specific features provided by the input device, e.g. functions controlled by the rotation of a mouse with dual sensing arrangements, or of the nature of the input device, e.g. tap gestures based on pressure sensed by a digitiser using a touch-screen or digitiser, e.g. input of commands through traced gestures
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Human Computer Interaction (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Data Mining & Analysis (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • User Interface Of Digital Computer (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application provides a construction area control method and device, electronic equipment and a readable storage medium, wherein a first selection operation for any thumbnail image is responded, and a panoramic image corresponding to the thumbnail image is displayed in a graphical user interface; in order to visually display the construction position with the quality hidden trouble, aiming at each construction monitoring point position, if the space variation numerical value of any space monitoring parameter between the current construction details and the historical construction details of the construction monitoring point position exceeds a preset variation threshold value, the first color is adjusted to be a second color, and the point position icon of the construction monitoring point position is displayed by the second color. Therefore, the construction area related to the target engineering project can be remotely, visually, wholly and digitally controlled, the construction position with the potential quality hazard can be timely positioned, and the construction details of the construction position with the potential quality hazard can be visually observed.

Description

Control method and device for construction area, electronic equipment and readable storage medium
Technical Field
The present disclosure relates to the field of monitoring technologies, and in particular, to a method and an apparatus for managing and controlling a construction area, an electronic device, and a readable storage medium.
Background
At present, along with the rapid development of the building industry, the scale of construction engineering is increasingly huge, and the procedures are numerous and complex, so that quality safety supervision work and construction progress data acquisition work on a construction site are very important, and the construction site is also faced with higher requirements.
Traditional quality safety supervision work and construction progress data acquisition work mainly rely on the manual work, but the time limit for a project of construction is all longer generally, and can receive the influence of various factors in the work progress, carry out quality supervision and all have lags, the easy scheduling problem that makes mistakes by the staff, consequently lead to the progress management and the quality control of construction project to master in time, easily lead to the construction progress to progress slowly, be difficult to guarantee the quality, the completion construction plan of guarantee, engineering quality and safe construction all can not obtain the guarantee.
Disclosure of Invention
In view of the above, an object of the present application is to provide a method and an apparatus for managing and controlling a construction area, an electronic device, and a readable storage medium, which can perform remote, visual, whole-course, and digital management and control on a construction area related to a target engineering project, and can visually observe construction details of a construction location with a quality hidden trouble, and further timely locate the construction location with the quality hidden trouble.
The embodiment of the application provides a construction area control method, which comprises the steps of displaying a graphical user interface through terminal equipment, wherein at least a part of thumbnail images of construction areas related to target engineering projects are displayed in the graphical user interface; the management and control method comprises the following steps:
responding to a first selection operation aiming at any thumbnail image, and displaying the corresponding panoramic image of the thumbnail image in the graphical user interface; the panoramic image map displays the measurement information of each construction object in the construction area and the point location icon of each construction monitoring point location; the point location icon is displayed in a first color;
and aiming at each construction monitoring point, if the spatial variation numerical value of any spatial monitoring parameter between the current construction details and the historical construction details of the construction monitoring point exceeds a preset variation threshold, adjusting the first color to be a second color, and displaying the point icon of the construction monitoring point by the second color.
In a possible implementation, the management and control method further includes:
responding to second selection operation of a point location icon aiming at any construction monitoring point location, and displaying space change information between historical construction details and current construction details of a target monitoring point location selected by the second selection operation; the spatial variation information comprises a plurality of spatial variation values.
In a possible implementation, the management and control method further includes:
responding to a first touch operation aiming at the panoramic image map, and dividing the panoramic image map into a plurality of local detail images for displaying;
for each local detail image, responding to the measurement selection operation for the local detail image, and determining a measurement mode for measuring the target parameters of the target construction object in the local detail image;
and measuring the target parameters of the target construction object according to the measuring mode, determining the measuring result of the target parameters of the target construction object, and displaying the measuring result.
In one possible implementation, the first touch operation includes a detail enlargement operation and an image division operation; the responding is to the first touch operation of the panoramic image map, the panoramic image map is divided into a plurality of local detail images to be displayed, and the method comprises the following steps:
responding to a detail amplification operation aiming at the panoramic image map, and determining an amplification area selected by the detail amplification operation from the panoramic image map;
displaying the area measurement image of the magnified area;
responding to image dividing operation aiming at the area measurement image, and determining a detail display area selected by the image dividing operation from the area measurement image;
and displaying a plurality of local detail images of the detail display area.
In one possible embodiment, the target construction object includes at least one of a designated area, a designated position, and a designated target object;
the measuring mode comprises at least one of size measurement, area measurement, thickness measurement, volume measurement, interval measurement and space measurement;
the target parameters comprise at least one of a building boundary red line, building axis deviation, size, length, width, thickness, height, elevation, verticality, levelness, flatness, gradient, area, volume, scaffold horizontal-vertical distance, support system distance, upper and lower support size, steel bar diameter, steel bar distance, pipeline diameter, pipeline length, pipeline trend, welding size, sleeve connection size and lap joint length.
In a possible implementation, the management and control method further includes:
responding to a second touch operation aiming at the panoramic image map, and acquiring a CAD design map of the panoramic image map;
determining a space comparison result between the panoramic image map and the CAD design map by comparing the panoramic image map and the CAD design map, and displaying the space comparison result in the graphical user interface; and the space comparison result shows the goodness of fit difference between the panoramic image map and the CAD design map.
In a possible implementation, the management and control method further includes:
responding to an amplifying touch operation aiming at the panoramic image map and/or the CAD design drawing, and amplifying the panoramic image map and/or the CAD design drawing; or the like, or, alternatively,
and responding to a reduction touch operation aiming at the panoramic image map and/or the CAD design drawing, and reducing the panoramic image map and/or the CAD design drawing.
In a possible embodiment, the determining a spatial comparison result between the panoramic image map and the CAD design map by comparing the panoramic image map and the CAD design map, and displaying the spatial comparison result in the graphical user interface includes:
responding to a first reference point selection operation aiming at the panoramic image map, and determining a first reference point position and a second reference point position from the panoramic image map;
responding to a second reference point selection operation aiming at the CAD design drawing, and determining a third reference point position and a fourth reference point position from the CAD design drawing; the first reference point location and the third reference point location have a corresponding relationship, and the second reference point location and the fourth reference point location have a corresponding relationship;
determining a comparison mapping relation between the panoramic image map and the CAD design map based on the first reference point location, the second reference point location, the third reference point location and the fourth reference point location;
according to the comparison mapping relation, determining a space comparison result between the panoramic image map and the CAD design map by using space measurement information carried by the panoramic image map and space data information carried by the CAD design map;
and overlapping and displaying the space comparison result in the panoramic image map.
In one possible implementation mode, the graphical user interface also displays the routing inspection detail information; the management and control method further comprises the following steps:
responding to a third touch operation aiming at the patrol detail information, and displaying an abnormal facility image of an abnormal scene facility included in the patrol detail information and a rectification facility image obtained by rectifying and rectifying the abnormal scene facility in the graphical user interface;
responding to a fourth touch operation aiming at any abnormal scene facility, and displaying the actual position of the abnormal scene facility in the construction area in the graphical user interface; and/or the presence of a gas in the gas,
responding to a fifth touch operation aiming at any abnormal scene facility, and displaying a plurality of historical image maps of the abnormal scene facility in different historical time periods in the graphical user interface; and determining the facility change information of the abnormal scene facility by comparing a plurality of historical image maps of the abnormal scene facility.
In a possible implementation, the management and control method further includes:
acquiring a plurality of panoramic image maps and a BIM (building information modeling) model of the construction area;
according to the actual size of the construction area, proportionally fusing the multiple panoramic image maps and the BIM to obtain a twin demonstration model;
displaying the twin demonstration model in the graphical user interface.
The embodiment of the application also provides a control device of the construction area, which displays a graphical user interface through terminal equipment, wherein at least a part of thumbnail images of the construction area related to the target engineering project are displayed in the graphical user interface; the management and control device comprises:
the image display module is used for responding to a first selection operation aiming at any thumbnail image and displaying the panoramic image corresponding to the thumbnail image in the graphical user interface; the panoramic image map displays the measurement information of each construction object in the construction area and the point location icon of each construction monitoring point location; the point location icon is displayed in a first color;
and the display adjusting module is used for adjusting the first color to a second color and displaying the point location icon of the construction monitoring point location by the second color if the spatial variation numerical value of any spatial monitoring parameter between the current construction details and the historical construction details of the construction monitoring point location exceeds a preset variation threshold value.
In a possible implementation manner, the management and control apparatus further includes an information display module, and the information display module is configured to:
responding to second selection operation of a point location icon aiming at any construction monitoring point location, and displaying space change information between historical construction details and current construction details of a target monitoring point location selected by the second selection operation; wherein, the space variation information comprises a plurality of space variation numerical values.
In a possible implementation manner, the management and control apparatus further includes a measurement result display module, and the measurement result display module is configured to:
responding to a first touch operation aiming at the panoramic image map, and dividing the panoramic image map into a plurality of local detail images for displaying;
for each local detail image, responding to the measurement selection operation aiming at the local detail image, and determining a measurement mode for measuring the target parameters of the target construction object in the local detail image;
and measuring the target parameters of the target construction object according to the measuring mode, determining the measuring result of the target parameters of the target construction object, and displaying the measuring result.
In one possible implementation, the first touch operation includes a detail enlargement operation and an image division operation; when the measurement result display module is used for responding to a first touch operation for the panoramic image map and dividing the panoramic image map into a plurality of local detail images for display, the measurement result display module is used for:
determining an enlargement area selected by the detail enlargement operation from the panoramic image map in response to the detail enlargement operation for the panoramic image map;
displaying the area measurement image of the magnified area;
responding to image dividing operation aiming at the area measurement image, and determining a detail display area selected by the image dividing operation from the area measurement image;
and displaying a plurality of local detail images of the detail display area.
In one possible embodiment, the target construction object includes at least one of a designated area, a designated position, and a designated target object;
the measuring mode comprises at least one of size measurement, area measurement, thickness measurement, volume measurement, interval measurement and space measurement;
the target parameters comprise at least one of building boundary red lines, building axis deviation, size, length, width, thickness, height, elevation, perpendicularity, levelness, flatness, gradient, area, volume, scaffold horizontal and vertical spacing, support system spacing, upper and lower support size, steel bar diameter, steel bar spacing, pipeline diameter, pipeline length, pipeline trend, welding size, sleeve connection size and lap joint length.
In a possible embodiment, the management and control apparatus further includes a difference comparison module, and the difference comparison module is configured to:
responding to a second touch operation aiming at the panoramic image map, and acquiring a CAD design map of the panoramic image map;
determining a space comparison result between the panoramic image map and the CAD design map by comparing the panoramic image map and the CAD design map, and displaying the space comparison result in the graphical user interface; and the space comparison result shows the goodness of fit difference between the panoramic image map and the CAD design map.
In a possible implementation, the management and control apparatus further includes a resizing module configured to:
responding to an amplifying touch operation aiming at the panoramic image map and/or the CAD design drawing, and amplifying the panoramic image map and/or the CAD design drawing; or the like, or a combination thereof,
and responding to a reduction touch operation aiming at the panoramic image map and/or the CAD design drawing, and reducing the panoramic image map and/or the CAD design drawing.
In a possible embodiment, when the difference comparison module is configured to determine a spatial comparison result between the panoramic image map and the CAD design map by comparing the panoramic image map and the CAD design map, and display the spatial comparison result in the graphical user interface, the difference comparison module is configured to:
responding to a first reference point selection operation aiming at the panoramic image map, and determining a first reference point position and a second reference point position from the panoramic image map;
responding to a second reference point selection operation aiming at the CAD design drawing, and determining a third reference point position and a fourth reference point position from the CAD design drawing; the first reference point location and the third reference point location have a corresponding relationship, and the second reference point location and the fourth reference point location have a corresponding relationship;
determining a comparison mapping relation between the panoramic image map and the CAD design map based on the first reference point position, the second reference point position, the third reference point position and the fourth reference point position;
according to the comparison mapping relation, determining a space comparison result between the panoramic image map and the CAD design map by using space measurement information carried by the panoramic image map and space data information carried by the CAD design map;
and overlapping and displaying the space comparison result in the panoramic image map.
In a possible implementation mode, tour inspection detail information is also displayed in the graphical user interface; the management and control device further comprises an adjusting and modifying detail display module, and the adjusting and modifying detail display module is used for:
responding to a third touch operation aiming at the routing inspection detail information, and displaying an abnormal facility image of an abnormal scene facility included in the routing inspection detail information and a rectification facility image obtained after rectification and rectification of the abnormal scene facility in the graphical user interface;
responding to a fourth touch operation aiming at any abnormal scene facility, and displaying the actual position of the abnormal scene facility in the construction area in the graphical user interface; and/or the presence of a gas in the atmosphere,
responding to a fifth touch operation aiming at any abnormal scene facility, and displaying a plurality of historical image maps of the abnormal scene facility in different historical time periods in the graphical user interface; and determining the facility change information of the abnormal scene facility by comparing a plurality of historical image maps of the abnormal scene facility.
In a possible implementation manner, the management and control apparatus further includes a model fusion module, and the model fusion module is configured to:
acquiring a plurality of panoramic image maps and a BIM (building information modeling) model of the construction area;
according to the actual size of the construction area, proportionally fusing the multiple panoramic image maps and the BIM to obtain a twin demonstration model;
displaying the twin demonstration model in the graphical user interface.
An embodiment of the present application further provides an electronic device, including: a processor, a memory and a bus, the memory storing machine-readable instructions executable by the processor, the processor and the memory communicating over the bus when the electronic device is running, the machine-readable instructions when executed by the processor performing the steps of the method of managing a construction area as described above.
The embodiment of the present application also provides a computer-readable storage medium, where a computer program is stored on the computer-readable storage medium, and when the computer program is executed by a processor, the steps of the method for managing and controlling a construction area are performed as described above.
The construction area management and control method and device, the electronic equipment and the readable storage medium respond to a first selection operation for any thumbnail image, and the panoramic image corresponding to the thumbnail image is displayed in the graphical user interface; the panoramic image map displays point location icons of all construction monitoring point locations related in a construction area corresponding to the panoramic image map; the point location icon is displayed in a first color; and aiming at each construction monitoring point location, if the spatial variation numerical value of any spatial monitoring parameter between the current construction details and the historical construction details of the construction monitoring point location exceeds a preset variation threshold value, adjusting the first color to be a second color, and displaying a point location icon of the construction monitoring point location by the second color. Therefore, the construction area related to the target engineering project can be remotely, visually, wholly and digitally controlled, construction details of the construction position with the quality hidden danger can be visually observed, and then the construction position with the quality hidden danger can be timely positioned.
In order to make the aforementioned objects, features and advantages of the present application more comprehensible, preferred embodiments accompanied with figures are described in detail below.
Drawings
To more clearly illustrate the technical solutions of the embodiments of the present application, the drawings needed in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present application and therefore should not be considered as limiting the scope, and those skilled in the art can also obtain other related drawings based on the drawings without inventive efforts.
Fig. 1 is a flowchart of a method for managing and controlling a construction area according to an embodiment of the present disclosure;
FIG. 2 is a schematic diagram of a graphical user interface provided by an embodiment of the present application;
fig. 3 is a second schematic diagram of a graphical user interface provided in an embodiment of the present application;
fig. 4 is a schematic structural diagram of a control device for a construction area according to an embodiment of the present disclosure;
fig. 5 is a second schematic structural diagram of a management and control apparatus for a construction area according to the second embodiment of the present disclosure;
fig. 6 is a schematic structural diagram of an electronic device according to an embodiment of the present application.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all the embodiments. The components of the embodiments of the present application, generally described and illustrated in the figures herein, can be arranged and designed in a wide variety of different configurations. Thus, the following detailed description of the embodiments of the present application, presented in the accompanying drawings, is not intended to limit the scope of the claimed application, but is merely representative of selected embodiments of the application. Every other embodiment that one skilled in the art can obtain without inventive effort based on the embodiments of the present application falls within the scope of protection of the present application.
The research shows that the traditional quality safety supervision work and construction progress data acquisition work mainly depend on manual work, but the construction period of building construction is generally longer, the construction process can be influenced by various factors, and the problems of lagging, error and the like exist in quality supervision and data recording of workers, so that the progress management and the quality management of a construction project cannot be mastered in time, the construction progress is slow to progress, quality guarantee and guarantee are difficult to complete construction plan, and the engineering quality and safety construction cannot be guaranteed.
Based on this, the embodiment of the application provides a construction area control method, which can perform remote, visual, whole-course and digital control on a construction area related to a target engineering project, and can visually observe construction details of a construction position with a quality hidden danger, so that the construction position with the quality hidden danger can be timely located.
Referring to fig. 1, fig. 1 is a flowchart illustrating a method for managing and controlling a construction area according to an embodiment of the present disclosure. Displaying a graphical user interface through terminal equipment, wherein at least a part of thumbnail images of construction areas related to target engineering projects are displayed in the graphical user interface; as shown in fig. 1, a method for managing and controlling a construction area provided in an embodiment of the present application includes:
s101, responding to a first selection operation aiming at any thumbnail image, and displaying the corresponding panoramic image of the thumbnail image in the graphical user interface.
S102, aiming at each construction monitoring point location, if the spatial variation numerical value of any spatial monitoring parameter between the current construction details and the historical construction details of the construction monitoring point location exceeds a preset variation threshold value, the first color is adjusted to be a second color, and the point location icon of the construction monitoring point location is displayed in the second color.
According to the construction area control method, thumbnail images of construction areas related to a target engineering project are provided for a user in a graphical user interface, and the user can check the panoramic image of the construction area corresponding to any one of the thumbnail images by selecting the thumbnail image; the point location icon of each construction monitoring point location is displayed in the panoramic image map, and when any one spatial variation numerical value of any construction monitoring point location exceeds a preset variation threshold value, namely when any construction monitoring point location has a quality hidden trouble, the purpose of warning a user is achieved by changing the color of the point location icon of the construction monitoring point location. Therefore, the user can comprehensively monitor each construction area, and can visually observe the construction position with the quality hidden danger, and then timely position the construction position with the quality hidden danger.
When monitoring each construction area related to a target engineering project, a user can open related information such as a panoramic image and the like of the construction area shot by using the panoramic imaging distance measuring camera through corresponding software, and the related information is displayed in a graphical user interface so that the user can know the construction condition of the construction area.
In order to facilitate the user to check the construction conditions of different construction periods or different construction areas, the thumbnail images of a plurality of construction areas can be displayed in the graphical user interface, and then the user can check the construction conditions of different construction periods or different construction areas by selecting the corresponding thumbnail images according to the requirements.
In step S101, a plurality of thumbnail images are displayed in the graphical user interface, and the constructor may apply a first selection operation on any one of the thumbnail images, determine the thumbnail image selected by the first selection operation, and display the panoramic image corresponding to the selected thumbnail image in the graphical user interface for the constructor.
Here, scene detail information matched with each thumbnail image is also displayed in the graphical user interface; specifically, the scene detail information includes at least one of the following: time, weather, number, layer number, elevation, construction description, coordinates, construction cost, number of construction workers on the working face and patrol information.
Here, for a plurality of thumbnail images displayed in the graphical user interface, the thumbnail images of the same construction area in different construction periods may be displayed; or, the method can also be used for thumbnail images of different construction areas in the same construction period; or, the thumbnail images of different construction areas and different construction periods can be taken.
Illustratively, 6 thumbnail images, namely, the thumbnail image 1 to the thumbnail image 6, are displayed in the graphical user interface, wherein the thumbnail image 1 to the thumbnail image 6 may be respectively monitoring images of the construction area a in 1 month to 6 months; or, the thumbnail images 1 to 6 can also be monitoring images of the construction areas a to F respectively; or, the thumbnail images 1 to 2 are respectively monitoring images of the construction area a in 4 months to 6 months, the thumbnail images 3 to 4 are respectively monitoring images of the construction area B in 4 months to 6 months, and the thumbnail images 5 to 6 are respectively monitoring images of the construction area C in 4 months to 6 months.
In the scheme provided by the application, the response to the first selection operation for any thumbnail image can be specifically that when a user touches any thumbnail image, a selection instruction for issuing the thumbnail image can be triggered; the user can send a selection instruction of the thumbnail image by touching the thumbnail image and/or presetting a combination key; specifically, the player can touch the thumbnail images through fingers, a mouse and the like; or through preset combination keys in the keyboard, for example, the keys of ctrl key, alt key, a key, etc. in the keyboard, the preset keys may be manually set according to the user's requirements.
The first selection operation comprises clicking operation, sliding operation, double-clicking operation, long-pressing operation and the like.
The panoramic image map is a panoramic digital image of the construction area in a target time period; the panoramic image map displays the measurement information of each construction object in the construction area and the point position icon of each construction monitoring point position; the point location icon is displayed in a first color.
Here, there are a plurality of construction monitoring points that need to be monitored for quality hidden danger in different construction areas of a target engineering project, that is, a constructor needs to monitor whether there is a quality hidden danger in each construction monitoring point, so that the constructor can visually see the position of each construction monitoring point, and a point icon corresponding to each construction monitoring point can be displayed in a panoramic image map in a first color.
In addition, in order to facilitate the constructors to find the construction monitoring point positions with the quality hidden troubles from the numerous construction monitoring point positions, the constructors can timely find the construction monitoring point positions with the quality hidden troubles by changing the display colors of the point position icons of the construction monitoring point positions.
For example, when the construction monitoring point location has no potential quality hazard, the point location icon corresponding to the construction monitoring point location may be displayed as "green"; and when the construction monitoring point location has the quality hidden trouble, converting the display color of the point location icon corresponding to the construction monitoring point location, and displaying the point location icon corresponding to the construction monitoring point location as yellow to fulfill the aim of warning constructors.
In step S102, for each construction monitoring point, the construction quality of the construction monitoring point can be monitored by comparing the current construction details and the historical construction details of the construction monitoring point; specifically, the quality of the construction monitoring point location can be monitored by comparing the current construction details of the construction monitoring point location with the spatial variation numerical values of various spatial monitoring parameters in the historical construction details within the period of time; if the spatial variation numerical value of any one spatial monitoring parameter between the current construction details and the historical construction details of the construction monitoring point location in the period of time exceeds a preset variation threshold value, it can be shown that the construction monitoring point location has a quality hidden trouble, at the moment, the display color of the point location icon corresponding to the construction monitoring point location can be adjusted from the first color to the second color, and the point location icon of the construction monitoring point location with the quality hidden trouble is displayed in the panoramic image map in the second color.
Here, in order to facilitate a user to view details of changes of each spatial monitoring parameter of each construction monitoring point location, spatial change information of the construction monitoring point location selected by a constructor can be displayed in a graphical user interface according to related operations of the constructor.
In one embodiment, the management and control method further includes: responding to second selection operation of the point location icon aiming at any construction monitoring point location, and displaying space change information between historical construction details and current construction details of the target monitoring point location selected by the second selection operation.
In the step, in response to a second selection operation applied by a constructor to a point location icon of any construction monitoring point location, determining a target monitoring point location corresponding to the point location icon selected by the constructor through the second selection operation, and displaying spatial change information between historical construction details and current construction details of the target monitoring point location selected by the second selection operation on a graphical user interface or a panoramic image; wherein, the space variation information comprises a plurality of space variation numerical values.
For example, please refer to fig. 2, fig. 2 is a schematic diagram of a graphical user interface provided in an embodiment of the present application; as shown in fig. 2, a point location icon 2c-1 of a construction monitoring point location (CJ 1) 2b-1, a point location icon 2c-2 of a construction monitoring point location (CJ 2) 2b-2, a point location icon 2c-3 of a construction monitoring point location (CJ 3) 2b-3, and a point location icon 2c-4 of a construction monitoring point location (CJ 4) 2b-4 are displayed in a graphical user interface 2a, and a constructor may apply a second selection operation on the point location icon 2c-4 to display spatial change information 2d between historical construction details and current construction details of the construction monitoring point location 2b-4 (i.e., a target monitoring point location) in the graphical user interface 2a, where the spatial change information 2d includes a historical construction image 2d-1 of the construction monitoring point location 2b-4, a current construction image 2d-2, a horizontal displacement cumulative change curve 2d-3, a horizontal displacement change rate curve 2d-4, a vertical displacement cumulative change curve 2d-5, a vertical displacement change rate curve 2d-6, and the like.
The spatial variation values include historical construction images of construction monitoring point locations, current construction images, displacement variation parameters (including horizontal displacement variation parameters, such as a horizontal displacement accumulated variation curve and a horizontal displacement variation rate curve, and vertical displacement variation parameters, such as a vertical displacement accumulated variation curve and a vertical displacement variation rate curve), descending parameters (including horizontal descending variation parameters, such as a horizontal descending accumulated variation curve and a horizontal descending variation rate curve, and vertical descending variation parameters, such as a vertical descending accumulated variation curve and a vertical descending variation rate curve), shape variation parameters and other variation values.
For constructors, the method has the requirement of measuring building materials such as formwork support ground rods, steel bars, pipelines and the like in the construction environment, and if the constructors measure in the construction environment in person, the method is relatively dangerous; therefore, the method and the device provide the possibility of measuring the relevant parameters of the target construction object in the construction area through the displayed panoramic image map for the constructor.
In the scheme provided by the application, the second selection operation of the point location icon for any construction monitoring point location is responded, and specifically, when a user touches the point location icon for any construction monitoring point location, a selection instruction of the construction monitoring point location can be triggered and issued; the user can issue a selection instruction of the construction monitoring point location by touching a point location icon and/or a preset combination key of any construction monitoring point location; specifically, players can monitor point location icons of point locations through touch construction of fingers, a mouse and the like; or through preset combination keys in the keyboard, for example, the keys of ctrl key, alt key, a key, etc. in the keyboard, the preset keys may be manually set according to the user's requirements.
The second selection operation comprises click operation, sliding operation, double-click operation, long-press operation and the like.
In one embodiment, the management and control method further includes:
step 1, responding to a first touch operation aiming at the panoramic image map, and dividing the panoramic image map into a plurality of local detail images for displaying.
In the step, a constructor can apply a first touch operation on a panoramic image displayed in a graphical user interface to display the panoramic image in the form of a plurality of local detail images; here, the details exhibited by the plurality of local detail images may be the detail images of all the details included in the panoramic image, or may be the detail images of the local details included in a certain area in the panoramic image.
In the scheme provided by the application, the response is to the first touch operation of the panoramic image map, specifically, when a user touches the panoramic image map, a division instruction of the panoramic image map can be triggered and issued; the user can send a dividing instruction of the panoramic image map through touch control of the panoramic image map and/or preset combined keys; specifically, the player can touch the panoramic image map through a finger, a mouse and the like; or through preset combination keys in the keyboard, for example, the keys such as ctrl key, alt key, a key, etc. in the keyboard, the preset keys may be manually set according to the user's requirements.
The first touch operation comprises click operation, sliding operation, double-click operation, long-press operation and the like.
In one embodiment, the first touch operation includes a detail enlargement operation and an image division operation; the step 1 comprises the following steps: and 11, responding to a detail amplification operation aiming at the panoramic image map, and determining an amplification area selected by the detail amplification operation from the panoramic image map.
In this step, the constructor may apply a detail enlargement operation to the panoramic image displayed in the graphical user interface, and at this time, an enlargement area where the constructor has an enlargement demand may be determined according to a touch position of the detail enlargement operation in the panoramic image.
In the scheme provided by the application, the detail amplifying operation aiming at the panoramic image is responded, and specifically, when a user touches an amplifying control part of the detail amplifying operation, a local amplifying instruction of the panoramic image can be triggered and issued; the user can send a local amplification instruction of the panoramic image map through an amplification control and/or a preset combined key of the touch detail amplification operation; specifically, the player can enlarge the enlargement control of the operation through the touch details such as fingers and a mouse; or through preset combination keys in the keyboard, for example, the keys such as ctrl key, alt key, a key, etc. in the keyboard, the preset keys may be manually set according to the user's requirements.
The detail amplification operation comprises click operation, sliding operation, double-click operation, long-press operation and the like.
And step 12, displaying the area measurement image of the amplified area.
In the step, after determining an amplification area which the constructor has an amplification requirement, displaying an area measurement image of the amplification area in a graphical user interface; the area measurement image of the amplified area can be displayed on the panoramic image in an overlapping manner, which can be determined according to the actual situation, and is not limited herein.
And step 13, responding to the image dividing operation aiming at the area measurement image, and determining a detail display area selected by the image dividing operation from the area measurement image.
In this step, for the area measurement image, the constructor may apply an image division operation for the area measurement image, and may determine a detail display area where the constructor has a detail display demand according to a touch position of the image division operation in the area measurement image.
In the scheme provided by the application, the image dividing operation aiming at the area measurement image is responded, and specifically, when a user touches a dividing control of the image dividing operation, a dividing instruction of the area measurement image can be triggered and issued; the user can issue a dividing instruction of the regional measurement image through a dividing control and/or a preset combined key of the touch image dividing operation; specifically, the player may touch the division control of the image division operation through a finger, a mouse, or the like; or through preset combination keys in the keyboard, for example, the keys of ctrl key, alt key, a key, etc. in the keyboard, the preset keys may be manually set according to the user's requirements.
The image dividing operation comprises clicking operation, sliding operation, double-clicking operation, long-pressing operation and the like.
And 14, displaying a plurality of local detail images of the detail display area.
In the step, a plurality of local detail images of the detail display area are displayed in a graphical user interface; here, the plurality of local detail images can clearly show all construction details included in the detail display area; correspondingly, a plurality of local detail images of the detail display area can be displayed in the graphical user interface; the multiple local detail images in the detail display area can be displayed on the panoramic image in an overlapping manner, and the display mode can be determined according to actual conditions without limitation.
And 2, aiming at each local detail image, responding to the measurement selection operation aiming at the local detail image, and determining a measurement mode for measuring the target parameters of the target construction object in the local detail image.
In this step, for each local detail image displayed in the graphical user interface, the constructor may apply a measurement selection operation on the local detail image, determine, through the measurement selection operation, a target construction object that the constructor desires to measure a relevant parameter, and determine a measurement mode for measuring a target parameter of the target construction object.
The target construction object comprises at least one of a designated area, a designated position and a designated object; the measuring mode comprises at least one of size measurement, area measurement, thickness measurement, volume measurement, interval measurement and space measurement;
the target parameters comprise at least one of a building boundary red line, building axis deviation, size, length, width, thickness, height, elevation, verticality, levelness, flatness, gradient, area, volume, scaffold horizontal-vertical distance, support system distance, upper and lower support size, steel bar diameter, steel bar distance, pipeline diameter, pipeline length, pipeline trend, welding size, sleeve connection size and lap joint length.
Illustratively, constructors can select to measure the area of a designated area through measurement selection operation; alternatively, diameter measurements are taken for a given setting (e.g., rebar, steel pipe); or alternatively, to measure the spacing of a given set-up (e.g., a template support ground bar), etc.
Referring to fig. 3, fig. 3 is a second schematic diagram of a graphical user interface according to an embodiment of the present application. As shown in FIG. 3, a local detail image 3b is displayed in the graphic user interface 3a, it is determined that a distance measurement needs to be performed on an actual distance value between any two points 3c-1 to 3c-2 in response to a measurement selection operation applied by a constructor with respect to any two points 3c-1 to 3c-2 in the local detail image 3b, it is determined that the actual distance value before any two points 3c-1 to 3c-2 is 30cm, and an actual distance value 3d (i.e., 30 cm) is displayed in the local detail image 3 b.
In the scheme provided by the application, the measurement selection operation for the local detail image is responded, and specifically, when a user touches a measurement control of the measurement selection operation, a measurement instruction of a target construction object in the local detail image can be triggered and issued; the user can send a measurement instruction of a target construction object through a measurement control and/or a preset combination key of touch measurement selection operation; specifically, the player can select a measurement control for operation by touch measurement through a finger, a mouse, and the like; or through preset combination keys in the keyboard, for example, the keys such as ctrl key, alt key, a key, etc. in the keyboard, the preset keys may be manually set according to the user's requirements.
The measurement selection operation includes a single-click operation, a sliding operation, a double-click operation (two-point touch operation), a three-point touch operation, a multi-point touch operation, a long-press operation, and the like.
For example, a constructor can select a designated area needing target parameter measurement through double-click operation; alternatively, the constructor may select a designated subject matter or the like, which is required to perform the target parameter measurement, through a one-click operation.
And 3, measuring the target parameters of the target construction object according to the measuring mode, determining the measuring result of the target parameters of the target construction object, and displaying the measuring result.
In this step, the determined target parameters of the target construction object are measured according to the determined measurement mode, so as to obtain measurement results (for example, the area of the designated area, the diameter of the steel bar, the diameter of the steel pipe, the distance between the formwork support ground rods and the like) of the target parameters of the target construction object, and the measurement results of the target construction object are displayed in a graphical user interface so as to be convenient for a constructor to view.
In order to visually and accurately check the deviation condition between the actual size and the design size of the verified construction area, a CAD design drawing aiming at the construction area before construction can be compared with a panoramic image collected by a panoramic imaging distance measuring camera in the construction process.
In one embodiment, the management and control method further comprises: responding to a second touch operation aiming at the panoramic image map, and acquiring a CAD design map of the panoramic image map; and determining a space comparison result between the panoramic image map and the CAD design map by comparing the panoramic image map and the CAD design map, and displaying the space comparison result in the graphical user interface.
In the step, a CAD design drawing of a construction area related to the panoramic image is acquired in response to a second touch operation applied by a constructor aiming at the panoramic image; determining a space comparison result between the panoramic image map of the construction area and the CAD design map by comparing the panoramic image map with the CAD related map; the space comparison result shows the goodness of fit difference between the panoramic image map and the CAD design map; i.e. the deviation between the actual size of the construction area and the design size.
The difference in goodness of fit indicates the degree of deviation between the panoramic image and the CAD design.
In the scheme provided by the application, the second touch operation aiming at the panoramic image map is responded, specifically, when a user touches the panoramic image map, an acquisition instruction of the CAD design map can be triggered and issued; the user can issue an acquisition instruction of the CAD design drawing by touching the panoramic image map and/or the preset combination key; specifically, the player can touch the panoramic image map through a finger, a mouse and the like; or through preset combination keys in the keyboard, for example, the keys such as ctrl key, alt key, a key, etc. in the keyboard, the preset keys may be manually set according to the user's requirements.
The second touch operation comprises at least one of clicking operation, sliding operation, double-clicking operation, long-pressing operation and the like.
Furthermore, considering the difference between the display size and the display position between the panoramic image and the CAD design drawing displayed in the graphical user interface, the problem of the misplaced display between the panoramic image and the CAD design drawing is easily caused, so that the construction personnel cannot clearly know the displayed content in the graphical user interface, and cannot compare the panoramic image with the CAD design drawing under the condition that the mapping relationship between the panoramic image and the CAD design drawing cannot be known, thereby providing the possibility for the construction personnel to adjust the parameters of the display size, the display position and the like of the panoramic image and the CAD design drawing on the basis.
In an embodiment, the determining a spatial comparison result between the panoramic image map and the CAD design map by comparing the panoramic image map and the CAD design map, and displaying the spatial comparison result in the graphical user interface includes:
step a, responding to a first reference point selection operation aiming at the panoramic image map, and determining a first reference point position and a second reference point position from the panoramic image map.
In this step, in response to a first reference point selection operation of a constructor for a panoramic image map displayed in a graphical user interface, first reference point locations and second reference point locations that can be used to determine a comparison mapping relationship between the panoramic image map and the CAD design map are determined from the panoramic image map.
For example, the first reference point selecting operation may be a double-click operation, a position clicked by the double-click operation for the first time in the panoramic image map is a first reference point location, and a position clicked by the double-click operation for the second time in the panoramic image map is a second reference point location.
Here, in the embodiment of the present application, an example of determining two reference point locations by a double-click operation is described, in other embodiments, the first reference point selecting operation may further include a single-click operation, and two reference point locations are selected by two single-click operations; the first reference point selecting operation may also be a three-point selecting operation, and three reference point locations are selected; the first reference point selection operation may also be a multi-point selection operation, selecting a plurality of reference point locations.
And b, responding to second reference point selection operation aiming at the CAD design drawing, and determining a third reference point position and a fourth reference point position from the CAD design drawing.
In the step, in response to a second reference point selection operation of a constructor aiming at a CAD design drawing displayed in a graphical user interface, a third reference point position and a fourth reference point position which can be used for determining a comparison mapping relation between a panoramic image and the CAD design drawing are determined from the CAD design drawing; the third reference point position of the CAD design drawing corresponds to the first reference point position in the panoramic image drawing, namely when the panoramic influence drawing and the CAD design drawing are displayed in an overlapped mode, the display position of the first reference point position is overlapped with the display position of the third reference point position; and the fourth reference point position of the CAD design drawing corresponds to the second reference point position in the panoramic image drawing, namely when the panoramic influence drawing and the CAD design drawing are displayed in an overlapped mode, the display position of the second reference point position coincides with the display position of the fourth reference point position.
For example, the second reference point selecting operation may be a double-click operation, a position of the double-click operation on the CAD design drawing at the first time is a third reference point, and a position of the double-click operation on the CAD design drawing at the second time is a fourth reference point.
Here, in the embodiment of the present application, the example of determining two reference point locations by a double-click operation is described, in other embodiments, the second reference point selecting operation may further include a single-click operation, and two reference point locations are selected by two single-click operations; the second reference point selection operation can also be a three-point selection operation, and three reference point positions are selected; the second reference point selection operation may also be a multi-point selection operation, selecting a plurality of reference point locations.
And c, determining a comparison mapping relation between the panoramic image map and the CAD design map based on the first reference point position, the second reference point position, the third reference point position and the fourth reference point position.
In the step, according to the positions of the first reference point position and the second reference point position in the panoramic influence image and the positions of the third reference point position and the fourth reference point position in the CAD design image, determining a comparison mapping relation between the panoramic image and the CAD design image; the corresponding relation between the panoramic image map and other positions in the CAD design map can be determined through the corresponding relation between the first reference point position and the third reference point position and the corresponding relation between the second reference point position and the fourth reference point position, and therefore the comparison mapping relation between the panoramic image map and the CAD design map is determined.
D, according to the comparison mapping relation, determining a space comparison result between the panoramic image map and the CAD design map by using space measurement information carried by the panoramic image map and space data information carried by the CAD design map;
in the step, according to the determined comparison mapping relationship, the spatial measurement information carried by the panoramic image map corresponds to the spatial data information carried by the CAD design map, and the spatial comparison result of the construction area related to the panoramic image map and the CAD design map is determined by comparing the spatial measurement information carried by the panoramic image map and the spatial data information carried by the CAD design map.
And e, overlapping and displaying the space comparison result in the panoramic image map.
Here, the spatial comparison result may also be displayed in a graphical user interface separately, which may be determined according to a specific actual situation, and is not limited herein.
In the construction process of a construction area related to a target engineering project, if a construction site has problems, a constructor can correct the encountered construction problems and record corrected facility images after the construction problems are corrected; therefore, the images of the reformed facilities can be viewed after being recorded.
In order to facilitate the view of the details in the panoramic image and/or the CAD design by the constructor, the embodiment provides the constructor with the possibility to enlarge and reduce the panoramic image and/or the CAD design.
In one embodiment, the management and control method further includes:
responding to an amplifying touch operation aiming at the panoramic image picture and/or the CAD design picture, and amplifying the panoramic image picture and/or the CAD design picture.
In the step, in response to the amplifying touch operation applied to the panoramic image and/or the CAD design drawing by a constructor, amplifying the panoramic image and/or the CAD design drawing, and amplifying a target area selected by the amplifying touch operation in the panoramic image and/or the CAD design drawing; and displaying the enlarged target area in the graphical user interface.
In the scheme provided by the application, the amplifying touch operation aiming at the panoramic image map and/or the CAD design map is responded, and specifically, when a user touches a corresponding control of the amplifying touch operation, an amplifying instruction can be issued; the user can send an amplifying instruction through the corresponding control and/or the preset combined key of the touch amplifying touch operation; specifically, the player can amplify the corresponding control through touch control by fingers, a mouse and the like; or through preset combination keys in the keyboard, for example, the keys of ctrl key, alt key, a key, etc. in the keyboard, the preset keys may be manually set according to the user's requirements.
The magnifying touch operation comprises any one of clicking operation, sliding operation, double-clicking operation, long-pressing operation and the like.
Or responding to a reduction touch operation aiming at the panoramic image map and/or the CAD design map, and reducing the panoramic image map and/or the CAD design map.
In the step, in response to the shrinking touch operation applied to the panoramic image and/or the CAD design drawing by a constructor, performing shrinking processing on the panoramic image and/or the CAD design drawing to shrink the display size of the panoramic image and/or the CAD design drawing in a graphical user interface; and displaying the reduced panoramic imagery and/or CAD design in the graphical user interface.
In the scheme provided by the application, the reduction touch operation aiming at the panoramic image and/or the CAD design drawing is responded, and specifically, when a user touches a corresponding control part of the reduction touch operation, a reduction instruction can be issued; the user can issue a reduction instruction through the corresponding control and/or the preset combined key of the touch reduction touch operation; specifically, the player can zoom out the corresponding control of the touch operation through the touch of fingers, a mouse and the like; or through preset combination keys in the keyboard, for example, the keys such as ctrl key, alt key, a key, etc. in the keyboard, the preset keys may be manually set according to the user's requirements.
The zoom-out touch operation includes any one of click operation, slide operation, double click operation, long press operation and the like.
In one embodiment, the graphical user interface also displays routing inspection detail information; the management and control method further comprises the following steps: responding to a third touch operation aiming at the routing inspection detail information, and displaying an abnormal facility image of an abnormal scene facility included in the routing inspection detail information and a rectification facility image obtained after rectification and rectification of the abnormal scene facility in the graphical user interface.
In the step, routing inspection detail information is displayed in a graphical user interface, and abnormal facility images of abnormal scene facilities included in the routing inspection detail information are displayed in the graphical user interface in response to third touch operation of a constructor for the routing inspection detail information; meanwhile, displaying in a graphical user interface, and recording the obtained rectification facility image after the constructor rectifies the abnormal scene facility.
In the scheme provided by the application, a third touch operation for the inspection detail information is responded, and specifically, when a user touches a control corresponding to the inspection detail information, a checking instruction of the inspection detail information can be triggered; the user can issue a check instruction of the inspection detail information through the touch inspection detail information corresponding control and/or a preset combined key; specifically, the player can touch the control corresponding to the patrol detail information through fingers, a mouse and the like; or through preset combination keys in the keyboard, for example, the keys such as ctrl key, alt key, a key, etc. in the keyboard, the preset keys may be manually set according to the user's requirements.
The third touch operation comprises click operation, sliding operation, double-click operation, long-press operation and the like.
Responding to a fourth touch operation aiming at any abnormal scene facility, and displaying the actual position of the abnormal scene facility in the construction area in the graphical user interface.
In this step, in response to a fourth touch operation of the constructor for any abnormal scene facility, an actual position of the abnormal scene facility in the construction area is displayed in the graphical user interface, so that in a subsequent process, the constructor can go to the actual position to view the abnormal scene facility.
And/or responding to a fifth touch operation aiming at any abnormal scene facility, and displaying a plurality of historical image maps of the abnormal scene facility in different historical time periods in the graphical user interface; and determining the facility change information of the abnormal scene facility by comparing a plurality of historical image maps of the abnormal scene facility.
In the step, in response to a fifth touch operation of a constructor aiming at any abnormal scene facility, displaying a plurality of historical image maps acquired by the abnormal scene facility in different historical time periods in a graphical user interface; and determining the facility change information of the abnormal scene facility in the construction process by comparing a plurality of historical image maps of the abnormal scene facility in different historical time periods.
Wherein the facility change information indicates the change condition of the abnormal scene facility in the construction process; specifically, the facility change information includes information such as a change image, a change parameter, and a change trend of the abnormal scene facility.
Furthermore, in order to facilitate completion acceptance of the target engineering project, a plurality of panoramic image maps and the BIM model of the construction area related to the target engineering project can be visually fused and displayed, so that reference and guidance are provided for subsequent acceptance links.
In one embodiment, the management and control method further comprises: acquiring a plurality of panoramic image maps and a BIM (building information modeling) model of the construction area; according to the actual size of the construction area, proportionally fusing the multiple panoramic image maps and the BIM to obtain a twin demonstration model; displaying the twin demonstration model in the graphical user interface.
In the step, a plurality of panoramic image maps of a construction area in different construction time periods and BIM models corresponding to target engineering projects are obtained; and according to the actual size of the construction area, fusing with the BIM according to the acquisition time sequence of the multiple panoramic image maps or the spatial corresponding positions of the multiple panoramic image maps.
For example, when the multiple panoramic images are fused according to the acquisition time sequence of the panoramic images, each panoramic image is sequenced according to the sequence of the acquisition time corresponding to each panoramic image, and then each panoramic image is sequentially overlaid into the BIM from bottom to top according to the sequence of the acquisition time to obtain the twin demonstration module.
When fusion is carried out according to the corresponding spatial positions of the panoramic image maps, the position information of the panoramic image maps in the BIM is determined according to the three-dimensional coordinate information carried by the panoramic image maps aiming at each panoramic image map; and then, sequentially adding each panoramic image map into the BIM according to the position information of each panoramic image map in the BIM to obtain a twin demonstration model, displaying the whole construction process of the target engineering project and really backtracking the actual construction condition of the target engineering project.
The BIM model is a three-dimensional building model corresponding to a building in the target engineering project. The twin demonstration model refers to a demonstration model obtained by proportionally fusing a BIM model and a panoramic image map.
According to the control method of the construction area, the first selection operation aiming at any thumbnail image is responded, and the panoramic image corresponding to the thumbnail image is displayed in the graphical user interface; the panoramic image map displays point location icons of all construction monitoring point locations related in a construction area corresponding to the panoramic image map; the point location icon is displayed in a first color; and aiming at each construction monitoring point location, if the spatial variation numerical value of any spatial monitoring parameter between the current construction details and the historical construction details of the construction monitoring point location exceeds a preset variation threshold value, adjusting the first color to be a second color, and displaying a point location icon of the construction monitoring point location by the second color. Therefore, the construction area related to the target engineering project can be remotely, visually, wholly and digitally controlled, construction details of the construction position with the quality hidden danger can be visually observed, and then the construction position with the quality hidden danger can be timely positioned.
Referring to fig. 4 and 5, fig. 4 is a first schematic structural view of a control device for a construction area according to an embodiment of the present disclosure, and fig. 5 is a second schematic structural view of a control device for a construction area according to an embodiment of the present disclosure. Displaying a graphical user interface through terminal equipment, wherein at least a part of thumbnail images of construction areas related to target engineering projects are displayed in the graphical user interface; as shown in fig. 4, the management apparatus 400 includes:
the image display module 410 is configured to display a panoramic image corresponding to any thumbnail in the graphical user interface in response to a first selection operation for the thumbnail; the panoramic image map displays the measurement information of each construction object in the construction area and the point location icon of each construction monitoring point location; the point location icon is displayed in a first color;
and the display adjusting module 420 is configured to, for each construction monitoring point, adjust the first color to a second color if a spatial variation numerical value of any spatial monitoring parameter between the current construction details and the historical construction details of the construction monitoring point exceeds a preset variation threshold, and display a point icon of the construction monitoring point in the second color.
Further, as shown in fig. 5, the management and control apparatus 400 further includes an information display module 430, where the information display module 430 is configured to:
responding to second selection operation of a point location icon aiming at any construction monitoring point location, and displaying space change information between historical construction details and current construction details of a target monitoring point location selected by the second selection operation; wherein, the space variation information comprises a plurality of space variation numerical values.
Further, as shown in fig. 5, the management and control apparatus 400 further includes a measurement result display module 440, where the measurement result display module 440 is configured to:
responding to a first touch operation aiming at the panoramic image map, and dividing the panoramic image map into a plurality of local detail images for displaying;
for each local detail image, responding to the measurement selection operation aiming at the local detail image, and determining a measurement mode for measuring the target parameters of the target construction object in the local detail image;
and measuring the target parameters of the target construction object according to the measuring mode, determining the measuring result of the target parameters of the target construction object, and displaying the measuring result.
Further, as shown in fig. 5, the first touch operation includes a detail enlarging operation and an image dividing operation; when the measurement result display module 440 is configured to respond to a first touch operation on the panoramic image map and divide the panoramic image map into a plurality of local detail images for display, the measurement result display module 440 is configured to:
determining an enlargement area selected by the detail enlargement operation from the panoramic image map in response to the detail enlargement operation for the panoramic image map;
displaying a region measurement image of the magnified region;
responding to an image dividing operation aiming at the area measurement image, and determining a detail display area selected by the image dividing operation from the area measurement image;
and displaying a plurality of local detail images of the detail display area.
Further, the target construction object comprises at least one of a designated area, a designated position and a designated object;
the measuring mode comprises at least one of size measurement, area measurement, thickness measurement, volume measurement, interval measurement and space measurement;
the target parameters comprise at least one of a building boundary red line, building axis deviation, size, length, width, thickness, height, elevation, verticality, levelness, flatness, gradient, area, volume, scaffold horizontal-vertical distance, support system distance, upper and lower support size, steel bar diameter, steel bar distance, pipeline diameter, pipeline length, pipeline trend, welding size, sleeve connection size and lap joint length.
Further, as shown in fig. 5, the management and control apparatus 400 further includes a difference comparison module 450, wherein the difference comparison module 450 is configured to:
responding to a second touch operation aiming at the panoramic image map, and acquiring a CAD design map of the panoramic image map;
determining a space comparison result between the panoramic image map and the CAD design map by comparing the panoramic image map and the CAD design map, and displaying the space comparison result in the graphical user interface; and the space comparison result shows the difference of the goodness of fit between the panoramic image map and the CAD design map.
Further, as shown in fig. 5, the management apparatus 400 further includes a size adjusting module 460, where the size adjusting module 460 is configured to:
responding to an amplifying touch operation aiming at the panoramic image map and/or the CAD design drawing, and amplifying the panoramic image map and/or the CAD design drawing; or the like, or, alternatively,
and responding to a reduction touch operation aiming at the panoramic image map and/or the CAD design drawing, and reducing the panoramic image map and/or the CAD design drawing.
Further, when the difference comparison module 450 is configured to determine a spatial comparison result between the panoramic image map and the CAD design map by comparing the panoramic image map and the CAD design map, and display the spatial comparison result in the graphical user interface, the difference comparison module 450 is configured to:
responding to a first reference point selection operation aiming at the panoramic image map, and determining a first reference point position and a second reference point position from the panoramic image map;
responding to a second reference point selection operation aiming at the CAD design drawing, and determining a third reference point position and a fourth reference point position from the CAD design drawing; the first reference point location and the third reference point location have a corresponding relationship, and the second reference point location and the fourth reference point location have a corresponding relationship;
determining a comparison mapping relation between the panoramic image map and the CAD design map based on the first reference point location, the second reference point location, the third reference point location and the fourth reference point location;
according to the comparison mapping relation, determining a space comparison result between the panoramic image map and the CAD design map by using space measurement information carried by the panoramic image map and space data information carried by the CAD design map;
and overlapping and displaying the space comparison result in the panoramic image map.
Further, as shown in fig. 5, routing inspection detail information is also displayed in the graphical user interface; the management and control device 400 further includes an adjustment detail display module 470, where the adjustment detail display module 470 is configured to:
responding to a third touch operation aiming at the routing inspection detail information, and displaying an abnormal facility image of an abnormal scene facility included in the routing inspection detail information and a rectification facility image obtained after rectification and rectification of the abnormal scene facility in the graphical user interface;
responding to a fourth touch operation aiming at any abnormal scene facility, and displaying the actual position of the abnormal scene facility in the construction area in the graphical user interface; and/or the presence of a gas in the gas,
responding to a fifth touch operation aiming at any abnormal scene facility, and displaying a plurality of historical image maps of the abnormal scene facility in different historical time periods in the graphical user interface; and determining the facility change information of the abnormal scene facility by comparing a plurality of historical image maps of the abnormal scene facility.
Further, as shown in fig. 5, the management and control apparatus 400 further includes a model fusion module 480, where the model fusion module 480 is configured to:
acquiring a plurality of panoramic image maps and a BIM (building information modeling) model of the construction area;
according to the actual size of the construction area, proportionally fusing the multiple panoramic image maps and the BIM to obtain a twin demonstration model;
displaying the twin demonstration model in the graphical user interface.
The control device for the construction area responds to a first selection operation for any thumbnail image, and displays the corresponding panoramic image of the thumbnail image in the graphical user interface; the panoramic image map displays point location icons of all construction monitoring point locations related in a construction area corresponding to the panoramic image map; the point location icon is displayed in a first color; and aiming at each construction monitoring point location, if the spatial variation numerical value of any spatial monitoring parameter between the current construction details and the historical construction details of the construction monitoring point location exceeds a preset variation threshold value, adjusting the first color to be a second color, and displaying a point location icon of the construction monitoring point location by the second color. Therefore, the construction area related to the target engineering project can be remotely, visually, wholly and digitally controlled, construction details of the construction position with the quality hidden danger can be visually observed, and then the construction position with the quality hidden danger can be timely positioned.
Referring to fig. 6, fig. 6 is a schematic structural diagram of an electronic device according to an embodiment of the present disclosure. As shown in fig. 6, the electronic device 600 includes a processor 610, a memory 620, and a bus 630.
The memory 620 stores machine-readable instructions executable by the processor 610, when the electronic device 600 runs, the processor 610 and the memory 620 communicate through the bus 630, and when the machine-readable instructions are executed by the processor 610, the steps of the method for managing and controlling a construction area in the method embodiment shown in fig. 1 may be executed.
An embodiment of the present application further provides a computer-readable storage medium, where a computer program is stored on the computer-readable storage medium, and when the computer program is executed by a processor, the step of the method for managing and controlling a construction area in the method embodiment shown in fig. 1 may be executed.
It can be clearly understood by those skilled in the art that, for convenience and simplicity of description, the specific working processes of the above-described systems, apparatuses and units may refer to the corresponding processes in the foregoing method embodiments, and are not described herein again.
In the several embodiments provided in the present application, it should be understood that the disclosed system, apparatus and method may be implemented in other ways. The above-described apparatus embodiments are merely illustrative, and for example, the division of the units into only one type of logical function may be implemented in other ways, and for example, multiple units or components may be combined or integrated into another system, or some features may be omitted, or not implemented. In addition, the shown or discussed coupling or direct coupling or communication connection between each other may be through some communication interfaces, indirect coupling or communication connection between devices or units, and may be in an electrical, mechanical or other form.
The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of the embodiment.
In addition, functional units in the embodiments of the present application may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit.
The functions, if implemented in the form of software functional units and sold or used as a stand-alone product, may be stored in a non-volatile computer-readable storage medium executable by a processor. Based on such understanding, the technical solution of the present application or portions thereof that substantially contribute to the prior art may be embodied in the form of a software product stored in a storage medium and including instructions for causing a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the method according to the embodiments of the present application. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk, an optical disk, or other various media capable of storing program codes.
Finally, it should be noted that: the above-mentioned embodiments are only specific embodiments of the present application, and are used to illustrate the technical solutions of the present application, but not to limit the technical solutions, and the scope of the present application is not limited to the above-mentioned embodiments, although the present application is described in detail with reference to the foregoing embodiments, those skilled in the art should understand that: any person skilled in the art can modify or easily conceive the technical solutions described in the foregoing embodiments or equivalent substitutes for some technical features within the technical scope disclosed in the present application; such modifications, changes or substitutions do not depart from the spirit and scope of the exemplary embodiments of the present application, and are intended to be covered by the scope of the present application. Therefore, the protection scope of the present application shall be subject to the protection scope of the claims.

Claims (13)

1. The construction area management and control method is characterized in that a graphical user interface is displayed through terminal equipment, and thumbnail images of construction areas related to at least partial target engineering projects are displayed in the graphical user interface; the management and control method comprises the following steps:
responding to a first selection operation for any thumbnail image, and displaying the corresponding panoramic image of the thumbnail image in the graphical user interface; the panoramic image map displays the measurement information of each construction object in the construction area and the point location icon of each construction monitoring point location; the point location icon is displayed in a first color;
and aiming at each construction monitoring point location, if the spatial variation numerical value of any spatial monitoring parameter between the current construction details and the historical construction details of the construction monitoring point location exceeds a preset variation threshold value, adjusting the first color to be a second color, and displaying a point location icon of the construction monitoring point location by the second color.
2. The management and control method according to claim 1, characterized by further comprising:
responding to second selection operation of a point location icon aiming at any construction monitoring point location, and displaying space change information between historical construction details and current construction details of a target monitoring point location selected by the second selection operation; the spatial variation information comprises a plurality of spatial variation values.
3. The management and control method according to claim 1, further comprising:
responding to a first touch operation aiming at the panoramic image map, and dividing the panoramic image map into a plurality of local detail images for displaying;
for each local detail image, responding to the measurement selection operation for the local detail image, and determining a measurement mode for measuring the target parameters of the target construction object in the local detail image;
and measuring the target parameters of the target construction object according to the measuring mode, determining the measuring result of the target parameters of the target construction object, and displaying the measuring result.
4. The control method according to claim 3, wherein the first touch operation includes a detail enlargement operation and an image division operation; the responding is to the first touch operation of the panoramic image map, the panoramic image map is divided into a plurality of local detail images to be displayed, and the method comprises the following steps:
responding to a detail amplification operation aiming at the panoramic image map, and determining an amplification area selected by the detail amplification operation from the panoramic image map;
displaying a region measurement image of the magnified region;
responding to an image dividing operation aiming at the area measurement image, and determining a detail display area selected by the image dividing operation from the area measurement image;
and displaying a plurality of local detail images of the detail display area.
5. The management and control method according to claim 3, wherein the target construction object includes at least one of a specified area, a specified position, and a specified target object;
the measuring mode comprises at least one of size measurement, area measurement, thickness measurement, volume measurement, interval measurement and space measurement;
the target parameters comprise at least one of building boundary red lines, building axis deviation, size, length, width, thickness, height, elevation, perpendicularity, levelness, flatness, gradient, area, volume, scaffold horizontal and vertical spacing, support system spacing, upper and lower support size, steel bar diameter, steel bar spacing, pipeline diameter, pipeline length, pipeline trend, welding size, sleeve connection size and lap joint length.
6. The management and control method according to claim 1, characterized by further comprising:
responding to a second touch operation aiming at the panoramic image map, and acquiring a CAD design map of the panoramic image map;
determining a space comparison result between the panoramic image map and the CAD design map by comparing the panoramic image map and the CAD design map, and displaying the space comparison result in the graphical user interface; and the space comparison result shows the goodness of fit difference between the panoramic image map and the CAD design map.
7. The management and control method according to claim 6, further comprising:
responding to an amplifying touch operation aiming at the panoramic image map and/or the CAD design drawing, and amplifying the panoramic image map and/or the CAD design drawing; or the like, or, alternatively,
and responding to a reduction touch operation aiming at the panoramic image map and/or the CAD design drawing, and reducing the panoramic image map and/or the CAD design drawing.
8. The management and control method according to claim 6, wherein the determining a spatial comparison result between the panoramic image map and the CAD design map by comparing the panoramic image map and the CAD design map, and displaying the spatial comparison result in the graphical user interface includes:
responding to a first reference point selection operation aiming at the panoramic image map, and determining a first reference point position and a second reference point position from the panoramic image map;
responding to a second reference point selection operation aiming at the CAD design drawing, and determining a third reference point position and a fourth reference point position from the CAD design drawing; the first reference point location and the third reference point location have a corresponding relationship, and the second reference point location and the fourth reference point location have a corresponding relationship;
determining a comparison mapping relation between the panoramic image map and the CAD design map based on the first reference point location, the second reference point location, the third reference point location and the fourth reference point location;
according to the comparison mapping relation, determining a space comparison result between the panoramic image map and the CAD design map by using space measurement information carried by the panoramic image map and space data information carried by the CAD design map;
and overlapping and displaying the space comparison result in the panoramic image map.
9. The management and control method according to claim 1, characterized in that routing inspection detail information is also displayed in the graphical user interface; the management and control method further comprises the following steps:
responding to a third touch operation aiming at the routing inspection detail information, and displaying an abnormal facility image of an abnormal scene facility included in the routing inspection detail information and a rectification facility image obtained after rectification and rectification of the abnormal scene facility in the graphical user interface;
responding to a fourth touch operation aiming at any abnormal scene facility, and displaying the actual position of the abnormal scene facility in the construction area in the graphical user interface; and/or the presence of a gas in the atmosphere,
responding to a fifth touch operation aiming at any abnormal scene facility, and displaying a plurality of historical image maps of the abnormal scene facility in different historical time periods in the graphical user interface; and determining the facility change information of the abnormal scene facility by comparing a plurality of historical image maps of the abnormal scene facility.
10. The management and control method according to claim 1, further comprising:
acquiring a plurality of panoramic image maps and a BIM (building information modeling) model of the construction area;
according to the actual size of the construction area, proportionally fusing the multiple panoramic image maps and the BIM to obtain a twin demonstration model;
displaying the twin demonstration model in the graphical user interface.
11. The control device for the construction areas is characterized in that a graphical user interface is displayed through terminal equipment, and thumbnail images of the construction areas related to at least partial target engineering projects are displayed in the graphical user interface; the management and control device comprises:
the image display module is used for responding to a first selection operation aiming at any thumbnail image and displaying the corresponding panoramic image of the thumbnail image in the graphical user interface; the panoramic image map displays the measurement information of each construction object in the construction area and the point location icon of each construction monitoring point location; the point location icon is displayed in a first color;
and the display adjusting module is used for adjusting the first color to a second color and displaying the point location icon of the construction monitoring point location by the second color if the spatial variation numerical value of any spatial monitoring parameter between the current construction details and the historical construction details of the construction monitoring point location exceeds a preset variation threshold value.
12. An electronic device, comprising: a processor, a memory and a bus, the memory storing machine-readable instructions executable by the processor, the processor and the memory communicating over the bus when the electronic device is operated, the machine-readable instructions when executed by the processor performing the steps of the method of managing a construction area according to any one of claims 1 to 10.
13. A computer-readable storage medium, characterized in that a computer program is stored thereon, which, when being executed by a processor, performs the steps of the method of managing and managing a construction area according to any one of claims 1 to 10.
CN202210947177.7A 2022-08-09 2022-08-09 Construction area management and control method and device, electronic equipment and readable storage medium Active CN115309303B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210947177.7A CN115309303B (en) 2022-08-09 2022-08-09 Construction area management and control method and device, electronic equipment and readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210947177.7A CN115309303B (en) 2022-08-09 2022-08-09 Construction area management and control method and device, electronic equipment and readable storage medium

Publications (2)

Publication Number Publication Date
CN115309303A true CN115309303A (en) 2022-11-08
CN115309303B CN115309303B (en) 2023-12-15

Family

ID=83861456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210947177.7A Active CN115309303B (en) 2022-08-09 2022-08-09 Construction area management and control method and device, electronic equipment and readable storage medium

Country Status (1)

Country Link
CN (1) CN115309303B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106815439A (en) * 2017-01-20 2017-06-09 上海市地下空间设计研究总院有限公司 Municipal Engineering Construction monitoring method and its system based on BIM
WO2018205200A1 (en) * 2017-05-11 2018-11-15 深圳市柘叶红实业有限公司 Remote monitoring management system and management method for fugitive dust at construction site
CN109697547A (en) * 2017-10-24 2019-04-30 上海嘉实(集团)有限公司 The management method and management system of safe mass inspection
CN112036755A (en) * 2020-09-02 2020-12-04 张海军 Supervision method and system for building engineering quality detection
CN112699430A (en) * 2021-01-04 2021-04-23 福建汇川物联网技术科技股份有限公司 Method and device for detecting remote video and drawing models
CN112733239A (en) * 2021-01-15 2021-04-30 广州市新誉工程咨询有限公司 Building engineering quality monitoring method and system based on BIM model
CN113205308A (en) * 2021-04-29 2021-08-03 基建通(三亚)国际科技有限公司 Construction engineering project construction monitoring method and device and computer program product
CN113360583A (en) * 2021-06-15 2021-09-07 东南大学 Construction progress visualization method based on BIM model and monitoring image comparison
CN114662948A (en) * 2022-03-30 2022-06-24 浙江宏炜检测科技有限公司 Construction engineering quality detection supervision method and system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106815439A (en) * 2017-01-20 2017-06-09 上海市地下空间设计研究总院有限公司 Municipal Engineering Construction monitoring method and its system based on BIM
WO2018205200A1 (en) * 2017-05-11 2018-11-15 深圳市柘叶红实业有限公司 Remote monitoring management system and management method for fugitive dust at construction site
CN109697547A (en) * 2017-10-24 2019-04-30 上海嘉实(集团)有限公司 The management method and management system of safe mass inspection
CN112036755A (en) * 2020-09-02 2020-12-04 张海军 Supervision method and system for building engineering quality detection
CN112699430A (en) * 2021-01-04 2021-04-23 福建汇川物联网技术科技股份有限公司 Method and device for detecting remote video and drawing models
CN112733239A (en) * 2021-01-15 2021-04-30 广州市新誉工程咨询有限公司 Building engineering quality monitoring method and system based on BIM model
CN113205308A (en) * 2021-04-29 2021-08-03 基建通(三亚)国际科技有限公司 Construction engineering project construction monitoring method and device and computer program product
CN113360583A (en) * 2021-06-15 2021-09-07 东南大学 Construction progress visualization method based on BIM model and monitoring image comparison
CN114662948A (en) * 2022-03-30 2022-06-24 浙江宏炜检测科技有限公司 Construction engineering quality detection supervision method and system

Also Published As

Publication number Publication date
CN115309303B (en) 2023-12-15

Similar Documents

Publication Publication Date Title
JP6833366B2 (en) Information processing device, control method and program of information processing device
US7139685B2 (en) Video-supported planning of equipment installation and/or room design
CN111272220B (en) Tunnel state detection monitoring management system
US10663294B2 (en) Systems and methods for estimation of building wall area and producing a wall estimation report
US10997782B2 (en) Associating a point cloud image with a piping line drawing and applying dimensions regarding the same
CN115314637A (en) Processing system and processing method for construction site panoramic image and electronic equipment
WO2021005717A1 (en) System and method for assisting management of production
JP2002083017A (en) Structure state change research support system
JP2016009432A (en) Image forming apparatus, image forming system, and image forming program
US20240020929A1 (en) System and method for presenting construction information
JP2024019350A (en) Information processing apparatus, information processing method, and program
JP2005310044A (en) Apparatus, method and program for data processing
CN115309303A (en) Control method and device for construction area, electronic equipment and readable storage medium
JP2022083611A (en) Construction work plan support system
AU2021107119A4 (en) A Floorplan Visualisation System
JP7005799B2 (en) Information processing equipment, control methods and programs for information processing equipment
US20210239466A1 (en) Ziplot-Instant Graphical Elevation Measurement Documentation
WO2023224030A1 (en) Information processing method, information processing device, and information processing program
WO2023224033A1 (en) Information processing method, information processing device, and information processing program
JP6129730B2 (en) Information management apparatus, client terminal, information management system including the same, information management method, and information management program
Kumara et al. Integrating BIM with 3D web design for enhanced 3D building visualization and safety planning in construction projects
JP2022187262A (en) Construction management apparatus and program
JP2019087871A (en) Print data editing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant