CN115288029B - Precast concrete bridge deck paving method and paving device for short T-shaped beam - Google Patents

Precast concrete bridge deck paving method and paving device for short T-shaped beam Download PDF

Info

Publication number
CN115288029B
CN115288029B CN202211052519.5A CN202211052519A CN115288029B CN 115288029 B CN115288029 B CN 115288029B CN 202211052519 A CN202211052519 A CN 202211052519A CN 115288029 B CN115288029 B CN 115288029B
Authority
CN
China
Prior art keywords
bridge deck
gantry crane
short
blocking disc
fixedly arranged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202211052519.5A
Other languages
Chinese (zh)
Other versions
CN115288029A (en
Inventor
张昱
胡文喜
张丙文
王习进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN202211052519.5A priority Critical patent/CN115288029B/en
Publication of CN115288029A publication Critical patent/CN115288029A/en
Application granted granted Critical
Publication of CN115288029B publication Critical patent/CN115288029B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A method for paving a precast concrete bridge deck of a short T-shaped beam and a paving device thereof, wherein the method comprises the following steps of S1: the method comprises the steps of moving a gantry crane to a short T beam, enabling the gantry crane to span across two sides of the short T beam, fixedly connecting a prefabricated concrete bridge deck with a suspension part of the gantry crane, and paving the bridge deck one by matching with manual traction through the movement of the gantry crane; s2: the method comprises the steps that four spray heads arranged below a suspension plate are fixedly connected with the middle parts of four sides of a bridge deck, and when the bridge deck is moved, the spray heads on the same side with the moving direction are started, and the spray heads spray and output high-pressure air flow; s3: and after the gantry crane moves the bridge deck to the designated position, the bridge deck slowly moves to a vertical state. The paving device comprises a connecting seat fixedly arranged at the bottom of the output end of the gantry crane, a sagging chain is connected to the bottom end of the connecting seat, a hanging tray is fixedly arranged at the bottom end of the sagging chain, a plurality of connecting ropes and fixing belts are fixedly arranged on the bottom surface of the hanging tray near the outer side, a spray head is fixedly arranged at the bottom end of the fixing belts, and an air injection assembly is arranged at one end of the spray head.

Description

Precast concrete bridge deck paving method and paving device for short T-shaped beam
Technical Field
The invention relates to the technical field of building bridge decks, in particular to a method and a device for paving a precast concrete bridge deck of a short T-shaped beam.
Background
Bridge deck pavement is used as a protective layer of a bridge and a surface layer bearing rolling of wheels, and is paved above a main beam.
One chinese patent with publication number CN111395163a discloses a precast concrete bridge deck pavement device for assembled short T beam, which comprises supporting columns, wherein the upper surface of the supporting columns is fixedly connected with a bridge deck bottom layer, the upper surface of the bridge deck bottom layer is provided with a plugging slot, the inner wall of the plugging slot is slidably connected with a plugging plate, and the lower surface of the plugging plate is fixedly connected with a slide bar, thereby achieving the effect of facilitating the repair and replacement of the precast concrete bridge deck of the assembled short T beam in later period.
In the prior art, when the bridge deck plate moves by using the gantry hanging belt, due to the fact that the length of the sagging chain is long, when the upper connecting seat moves, the bridge deck plate below can swing to the position under the action of the tensile force, so that the bridge deck plate below can continuously swing under the action of inertia, the subsequent alignment process is inconvenient, the working efficiency is low, and workers are easily injured by mistake.
Disclosure of Invention
The invention mainly aims to provide a method and a device for paving a precast concrete bridge deck of a short T-shaped beam, and aims to solve the technical problems.
In order to achieve the above purpose, in one aspect, the present invention provides a method for paving a precast concrete bridge deck of a short T-beam, which specifically includes:
S1: the method comprises the steps of moving a gantry crane to a short T beam, enabling the gantry crane to span across two sides of the short T beam, fixedly connecting a prefabricated concrete bridge deck with a suspension part of the gantry crane, and paving the bridge deck one by matching with manual traction through the movement of the gantry crane;
S2: the four spray heads arranged below the suspension plate are fixedly connected with the middle parts of four sides of the bridge deck, and when the bridge deck is moved, the spray heads on the same side with the moving direction are started to spray high-pressure air flow;
S3: when the gantry crane moves the bridge deck to the designated position, the bridge deck which moves along with the gantry crane rapidly under the action of the tensile force is slowly moved to a vertical state, so that the inertial swinging generated in the moving process of the bridge deck is greatly reduced, and the alignment and the construction process are light, loose and rapid;
The setting can make the bridge deck plate move to the position right below the output end of the gantry crane, and then the swing is stopped, thereby not only facilitating the positioning process, but also reducing the time required for waiting for the inertia consumption, thereby improving the efficiency, reducing the situation of accidentally injuring operators and improving the safety during laying.
On the other hand, the invention also provides a precast concrete bridge deck pavement device of the short T beam, the device is suitable for the precast concrete bridge deck pavement method of the short T beam, the precast concrete bridge deck pavement device comprises a gantry crane, a connecting seat is fixedly arranged at the bottom of an output end of the gantry crane, a drooping chain is connected to the bottom end of the connecting seat, a hanging plate is fixedly arranged at the bottom end of the drooping chain, a plurality of connecting ropes and a fixed belt are fixedly arranged at the bottom of the hanging plate, a spray head is fixedly arranged at one end of the fixed belt, a spray assembly is arranged at one end of the spray head and used for spraying gas, during operation, the prefabricated bridge deck is firstly fixed by the connecting ropes, and a plurality of spray heads are fixed with the top surface of the bridge deck, when the gantry crane moves with the bridge deck, due to the fact that the length of the drooping chain is long, when the upper connecting seat moves, the lower bridge deck is enabled to swing to the position under the action of a tensile force, the bridge deck is enabled to continuously swing under the action, the action of the drooping chain is inconvenient to be in the subsequent alignment process, the work efficiency is low, and the air flow is easy to be damaged, and the spray head is enabled to be easily to be stopped to the position the swing assembly, and the air flow is easy to be stopped, and the inertia is required to be partially damaged by the swing assembly is easy to be moved, and the swing the spray head is required to be moved to the bridge deck assembly.
The quantity of a plurality of connecting rope is four, the quantity of a plurality of fixed band is four, four connecting rope is the annular setting, four fixed bands are located the middle part of two adjacent connecting ropes respectively, the bottom fixed mounting who connects the rope has the lifting hook, during operation, when fixed decking, pass the preformed hole in four corners on the prefabricated decking top surface with four lifting hooks, after passing, get around the lifting hook from the bottom and block connecting rope, thereby guaranteed the effect of stably grabbing the decking, and easy operation structure is uncomplicated, fix four shower nozzles in the middle part position on four limits of decking after four connecting ropes are fixed, because the gantry crane can only water on the horizontal plane four directions remove, four shower nozzles just can correspond the motion of four directions, the jet process of operation shower nozzle has been made things convenient for.
The middle part of the bottom of the hanging plate is rotationally connected with the ball, the top of the sagging chain and the bottom fixed connection of the ball, four extension rods are fixedly arranged on the outer side of the ball, the extension rods are annularly arranged, four groups of swinging grooves are formed in the inner side of the hanging plate, the extension rods are located in the swinging grooves, when the portal crane drives the connecting seat to move during operation, the hanging plate below can not move immediately, so that the sagging chain can generate a deflection angle with the connecting seat, the ball is matched with the setting of the ball, the ball can rotate to replace the deflection angle, the shearing force between the sagging chain and the connecting seat can be reduced, the service life of the sagging chain is prolonged, the ball can only turn in four directions due to the setting of the four extension rods, when the sagging chain changes in the swinging direction due to external influence, the resistance to the fact that the sagging chain swings in other directions is relatively large due to the fact that the ball cannot rotate at the moment, and therefore the effect of irregular swinging of the sagging chain caused by factors can be reduced.
The jet assembly comprises four fixed pipes, the four fixed pipes are fixedly connected to the bottom surface of the hanging scaffold, the four fixed pipes are annularly arranged, an air pump is fixedly arranged at one end of each fixed pipe, an air flow pipe is fixedly arranged at the other end of each fixed pipe, the air flow pipe is communicated with the spray head, and when the jet assembly works, the air pump is fixedly connected to the connecting seat, the spray head is connected with the air pump through the air flow pipe, the air pump is large, enough airflow driving force is guaranteed, meanwhile, the air pump is arranged in a separated mode, the air pump cannot be clamped at the hanging scaffold, and the problem of inertia force increase is caused.
The spray heads of four fixed pipes and being communicated are on a vertical plane, the inner side of the hanging plate is slidably connected with four groups of lower sliding plates, one side of each lower sliding plate is fixedly connected with an extension rod, the bottom end of each lower sliding plate is fixedly provided with a clamping rod, each clamping rod is slidably connected with the outer side wall of each fixed pipe, the cross section of each fixed pipe is square, the inner side of each fixed pipe is rotatably connected with a blocking plate, the bottom end of each fixed pipe is fixedly provided with a pressing button for controlling the air pump, when the connecting seat moves to enable the hanging plate and the bridge deck below to start swinging, at the moment, the round balls rotate, the extension rods on the same side with the swinging direction are pressed downwards, the clamping rods are driven to slide downwards, the blocking plates are pressed to be in a horizontal state from the original inclined state, meanwhile, the pressing buttons are not pressed any more, the corresponding air pumps start to work when the pressing buttons are pressed down, and the air pumps stop working along with the larger swinging amplitude of the round balls, the blocking plates are pressed horizontally; the blocking disc can only rotate to a horizontal state at most and cannot rotate reversely; when horizontal, the air current output effect blocks minima, along with the angle of sagging chain and connecting seat is less more, the skew of ball and extension rod is less more, the extension rod will block into the pole and draw back, let the baffle plate block the more spaces of post fixed tube, through this kind of setting, when having realized sagging chain swing, the air pump of corresponding side will open automatically, let the shower nozzle begin jet effect, need not the manual work and operate, simultaneously can be along with sagging chain trend more vertical more, the air current is just less more, let sagging chain return to vertical state under more stable state.
The rotation junction that blocks dish and fixed pipe is located the middle part of blocking the dish and leans on the one end of card income pole, blocks the both ends of dish and is magnetite material, and fixed pipe is metal material, and the during operation, the cooperation blocks the heavy setting of dish one side and light for it is in closed state always to block the dish at the beginning, magnetite material simultaneously, makes to block the dish at the beginning have great dynamics to press down the button and hold, simultaneously after the extension pole returns the level, blocks the dish and no longer is extrudeed, blocks the dish can also be rotated to closed state under gravity and wind-force effect this moment, has realized repeatedly usable's effect.
The top surface that blocks the dish to be close to card income pole one end is offered the card and is gone into the groove, the inboard sliding connection in card income groove has the lug, the outside of card income pole is offered flutedly, the rigid coupling has the first spring between lug and the baffle dish, and one side of lug is provided with power component, power component is used for pulling the lug and contracts, during operation, when card income pole and the extrusion of blocking the dish, card income pole can jack into card income groove, and with the lug joint, thereby make card income pole can rise when returning, drive the one end that blocks the dish and rise, at last power component triggers, retrieve the lug, let card income pole can separate, this kind of setting, make at last stage block the dish and be in the incline state, can cooperate wind-force, let self slope, let block the dish have enough dynamics to press down the button, let the air pump close, simultaneously also can let card income pole have enough dynamics control to block the dish to remove.
The power component comprises a pressing block, a pressure groove is formed in the inner side of one end of the blocking disc, liquid is filled in the pressure groove, the pressing block is in sliding connection with the top of the pressure groove, the pressure groove is arranged in a mode of being wide at the upper part and narrow at the lower part, a sealing block is connected to the inner side of the pressure groove in a sliding mode, a movable rope is fixedly connected between the sealing block and the convex block, a spring II is fixedly connected between the pressing block and the blocking disc, during operation, when the blocking rod is used for driving one end of the blocking disc to tilt upwards, when the pressing block is extruded to the inner wall of a fixed pipe, the pressing block is enabled to sink, liquid in the pressure groove is enabled to extrude the sealing block to slide downwards, the convex block is pulled back to the original position by being matched with the pulling of the movable rope, and because the sealing block is wide at the upper part and narrow at the lower part, then the end of the blocking disc is always attached to the fixed pipe to wait for next operation under the adsorption effect of a magnet.
The shower nozzle includes three ventholes, the bottom fixed mounting of shower nozzle has the upper plate, the bottom of upper plate is provided with the hypoplastron, rotate on the top surface of running through the upper plate and be connected with two symmetries and be provided with the handle, the bottom fixed mounting of handle has the threaded rod, the threaded rod runs through the top surface of hypoplastron and with hypoplastron threaded connection, during operation, the structure setting of cooperation shower nozzle lets the outside spun area of air current bigger, have more even power to guarantee the stable process of returning of decking, and upper plate and hypoplastron are used for blocking the decking, through rotatory handle and threaded rod, let the hypoplastron rise to clip the decking, guarantee the stable installation process and the convenient process of unloading of shower nozzle.
Due to the adoption of the technical scheme, the invention has the following beneficial effects:
(1) According to the invention, the bridge deck plate can stop swinging after moving to the position right below the output end of the gantry crane through the arrangement of the four spray heads, so that the positioning process is convenient, the time required for waiting for inertial consumption is reduced, the efficiency is improved, the condition of accidentally injuring operators is also reduced, and the safety in laying is improved.
(2) According to the invention, through the arrangement of the ball, the ball can rotate to replace the occurrence of a deflection angle, so that the shearing force between the sagging chain and the connecting seat can be reduced, the service life of the sagging chain is prolonged, and the ball can only turn in four directions due to the arrangement of the four extension rods, when the swinging direction of the sagging chain changes due to external influence, the ball cannot rotate at the moment, and the resistance to be overcome when the sagging chain swings in other directions is larger, so that the irregular swinging effect of the sagging chain caused by external factors can be reduced.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and other drawings may be obtained according to the structures shown in these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a block diagram of a method of the present invention;
FIG. 2 is a perspective view of the present invention;
FIG. 3 is a cross-sectional view of the connection base and suspension pan of the present invention;
FIG. 4 is an enlarged view of a portion of FIG. 3 at A;
FIG. 5 is a cross-sectional view of the connection of the blocking disk and the snap-in lever;
FIG. 6 is a top view of a spray head of the present invention;
Reference numerals illustrate: 1. a gantry crane; 2. a hanging scaffold; 3. a connecting seat; 4. a connecting rope; 5. a lifting hook; 6. a fixing belt; 7. a spray head; 8. a drooping chain; 9. a gas flow tube; 10. a ball; 11. an air pump; 12. a swinging groove; 13. an extension rod; 14. a lower slide plate; 15. a clamping rod; 16. a fixed tube; 17. a blocking disk; 18. pressing the button; 19. clamping into the groove; 20. a bump; 21. a sealing block; 22. an upper plate; 23. a lower plate; 24. a handle; 26. and pressing the block.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and fully with reference to the accompanying drawings, in which it is evident that the embodiments described are only some, but not all embodiments of the invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
It should be noted that all directional indicators (such as up, down, left, right, front, and rear … …) in the embodiments of the present invention are merely used to explain the relative positional relationship, movement, etc. between the components in a particular posture (as shown in the drawings), and if the particular posture is changed, the directional indicator is changed accordingly.
Furthermore, the description of "first," "second," etc. in this disclosure is for descriptive purposes only and is not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include at least one such feature. In addition, the technical solutions of the embodiments may be combined with each other, but it is necessary to base that the technical solutions can be realized by those skilled in the art, and when the technical solutions are contradictory or cannot be realized, the combination of the technical solutions should be considered to be absent and not within the scope of protection claimed in the present invention.
Example 1
As shown in fig. 1, the method for paving a precast concrete bridge deck of a short T beam according to the embodiment of the present invention specifically includes:
S1: the method comprises the steps of moving a gantry crane 1 to a short T beam, enabling the gantry crane 1 to span across two sides of the short T beam, fixedly connecting a prefabricated concrete bridge deck with a suspension part of the gantry crane 1, and paving the bridge deck one by matching with manual traction through the movement of the gantry crane 1;
S2: the four spray heads 7 arranged below the hanging plate 2 are fixedly connected with the middle parts of four sides of the bridge deck, and when the bridge deck is moved, the spray heads 7 on the same side with the moving direction are started to spray high-pressure air flow from the spray heads 7;
s3: when the gantry crane 1 moves the bridge deck to the designated position, the bridge deck which moves along with the gantry crane 1 rapidly under the action of the tensile force is slowly moved to a vertical state, so that the inertial swinging generated in the moving process of the bridge deck is greatly reduced, and the alignment and the construction process are light, loose and rapid;
The setting can make the bridge deck plate move to the position right below the output end of the gantry crane 1, and then the swing is stopped, thereby not only facilitating the positioning process, but also reducing the time required for waiting for the inertia consumption, thereby improving the efficiency, reducing the situation of accidentally injuring operators and improving the safety during laying.
As shown in fig. 2 to 3, the device is suitable for the precast concrete bridge deck pavement method of the short T beam, comprising a gantry crane 1, the bottom of the output end of the gantry crane 1 is fixedly provided with a connecting seat 3, the bottom end of the connecting seat 3 is connected with a drooping chain 8, the bottom end of the drooping chain 8 is fixedly provided with a hanging plate 2, the bottom surface of the hanging plate 2 is fixedly provided with a plurality of connecting ropes 4 and a fixed belt 6 near the outer side, the bottom end of the fixed belt 6 is fixedly provided with a spray head 7, one end of the spray head 7 is provided with a jet assembly, the jet assembly is used for jetting gas, during operation, the precast bridge deck is fixed by the connecting ropes 4 first, and a plurality of spray heads 7 are fixed with the top surface of the bridge deck, when the gantry crane 1 moves with the bridge deck, due to the longer length of the drooping chain 8, when the upper connecting seat 3 moves, the bridge deck below can "swing" to the position under the action of a swinging force, the bridge deck can be continuously under the inertia effect, the action of the swing, the bridge deck is not stopped, the air flow can be conveniently stopped by the swing assembly, the jet assembly is not aligned to the side of the bridge deck, the side of the bridge deck is easily, the air flow can be easily stopped, the air flow can be easily damaged by the people, and the people can be easily stopped by the swing assembly, and the people can be easily and the air-stopped by the swing assembly through the swing assembly, and the jet assembly through the swing assembly.
As shown in fig. 2 to 3, the number of the plurality of connecting ropes 4 is four, the number of the plurality of fixing belts 6 is four, the four connecting ropes 4 are in annular arrangement, the four fixing belts 6 are respectively located in the middle of two adjacent connecting ropes 4, the lifting hooks 5 are fixedly arranged at the bottom ends of the connecting ropes 4, when the bridge deck is fixed in operation, the four lifting hooks 5 penetrate through reserved holes in four corners on the top surface of the prefabricated bridge deck, after penetrating, the lifting hooks 5 are wound up from the bottom and clamp the connecting ropes 4, so that the effect of stably grabbing the bridge deck is ensured, the operation is simple, the structure is not complicated, and after the four connecting ropes 4 are fixed, the four spray heads 7 are fixed in the middle positions of four sides of the bridge deck, and as the gantry crane 1 can only move in four directions in the front-back-and-left-right direction on the horizontal plane, the four spray heads 7 just can correspond to the movement in four directions, and the process of operating the spray heads 7 is convenient.
As shown in fig. 3 to 4, the middle part of the bottom end of the hanging scaffold 2 is rotationally connected with a ball 10, the top end of the sagging chain 8 is fixedly connected with the bottom end of the ball 10, four extension rods 13 are fixedly arranged on the outer side of the ball 10, the extension rods 13 are annularly arranged, four groups of swinging grooves 12 are formed in the inner side of the hanging scaffold 2, the extension rods 13 are located in the inner sides of the swinging grooves 12, when the gantry crane 1 drives the connecting seat 3 to move, the sagging chain 8 can generate a deflection angle with the connecting seat 3 due to the fact that the hanging scaffold 2 below cannot move immediately, the ball 10 can rotate in cooperation with the setting of the ball 10, the occurrence of the deflection angle is replaced, the shearing force between the sagging chain 8 and the connecting seat 3 can be reduced, the service life of the sagging chain 8 is prolonged, the four extension rods 13 are arranged, the ball 10 can only turn in four directions at the moment, when the swinging direction is changed due to external influence, and when the sagging chain 8 cannot swing, the swinging direction is greatly reduced due to the fact that the ball 10 cannot rotate, and other factors of the sagging chain 8 can not swing in the swinging direction need to overcome.
As shown in fig. 3 to 4, the air injection assembly comprises four fixing pipes 16, the four fixing pipes 16 are fixedly connected to the bottom surface of the hanging scaffold 2, the four fixing pipes 16 are in annular arrangement, one end of each fixing pipe 16 is fixedly provided with an air pump 11, the other end of each fixing pipe 16 is fixedly provided with an air flow pipe 9, the air flow pipes 9 are communicated with the spray head 7, and in operation, the spray head 7 is fixedly connected to the connecting seat 3 through the air flow pipes 9, and then the spray head 7 is connected with the air pump 11 through the air flow pipes 9.
As shown in fig. 3 to 4, the four fixed pipes 16 are connected with the communicated spray heads 7 on a vertical plane, the inner side of the hanging disc 2 is connected with four groups of lower sliding plates 14 in a sliding manner, one side of each lower sliding plate 14 is fixedly connected with each extension rod 13, the bottom end of each lower sliding plate 14 is fixedly provided with each clamping rod 15, each clamping rod 15 is connected with the outer side wall of each fixed pipe 16 in a sliding manner, the cross section of each fixed pipe 16 is square, each fixed pipe 16 is rotatably connected with each blocking disc 17 on the inner side, each fixed pipe 16 is fixedly provided with a pressing button 18 at the bottom end, each pressing button 18 is used for controlling the air pump 11, when the connecting seat 3 moves to enable the hanging disc 2 and the bridge deck below to start swinging, at the moment, the round balls 10 rotate, the extension rods 13 on the same side with the swinging direction are pressed down, the clamping rods 15 are driven to slide down, the blocking discs 17 are pressed from the original inclined state to the horizontal state, meanwhile, the pressing buttons 18 are not pressed any more, the corresponding air pumps 11 start to work when the pressing buttons 18 are pressed down, and when the pressing buttons 18 stop pressing buttons 18 are pressed down, and the work, and the round balls 10 stop swinging along with the pressing balls 10 and the round discs are pressed more greatly, and the round discs are pressed down; the blocking disc 17 can only rotate to a horizontal state at most and cannot rotate reversely; when horizontal, the air current output effect stops minimumly, along with the angle of sagging chain 8 with connecting seat 3 is less, the skew of ball 10 and extension rod 13 is less, extension rod 13 will block into pole 15 and pull back, let block the dish 17 and block the more space of post fixed tube 16, when having realized sagging chain 8 swing through this kind of setting, the air pump 11 of corresponding side will open automatically, let shower nozzle 7 begin the jet effect, need not the manual work and operate, simultaneously can be along with sagging chain 8 trend more vertical, the air current is just less, let sagging chain 8 return to vertical state under more stable state.
As shown in fig. 3 to 4, the rotation connection position of the blocking disc 17 and the fixed tube 16 is located at one end of the blocking disc 17 near the clamping rod 15, both ends of the blocking disc 17 are made of magnetite materials, the fixed tube 16 is made of metal materials, and the blocking disc 17 is matched with the arrangement that the blocking disc 17 is heavy and light at one side during working, so that the blocking disc 17 is always in a closed state at the beginning, meanwhile, the magnetite materials enable the blocking disc 17 to have larger force to press the pressing button 18 at the beginning, and meanwhile, after the extension rod 13 returns to the horizontal state, the blocking disc 17 is not extruded any more, and at the moment, the blocking disc 17 can be rotated to the closed state under the action of gravity and wind force, so that the reusable effect is realized.
As shown in fig. 4 to 5, a clamping groove 19 is formed in the top surface of the blocking disc 17, which is close to one end of the clamping rod 15, a protruding block 20 is slidably connected to the inner side of the clamping groove 19, a groove is formed in the outer side of the clamping rod 15, a first spring is fixedly connected between the protruding block 20 and the blocking disc 17, a power component is arranged on one side of the protruding block 20 and used for pulling the protruding block 20 to retract, when the clamping rod 15 and the blocking disc 17 are extruded, the clamping rod 15 can jack into the clamping groove 19 and is clamped with the protruding block 20, so that one end of the blocking disc 17 is driven to rise when the clamping rod 15 rises and returns, the protruding block 20 is triggered by the power component finally, the clamping rod 15 can be separated, the blocking disc 17 is in an inclined state in the last stage and can be matched with wind power to incline by itself, the blocking disc 17 has enough force to press the pressing button 18, the air pump 11 is closed, and meanwhile, the clamping rod 15 can also have enough force to control the blocking disc 17 to move.
As shown in fig. 4 to 5, the power assembly includes a pressing block 26, a pressure groove is formed on the inner side of one end of the blocking disc 17 near the clamping rod 15, liquid is filled in the pressure groove, the pressing block 26 is slidably connected with the top of the pressure groove, the pressure groove is arranged in a shape of being wide at the top and narrow at the bottom, a sealing block 21 is slidably connected on the inner side of the pressure groove, a moving rope is fixedly connected between the sealing block 21 and the convex block 20, a spring II is fixedly connected between the pressing block 26 and the blocking disc 17, when the clamping rod 15 returns to drive one end of the blocking disc 17 to tilt up, when the pressing block 26 extrudes the inner wall of the fixed tube 16, the liquid in the pressure groove extrudes the sealing block 21 to slide down due to sinking of the pressing block 26, the convex block 20 is pulled back to the original position due to pulling of the moving rope, and the sealing block 21 has enough power to pull the convex block 20 back due to being wide at the top and narrow at the bottom of the pressure groove, then the end of the blocking disc 17 is always attached to the fixed tube 16 under the adsorption effect of a magnet, and the function of locking the convex block 20 to lock the clamping rod 15 and releasing the clamping rod 15 can be realized without other energy.
Example two
As shown in fig. 6, in comparative example one, another embodiment of the present invention is: the shower nozzle 7 includes three ventholes, the bottom fixed mounting of shower nozzle 7 has upper plate 22, the bottom of upper plate 22 is provided with hypoplastron 23, rotate on the top surface of running through upper plate 22 and be connected with two symmetries and be provided with handle 24, the bottom fixed mounting of handle 24 has the threaded rod, the threaded rod runs through the top surface of hypoplastron 23 and with hypoplastron 23 threaded connection, during operation, cooperation shower nozzle 7's structure setting lets the air current outwards spun area bigger, have more even power to guarantee the stable process of rectifying of decking, and upper plate 22 and hypoplastron 23 are used for blocking the decking, through rotatory handle 24 and threaded rod, let hypoplastron 23 rise, thereby clip the decking, guarantee the stable installation process and the convenient process of unloading of shower nozzle 7.
When the invention works, the prefabricated bridge deck is fixed by the connecting rope 4, a plurality of spray heads 7 are fixed with the top surface of the bridge deck, when the gantry crane 1 moves with the bridge deck, the lower bridge deck can swing to the position under the action of the tensile force due to the longer length of the drooping chain 8, so that the lower bridge deck can swing continuously under the action of the tensile force, the subsequent alignment process is inconvenient, the working efficiency is lower, workers are easy to be accidentally injured, through the arrangement of the spray heads 7 and the spray assemblies, when the bridge deck follows the swing process of the gantry crane, the spray assemblies are started to spray air flow from the spray heads 7 and face towards the swing direction, so that part of inertia of the bridge deck is counteracted, and after the bridge deck moves to the position right below the output end of the gantry crane 1, the swing is stopped, thereby not only facilitating the positioning process, reducing the time required for waiting for the inertia consumption, but also reducing the situation of accidentally injuring operators; when the bridge deck is fixed, four lifting hooks 5 penetrate through reserved holes at four corners on the top surface of the prefabricated bridge deck, after penetrating, the lifting hooks 5 are wound on from the bottom and clamp the connecting ropes 4, so that the effect of stably grabbing the bridge deck is ensured, the operation is simple, the structure is not complex, when the four connecting ropes 4 are fixed, the four spray heads 7 are fixed at the middle positions of the four sides of the bridge deck, and as the gantry crane 1 can only move in four directions of front, back, left and right on the horizontal plane, the four spray heads 7 just can move in the corresponding four directions, and the air injection process of the spray heads 7 is convenient to operate; when the gantry crane 1 drives the connecting seat 3 to move, the hanging plate 2 below does not move immediately, so that a deflection angle is generated between the sagging chain 8 and the connecting seat 3, the spherical balls 10 rotate in cooperation with the arrangement of the spherical balls 10, the shearing force between the sagging chain 8 and the connecting seat 3 can be reduced instead of the deflection angle, the service life of the sagging chain 8 is prolonged, the spherical balls 10 can only turn in four directions due to the arrangement of the four extension rods 13, and when the swinging direction of the sagging chain 8 changes due to external influence, the resistance to be overcome when the sagging chain 8 swings in other directions is larger due to the fact that the spherical balls 10 cannot rotate at the moment, so that the irregular swinging effect of the sagging chain 8 caused by external factors can be reduced; when the air pump device works, the air pump 11 is fixedly connected to the connecting seat 3, and then the spray head 7 is connected with the air pump 11 through the air flow pipe 9, so that the air pump 11 can be large, enough air flow driving force is ensured, and meanwhile, the air pump device is arranged in a separated mode, so that the weight of the air pump 11 is not clamped at the hanging plate 2, and the problem of inertia force increase is solved; when the connecting seat 3 moves to enable the hanging plate 2 and the bridge deck below to start swinging, the ball 10 rotates at the moment, so that the extension rod 13 on the same side with the swinging direction is pressed down to drive the clamping rod 15 to slide down and press the blocking disc 17 from the original inclined state to the horizontal state, meanwhile, as the blocking disc 17 is horizontal, the pressing button 18 is not pressed any more, the corresponding air pump 11 starts to work when the pressing button 18 is released, when the pressing button 18 is pressed down, the air pump 11 stops working, and as the swing amplitude of the ball 10 is larger, the blocking disc 17 is pressed more horizontally; the blocking disc 17 can only rotate to a horizontal state at most and cannot rotate reversely; when the air flow output effect is blocked at the minimum level, as the angle between the sagging chain 8 and the connecting seat 3 is smaller, the deviation between the ball 10 and the extension rod 13 is smaller, the extension rod 13 can pull the clamping rod 15 back, so that the blocking disc 17 blocks more space of the column fixing pipe 16, through the arrangement, the effect that the air pump 11 at the corresponding side is automatically opened when the sagging chain 8 swings is realized, the spray head 7 starts to spray air is realized, the manual operation is not needed, and meanwhile, as the sagging chain 8 tends to be vertical, the air flow is smaller, and the sagging chain 8 returns to the vertical state in a more stable state; when the device works, the blocking disc 17 is arranged in a light-weight mode at one side, so that the blocking disc 17 is always in a closed state at the beginning, meanwhile, the magnet material enables the blocking disc 17 to have larger force to press the pressing button 18 at the beginning, meanwhile, after the extension rod 13 returns to the horizontal state, the blocking disc 17 is not extruded any more, and at the moment, the blocking disc 17 can be rotated to the closed state under the action of gravity and wind force, so that the reusable effect is realized; when the clamping rod 15 and the blocking disc 17 are extruded, the clamping rod 15 can be jacked into the clamping groove 19 and clamped with the convex block 20, so that when the clamping rod 15 can ascend and return, one end of the blocking disc 17 is driven to ascend, the convex block 20 is triggered to be recovered by the final power component, the clamping rod 15 can be separated, and the blocking disc 17 is in an inclined state in the final stage and can be matched with wind power to incline, the blocking disc 17 has enough force to press the pressing button 18, the air pump 11 is closed, and meanwhile, the clamping rod 15 can also have enough force to control the blocking disc 17 to move; when the clamping rod 15 returns to drive one end of the blocking disc 17 to tilt upwards, so that when the lower pressing block 26 extrudes to the inner wall of the fixed pipe 16, the liquid in the pressure groove extrudes the sealing block 21 to slide downwards due to sinking of the lower pressing block 26, the lug 20 is pulled back to the original position by being matched with pulling of the moving rope, and the sealing block 21 has enough power to pull the lug 20 back due to the fact that the pressure groove is wide in upper part and narrow in lower part, and then the end of the blocking disc 17 always clings to the fixed pipe 16 to wait for the next operation under the adsorption effect of the magnet.
The foregoing description is only of the preferred embodiments of the present invention, and is not intended to limit the scope of the invention, but rather, the equivalent structural changes made by the description of the present invention and the accompanying drawings or the direct/indirect application in other related technical fields are included in the scope of the invention.

Claims (2)

1. The device is suitable for a method for paving a precast concrete bridge deck of a short T beam, and is characterized by comprising the following steps of:
S1: the method comprises the steps of moving a gantry crane to a short T beam, enabling the gantry crane to span across two sides of the short T beam, fixedly connecting a prefabricated concrete bridge deck with a suspension part of the gantry crane, and paving the bridge deck one by matching with manual traction through the movement of the gantry crane;
S2: the four spray heads arranged below the suspension plate are fixedly connected with the middle parts of four sides of the bridge deck, and when the bridge deck is moved, the spray heads on the same side with the moving direction are started to spray high-pressure air flow;
s3: when the gantry crane moves the bridge deck to a designated position, the bridge deck which moves along with the gantry crane rapidly under the action of pulling force is slowly moved to a vertical state;
the precast concrete bridge deck pavement device of the short T beam comprises a gantry crane, wherein a connecting seat is fixedly arranged at the bottom of the output end of the gantry crane, the bottom end of the connecting seat is connected with a sagging chain, a hanging plate is fixedly arranged at the bottom end of the sagging chain, a plurality of connecting ropes and fixing belts are fixedly arranged on the bottom surface of the hanging plate near the outer side, a spray head is fixedly arranged at the bottom end of the fixing belt, and one end of the spray head is provided with a spray assembly used for spraying gas;
The number of the connecting ropes is four, the number of the fixing belts is four, the four connecting ropes are in annular arrangement, the four fixing belts are respectively positioned in the middle parts of two adjacent connecting ropes, and the bottom ends of the connecting ropes are fixedly provided with lifting hooks;
The middle part of the bottom end of the suspension disc is rotationally connected with a ball, the top end of the drooping chain is fixedly connected with the bottom end of the ball, four extension rods are fixedly arranged on the outer side of the ball, the extension rods are annularly arranged, four groups of swinging grooves are formed in the inner side of the suspension disc, and the extension rods are positioned in the inner sides of the swinging grooves;
The air injection assembly comprises four fixed pipes which are fixedly connected to the bottom surface of the suspension pan, the four fixed pipes are in annular arrangement, an air pump is fixedly arranged at one end of each fixed pipe, an air flow pipe is fixedly arranged at the other end of each fixed pipe, and the air flow pipes are communicated with the spray heads;
the four fixed pipes are connected with the spray heads on a vertical plane, the inner side of the hanging plate is slidably connected with four groups of lower sliding plates, one side of each lower sliding plate is fixedly connected with the corresponding extension rod, the bottom end of each lower sliding plate is fixedly provided with a clamping rod, each clamping rod is slidably connected with the outer side wall of each fixed pipe, the cross section of each fixed pipe is square, the inner side of each fixed pipe is rotatably connected with a blocking plate, the bottom end of each fixed pipe is fixedly provided with a pressing button, and each pressing button is used for controlling the air pump;
The rotary connection part of the blocking disc and the fixed tube is positioned at one end of the middle part of the blocking disc close to the clamping rod, both ends of the blocking disc are made of magnetite materials, and the fixed tube is made of metal materials;
A clamping groove is formed in the top surface of the blocking disc, which is close to one end of the clamping rod, a protruding block is connected to the inner side of the clamping groove in a sliding manner, a groove is formed in the outer side of the clamping rod, a first spring is fixedly connected between the protruding block and the blocking disc, a power component is arranged on one side of the protruding block, and the power component is used for pulling the protruding block to retract;
The power assembly comprises a lower pressing block, a pressure groove is formed in the inner side of one end of the blocking disc, which is clamped into the rod, liquid is filled in the pressure groove, the lower pressing block is slidably connected with the top of the pressure groove, the pressure groove is arranged in a mode of being wide at the upper part and narrow at the lower part, a sealing block is slidably connected with the inner side of the pressure groove, a movable rope is fixedly connected between the sealing block and the protruding block, and a second spring is fixedly connected between the lower pressing block and the blocking disc.
2. A precast concrete deck pavement system for a short T-beam according to claim 1, wherein: the shower nozzle includes three ventholes, and the bottom fixed mounting of shower nozzle has the upper plate, and the bottom of upper plate is provided with the hypoplastron, rotates on the top surface of running through the upper plate to be connected with two symmetries and is provided with the handle, and the bottom fixed mounting of handle has the threaded rod, and the threaded rod runs through the top surface of hypoplastron and with hypoplastron threaded connection.
CN202211052519.5A 2022-08-31 2022-08-31 Precast concrete bridge deck paving method and paving device for short T-shaped beam Active CN115288029B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211052519.5A CN115288029B (en) 2022-08-31 2022-08-31 Precast concrete bridge deck paving method and paving device for short T-shaped beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211052519.5A CN115288029B (en) 2022-08-31 2022-08-31 Precast concrete bridge deck paving method and paving device for short T-shaped beam

Publications (2)

Publication Number Publication Date
CN115288029A CN115288029A (en) 2022-11-04
CN115288029B true CN115288029B (en) 2024-05-10

Family

ID=83831344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211052519.5A Active CN115288029B (en) 2022-08-31 2022-08-31 Precast concrete bridge deck paving method and paving device for short T-shaped beam

Country Status (1)

Country Link
CN (1) CN115288029B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2031842A (en) * 1978-09-13 1980-04-30 Peiner Masch Schrauben A load rotating device
JPH0753178A (en) * 1993-08-06 1995-02-28 Ohbayashi Corp Attitude controller for suspended load
JP2013067496A (en) * 2011-09-22 2013-04-18 Shimizu Corp Lifting slewing control device
US9422139B1 (en) * 2014-05-19 2016-08-23 Google Inc. Method of actively controlling winch swing via modulated uptake and release
JP2016210607A (en) * 2015-05-13 2016-12-15 鹿島建設株式会社 Attitude control device and attitude control method for suspended cargo
CN206606934U (en) * 2017-04-10 2017-11-03 三峡大学 A kind of cage antiswing device being used for during cable machine cage puts in storage
CN107500137A (en) * 2017-08-14 2017-12-22 三海洋重工有限公司 A kind of crane gear is anti-to shake control method, device, suspender and crane
CN108545589A (en) * 2018-07-13 2018-09-18 上海外高桥造船海洋工程有限公司 A kind of jet-propelled telecontrolled rotating hanging beam
CN112723180A (en) * 2020-12-29 2021-04-30 珠海迪沃航空工程有限公司 Intelligent airplane engine position changing device and position changing method thereof
CN113636464A (en) * 2021-07-22 2021-11-12 中车长江车辆有限公司 Loading and unloading hoisting device, shore bridge and rail bridge integrated rapid transport system and dam-turning transport system
CN113682956A (en) * 2021-07-19 2021-11-23 杭州大杰智能传动科技有限公司 Automatic material environment condition identification and analysis method and system for intelligent tower crane

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2020316044A1 (en) * 2019-07-21 2022-02-17 Vita Inclinata Ip Holdings Llc Hoist and deployable equipment apparatus, system, and method

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2031842A (en) * 1978-09-13 1980-04-30 Peiner Masch Schrauben A load rotating device
JPH0753178A (en) * 1993-08-06 1995-02-28 Ohbayashi Corp Attitude controller for suspended load
JP2013067496A (en) * 2011-09-22 2013-04-18 Shimizu Corp Lifting slewing control device
US9422139B1 (en) * 2014-05-19 2016-08-23 Google Inc. Method of actively controlling winch swing via modulated uptake and release
JP2016210607A (en) * 2015-05-13 2016-12-15 鹿島建設株式会社 Attitude control device and attitude control method for suspended cargo
CN206606934U (en) * 2017-04-10 2017-11-03 三峡大学 A kind of cage antiswing device being used for during cable machine cage puts in storage
CN107500137A (en) * 2017-08-14 2017-12-22 三海洋重工有限公司 A kind of crane gear is anti-to shake control method, device, suspender and crane
CN108545589A (en) * 2018-07-13 2018-09-18 上海外高桥造船海洋工程有限公司 A kind of jet-propelled telecontrolled rotating hanging beam
CN112723180A (en) * 2020-12-29 2021-04-30 珠海迪沃航空工程有限公司 Intelligent airplane engine position changing device and position changing method thereof
CN113682956A (en) * 2021-07-19 2021-11-23 杭州大杰智能传动科技有限公司 Automatic material environment condition identification and analysis method and system for intelligent tower crane
CN113636464A (en) * 2021-07-22 2021-11-12 中车长江车辆有限公司 Loading and unloading hoisting device, shore bridge and rail bridge integrated rapid transport system and dam-turning transport system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
廖原时 ; .石材矿山分离体翻倒和荒料移动及装车设备.石材.2009,(第07期),37-43. *
石材矿山分离体翻倒和荒料移动及装车设备;廖原时;;石材;20090705(第07期);37-43 *

Also Published As

Publication number Publication date
CN115288029A (en) 2022-11-04

Similar Documents

Publication Publication Date Title
US9175487B2 (en) Self-climbing perimetric protection system for construction works in buildings
US6257556B1 (en) Safety fence used on a building being constructed
CN209703989U (en) A kind of non-perpendicular elevation construction of building hangs blue device
CN115288029B (en) Precast concrete bridge deck paving method and paving device for short T-shaped beam
US10982454B2 (en) Safety fence assembly
DE3822424C2 (en)
CN109468963B (en) Hanging basket for overhead operation of bridge and overhead construction method of bridge
US20140262064A1 (en) Batter's eye apparatus and system
CN220142463U (en) Automatic open protection slowly falls device that falls
CN110925531B (en) Independent steel support tripod and using method thereof
CN113585711B (en) Safe anti-falling device for climbing formwork
CN113235904B (en) Circulating mutual climbing lifting column and using method thereof
GB2211481A (en) Elevatable sign board
JPH10245189A (en) Omnidirectional moving crane used for high rise building construction
CN213837664U (en) Separated type climbing frame
CN209742342U (en) Climbing formula scaffold frame support increases subassembly
JP2008266895A5 (en)
CN219060835U (en) Self-elevating lighting well operation platform device
CN219887479U (en) Adjustable hanging bar construction device
CN214835105U (en) Movable mechanical protection shed
CN213774415U (en) Elevator shaft triangular operation frame adaptable to different floor heights
CN220267151U (en) Lifting type supporting device
CN220580460U (en) House construction platform
AU2005334454A1 (en) Collapsible fencing system
CN213268795U (en) Strutting arrangement is used in civil engineering construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant